(continued) ted cross-sound travel through the year 2020 and identified the Southworth to Seattle and the Kingston to Seattle passenger-only ferry routes as promising based on criteria evaluating cost-effectiveness, time savings, physical constraints to operation, nonduplication of current service, and ability to relieve congestion.

Furthermore, as a result of legislative direction provided in the 1991-93 transportation budget to the state transportation commission to evaluate and determine the location of new passenger-only ferry routes, the commission reviewed several service alternatives, determined that the Southworth to Seattle and Kingston to Seattle routes ranked highest, and directed the Washington state ferries to proceed with the design and permitting processes for passenger-only terminals at both Southworth and Kingston.


[1998 c 166 § 1.]




--------------------------------------------------------------------------------

47.60.652
Passenger-only ferry service — Vessel and terminal acquisition, procurement, and construction.
The department is authorized to proceed with the acquisition, procurement, and construction of a maximum of four passenger-only vessels that respond to the service demands of state ferry service on the Southworth to Seattle and Kingston to Seattle ferry routes, including the terminal and docking facilities necessary to accommodate such service. The acquisition, procurement, and construction of vessels and terminals authorized herein shall be undertaken in accordance with the authority provided in RCW 47.56.030.


[1998 c 166 § 2.]




--------------------------------------------------------------------------------

47.60.654
Passenger-only ferry service — Contingency.
The department's authority to proceed with the acquisition, procurement, and construction of vessels and terminals authorized under RCW 47.60.652 is contingent on a legislative appropriation approving that authority: PROVIDED, That the appropriation does not reduce the current level of funding for the maintenance and repair of vessels and terminals in service as of June 11, 1998.


[1998 c 166 § 3.]

Notes: Reviser's note: Cf. 1998 c 346 § 913.






--------------------------------------------------------------------------------

47.60.656
Passenger-only ferry service — Conveyance of vessels authorized.
The department of transportation may enter into contracts with public transportation benefit areas meeting the requirements of RCW 36.57A.200 or county ferry districts to convey passenger-only ferry vessels and other properties associated with passenger-only ferry service that serve to provide passenger-only ferry service, as full or part consideration for the benefit area or ferry district assuming all future maintenance and operation obligations and costs required to maintain and operate the vessel and facilities. The conveyances must provide that the vessels or properties revert to the department if the vessels are not used for providing passenger-only ferry service.


[2003 c 83 § 203.]

Notes: Reviser's note: 2003 c 83 directed that this section be added to chapter 47.52 RCW. However, codification in chapter 47.60 RCW appears to be more appropriate.

Findings -- Intent -- Captions, part headings not law -- Severability -- Effective date -- 2003 c 83: See notes following RCW 36.57A.200.







--------------------------------------------------------------------------------

47.60.680
Prequalification of contractors required.
No contract for the construction, improvement, or repair of a ferry, ferry terminal, or other facility operated by the Washington state ferries or for the repair, overhaul, or the dry-docking of any ferry operated by Washington state ferries may be awarded to any contractor who has not first been prequalified to perform the work by the department of transportation. No bid or proposal for such a contract may be received from any contractor who has not first been prequalified to perform the work by the department of transportation.


[1983 c 133 § 1.]




--------------------------------------------------------------------------------

47.60.690
Qualifications of contractor — Rules to assure.
The secretary of transportation shall adopt rules prescribing standards and criteria to assure that each ferry system construction and repair contract described in RCW 47.60.680 shall be awarded to a competent and responsible contractor who has all of the following qualifications:

(1) Adequate financial resources, which may take into account the ability of the contractor to secure such resources;

(2) The necessary organization, personnel, equipment, facilities, experience, and technical qualification[s] to perform ferry system construction and repair contracts generally and with respect to any specific contract such additional special qualifications as may be necessary to perform the contract;

(3) The ability to comply with the department's performance schedules taking into account the outstanding work on all of the contractor's construction and repair contracts;

(4) A satisfactory record of performing previous contracts;

(5) A satisfactory record of integrity, judgment, and skills; and

(6) Such other qualifications as the secretary may prescribe to assure that prequalified contractors are competent and responsible.


[1983 c 133 § 2.]




--------------------------------------------------------------------------------

47.60.700
Application for prequalification — Form.
Any contractor desiring to submit bids or proposals for ferry system construction or repair contracts as described in RCW 47.60.680 shall file an application for prequalification with the department. The application shall be on a standard form supplied by the department. The form shall require a complete statement of the applicant's financial ability, including a statement of the applicant's current net assets and working capital. The form shall require such additional information as may be necessary for the department to determine whether or not the applicant is entitled to be prequalified in accordance with RCW 47.60.680 through 47.60.760 and the rules adopted thereunder.


[1983 c 133 § 3.]




--------------------------------------------------------------------------------

47.60.710
Department authority to obtain information.
Upon request by the department an applicant for prequalification shall authorize the department to obtain any information pertinent to the application, including information relating to the applicant's net worth, assets, and liabilities, from banks or other financial institutions, surety companies, and material and equipment suppliers.


[1983 c 133 § 4.]




--------------------------------------------------------------------------------

47.60.720
Additional investigation — Terms of prequalification — Notice of nonqualification.
Upon receipt of an application by a contractor for prequalification to perform ferry system construction and repair contracts, the department shall conduct such additional investigation as it deems necessary. If it finds that the applicant is qualified in accordance with the rules as adopted by the secretary, the department shall prequalify the contractor to perform the contracts for a period of one year. The prequalification shall fix the aggregate dollar amount of work, including any contract let by the department, that the contractor may have under contract and uncompleted at any one time and may limit the contractor to the submission of bids or proposals upon a certain class of work. Subject to any restrictions on the dollar amount or class of work specified thereunder, the prequalification shall authorize a contractor to bid or submit proposals on all ferry system construction and repair contracts mentioned in RCW 47.60.680 except contracts requiring special prequalification. If the department determines that an applicant is not entitled to prequalification, it shall give written notice of the determination to the applicant.


[1983 c 133 § 5.]




--------------------------------------------------------------------------------

47.60.730
Renewal of prequalification — Nonrenewal or revocation, notice.
A contractor may apply annually for renewal of its prequalification by submission of a new or supplemental questionnaire and financial statement on standard forms provided by the department. Based upon information received at the time of renewal or at any other time the department may amend the prequalification of the contractor as to the dollar amount or class of work that the contractor may perform or may refuse to renew the prequalification or may revoke a prequalification previously approved, all in accordance with the same standards and criteria used for considering an original application for prequalification. The department shall give written notice of any such action to the contractor.


[1983 c 133 § 6.]




--------------------------------------------------------------------------------

47.60.740
Rejection of bid despite prequalification — Unqualified bidder.
If the department finds, after the opening of bids, that facts exist that would disqualify the lowest bidder, or that the lowest bidder is not competent or responsible in accordance with the standards and criteria for prequalifying contractors, the department shall reject the bid despite the prior prequalification of the bidder. No contract may be awarded to a bidder not qualified to bid on it at the time fixed for receiving bids.


[1983 c 133 § 7.]




--------------------------------------------------------------------------------

47.60.750
Appeal of refusal, modification, or revocation of prequalification.
The action of the department in refusing, modifying, or revoking the prequalification of any contractor under RCW 47.60.680 through 47.60.740 is conclusive unless an appeal is filed with the Thurston county superior court within ten days after receiving written notice of the refusal, modification, or revocation. The appeal shall be heard summarily within twenty days after the appeal is taken and on five days notice thereof to the department. The court shall hear any such appeal on the administrative record that was before the department. The court may affirm the decision of the department, or it may reverse the decision if it determines the action of the department was arbitrary or capricious.


[1983 c 133 § 8.]




--------------------------------------------------------------------------------

47.60.760
Financial information regarding qualifying not public.
The department of transportation shall not be required to make available for public inspection and copying financial information supplied by any person, firm, or corporation for the purpose of qualifying to submit a bid or proposal for a ferry system construction or repair contract as required by RCW 47.60.680 through 47.60.750.


[1983 c 133 § 9.]




--------------------------------------------------------------------------------

47.60.770
Jumbo ferry construction — Notice.
Whenever the department is authorized to construct one or more new jumbo ferry vessels under this chapter, it shall publish a notice of its intent once a week for at least two consecutive weeks in at least one trade paper and one other paper, both of general circulation in the state. The notice shall contain, but not be limited to, the following information:

(1) The number of jumbo ferry vessels to be constructed and the proposed delivery date for each vessel;

(2) A short summary of the requirements for prequalification of bidders including a statement that prequalification is a prerequisite to consideration by the department of any bid, and a statement that the bidder shall submit its bid for the vessel in compliance with the plans and specifications supplied by the state; and

(3) An address and telephone number that may be used to obtain the bid package.


[1993 c 493 § 1.]

Notes: Effective date -- 1993 c 493: "This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately [May 18, 1993]." [1993 c 493 § 8.]






--------------------------------------------------------------------------------

47.60.772
Jumbo ferry construction — Bidding documents.
The department shall send to any firm that requests it bidding documents specifying the criteria for the jumbo ferry vessels. The bid documents shall include, but not be limited to, the following information:

(1) Solicitation of a bid to deliver to the department vessels that are constructed as specified by the plans and specifications provided by the department;

(2) A requirement that bids submitted should include one bid for the construction of three vessels;

(3) The proposed delivery date for each vessel, the port on Puget Sound where delivery will be taken, and the location where acceptance sea trials will be held;

(4) The amount and form of required contract security under RCW 39.08.100;

(5) A copy of the vessel construction contract that will be signed by the successful bidder;

(6) The date by which bids for ferry vessel construction must be received by the department in order to be considered;

(7) A requirement that the contractor comply with all applicable laws, rules, and regulations including, but not limited to those pertaining to the environment, worker health and safety, and prevailing wages;

(8) A requirement that the vessels be constructed within the boundaries of the state of Washington except that equipment furnished by the state and components, products, and systems that are standard manufactured items are not subject to the in-state requirement under this subsection. For the purposes of this section, "constructed" means: The fabrication, by the joining together by welding or fastening of all steel parts from which the total vessel is constructed, including, but not limited to, all shell frames, longitudinals, bulkheads, webs, piping runs, wire ways, and ducting. "Constructed" also means the installation of all components and systems, including, but not limited to, equipment and machinery, castings, electrical, electronics, deck covering, lining, paint and joiner work, required by the contract. "Constructed" also means the interconnection of all equipment, machinery, and services, such as piping, wiring, and ducting;

(9) A requirement that all warranty work on the vessel be performed within the boundaries of the state of Washington, insofar as practicable;

(10) A statement that any bid submitted constitutes an offer and remains open until ninety days after the deadline for submitting bids, unless the firm submitting it withdraws it by formal written notice that is received by the department before the date and time specified for opening of the bids, together with an explanation of the requirement that all bids submitted be accompanied by a bid deposit in the amount of five percent of the bid amount; and

(11) A listing of all equipment to be furnished by the state.


[1993 c 493 § 2.]

Notes: Effective date -- 1993 c 493: See note following RCW 47.60.770.






--------------------------------------------------------------------------------

47.60.774
Jumbo ferry construction — Procedure on conclusion of evaluation.
(1) Upon concluding its evaluation, the department may:

(a) Select the firm submitting the lowest responsible bid for the construction of new jumbo ferries, taking into consideration the requirements stated in the bid documents and rank the remaining firms, judging them by the same standards;

(b) Reject all bids not in compliance with the requirements contained in the bid documents;

(c) Reject all bids.

(2) The department shall immediately notify those firms that were not selected as the firm presenting the lowest responsible bid. The department's selection is conclusive unless appeal from it is taken by an aggrieved firm to the superior court of Thurston county within five days after receiving notice of the department's final decision. The appeal shall be heard summarily within ten days after it is taken and on five days' notice to the department. The court shall hear any appeal on the administrative record that was before the department. The court may affirm the decision of the department, or it may reverse the decision if it determines the action of the department was arbitrary or capricious.


[1993 c 493 § 4.]

Notes: Effective date -- 1993 c 493: See note following RCW 47.60.770.






--------------------------------------------------------------------------------

47.60.776
Jumbo ferry construction — Contract.
(1) Upon selecting the firm that has submitted the lowest responsible bid for the construction of new jumbo ferries, and ranking the remaining firms in order of preference, the department shall:

(a) Sign a contract with the firm presenting the lowest responsible bid; or

(b) If a final agreement satisfactory to the department cannot be signed with the firm presenting the lowest responsible bid, the department may sign a contract with the firm ranked next lowest bidder. If necessary, the department may repeat this procedure with each firm in order until the list of firms has been exhausted, or reject all bids.

(2) In developing a contract for the construction of ferry vessels, the department may, subject to the provisions of *RCW 39.25.020, authorize the use of foreign-made materials and components, products, and systems that are standard manufactured items in the construction of ferries in order to minimize costs.


[1993 c 493 § 5.]

Notes: *Reviser's note: RCW 39.25.020 was repealed by 1994 c 138 § 2.

Effective date -- 1993 c 493: See note following RCW 47.60.770.







--------------------------------------------------------------------------------

47.60.778
Jumbo ferry construction — Bid deposits — Low bidder claiming error.
Bids submitted by firms under this section constitute an offer and shall remain open for ninety days. When submitted, each bid shall be accompanied by a deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent of the bid amount, and no bid may be considered unless the deposit is enclosed. If the department awards a contract to a firm and the firm fails to enter into a contract or fails to furnish a satisfactory contract security as required by RCW 39.08.100, its deposit shall be forfeited to the state and be deposited by the state treasurer to the credit of the Puget Sound capital construction account. A low bidder who claims error and fails to enter into a contract is prohibited from bidding on the same project if a second or subsequent call for bids is made for the project. Upon the execution of a ferry construction contract for the construction of new jumbo ferries, all bid deposits shall be returned.


[1996 c 18 § 9; 1993 c 493 § 6.]

Notes: Effective date -- 1993 c 493: See note following RCW 47.60.770.






--------------------------------------------------------------------------------

47.60.780
Jumbo ferry construction — Propulsion system acquisition.
(1) The department may enter into a contract for the acquisition of the propulsion system, or any component of it, including diesel engines and spare parts, for installation into one or more of the three Jumbo Class Mark II ferry vessels authorized under this chapter. This authorization does not limit the department from obtaining and installing the propulsion system, or any component of it, as incidental to the overall vessel construction contract authorized under RCW 47.60.770 through 47.60.778, nor from proceeding to complete an existing contract for acquisition of the propulsion system or any component of it.

(2) Acquisition of a propulsion system, or any component of it, for the Jumbo Class Mark II ferries by the department under this section is exempt from chapter 43.19 RCW.

(3) Whenever the department decides to enter into an acquisition contract under this section it shall publish a notice of its intent to negotiate such a contract once a week for at least two consecutive weeks in one trade newspaper and one other newspaper, both of general circulation in the state. The notice must contain, but is not limited to, the following information:

(a) The identity of the propulsion system or components to be acquired and the proposed delivery dates for the propulsion system or components;

(b) An address and telephone number that may be used to obtain the request for proposal.

(4) The department shall send to any firm that requests it, a request for proposal outlining the design and construction requirements for the propulsion system, including any desired components. The request for proposal must include, but is not limited to, the following information:

(a) The proposed delivery date for each propulsion system or desired component and the location where delivery will be taken;

(b) The form and formula for contract security;

(c) A copy of the proposed contract;

(d) The date by which proposals must be received by the department in order to be considered; and

(e) A statement that any proposal submitted constitutes an offer and must remain open until ninety days after the deadline for submitting proposals, together with an explanation of the requirement that all proposals submitted must be accompanied by a deposit in the amount of five percent of the proposed cost.

(5) The department shall evaluate all timely proposals received for: (a) Compliance with the requirements specified in the request for proposal; and (b) suitability of each firm's proposal by applying appropriate criteria to be developed by the department: (i) To assess the ability of the firm to expeditiously and satisfactorily perform and (ii) to accomplish an acquisition that is most advantageous to the department. A portion of the technical requirements addressed in the request for proposal shall include, but is not limited to, user verifications of manufacturer's reliability claims; the quality of engine maintenance documentation; and engine compatibility with ship design.

(6) The criteria to select the most advantageous diesel engine under subsection (5)(b)(ii) shall consist of life-cycle cost factors weighted at forty-five percent; and operational factors weighted as follows: Reliability at twenty percent, maintainability at twenty percent, and engine performance at fifteen percent. For purposes of this subsection, the life-cycle cost factors shall consist of the costs for engine acquisition and warranty, spare parts acquisition and inventory, fuel efficiency and lubricating oil consumption, and commonality. The fuel efficiency and lubricating oil consumption life-cycle cost factors shall receive not less than twenty percent of the total evaluation weighting and shall be evaluated under a format similar to that employed in the 1992 M.V. Tyee engine replacement contract. The reliability factors shall consist of the length of service and reliability record in comparable uses, and mean time between overhauls. The mean time between overhauls evaluation shall be based upon the manufacturer's required hours between change of wear components. The maintainability factors shall consist of spare parts availability, the usual time anticipated to perform typical repair functions, and the quality of factory training programs for ferry system maintenance staff. The performance factors shall consist of load change responsiveness, and air quality of exhaust and engine room emissions.

(7) Upon concluding its evaluation, the department shall:

(a) Select the firm presenting the proposal most advantageous to the department, taking into consideration compliance with the requirements stated in the request for proposal, and the criteria developed by the department, and rank the remaining firms in order of preference, judging them by the same standards; or

(b) Reject all proposals as not in compliance with the requirements contained in the request for proposals.

(8) The department shall immediately notify those firms that were not selected as the firm presenting the most advantageous proposal of the department's decision. The department's decision is conclusive unless an aggrieved firm appeals the decision to the superior court of Thurston county within five days after receiving notice of the department's final decision. The appeal shall be heard summarily within ten days after it is taken and on five days' notice to the department. The court shall hear the appeal on the administrative record that was before the department. The court may affirm the decision of the department, or it may reverse the decision if it determines the action of the department is arbitrary or capricious.

(9) Upon selecting the firm that has presented the most advantageous proposal and ranking the remaining firms in order of preference, the department shall:

(a) Negotiate a contract with the firm presenting the most advantageous proposal; or

(b) If a final agreement satisfactory to the department cannot be negotiated with the firm presenting the most advantageous proposal, the department may then negotiate with the firm ranked next highest in order of preference. If necessary, the department may repeat this procedure and negotiate with each firm in order of rank until the list of firms has been exhausted.

(10) Proposals submitted by firms under this section constitute an offer and must remain open for ninety days. When submitted, each proposal must be accompanied by a deposit in cash, certified check, cashier's check, or surety bond in the amount equal to five percent of the amount of the proposed contract price, and the department may not consider a proposal that has no deposit enclosed with it. If the department awards a contract to a firm under the procedure set forth in this section and the firm fails to enter into the contract and furnish the required contract security within twenty days, exclusive of the day of the award, its deposit shall be forfeited to the state and deposited by the state treasurer to the credit of the Puget Sound capital construction account. Upon the execution of a contract all proposal deposits shall be returned.


[1994 c 181 § 2.]

Notes: Finding and intent -- 1994 c 181: "The legislature finds and declares that:

A 1991 legislative study, conducted by Booz. Allen, Hamilton and M. Rosenblatt and Son, examining the Washington state ferries' management of its vessel refurbishment and construction program, resulted in recommendations for improvements and changes in the vessel refurbishment and construction program. These legislatively adopted recommendations encourage and support input by Washington state ferries' engineers in the development of refurbishment and new construction project requirements.

The recommendations of the Booz. Allen study have been applied to the construction of the Jumbo Class Mark II ferries through the appointment of a Jumbo Class Mark II steering committee comprised of current state ferry engineers responsible for the design, operation, and maintenance of state ferry vessels.

The steering committee, in carrying out the recommendations of the Booz. Allen study, has determined that the procedure for the procurement of equipment, parts, and supplies for the Jumbo Class Mark II ferry vessels authorized by RCW 47.60.770 through 47.60.778, must take into consideration, in addition to life-cycle cost criteria, criteria that are essential to the operation of a public mass transportation system responsive to the needs of Washington state ferries' users, and that assess the reliability, maintainability, and performance of equipment, parts, and supplies to be installed in the Jumbo Mark II ferries.

The construction of the new Jumbo Class Mark II ferry vessels authorized by RCW 47.60.770 through 47.60.778 is critical to the welfare of the state and any delay in the immediate construction of the ferries will result in severe hardship and economic loss to the state and its citizens. Recognizing these findings, it is the intent of the legislature that the vessel construction should not be delayed further because of the acquisition of a propulsion system, or any component of it, for the ferries, and to authorize the department of transportation to acquire all components of a complete propulsion system as soon as possible so that planned construction of the Jumbo Class Mark II ferry vessels can proceed immediately.

The purpose of this chapter is to authorize the use, by the department, of supplemental, alternative contracting procedures for the procurement of a propulsion system, and the components thereof, for the Jumbo Class Mark II ferries; and to prescribe appropriate requirements and criteria to ensure that contracting procedures for such procurement serve the public interest." [1994 c 181 § 1.]

Effective date -- 1994 c 181: "This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately [March 30, 1994]." [1994 c 181 § 4.]







--------------------------------------------------------------------------------

47.60.800
General obligation bonds — 1992 issue — Purpose — Issuance and sale.
In order to provide funds necessary for vessel and terminal acquisition, construction, and major and minor improvements, including long lead time materials acquisition for the Washington state ferries, there shall be issued and sold upon the request of the Washington state transportation commission and legislative appropriation a total of two hundred ten million dollars of general obligation bonds of the state of Washington.


[1992 c 158 § 1.]




--------------------------------------------------------------------------------

47.60.802
Bonds — 1992 issue — Supervision of sale by state finance committee — Option of short-term obligations.
(1) Upon request being made by the transportation commission, the state finance committee shall supervise and provide for the issuance, sale, and retirement of the bonds authorized by RCW 47.60.800 through 47.60.808 in accordance with chapter 39.42 RCW. The bonds may be sold from time to time in such amounts as may be necessary for the purposes under RCW 47.60.800. The bonds shall be sold in such manner, at such time or times, in such amounts, and at such price or prices as the state finance committee shall determine. No such bonds may be offered for sale without prior legislative appropriation of the net proceeds of the sale of the bonds.

(2) The state finance committee shall consider the issuance of short-term obligations in lieu of long-term obligations for the purposes of more favorable interest rates, lower total interest costs, and increased marketability and for the purposes of retiring the bonds during the life of the project for which they were issued.


[1992 c 158 § 2.]




--------------------------------------------------------------------------------

47.60.804
Bonds — 1992 issue — Use of proceeds.
The proceeds from the sale of bonds authorized by RCW 47.60.800 through 47.60.808 shall be deposited in the Puget Sound capital construction account of the motor vehicle fund and such proceeds shall be available only for the purposes under RCW 47.60.800, for the payment of bond anticipation notes, if any, and for the payment of bond issuance costs, including the costs of underwriting.


[1992 c 158 § 3.]




--------------------------------------------------------------------------------

47.60.806
Bonds — 1992 issue — Payment of principal and interest from pledged excise taxes.
Bonds issued under the authority of RCW 47.60.800 through 47.60.808 shall distinctly state that they are a general obligation of the state of Washington, shall pledge the full faith and credit of the state to the payment of the principal thereof and the interest thereon, and shall contain an unconditional promise to pay such principal and interest as the same shall become due. The principal and interest shall be first payable in the manner provided in RCW 47.60.800 through 47.60.808 from the proceeds of the state excise taxes on motor vehicle and special fuels imposed by chapters 82.36 and 82.38 RCW and distributed to the state pursuant to RCW 46.68.130 and shall never constitute a charge against any allocations of such funds to counties, cities, and towns unless and until the amount of the motor vehicle fund arising from the excise taxes on motor vehicle and special fuels and available for state highway purposes proves insufficient to meet the requirements for bond retirement or interest on any such bonds. Proceeds of such excise taxes are hereby pledged to the payment of any bonds and the interest thereon issued under the authority of RCW 47.60.800 through 47.60.808, and the legislature agrees to continue to impose these excise taxes on motor vehicle and special fuels in amounts sufficient to pay, when due, the principal and interest on all bonds issued under the authority of RCW 47.60.800 through 47.60.808.


[1995 c 274 § 19; 1992 c 158 § 4.]




--------------------------------------------------------------------------------

47.60.808
Bonds — 1992 issue — Payment from ferry bond retirement fund.
Both principal and interest on the bonds issued for the purposes of RCW 47.60.800 through 47.60.808 shall be payable from the ferry bond retirement fund authorized in RCW 47.60.600. Whenever, pursuant to RCW 47.60.800 and 47.60.806, the state treasurer transfers funds from the motor vehicle fund to the ferry bond retirement fund, the state treasurer may at the same time reimburse the motor vehicle fund in an identical amount from the Puget Sound capital construction account.


[1992 c 158 § 5.]




--------------------------------------------------------------------------------

47.60.810
Design-build ferries — Authorized — Phases defined.
(1) The department may purchase new auto ferries through use of a modified request for proposals process whereby the prevailing shipbuilder and the department engage in a design and build partnership for the design and construction of the auto ferries. The process consists of the three phases described in subsection (2) of this section.

(2) The definitions in this subsection apply throughout RCW 47.60.812 through 47.60.822.

(a) "Phase one" means the evaluation and selection of proposers to participate in development of technical proposals in phase two.

(b) "Phase two" means the preparation of technical proposals by the selected proposers in consultation with the department.

(c) "Phase three" means the submittal and evaluation of bids, the award of the contract to the successful proposer, and the design and construction of the auto ferries.


[2001 c 226 § 4.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.812
Design-build ferries — Notice of request for proposals.
To commence the request for proposals process, the department shall publish a notice of its intent once a week for at least two consecutive weeks in at least one trade paper and one other paper, both of general circulation in the state. The notice must contain, but is not limited to, the following information:

(1) The number of auto ferries to be procured, the auto and passenger capacities, the delivery dates, and the estimated price range for the contract;

(2) A statement that a modified request for proposals design and build partnership will be used in the procurement process;

(3) A short summary of the requirements for prequalification of proposers including a statement that prequalification is a prerequisite to submittal of a proposal in phase one; and

(4) An address and telephone number that may be used to obtain a prequalification questionnaire and the request for proposals.


[2001 c 226 § 5.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.814
Design-build ferries — Issuance of request for proposals.
Subject to legislative appropriation for the procurement of vessels, the department shall issue a request for proposals to interested parties that must include, at least, the following:

(1) Solicitation of a proposal to participate in a design and build partnership with the department to design and construct the auto ferries;

(2) Instructions on the prequalification process and procedures;

(3) A description of the modified request for proposals process. Under this process, the department may modify any component of the request for proposals, including the outline specifications, by addendum at any time before the submittal of bids in phase three;

(4) A description of the design and build partnership process to be used for procurement of the vessels;

(5) Outline specifications that provide the requirements for the vessels including, but not limited to, items such as length, beam, displacement, speed, propulsion requirements, capacities for autos and passengers, passenger space characteristics, and crew size. The department will produce notional line drawings depicting hull geometry that will interface with Washington state ferries terminal facilities. Notional lines may be modified in phase two, subject to approval by the department;

(6) Instructions for the development of technical proposals in phase two, and information regarding confidentiality of technical proposals;

(7) The vessel delivery schedule, identification of the port on Puget Sound where delivery must take place, and the location where acceptance trials must be held;

(8) The estimated price range for the contract;

(9) The form and amount of the required bid deposit and contract security;

(10) A copy of the contract that will be signed by the successful proposer;

(11) The date by which proposals in phase one must be received by the department in order to be considered;

(12) A description of information to be submitted in the proposals in phase one concerning each proposer's qualifications, capabilities, and experience;

(13) A statement of the maximum number of proposers that may be selected in phase one for development of technical proposals in phase two;

(14) Criteria that will be used for the phase one selection of proposers to participate in the phase two development of technical proposals;

(15) A description of the process that will be used for the phase three submittal and evaluation of bids, award of the contract, and postaward administrative activities;

(16) A requirement that the contractor comply with all applicable laws, rules, and regulations including but not limited to those pertaining to the environment, worker health and safety, and prevailing wages;

(17) A requirement that the vessels be constructed within the boundaries of the state of Washington except that equipment furnished by the state and components, products, and systems that are standard manufactured items are not subject to the in-state requirement under this subsection. For the purposes of this subsection, "constructed" means the fabrication, by the joining together by welding or fastening of all steel parts from which the total vessel is constructed, including, but not limited to, all shell frames, longitudinals, bulkheads, webs, piping runs, wire ways, and ducting. "Constructed" also means the installation of all components and systems, including, but not limited to, equipment and machinery, castings, electrical, electronics, deck covering, lining, paint, and joiner work required by the contract. "Constructed" also means the interconnection of all equipment, machinery, and services, such as piping, wiring, and ducting; and

(18) A requirement that all warranty work on the vessel must be performed within the boundaries of the state of Washington, insofar as practical.


[2001 c 226 § 6.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.816
Design-build ferries — Phase one.
Phase one of the request for proposals process consists of evaluation and selection of prequalified proposers to participate in subsequent development of technical proposals in phase two, as follows:

(1) The department shall issue a request for proposals to interested parties.

(2) The request for proposals must require that each proposer prequalify for the contract under chapter 468-310 WAC, except that the department may adopt rules for the financial prequalification of proposers for this specific contract only. The department shall modify the financial prequalification rules in chapter 468-310 WAC in order to maximize competition among financially capable and otherwise qualified proposers. In adopting these rules, the department shall consider factors including, without limitation: (a) Shipyard resources in Washington state; (b) the cost to design and construct multiple vessels under a single contract without options; and (c) the sequenced delivery schedule for the vessels.

(3) The department may use some, or all, of the nonfinancial prequalification factors as part of the evaluation factors in phase one to enable the department to select a limited number of best qualified proposers to participate in development of technical proposals in phase two.

(4) The department shall evaluate submitted proposals in accordance with the selection criteria established in the request for proposals. Selection criteria may include, but are not limited to, the following:

(a) Shipyard facilities;

(b) Organization components;

(c) Design capability;

(d) Build strategy;

(e) Experience and past performance;

(f) Ability to meet vessel delivery dates;

(g) Projected workload; and

(h) Expertise of project team and other key personnel.

(5) Upon concluding its evaluation of proposals, the department shall select the best qualified proposers in accordance with the request for proposals. The selected proposers must participate in development of technical proposals. Selection must be made in accordance with the selection criteria stated in the request for proposals. All proposers must be ranked in order of preference as derived from the same selection criteria.


[2001 c 226 § 7.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.818
Design-build ferries — Phase two.
Phase two of the request for proposals process consists of preparation of technical proposals in consultation with the department, as follows:

(1) The development of technical proposals in compliance with the detailed instructions provided in the request for proposals, including the outline specifications, and any addenda to them. Technical proposals must include the following:

(a) Design and specifications sufficient to fully depict the ferries' characteristics and identify installed equipment;

(b) Drawings showing arrangements of equipment and details necessary for the proposer to develop a firm, fixed price bid;

(c) Project schedule including vessel delivery dates; and

(d) Other appropriate items.

(2) The department shall conduct periodic reviews with each of the selected proposers to consider and critique their designs, drawings, and specifications. These reviews must be held to ensure that technical proposals meet the department's requirements and are responsive to the critiques conducted by the department during the development of technical proposals.

(3) If, as a result of the periodic technical reviews or otherwise, the department determines that it is in the best interests of the department to modify any element of the request for proposals, including the outline specifications, it shall do so by written addenda to the request for proposals.

(4) Proposers must submit final technical proposals for approval that include design, drawings, and specifications at a sufficient level of detail to fully depict the ferries' characteristics and identify installed equipment, and to enable a proposer to deliver a firm, fixed price bid to the department. The department shall reject final technical proposals that modify, fail to conform to, or are not fully responsive to and in compliance with the requirements of the request for proposals, including the outline specifications, as amended by addenda.


[2001 c 226 § 8.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.820
Design-build ferries — Phase three.
Phase three consists of the submittal and evaluation of bids and the award of the contract to the successful proposer for the final design and construction of the auto ferries, as follows:

(1) The department shall request bids for detailed design and construction of the vessels after completion of the review of technical proposals in phase two. The department will review detailed design drawings in phase three for conformity with the technical proposals submitted in phase two. In no case may the department's review replace the builder's responsibility to deliver a product meeting the phase two technical proposal. The department may only consider bids from selected proposers that have qualified to bid by submitting technical proposals that have been approved by the department.

(2) Each qualified proposer must submit its total bid price for all vessels, including certification that the bid is based upon its approved technical proposal and the request for proposals.

(3) Bids constitute an offer and remain open for ninety days from the date of the bid opening. A deposit in cash, certified check, cashier's check, or surety bond in an amount specified in the request for proposals must accompany each bid and no bid may be considered unless the deposit is enclosed.

(4) The department shall evaluate the submitted bids. Upon completing the bid evaluation, the department may select the responsive and responsible proposer that offers the lowest total bid price for all vessels.

(5) The department may waive informalities in the proposal and bid process, accept a bid from the lowest responsive and responsible proposer, reject any or all bids, republish, and revise or cancel the request for proposals to serve the best interests of the department.

(6) The department may:

(a) Award the contract to the proposer that has been selected as the responsive and responsible proposer that has submitted the lowest total bid price;

(b) If a contract cannot be signed with the apparent successful proposer, award the contract to the next lowest responsive and responsible proposer; or

(c) If necessary, repeat this procedure with each responsive and responsible proposer in order of rank until the list of those proposers has been exhausted.

(7) If the department awards a contract to a proposer under this section, and the proposer fails to enter into the contract and furnish satisfactory contract security as required by chapter 39.08 RCW within twenty days from the date of award, its deposit is forfeited to the state and will be deposited by the state treasurer to the credit of the Puget Sound capital construction account. Upon the execution of a ferry design and construction contract all proposal deposits will be returned.

(8) The department may provide an honorarium to reimburse each unsuccessful phase three proposer for a portion of its technical proposal preparation costs at a preset, fixed amount to be specified in the request for proposals. If the department rejects all bids, the department may provide the honoraria to all phase three proposers that submitted bids.


[2001 c 226 § 9.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.






--------------------------------------------------------------------------------

47.60.822
Design-build ferries — Notice to proposers not selected — Appeal.
(1) The department shall immediately notify those proposers that are not selected to participate in development of technical proposals in phase one and those proposers who submit unsuccessful bids in phase three.

(2) The department's decision is conclusive unless an aggrieved proposer files an appeal with the superior court of Thurston county within five days after receiving notice of the department's award decision. The court shall hear any such appeal on the department's administrative record for the project. The court may affirm the decision of the department, or it may reverse or remand the administrative decision if it determines the action of the department was arbitrary and capricious.


[2001 c 226 § 10.]

Notes: Findings -- Purpose -- 2001 c 226: See note following RCW 47.20.780.