173-303-250
Dangerous waste acceptance, transport, and delivery.
(1) A transporter must not accept dangerous waste from a generator unless it is accompanied by a manifest signed by the generator in accordance with WAC 173-303-180, Manifest.

In the case of exports other than those subject to 40 CFR subpart H part 262 (which is incorporated by reference at WAC 173-303-230(1)), a transporter may not accept such waste from a primary exporter or other person if he knows the shipment does not conform to the EPA Acknowledgment of Consent; and unless, in addition to a manifest signed in accordance with the provisions of WAC 173-303-180, such waste is also accompanied by an EPA Acknowledgment of Consent which, except for shipment by rail, is attached to the manifest (or shipping paper for exports by water (bulk shipment)). For exports of hazardous waste subject to the requirements of 40 CFR subpart H part 262, a transporter may not accept hazardous waste without a tracking document that includes all information required by 40 CFR 262.84.

(2) Before transporting a dangerous waste shipment, the transporter must sign and date the manifest, acknowledging acceptance of the dangerous waste. The transporter shall return a signed copy to the generator before commencing transport.

(3) The transporter must insure that the manifest accompanies the dangerous waste shipment.

(4) A transporter who delivers a dangerous waste to another transporter, or to the designated facility must:

(a) Obtain the date of delivery and the handwritten signature of that transporter or designated facility owner/operator on the manifest;

(b) Retain one copy of the manifest in accordance with WAC 173-303-260, Transporter recordkeeping; and

(c) Give the remaining copies of the manifest to the accepting transporter or designated facility.

(5) The transporter must deliver the entire quantity of dangerous waste which he has accepted from a generator or a transporter to:

(a) The designated facility listed on the manifest; or

(b) The alternate designated facility, if the dangerous waste cannot be delivered to the designated facility because an emergency prevents delivery; or

(c) The next designated transporter; or

(d) The place outside the United States designated by the generator.

(6) If the dangerous waste cannot be delivered in accordance with subsection (5) of this section, the transporter must contact the generator for further directions, and must revise the manifest according to the generator's instructions.

(7) The requirements of subsections (3), (4), and (8) of this section do not apply to water (bulk shipment) transporters if:

(a) The dangerous waste is delivered by water (bulk shipment) to the designated facility;

(b) A shipping paper containing all the information required on the manifest (excluding the EPA/state identification numbers, generator certification, and signatures) accompanies the dangerous waste;

(c) The delivering transporter obtains the date of delivery and handwritten signature of the owner or operator of the designated facility on either the manifest or the shipping paper;

(d) The person delivering the dangerous waste to the initial water (bulk shipment) transporter obtains the date of delivery and signature of the water (bulk shipment) transporter on the manifest and forwards it to the designated facility; and

(e) A copy of the shipping paper or manifest is retained by each water (bulk shipment) transporter in accordance with WAC 173-303-260(2).

(8) For shipments involving rail transportation, the requirements of subsections (3), (4), and (7) of this section do not apply and the following requirements do apply.

(a) When accepting dangerous waste from a nonrail transporter, the initial rail transporter must:

(i) Sign and date the manifest acknowledging acceptance of the dangerous waste;

(ii) Return a signed copy of the manifest to the nonrail transporter;

(iii) Forward at least three copies of the manifest to:

(A) The next nonrail transporter, if any; or

(B) The designated facility, if the shipment is delivered to that facility by rail; or

(C) The last rail transporter designated to handle the waste in the United States;

(iv) Retain one copy of the manifest and rail shipping paper in accordance with WAC 173-303-260(2).

(b) Rail transporters must ensure that a shipping paper containing all the information required on the manifest (excluding the EPA/state identification numbers, generator certification, and signatures) accompanies the dangerous waste at all times.

(c) When delivering dangerous waste to the designated facility, a rail transporter must:

(i) Obtain the date of delivery and handwritten signature of the owner or operator of the designated facility on the manifest or the shipping paper (if the manifest has not been received by the facility); and

(ii) Retain a copy of the manifest or signed shipping paper in accordance with WAC 173-303-260(2).

(d) When delivering dangerous waste to a nonrail transporter a rail transporter must:

(i) Obtain the date of delivery and the handwritten signature of the next nonrail transporter on the manifest; and

(ii) Retain a copy of the manifest in accordance with WAC 173-303-260(2).

(e) Before accepting dangerous waste from a rail transporter, a nonrail transporter must sign and date the manifest and provide a copy to the rail transporter.

(9) Transporters who transport dangerous waste out of the United States must:

(a) Indicate on the manifest the date the dangerous waste left the United States;

(b) Sign the manifest and retain one copy in accordance with WAC 173-303-260(3), Transporter recordkeeping; and

(c) Return a signed copy of the manifest to the generator.



[Statutory Authority: Chapters 70.105, 70.105D, and 15.54 RCW and RCW 70.105.007. 04-24-065 (Order 03-10), § 173-303-250, filed 11/30/04, effective 1/1/05. Statutory Authority: Chapters 70.105 and 70.105D RCW. 95-22-008 (Order 94-30), § 173-303-250, filed 10/19/95, effective 11/19/95. Statutory Authority: Chapter 70.105 RCW. 84-09-088 (Order DE 83-36), § 173-303-250, filed 4/18/84. Statutory Authority: Chapter 70.105 RCW and RCW 70.95.260. 82-05-023 (Order DE 81-33), § 173-303-250, filed 2/10/82. Formerly WAC 173-302-220 and 173-302-230.]




--------------------------------------------------------------------------------

173-303-260
Transporter recordkeeping.
(1) A transporter of dangerous waste must keep a copy of the manifest signed by the generator, himself, and the next designated transporter or the owner or operator of the designated facility for a period of three years from the date the dangerous waste was accepted by the initial transporter.

(2) Water (bulk shipment) and rail transporter recordkeeping.

(a) For shipments delivered to the designated facility by rail or water (bulk shipment), each rail or water (bulk shipment) transporter must retain a copy of a shipping paper containing all the information required on a manifest (excluding the EPA/state identification numbers, generator certification, and signatures) for a period of three years from the date the dangerous waste was accepted by the initial transporter.

(b) For shipments of dangerous waste by rail within the United States:

(i) The initial rail transporter must keep a copy of the manifest and shipping paper with all the information required on a manifest (excluding the EPA/state identification numbers, generator certification, and signatures) for a period of three years from the date the dangerous waste was accepted by the initial transporter; and

(ii) The final rail transporter must keep a copy of the signed manifest (or the shipping paper if signed by the designated facility in lieu of the manifest) for a period of three years from the date the dangerous waste was accepted by the initial transporter.

(3) A transporter who transports dangerous waste out of the United States must keep a copy of the manifest, indicating that the dangerous waste left the United States, for a period of three years from the date the dangerous waste was accepted by the initial transporter.

(4) The periods of retention referred to in this section are extended automatically during the course of any unresolved enforcement action regarding the regulated activity, or as requested by the director.



[Statutory Authority: Chapters 70.105 and 70.105D RCW. 95-22-008 (Order 94-30), § 173-303-260, filed 10/19/95, effective 11/19/95. Statutory Authority: Chapter 70.105 RCW. 84-09-088 (Order DE 83-36), § 173-303-260, filed 4/18/84. Statutory Authority: Chapter 70.105 RCW and RCW 70.95.260. 82-05-023 (Order DE 81-33), § 173-303-260, filed 2/10/82.]




--------------------------------------------------------------------------------

173-303-270
Discharges during transport.
In the event of a spill or discharge of dangerous waste during transportation, the transporter must comply with the requirements of WAC 173-303-145, Spills and discharges into the environment. In addition to the notices required by WAC 173-303-145, the transporter must provide the following notifications:

(1) Give notice to the generator of the waste that a discharge has occurred;

(2) Give notice to the National Response Center (800-424-8802 or 202-426-2675), if required by 49 CFR 171.15;

(3) Report in writing as required by 49 CFR 171.16 to the Director, Office of Hazardous Materials Regulations, Materials Transportation Bureau, Department of Transportation, Washington D.C., 20590; and,

(4) For a water (bulk shipment) transporter, give the same notice as required by 33 CFR 153.203 for oil and hazardous substances.



[Statutory Authority: Chapters 70.105 and 70.105D RCW. 95-22-008 (Order 94-30), § 173-303-270, filed 10/19/95, effective 11/19/95. Statutory Authority: Chapter 70.105 RCW. 84-09-088 (Order DE 83-36), § 173-303-270, filed 4/18/84. Statutory Authority: Chapter 70.105 RCW and RCW 70.95.260. 82-05-023 (Order DE 81-33), § 173-303-270, filed 2/10/82.]




--------------------------------------------------------------------------------

173-303-280
General requirements for dangerous waste management facilities.
(1) Applicability. The requirements of WAC 173-303-280 through 173-303-395 apply to all owners and operators of facilities which store, treat, or dispose of dangerous wastes and which must be permitted under the requirements of this chapter 173-303 WAC, unless otherwise specified in this chapter. Whenever a shipment of dangerous waste is initiated from a facility, the owner or operator of that facility must comply with the requirements for generators, WAC 173-303-170 through 173-303-230.

(2) Imminent hazard. Notwithstanding any provisions of this chapter, enforcement actions may be brought in the event that the management practices of a facility present an imminent and substantial hazard to the public health and the environment, regardless of the quantity or concentration of a dangerous waste.

(3) Identification numbers. Every facility owner or operator must apply for an EPA/state identification number from the department in accordance with WAC 173-303-060.

(4) The owner or operator must comply with the special land disposal restrictions for certain dangerous wastes in WAC 173-303-140.

(5) Salt dome formations, salt bed formations, underground mines and caves. The placement of any noncontainerized or bulk liquid dangerous waste in any salt dome formation, salt bed formation, underground mine or cave is prohibited.

(6) The requirements of WAC 173-303-290 through 173-303-360 and WAC 173-303-395 do not apply to cleanup-only facilities. Instead, owners/operators of cleanup-only facilities must comply with the following requirements.

(a) Obtain an EPA/state identification number in accordance with WAC 173-303-060(2).

(b) Obtain a detailed chemical and physical analysis of a representative sample of the dangerous remediation waste to be treated, stored or disposed at the site. At a minimum, this analysis must contain all information that must be known to treat, store or dispose of the dangerous remediation waste according to WAC 173-303-140 (2)(a), 173-303-280 through 173-303?395 and WAC 173-303-600 through 173-303-695 and must be kept accurate and up to date.

(c) Prevent people who are unaware of the danger from entering, and minimize the possibility for unauthorized people or livestock to enter onto the active portion of the remediation waste management site, unless the owner or operator can demonstrate to the director that:

(i) Physical contact with the dangerous remediation waste, structures or equipment within the active portion of the remediation waste management site will not injure people or livestock who may enter the active portion of the remediation waste management site; and

(ii) Disturbance of the dangerous remediation waste or equipment by people or livestock who enter onto the active portion of the remediation waste management site will not cause a violation of the requirements of WAC 173-303-280 through173-303-395 or WAC 173-303-600 through 173-303-695.

(d) Inspect the remediation waste management site for malfunctions, deterioration, operator errors, and discharges that may lead to a release of dangerous constituents to the environment or a threat to human health. Inspections must be conducted often enough to identify problems in time to correct them before they harm human health or the environment. Problems must be remedied before they lead to a human health or environmental threat. Where a hazard is imminent or has already occurred, remedial action must be taken immediately.

(e) Provide personnel with classroom or on-the-job training on how to perform their duties in a way that ensures the remediation waste management site complies with the requirements of WAC 173-303-280 through 173-303?395 and WAC 173-303-600 through 173-303-695 and on how to effectively respond to emergencies.

(f) Take precautions to prevent accidental ignition or reaction of ignitable or reactive dangerous remediation waste and prevent threats to human health and the environment from ignitable, reactive and incompatible dangerous remediation waste.

(g) Develop and maintain a construction quality assurance program for all surface impoundments, waste piles and landfill units that are required to comply with WAC 173-303-650 (2)(j) and (k), 173-303-660 (2)(j) and (k) or 173-303-655 (2)(h), (i) and (j). The construction quality assurance must meet the requirements of WAC 173-303-335.

(h) Develop and maintain procedures to prevent accidents and a contingency and emergency plan to control accidents that occur. The procedures must address proper design, construction, maintenance and operation of remediation waste management units at the site. The goal of the plan must be to minimize the possibility of, and the hazards from, a fire, explosion or any other unplanned sudden or nonsudden release of dangerous remediation waste or dangerous constituents to the air, soil or surface water that could threaten human health or the environment. The plan must explain specifically how to treat, store or dispose of the remediation waste in question and must be implemented immediately whenever a fire, explosion or release of dangerous remediation waste or dangerous constituents occurs and could threaten human health or the environment.

(i) Designate at least one employee, either on the remediation waste management site premises or on call (that is, available to respond to an emergency by reaching the remediation waste management site quickly), to coordinate all emergency response measures. The emergency coordinator must be thoroughly familiar with all aspects of the remediation waste management site contingency plan, all operations and activities at the site, the location and characteristics of dangerous remediation waste handled, the location of all records within the site, and the site layout. The emergency coordinator must have authority to commit the resources needed to carry out the contingency plan.

(j) Develop, maintain and implement a plan to meet the requirements of this subsection.

(k) Maintain records documenting compliance with this subsection.



[Statutory Authority: Chapters 70.105, 70.105D, 15.54 RCW and RCW 70.105.007. 00-11-040 (Order 99-01), § 173-303-280, filed 5/10/00, effective 6/10/00. Statutory Authority: Chapters 70.105 and 70.105D RCW. 98-03-018 (Order 97-03), § 173-303-280, filed 1/12/98, effective 2/12/98; 95-22-008 (Order 94-30), § 173-303-280, filed 10/19/95, effective 11/19/95. Statutory Authority: Chapter 70.105 RCW. 88-02-057 (Order DE 83-36), § 173-303-280, filed 1/5/88, effective 2/5/88; 87-14-029 (Order DE-87-4), § 173-303-280, filed 6/26/87; 86-12-057 (Order DE-85-10), § 173-303-280, filed 6/3/86; 84-09-088 (Order DE 83-36), § 173-303-280, filed 4/18/84. Statutory Authority: Chapter 70.105 RCW and RCW 70.95.260. 82-05-023 (Order DE 81-33), § 173-303-280, filed 2/10/82.]




--------------------------------------------------------------------------------

173-303-281
Notice of intent.
(1) Purpose. The purpose of this section is to provide notification to the department, local communities and the public that the siting of a dangerous waste management facility is being considered. Also, to provide general information about the proposed facility owner/operator, the type of facility and the types of wastes to be managed and compliance with the siting criteria.

(2) Applicability. This section applies to owners/operators of proposed facilities. This section also applies to existing facilities applying for a significant expansion, as defined in WAC 173-303-282(3). This section does not apply to owners/operators of facilities or portions of facilities who are applying for research, development and demonstration permits, pursuant to section 3005(g) of the Resource Conservation and Recovery Act, codified in 40 CFR Part 270.65. In addition, this section does not apply to owners/operators of facilities operating under an emergency permit pursuant to WAC 173-303-804 or to persons at facilities conducting on-site cleanup of sites under the Comprehensive Environmental Response Compensation and Liability Act, Sections 3004(u), 3004(v), and 3008(h) of the Resource Conservation and Recovery Act, chapter 70.105 RCW, or chapter 70.105D RCW, provided the cleanup activities are being conducted under a consent decree, agreed order, or enforcement order, or is being conducted by the department or United States Environmental Protection Agency. As used in this section:

(a) "Proposed facility" means a facility which has not qualified for interim status under WAC 173-303-805 or for which the department has not issued a final facility permit under WAC 173-303-806 prior to the effective date of this section;

(b) "Existing facility" means a facility which has qualified for interim status under WAC 173-303-805 or for which the department has issued a final facility permit under WAC 173-303-806 prior to the effective date of this section; and

(c) "Expansion" means the enlargement of the land surface area of an existing facility from that described in an interim status permit application or final status permit, the addition of a new dangerous waste management process, or an increase in the overall design capacity of existing dangerous waste management processes at a facility.

(3) Notice of intent to file for an interim status or a dangerous waste permit.

(a) The notice of intent to be prepared by the owners/operators of the applicable facilities must consist of:

(i) The name, address, and telephone number of the owner, operator, and corporate officers;

(ii) The location of the proposed facility or expansion on a topographic map with specifications as detailed in WAC 173-303-806 (4)(a)(xviii);

(iii) A brief description of the types and amounts of wastes to be managed annually;

(iv) A brief description of the major equipment items proposed, if any, and the waste management activities requiring a permit or revision of an existing permit;

(v) Demonstration of compliance with the siting criteria as required under WAC 173-303-282 (6) and (7). The site conditions with regards to satisfying the criteria are to be assessed as of the date of submittal of the notice of intent to the department;

(vi) For informational purposes a complete summary of compliance violations of permit conditions at hazardous waste management facilities owned or operated by the applicant, its subsidiaries or its parent company, during the ten calendar years preceding the permit application. Along with the summary of compliance violations, as issued by appropriate state or federal regulatory agencies, the applicant must also submit responses to past violations and any written correspondence with regulatory agencies regarding the compliance status of any hazardous waste management facility owned or operated by the applicant, its subsidiaries or parent company of the owner or operator. A more detailed compliance record must be provided upon request by the department;

(vii) For informational purposes the need for the proposed facility or expansion must be demonstrated by one of the following methods:

(A) Current overall capacity within Washington is inadequate for dangerous wastes generated in Washington as determined by regional or state dangerous waste management plans; or

(B) The facility is a higher priority management method, as described in RCW 70.105.150, than is currently in place or practical and available for the types of waste proposed to be managed; or

(C) The facility will add to the types of technology available or will reduce cost impacts (not to include transportation costs) to Washington generators for disposal of dangerous wastes; and

(ix) For informational purposes it must be shown how the capacity of the proposed facility or expansion will affect the overall capacity within the state, in conjunction with existing facilities in Washington.

(b) The notice of intent must be filed with the department, and copies must be made available for public review, no less than one hundred fifty days prior to filing an application for a permit or permit revision. The department will send a copy of the notice of intent to the elected officials of the lead local government and all local governments within the potentially affected area as required by WAC 173-303-902 (5)(b)(i). The department will continue to coordinate with interested local governments throughout the review of the proposal.

(c) Reserved.

(4) Preapplication public meeting and notice.

(a) Applicability. The requirements of subsections (4), (5), and (6) of this section apply to all final facility (part B) applications seeking initial permits for dangerous waste management units over which the department has permit issuance authority. These requirements also apply to final facility part B applications seeking renewal of permits for such units, where the renewal application is proposing a significant change in facility operations. For the purposes of these subsections, a "significant change" is any change that would qualify as a class 3 permit modification under WAC 173-303-840(4). For the purposes of these subsections only, "dangerous waste management units over which the department has permit issuance authority" refers to dangerous waste management units for which the department has been authorized to issue dangerous waste permits. The requirements of these subsections do not apply to permit modifications under WAC 173-303-840(4) or to applications that are submitted for the sole purpose of conducting post-closure activities or post-closure activities and corrective action at a facility.

The applicant's meeting date must be coordinated with and approved by ecology. If timing allows, both the applicant and ecology's meetings may be held on the same day.

(b) Prior to the submission of a part B final facility permit application for a facility, the applicant must hold at least one meeting with the public in order to solicit questions from the community and inform the community of proposed dangerous waste management activities. The applicant must post a sign-in sheet or otherwise provide a voluntary opportunity for attendees to provide their names and addresses.

(c) The applicant must submit a summary of the meeting, along with the list of attendees and their addresses developed under (b) of this subsection, and copies of any written comments or materials submitted at the meeting, to the department as a part of the part B application, in accordance with WAC 173-303-806 (4)(a).

(d) The applicant must provide public notice of the preapplication meeting at least thirty days prior to the meeting. The applicant must maintain, and provide to the department upon request, documentation of the notice.

(i) The applicant must provide public notice in all of the following forms:

(A) A newspaper advertisement. The applicant must publish a notice, fulfilling the requirements in (d)(ii) of this subsection, in a newspaper of general circulation in the county or equivalent jurisdiction that hosts the proposed location of the facility. In addition, the department will instruct the applicant to publish the notice in newspapers of general circulation in adjacent counties, where the department determines that such publication is necessary to inform the affected public. The notice must be published as a display advertisement.

(B) A visible and accessible sign. The applicant must post a notice on a clearly marked sign at or near the facility, fulfilling the requirements in (d)(ii) of this subsection. If the applicant places the sign on the facility property, then the sign must be large enough to be readable from the nearest point where the public would pass by the site.

(C) A broadcast media announcement. The applicant must broadcast a notice, fulfilling the requirements in (d)(ii) of this subsection, at least once on at least one local radio station or television station. The applicant may employ another medium with prior approval of the department.

(D) A notice to the department. The applicant must send a copy of the newspaper notice to the department and to the appropriate units of state and local government, in accordance with WAC 173-303-840 (3)(e)(i)(E).

(ii) The notices required under (d)(i) of this subsection must include:

(A) The date, time, and location of the meeting;

(B) A brief description of the purpose of the meeting;

(C) A brief description of the facility and proposed operations, including the address or a map (e.g., a sketched or copied street map) of the facility location;

(D) A statement encouraging people to contact the facility at least seventy-two hours before the meeting if they need special access to participate in the meeting; and

(E) The name, address, and telephone number of a contact person for the applicant.

(5) Public notice requirements at the application stage.

(a) Applicability. The requirements of this section apply to all final facility part B applications seeking initial permits for dangerous waste management units over which the department has permit issuance authority. The requirements of this section also apply to final facility part B applications seeking renewal of permits for such units under WAC 173-303-806 (7)(a). For the purposes of this section only, "dangerous waste management units over which the department has permit issuance authority" refers to dangerous waste management units for which the department has been authorized to issue final facility permits. The requirements of this section do not apply to permit modifications under WAC 173-303-830(4) or permit applications submitted for the sole purpose of conducting post-closure activities or post-closure activities and corrective action at a facility.

(b) Notification at application submittal.

(i) The department will provide public notice as set forth in WAC 173-303-840 (3)(e)(i)(D), and notice to appropriate units of state and local government as set forth in WAC 173-303-840 (3)(e)(i)(E), that a part B permit application has been submitted to the department and is available for review.

(ii) The notice will be published within a reasonable period of time after the application is received by the department. The notice must include:

(A) The name and telephone number of the applicant's contact person;

(B) The name and telephone number of the department's contact, and a mailing address to which information, opinions, and inquiries may be directed throughout the permit review process;

(C) An address to which people can write in order to be put on the facility mailing list;

(D) The location where copies of the permit application and any supporting documents can be viewed and copied;

(E) A brief description of the facility and proposed operations, including the address or a map (for example, a sketched or copied street map) of the facility location on the front page of the notice; and

(F) The date that the application was submitted.

(iii) Concurrent with the notice required under (b) of this subsection, the department will place the permit application and any supporting documents in a location accessible to the public in the vicinity of the facility or at the department's office.

(6) Information repository.

(a) Applicability. The requirements of this section apply to all applications seeking final facility permits for dangerous waste management units over which the department has permit issuance authority. For the purposes of this section only, "dangerous waste management units over which the department has permit issuance authority" refers to dangerous waste management units for which the department has been authorized to issue dangerous waste permits.

(b) The department may assess the need, on a case-by-case basis, for an information repository. When assessing the need for an information repository, the department will consider a variety of factors, including: The level of public interest; the type of facility; the presence of an existing repository; and the proximity to the nearest copy of the administrative record. If the department determines, at any time after submittal of a permit application, that there is a need for a repository, then the department will notify the facility that it must establish and maintain an information repository. (See WAC 173-303-810(16) for similar provisions relating to the information repository during the life of a permit.)

(c) The information repository must contain all documents, reports, data, and information deemed necessary by the department to fulfill the purposes for which the repository is established. The department will have the discretion to limit the contents of the repository.

(d) The information repository must be located and maintained at a site chosen by the facility. If the department finds the site unsuitable for the purposes and persons for which it was established, due to problems with the location, hours of availability, access, or other relevant considerations, then the department will specify a more appropriate site.

(e) The department will specify requirements for informing the public about the information repository. At a minimum, the department will require the facility to provide a written notice about the information repository to all individuals on the facility mailing list.

(f) The facility owner/operator will be responsible for maintaining and updating the repository with appropriate information throughout a time period specified by the department. The department may close the repository at its discretion, based on the factors in (b) of this subsection.



[Statutory Authority: Chapters 70.105, 70.105D, 15.54 RCW and RCW 70.105.007. 00-11-040 (Order 99-01), § 173-303-281, filed 5/10/00, effective 6/10/00. Statutory Authority: Chapters 70.105 and 70.105D RCW. 95-22-008 (Order 94-30), § 173-303-281, filed 10/19/95, effective 11/19/95; 94-01-060 (Order 92-33), § 173-303-281, filed 12/8/93, effective 1/8/94. Statutory Authority: RCW 43.21A.080 and 70.105.210, et seq. 90-20-016, § 173-303-281, filed 9/21/90, effective 10/22/90. Statutory Authority: Chapter 70.105 RCW. 88-18-083 (Order 88-29), § 173-303-281, filed 9/6/88.]




--------------------------------------------------------------------------------

173-303-282
Siting criteria.
(1) Purpose. This section establishes siting criteria which serve as an initial screen in the consideration of sites for dangerous waste management facilities. The purpose of the siting criteria is to immediately disqualify proposed dangerous waste facility sites in locations considered unsuitable or inappropriate for the management of dangerous wastes. Under RCW 70.105.200 (1)(d), siting criteria cannot prevent existing dangerous waste management facilities from operating at or below their present level of activity.

A proposed site which is not disqualified under these criteria will be further studied to determine if it qualifies under site specific rules. Compliance with the siting criteria does not imply that a given project at a given location poses an acceptable level of risk, nor does it commit the department to the issuance of a dangerous waste permit. Projects that demonstrate compliance with the siting criteria will be subjected to comprehensive environmental and technical review pursuant to applicable laws and regulations before the department makes a final decision on a dangerous waste permit.

The department may deny a permit or require protective measures such as engineering enhancements or increased setback distances from resources in order to ensure protection of human health and the environment.

(2) Applicability.

(a) Except as otherwise specifically provided, this section applies to:

(i) Owners/operators of proposed facilities; and

(ii) Owners or operators of existing land-based facilities at which an expansion of the land based unit is proposed;

(iii) Owners or operators of existing incinerators at which an expansion is proposed; and

(iv) Owners or operators proposing a significant expansion of other existing dangerous waste management facilities not subject to (a)(i), (ii) and (iii) of this subsection, unless the owner/operator can demonstrate to the satisfaction of the department that the proposed expansion will provide a net increase in protection to human health and the environment beyond that which is currently provided at the facility. However, demonstrations under this subsection (iv) must not result in treatment or storage facilities expanding into land-based or incineration facilities if siting criteria cannot be satisfied.

(b) This section does not apply to:

(i) Owners/operators of facilities or portions of facilities who are applying for research, development and demonstration permits, pursuant to section 3005(g) of the Resource Conservation and Recovery Act, codified in 40 CFR Part 270.65 or WAC 173-303-809;

(ii) Owners/operators of facilities operating under an emergency permit pursuant to WAC 173-303-804;

(iii) Persons at facilities conducting on-site cleanup of sites under the Comprehensive Environmental Response Compensation and Liability Act, Sections 3004(u), 3004(v), and 3008(h) of the Resource Conservation and Recovery Act, chapter 70.105 RCW, or chapter 70.105D RCW, provided the cleanup activities are being conducted under a consent decree, agreed order, or enforcement order, or is being conducted by the department or United States Environmental Protection Agency;

(iv) Persons managing solid wastes who become subject to dangerous waste regulations through amendments to this chapter after the effective date of this section. This provision applies only to those activities operated in accordance with local, state, and federal requirements and which were being conducted prior to becoming subject to dangerous waste regulations, chapter 173-303 WAC or expansions, if it can be demonstrated to the satisfaction of the department that the proposed expansion of such activities will provide a net increase in protection to human health and the environment beyond that which is currently provided at the facility; or

(v) Owners/operators of facilities which recycle hazardous waste and:

(A) Are otherwise exempt from regulation by this chapter under 120;

(B) Have notified the department pursuant to WAC 173-303-060, prior to the effective date of this section;

(C) Are currently operating as a recycling facility as of the effective date of this regulation; and

(D) Seek only to obtain a tank or container storage permit to support recycling operations under this chapter.

Further, significant expansions of such storage facilities meeting the qualifications for this exemption may be considered under subsection (2)(a)(iv) of this section.

(3) Definitions. Any terms used in this section that are not defined below have the meanings provided in WAC 173-303-040. For the purposes of this section, the following terms have the described meanings:

(a) "Aquifer of beneficial use" means an aquifer that contains sufficient quality and quantity of water to allow it to be withdrawn for beneficial uses which include, but are not limited to, uses for domestic, stock watering, industrial, commercial, agricultural, irrigation, mining, fish and wildlife maintenance and enhancement, or recreational purposes.

(b) "Displacement" means the relative movement of any two sides of a fault measured in any direction.

(c) "Domestic water use" means any water used for human consumption, other domestic activities or livestock watering for which the department has issued a permit of water right for surface water diversions pursuant to chapter 90.03 RCW, or for a well pursuant to chapter 90.44 RCW, or for which the department has received a well water report pursuant to RCW 18.104.050, or for any other valid water right claimed in accordance with chapter 90.14 RCW. This does not apply to wells abandoned in compliance with chapter 173-160 WAC.

(d) "Existing facility" means a facility which has qualified for interim status under WAC 173-303-805 or for which the department has issued a final facility permit under WAC 173-303-806.

(e) "Expansion" means the enlargement of the land surface area of an existing facility from that described in an interim status permit application or final facility permit, the addition of a new dangerous waste management process, or an increase in overall design capacity of existing dangerous waste management processes at a facility. However, a process or equipment change within the existing handling code (not to include "other") as defined under WAC 173-303-380 (2)(d) will not be considered a new dangerous waste management process.

(f) "Fault" means a fracture along which rocks or soils on one side have been displaced with respect to those on the other side.

(g) "Holocene" means the most recent epoch of the Quaternary period, extending from the end of the Pleistocene to the present.

(h) "Land-based facility" means a dangerous waste management facility which falls under the definition of land disposal as defined in Section 3004(k) of the Resource Conservation and Recovery Act. These facilities use the land as an integral part of their waste management method and include, but are not limited to, landfills, surface impoundments, waste piles, and land treatment facilities. For the purposes of this section, this would not include waste piles in which the dangerous wastes are stored inside or under a structure that provides protection from precipitation and when runoff, leachate, or other types of waste dispersal are not generated under any conditions.

(i) "Nonland based facility" means a facility which does not use the land as an integral part of its waste management method and is not subject to the requirements of WAC 173-303-806 (4)(a)(xxi). These facilities include, but are not limited to, tanks, containers, and incinerators.

(j) "Perennial surface water body" means a surface water body which is normally continuous with natural flows throughout the year or an annually recurring body of water including lakes, rivers, ponds, streams, reservoirs, inland waters, and saltwaters. This does not include roadside ditches or storm drains. However, this definition does apply to irrigation or domestic water supply channels existing, or planned and approved by a governmental agency, at the time an owner/operator submits a notice of intent.

(k) "Preempted facility" means any facility that includes as a significant part of its activities any of the following operations: (i) Landfill; (ii) incineration; (iii) land treatment; (iv) surface impoundment to be closed as a landfill; or (v) waste pile to be closed as a landfill.

(l) "Prime farmland" means the land which has the best combination of physical and chemical characteristics for producing food, feed, forage, fiber or oilseed crops, and is also available for these uses. It has the soil quality, growing season, and moisture supply needed to economically produce sustained high yields of crops when treated and managed, including water management, according to acceptable farming methods. In general, prime farmland has an adequate and dependable water supply from precipitation or irrigation, a favorable temperature and growing season, acceptable acidity or alkalinity, acceptable salt and sodium content, and few or no rocks. It is permeable to water and air. Prime farmland is not excessively erodible or saturated with water for a long period of time, and it either does not flood frequently or is protected from flooding. Prime farmland will be determined by those general and specific criteria as defined in the National Soils Handbook, Soil Conservation Service, United States Department of Agriculture, Washington, D.C. and 7 CFR 2.62. Areas of prime farmland are identified in the most recent county soil survey maps prepared by the National Cooperative Soil Survey.

(m) "Proposed facility" means a facility which has not qualified for interim status under WAC 173-303-805 or for which the department has not issued a final facility permit under WAC 173-303-806.

(n) "Public gathering places" means a place such as a public or private health care or child care facility; an educational institution; a church; a government institution not associated with dangerous waste management; or a retail shopping center.

(o) "Residence" means any dwelling including, but not limited to, private homes, rental homes, boarding houses, apartments, motels, or hotels.

(p) "Significant expansion" means an expansion of an existing facility, operating under interim status or a final status permit, that is considered a class three modification as designated by 40 CFR Parts 270.41 and 270.42. Examples include, but are not limited to, a modification or addition of container units resulting in greater than a twenty-five percent increase in the facility's container storage capacity, storage of different wastes in containers that require additional or different management practices from those authorized under interim status or by a final status permit, and a modification or addition of tank units resulting in greater than twenty-five percent increase in the facility's capacity. For the purposes of this section, a single or cumulative increase of greater than twenty-five percent of the process design capacity as described in the facility's original Part A permit application will be considered a significant expansion.

(q) "Slope and soil instability" means areas for which there is credible evidence of, or the potential for, landslides, slumps, avalanches, earth or mud flows, or other unsuitable slope conditions.

(r) "Subsidence" means areas for which there is credible evidence of, or potential for, sinking of the land surface. Areas of subsurface mines, caves, cavernous materials, or where there has been significant removal of fluids may provide credible evidence of subsidence.

(s) "Wetland" means land transitional between terrestrial and aquatic systems where the water table is usually at or near the surface or the land is covered by shallow water. For purposes of this classification a wetland must have one or more of the following three attributes: (i) At least periodically, the land supports predominantly hydrophytes; (ii) the substrate is predominantly undrained hydric soil; and (iii) the substrate is nonsoil and is saturated with water or covered by shallow water at some time during the growing season of each year. The Joint Federal Methodology for Identifying and Delineating Wetlands must be used for defining the upland boundary of wetlands.

(4) Implementation.

(a) Submittal of information to demonstrate compliance. Documentation that a proposed facility or expansion site meets the siting criteria must be submitted to the department:

(i) In the notice of intent for those facilities for which a notice of intent is filed after the effective date of this section; or

(ii) Within ninety days of the effective date of this section for proposed facilities for which a notice of intent or an application for a Part B permit has been submitted to the department prior to the effective date of this section.

(b) Consultation by department. The department will consult with the lead local government as defined in WAC 173-303-902 (4)(h) and consider those local land use, building, fire, air quality, and transportation standards to the extent they add to and do not conflict with the requirements of this section. Such consultation and consideration will be made prior to the department's rendering of a tentative decision under subsection (4)(c) of this section.

(c) Response by department. Within sixty days of receipt of a demonstration of compliance, the department will undertake one of the following actions:

(i) Return the demonstration of compliance as incomplete with written comments identifying the need for additional information. The owner or operator may resubmit the demonstration of compliance with complete information; or

(ii) Render a written tentative decision to approve or deny the demonstration of compliance.

(d) Public notice and hearing process. The department in making a tentative decision to approve or deny a demonstration of compliance with this section will take the following actions:

(i) For land-based facilities and incinerators:

(A) The department will publish a notice of its tentative decision in a daily or weekly newspaper of general circulation in the potentially affected area, and will give notice by other reasonable methods to persons potentially affected.

(B) The department will hold a public hearing at a location convenient to the public in the potentially affected area. Notice of the date, time, purpose, and place of the hearing will be provided in the publication of notice.

(C) The department will accept comments on its tentative decision for a minimum of forty-five days.

(D) After evaluating all public comments the department will make a final decision in accordance with chapter 34.05 RCW. The department will either approve or deny the owner/operator's demonstration of compliance.

(ii) For nonland-based facilities, excluding incinerators:

(A) The department will publish a notice of its tentative decision in a daily or weekly newspaper of general circulation in the potentially affected area, and will give notice by other reasonable methods to persons potentially affected.

(B) Upon the written request of any interested person, the department may hold a public hearing to consider public comments on the owner or operator's demonstration of compliance. A person requesting the hearing must state the issues to be raised and explain why written comments would not suffice. In any case, if ten or more persons request a public hearing on the subject of the department's tentative decision, the department will hold a public hearing for the purpose of receiving comments.

(C) The department will accept comments on its tentative decision for a minimum of forty-five days.

(D) After evaluating all public comments the department will make a final decision in accordance with chapter 34.05 RCW. The department will either approve or deny the owner or operator's demonstration of compliance.

(5) Appeal of a department decision. Any person who is adversely affected by a decision of the department under this section may appeal the decision to the pollution control hearings board pursuant to the authority of WAC 173-303-845.

(6) Criteria for elements of the natural environment. The following siting criteria establish locations from which facilities are excluded and establish minimum setback distances from identified resources. Unless otherwise stated, setback distances are measured horizontally from the dangerous waste management unit boundary to the identified resource. (continued)