Chapter 77.55 RCW Construction projects in state waters





--------------------------------------------------------------------------------

77.55.011
Definitions.
The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.

(1) "Bed" means the land below the ordinary high water lines of state waters. This definition does not include irrigation ditches, canals, storm water runoff devices, or other artificial watercourses except where they exist in a natural watercourse that has been altered by man.

(2) "Board" means the hydraulic appeals board created in RCW 77.55.301.

(3) "Commission" means the state fish and wildlife commission.

(4) "Department" means the department of fish and wildlife.

(5) "Director" means the director of the department of fish and wildlife.

(6) "Emergency" means an immediate threat to life, the public, property, or of environmental degradation.

(7) "Hydraulic project" means the construction or performance of work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or freshwaters of the state.

(8) "Imminent danger" means a threat by weather, water flow, or other natural conditions that is likely to occur within sixty days of a request for a permit application.

(9) "Marina" means a public or private facility providing boat moorage space, fuel, or commercial services. Commercial services include but are not limited to overnight or live-aboard boating accommodations.

(10) "Marine terminal" means a public or private commercial wharf located in the navigable water of the state and used, or intended to be used, as a port or facility for the storing, handling, transferring, or transporting of goods to and from vessels.

(11) "Ordinary high water line" means the mark on the shores of all water that will be found by examining the bed and banks and ascertaining where the presence and action of waters are so common and usual, and so long continued in ordinary years as to mark upon the soil or vegetation a character distinct from the abutting upland. Provided, that in any area where the ordinary high water line cannot be found, the ordinary high water line adjoining saltwater is the line of mean higher high water and the ordinary high water line adjoining fresh water is the elevation of the mean annual flood.

(12) "Permit" means a hydraulic project approval permit issued under this chapter.

(13) "Sandbars" includes, but is not limited to, sand, gravel, rock, silt, and sediments.

(14) "Small scale prospecting and mining" means the use of only the following methods: Pans; nonmotorized sluice boxes; concentrators; and minirocker boxes for the discovery and recovery of minerals.

(15) "Spartina," "purple loosestrife," and "aquatic noxious weeds" have the same meanings as defined in RCW 17.26.020.

(16) "Streambank stabilization" means those projects that prevent or limit erosion, slippage, and mass wasting. These projects include, but are not limited to, bank resloping, log and debris relocation or removal, planting of woody vegetation, bank protection using rock or woody material or placement of jetties or groins, gravel removal, or erosion control.

(17) "Tide gate" means a one-way check valve that prevents the backflow of tidal water.

(18) "Waters of the state" and "state waters" means all salt and fresh waters waterward of the ordinary high water line and within the territorial boundary of the state.


[2005 c 146 § 101.]

Notes: Part headings not law -- 2005 c 146: "Part headings used in this act are not any part of the law." [2005 c 146 § 1007.]






--------------------------------------------------------------------------------

77.55.021
Permit.
(1) Except as provided in RCW 77.55.031, 77.55.051, and 77.55.041, in the event that any person or government agency desires to undertake a hydraulic project, the person or government agency shall, before commencing work thereon, secure the approval of the department in the form of a permit as to the adequacy of the means proposed for the protection of fish life.

(2) A complete written application for a permit may be submitted in person or by registered mail and must contain the following:

(a) General plans for the overall project;

(b) Complete plans and specifications of the proposed construction or work within the mean higher high water line in saltwater or within the ordinary high water line in freshwater;

(c) Complete plans and specifications for the proper protection of fish life; and

(d) Notice of compliance with any applicable requirements of the state environmental policy act, unless otherwise provided for in this chapter.

(3)(a) Protection of fish life is the only ground upon which approval of a permit may be denied or conditioned. Approval of a permit may not be unreasonably withheld or unreasonably conditioned. Except as provided in this subsection and subsections (8), (10), and (11) of this section, the department has forty-five calendar days upon receipt of a complete application to grant or deny approval of a permit. The forty-five day requirement is suspended if:

(i) After ten working days of receipt of the application, the applicant remains unavailable or unable to arrange for a timely field evaluation of the proposed project;

(ii) The site is physically inaccessible for inspection;

(iii) The applicant requests a delay; or

(iv) The department is issuing a permit for a storm water discharge and is complying with the requirements of RCW 77.55.161(3)(b).

(b) Immediately upon determination that the forty-five day period is suspended, the department shall notify the applicant in writing of the reasons for the delay.

(c) The period of forty-five calendar days may be extended if the permit is part of a multiagency permit streamlining effort and all participating permitting agencies and the permit applicant agree to an extended timeline longer than forty-five calendar days.

(4) If the department denies approval of a permit, the department shall provide the applicant a written statement of the specific reasons why and how the proposed project would adversely affect fish life. Issuance, denial, conditioning, or modification of a permit shall be appealable to the department or the board as specified in RCW 77.55.301 within thirty days of the notice of decision.

(5)(a) The permittee must demonstrate substantial progress on construction of that portion of the project relating to the permit within two years of the date of issuance.

(b) Approval of a permit is valid for a period of up to five years from the date of issuance, except as provided in (c) of this subsection and in RCW 77.55.151.

(c) A permit remains in effect without need for periodic renewal for hydraulic projects that divert water for agricultural irrigation or stock watering purposes and that involve seasonal construction or other work. A permit for streambank stabilization projects to protect farm and agricultural land as defined in RCW 84.34.020 remains in effect without need for periodic renewal if the problem causing the need for the streambank stabilization occurs on an annual or more frequent basis. The permittee must notify the appropriate agency before commencing the construction or other work within the area covered by the permit.

(6) The department may, after consultation with the permittee, modify a permit due to changed conditions. The modification becomes effective unless appealed to the department or the board as specified in RCW 77.55.301 within thirty days from the notice of the proposed modification. For hydraulic projects that divert water for agricultural irrigation or stock watering purposes, or when the hydraulic project or other work is associated with streambank stabilization to protect farm and agricultural land as defined in RCW 84.34.020, the burden is on the department to show that changed conditions warrant the modification in order to protect fish life.

(7) A permittee may request modification of a permit due to changed conditions. The request must be processed within forty-five calendar days of receipt of the written request. A decision by the department may be appealed to the board within thirty days of the notice of the decision. For hydraulic projects that divert water for agricultural irrigation or stock watering purposes, or when the hydraulic project or other work is associated with streambank stabilization to protect farm and agricultural land as defined in RCW 84.34.020, the burden is on the permittee to show that changed conditions warrant the requested modification and that such a modification will not impair fish life.

(8) The department or the county legislative authority may declare and continue an emergency. The county legislative authority shall immediately notify the department if it declares an emergency under this subsection. The department, through its authorized representatives, shall issue immediately, upon request, oral approval for a stream crossing, or work to remove any obstructions, repair existing structures, restore streambanks, protect fish life, or protect property threatened by the stream or a change in the stream flow without the necessity of obtaining a written permit prior to commencing work. Conditions of the emergency oral permit must be established by the department and reduced to writing within thirty days and complied with as provided for in this chapter. The department may not require the provisions of the state environmental policy act, chapter 43.21C RCW, to be met as a condition of issuing a permit under this subsection.

(9) All state and local agencies with authority under this chapter to issue permits or other authorizations in connection with emergency water withdrawals and facilities authorized under RCW 43.83B.410 shall expedite the processing of such permits or authorizations in keeping with the emergency nature of such requests and shall provide a decision to the applicant within fifteen calendar days of the date of application.

(10) The department or the county legislative authority may determine an imminent danger exists. The county legislative authority shall notify the department, in writing, if it determines that an imminent danger exists. In cases of imminent danger, the department shall issue an expedited written permit, upon request, for work to remove any obstructions, repair existing structures, restore banks, protect fish resources, or protect property. Expedited permit requests require a complete written application as provided in subsection (2) of this section and must be issued within fifteen calendar days of the receipt of a complete written application. Approval of an expedited permit is valid for up to sixty days from the date of issuance. The department may not require the provisions of the state environmental policy act, chapter 43.21C RCW, to be met as a condition of issuing a permit under this subsection.

(11) The department may issue an expedited written permit in those instances where normal permit processing would result in significant hardship for the applicant or unacceptable damage to the environment. Expedited permit requests require a complete written application as provided in subsection (2) of this section and must be issued within fifteen calendar days of the receipt of a complete written application. Approval of an expedited permit is valid for up to sixty days from the date of issuance. The department may not require the provisions of the state environmental policy act, chapter 43.21C RCW, to be met as a condition of issuing a permit under this subsection.


[2005 c 146 § 201.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.031
Driving across established ford.
The act of driving across an established ford is exempt from a permit. Driving across streams or on wetted streambeds at areas other than established fords requires a permit. Work within the ordinary high water line of state waters to construct or repair a ford or crossing requires a permit.


[2005 c 146 § 301.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.041
Derelict fishing gear — Removal.
The removal of derelict fishing gear does not require a permit under this chapter if the gear is removed according to the guidelines described in RCW 77.12.865.


[2005 c 146 § 302; 2002 c 20 § 4. Formerly RCW 77.55.330.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Purpose -- 2002 c 20: See note following RCW 77.12.865.







--------------------------------------------------------------------------------

77.55.051
Spartina/purple loosestrife — Removal or control.
(1) An activity conducted solely for the removal or control of spartina does not require a permit.

(2) An activity conducted solely for the removal or control of purple loosestrife and which is performed with handheld tools, handheld equipment, or equipment carried by a person does not require a permit.


[2005 c 146 § 303.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.061
Hazardous substance remedial actions — Procedural requirements not applicable.
The procedural requirements of this chapter shall not apply to any person conducting a remedial action at a facility pursuant to a consent decree, order, or agreed order issued pursuant to chapter 70.105D RCW, or to the department of ecology when it conducts a remedial action under chapter 70.105D RCW. The department of ecology shall ensure compliance with the substantive requirements of this chapter through the consent decree, order, or agreed order issued pursuant to chapter 70.105D RCW, or during the department-conducted remedial action, through the procedures developed by the department pursuant to RCW 70.105D.090.


[1994 c 257 § 18. Formerly RCW 77.55.030, 75.20.025.]

Notes: Severability -- 1994 c 257: See note following RCW 36.70A.270.






--------------------------------------------------------------------------------

77.55.071
Certain secure community transition facilities not subject to this chapter. (Expires June 30, 2009.)
An emergency has been caused by the need to expeditiously site facilities to house sexually violent predators who have been committed under chapter 71.09 RCW. To meet this emergency, secure community transition facilities sited pursuant to the preemption provisions of RCW 71.09.342 and secure facilities sited pursuant to the preemption provisions of RCW 71.09.250 are not subject to the provisions of this chapter.

This section expires June 30, 2009.


[2002 c 68 § 14. Formerly RCW 77.55.360.]

Notes: Purpose -- Severability -- Effective date -- 2002 c 68: See notes following RCW 36.70A.200.







--------------------------------------------------------------------------------

77.55.081
Removal or control of aquatic noxious weeds — Rules — Pamphlet.
(1) By June 30, 1997, the department shall develop rules for projects conducted solely for the removal or control of various aquatic noxious weeds other than spartina and purple loosestrife and for activities or hydraulic projects for controlling purple loosestrife not covered by RCW 77.55.051(2). Following the adoption of the rules, the department shall produce and distribute a pamphlet describing the methods of removing or controlling the aquatic noxious weeds that are approved under the rules. The pamphlet serves as the permit for any project that is conducted solely for the removal or control of such aquatic noxious weeds and that is conducted as described in the pamphlet. No further permit is required for such a project.

(2) From time to time as information becomes available, the department shall adopt similar rules for additional aquatic noxious weeds or additional activities for removing or controlling aquatic noxious weeds not governed by RCW 77.55.051 (1) and (2) and shall produce and distribute one or more pamphlets describing these methods of removal or control. Such a pamphlet serves as the permit for any project that is conducted solely for the removal or control of such aquatic noxious weeds and that is conducted as described in the pamphlet. No further permit is required for such a project.

(3) Nothing in this section shall prohibit the department from requiring a permit for those parts of hydraulic projects that are not specifically for the control or removal of spartina, purple loosestrife, or other aquatic noxious weeds.


[2005 c 146 § 401; 1995 c 255 § 4. Formerly RCW 77.55.150, 75.20.108.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Severability -- Effective date -- 1995 c 255: See RCW 17.26.900 and 17.26.901.







--------------------------------------------------------------------------------

77.55.091
Small scale prospecting and mining — Rules.
(1) Small scale prospecting and mining shall not require a permit under this chapter if the prospecting is conducted in accordance with rules established by the department.

(2) By December 31, 1998, the department shall adopt rules applicable to small scale prospecting and mining activities subject to this section. The department shall develop the rules in cooperation with the recreational mining community and other interested parties.

(3) Within two months of adoption of the rules, the department shall distribute an updated gold and fish pamphlet that describes methods of mineral prospecting that are consistent with the department's rule. The pamphlet shall be written to clearly indicate the prospecting methods that require a permit under this chapter and the prospecting methods that require compliance with the pamphlet. To the extent possible, the department shall use the provisions of the gold and fish pamphlet to minimize the number of specific provisions of a written permit issued under this chapter.


[2005 c 146 § 402; 1997 c 415 § 2. Formerly RCW 77.55.270, 75.20.330.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Findings -- 1997 c 415: "The legislature finds that small scale prospecting and mining: (1) Is an important part of the heritage of the state; (2) provides economic benefits to the state; and (3) can be conducted in a manner that is beneficial to fish habitat and fish propagation. Now, therefore, the legislature declares that small scale prospecting and mining shall be regulated in the least burdensome manner that is consistent with the state's fish management objectives and the federal endangered species act." [1997 c 415 § 1.]







--------------------------------------------------------------------------------

77.55.101
Environmental excellence program agreements — Effect on chapter.
Notwithstanding any other provision of law, any legal requirement under this chapter, including any standard, limitation, rule, or order is superseded and replaced in accordance with the terms and provisions of an environmental excellence program agreement, entered into under chapter 43.21K RCW.


[1997 c 381 § 25. Formerly RCW 77.55.020, 75.20.015.]

Notes: Purpose -- 1997 c 381: See RCW 43.21K.005.






--------------------------------------------------------------------------------

77.55.111
Habitat incentives agreement.
When a private landowner is applying for a permit under this chapter and that landowner has entered into a habitat incentives agreement with the department and the department of natural resources as provided in RCW 77.55.121, the department shall comply with the terms of that agreement when evaluating the request for a permit.


[2005 c 146 § 403; 2001 c 253 § 54; 1997 c 425 § 4. Formerly RCW 77.55.280, 75.20.340.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Intent -- 1997 c 425: See note following RCW 77.55.121.







--------------------------------------------------------------------------------

77.55.121
Habitat incentives program — Goal — Requirements of agreement — Application evaluation factors.
(1) Beginning in January 1998, the department and the department of natural resources shall implement a habitat incentives program based on the recommendations of federally recognized Indian tribes, landowners, the regional fisheries enhancement groups, the timber, fish, and wildlife cooperators, and other interested parties. The program shall allow a private landowner to enter into an agreement with the departments to enhance habitat on the landowner's property for food fish, game fish, or other wildlife species. In exchange, the landowner shall receive state regulatory certainty with regard to future applications for a permit or a forest practices permit on the property covered by the agreement. The overall goal of the program is to provide a mechanism that facilitates habitat development on private property while avoiding an adverse state regulatory impact to the landowner at some future date. A single agreement between the departments and a landowner may encompass up to one thousand acres. A landowner may enter into multiple agreements with the departments, provided that the total acreage covered by such agreements with a single landowner does not exceed ten thousand acres. The departments are not obligated to enter into an agreement unless the departments find that the agreement is in the best interest of protecting fish or wildlife species or their habitat.

(2) A habitat incentives agreement shall be in writing and shall contain at least the following: (a) A description of the property covered by the agreement; (b) an expiration date; (c) a description of the condition of the property prior to the implementation of the agreement; and (d) other information needed by the landowner and the departments for future reference and decisions.

(3) As part of the agreement, the department may stipulate the factors that will be considered when the department evaluates a landowner's application for a permit on property covered by the agreement. The department's identification of these evaluation factors shall be in concurrence with the department of natural resources and affected federally recognized Indian tribes. In general, future decisions related to the issuance, conditioning, or denial of a permit must be based on the conditions present on the landowner's property at the time of the agreement, unless all parties agree otherwise.

(4) As part of the agreement, the department of natural resources may stipulate the factors that will be considered when the department of natural resources evaluates a landowner's application for a forest practices permit under chapter 76.09 RCW on property covered by the agreement. The department of natural resources' identification of these evaluation factors shall be in concurrence with the department and affected federally recognized Indian tribes. In general, future decisions related to the issuance, conditioning, or denial of forest practices permits shall be based on the conditions present on the landowner's property at the time of the agreement, unless all parties agree otherwise.

(5) The agreement is binding on and may be used by only the landowner who entered into the agreement with the department. The agreement shall not be appurtenant with the land. However, if a new landowner chooses to maintain the habitat enhancement efforts on the property, the new landowner and the department and the department of natural resources may jointly choose to retain the agreement on the property.

(6) If the department and the department of natural resources receive multiple requests for agreements with private landowners under the habitat incentives program, the departments shall prioritize these requests and shall enter into as many agreements as possible within available budgetary resources.


[2005 c 146 § 404; 2000 c 107 § 229; 1997 c 425 § 3. Formerly RCW 77.55.300, 77.12.830.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Intent -- 1997 c 425: "In an effort to increase the amount of habitat available for fish and wildlife, the legislature finds that it is desirable for the department of fish and wildlife, the department of natural resources, and other interested parties to work closely with private landowners to achieve habitat enhancements. In some instances, private landowners avoid enhancing habitat because of a concern that the presence of fish or wildlife may make future land management more difficult. It is the intent of this act to provide a mechanism that facilitates habitat development while avoiding an adverse impact on the landowner at a later date. The habitat incentives program is not intended to supercede any federal laws." [1997 c 425 § 1.]







--------------------------------------------------------------------------------

77.55.131
Dike vegetation management guidelines — Memorandum of agreement.
The department and the department of ecology will work cooperatively with the United States army corps of engineers to develop a memorandum of agreement outlining dike vegetation management guidelines so that dike owners are eligible for coverage under P.L. 84-99, and state requirements established pursuant to RCW 77.55.021 are met.


[2005 c 146 § 405; 2000 c 107 § 18; 1993 sp.s. c 2 § 34; 1991 c 322 § 19. Formerly RCW 77.55.130, 75.20.1041.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Effective date -- 1993 sp.s. c 2 §§ 1-6, 8-59, and 61-79: See RCW 43.300.900.


Severability -- 1993 sp.s. c 2: See RCW 43.300.901.


Findings -- Intent -- 1991 c 322: See note following RCW 86.12.200.







--------------------------------------------------------------------------------

77.55.141
Marine beach front protective bulkheads or rockwalls.
(1) In order to protect the property of marine waterfront shoreline owners it is necessary to facilitate issuance of permits for bulkheads or rockwalls under certain conditions.

(2) The department shall issue a permit with or without conditions within forty-five days of receipt of a complete and accurate application which authorizes commencement of construction, replacement, or repair of a marine beach front protective bulkhead or rockwall for single-family type residences or property under the following conditions:

(a) The waterward face of a new bulkhead or rockwall shall be located only as far waterward as is necessary to excavate for footings or place base rock for the structure and under no conditions shall be located more than six feet waterward of the ordinary high water line;

(b) Any bulkhead or rockwall to replace or repair an existing bulkhead or rockwall shall be placed along the same alignment as the bulkhead or rockwall it is replacing. However, the replaced or repaired bulkhead or rockwall may be placed waterward of and directly abutting the existing structure only in cases where removal of the existing bulkhead or rockwall would result in environmental degradation or removal problems related to geological, engineering, or safety considerations; and

(c) Construction of a new bulkhead or rockwall, or replacement or repair of an existing bulkhead or rockwall waterward of the existing structure shall not result in the permanent loss of critical food fish or shellfish habitats; and

(d) Timing constraints shall be applied on a case-by-case basis for the protection of critical habitats, including but not limited to migration corridors, rearing and feeding areas, and spawning habitats, for the proper protection of fish life.

(3) Any bulkhead or rockwall construction, replacement, or repair not meeting the conditions in this section shall be processed under this chapter in the same manner as any other application.

(4) Any person aggrieved by the approval, denial, conditioning, or modification of a permit under this section may formally appeal the decision to the board pursuant to this chapter.


[2005 c 146 § 501; 1991 c 279 § 1. Formerly RCW 77.55.200, 75.20.160.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.151
Marina or marine terminal.
(1) For a marina or marine terminal in existence on June 6, 1996, or a marina or marine terminal that has received a permit for its initial construction, a renewable, five-year permit shall be issued, upon request, for regular maintenance activities of the marina or marine terminal.

(2) Upon construction of a new marina or marine terminal that has received a permit, a renewable, five-year permit shall be issued, upon request, for regular maintenance activities of the marina or marine terminal.

(3) For the purposes of this section, regular maintenance activities are only those activities necessary to restore the marina or marine terminal to the conditions approved in the initial permit. These activities may include, but are not limited to, dredging, piling replacement, and float replacement.

(4) The five-year permit must include a requirement that a fourteen-day notice be given to the department before regular maintenance activities begin.


[2005 c 146 § 502; 2002 c 368 § 7; 1996 c 192 § 2. Formerly RCW 77.55.220, 75.20.180.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Intent -- 2002 c 368: See note following RCW 77.55.340.


Finding -- Intent -- 1996 c 192: "The legislature finds that initial construction of a marina and some maintenance activities change the natural flow or bed of the salt or fresh water body in which the marina is constructed. Because of this disturbance, it is appropriate that plans for initial marina construction as well as some maintenance activities undergo the hydraulic project review and approval process established in chapter 75.20 RCW.

It is the intent of the legislature that after a marina has received a hydraulic project approval and been constructed, a renewable, five-year hydraulic project approval be issued, upon request, for regular maintenance activities within the marina." [1996 c 192 § 1.]







--------------------------------------------------------------------------------

77.55.161
Storm water discharges.
(1) Notwithstanding any other provision of this chapter, all permits related to storm water discharges must follow the provisions established in this section.

(2) Permits issued in locations covered by a national pollution discharge elimination system municipal storm water general permit may not be conditioned or denied for water quality or quantity impacts arising from storm water discharges. A permit is required only for the actual construction of any storm water outfall or associated structures pursuant to this chapter.

(3)(a) In locations not covered by a national pollution discharge elimination system municipal storm water general permit, the department may issue permits that contain provisions that protect fish life from adverse effects, such as scouring or erosion of the bed of the water body, resulting from the direct hydraulic impacts of the discharge.

(b) Prior to the issuance of a permit issued under this subsection (3), the department must:

(i) Make a finding that the discharge from the outfall will cause harmful effects to fish life;

(ii) Transmit the findings to the applicant and to the city or county where the project is being proposed; and

(iii) Allow the applicant an opportunity to use local ordinances or other mechanisms to avoid the adverse effects resulting from the direct hydraulic discharge. The forty-five day requirement for permit issuance under RCW 77.55.021 is suspended during the time period the department is meeting the requirements of this subsection (3)(b).

(c) After following the procedures set forth in (b) of this subsection, the department may issue a permit that prescribes the discharge rates from an outfall structure that will prevent adverse effects to the bed or flow of the waterway. The department may recommend, but not specify, the measures required to meet these discharge rates. The department may not require changes to the project design above the mean higher high water mark of marine waters, or the ordinary high water mark of freshwaters of the state. Nothing in this section alters any authority the department may have to regulate other types of projects under this chapter.


[2005 c 146 § 503; 2002 c 368 § 4. Formerly RCW 77.55.340.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Intent -- 2002 c 368: "The legislature finds that hydraulic project approvals should ensure that fish life is properly protected, but conditions attached to the approval of these permits must reasonably relate to the potential harm that the projects may produce. The legislature is particularly concerned over the current overlap of agency jurisdiction regarding storm water projects, and believes that there is an immediate need to address this issue to ensure that project applicants are not given conflicting directions over project design. Requiring a major redesign of a project results in major delays, produces exponentially rising costs for both public and private project applicants, and frequently produces only marginal benefits for fish.

The legislature recognizes that the department of ecology is primarily responsible for the approval of storm water projects. The legislature believes that once the department of ecology approves a proposed storm water project, it is inappropriate for the department of fish and wildlife to require a major redesign of that project in order for the applicant to obtain hydraulic project approval. The legislature further believes that it is more appropriate for the department of fish and wildlife to defer the design elements of a storm water project to the department of ecology and focus its own efforts on determining reasonable mitigation or conditions for the project based upon the project's potential harm to fish. It is the intent of the legislature to restore some balance over conditions attached to hydraulic permits, and to minimize overlapping state regulatory authority regarding storm water projects in order to reduce waste in both time and money while still providing ample protection for fish life." [2002 c 368 § 1.]







--------------------------------------------------------------------------------

77.55.171
Watershed restoration projects — Permit processing.
A permit required by the department for a watershed restoration project as defined in RCW 89.08.460 shall be processed in compliance with RCW 89.08.450 through 89.08.510.


[2005 c 146 § 504; 1995 c 378 § 14. Formerly RCW 77.55.210, 75.20.170.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.181
Fish habitat enhancement project — Permit review and approval process.
(1) In order to receive the permit review and approval process created in this section, a fish habitat enhancement project must meet the criteria under (a) and (b) of this subsection:

(a) A fish habitat enhancement project must be a project to accomplish one or more of the following tasks:

(i) Elimination of human-made fish passage barriers, including culvert repair and replacement;

(ii) Restoration of an eroded or unstable streambank employing the principle of bioengineering, including limited use of rock as a stabilization only at the toe of the bank, and with primary emphasis on using native vegetation to control the erosive forces of flowing water; or

(iii) Placement of woody debris or other instream structures that benefit naturally reproducing fish stocks.

The department shall develop size or scale threshold tests to determine if projects accomplishing any of these tasks should be evaluated under the process created in this section or under other project review and approval processes. A project proposal shall not be reviewed under the process created in this section if the department determines that the scale of the project raises concerns regarding public health and safety; and

(b) A fish habitat enhancement project must be approved in one of the following ways:

(i) By the department pursuant to chapter 77.95 or 77.100 RCW;

(ii) By the sponsor of a watershed restoration plan as provided in chapter 89.08 RCW;

(iii) By the department as a department-sponsored fish habitat enhancement or restoration project;

(iv) Through the review and approval process for the jobs for the environment program;

(v) Through the review and approval process for conservation district-sponsored projects, where the project complies with design standards established by the conservation commission through interagency agreement with the United States fish and wildlife service and the natural resource conservation service;

(vi) Through a formal grant program established by the legislature or the department for fish habitat enhancement or restoration; and

(vii) Through other formal review and approval processes established by the legislature.

(2) Fish habitat enhancement projects meeting the criteria of subsection (1) of this section are expected to result in beneficial impacts to the environment. Decisions pertaining to fish habitat enhancement projects meeting the criteria of subsection (1) of this section and being reviewed and approved according to the provisions of this section are not subject to the requirements of RCW 43.21C.030(2)(c).

(3)(a) A permit is required for projects that meet the criteria of subsection (1) of this section and are being reviewed and approved under this section. An applicant shall use a joint aquatic resource permit application form developed by the office of regulatory assistance to apply for approval under this chapter. On the same day, the applicant shall provide copies of the completed application form to the department and to each appropriate local government. Local governments shall accept the application as notice of the proposed project. The department shall provide a fifteen-day comment period during which it will receive comments regarding environmental impacts. Within forty-five days, the department shall either issue a permit, with or without conditions, deny approval, or make a determination that the review and approval process created by this section is not appropriate for the proposed project. The department shall base this determination on identification during the comment period of adverse impacts that cannot be mitigated by the conditioning of a permit. If the department determines that the review and approval process created by this section is not appropriate for the proposed project, the department shall notify the applicant and the appropriate local governments of its determination. The applicant may reapply for approval of the project under other review and approval processes.

(b) Any person aggrieved by the approval, denial, conditioning, or modification of a permit under this section may formally appeal the decision to the board pursuant to the provisions of this chapter.

(4) No local government may require permits or charge fees for fish habitat enhancement projects that meet the criteria of subsection (1) of this section and that are reviewed and approved according to the provisions of this section.


[2005 c 146 § 505; 2001 c 253 § 55; 1998 c 249 § 3. Formerly RCW 77.55.290, 75.20.350.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Findings -- Purpose -- 1998 c 249: "The legislature finds that fish habitat enhancement projects play a key role in the state's salmon and steelhead recovery efforts. The legislature finds that there are over two thousand barriers to fish passage at road crossings throughout the state, blocking fish access to as much as three thousand miles of freshwater spawning and rearing habitat. The legislature further finds that removal of these barriers and completion of other fish habitat enhancement projects should be done in a cost-effective manner, which includes providing technical assistance and training to people who will undertake projects such as removal of barriers to salmon passage and minimizing the expense and delays of various permitting processes. The purpose of this act is to take immediate action to facilitate the review and approval of fish habitat enhancement projects, to encourage efforts that will continue to improve the process in the future, to address known fish passage barriers immediately, and to develop over time a comprehensive system to inventory and prioritize barriers on a statewide basis." [1998 c 249 § 1.]


Joint aquatic resource permit application form -- Modification -- 1998 c 249: "The department of ecology permit assistant [assistance] center shall immediately modify the joint aquatic resource permit application form to incorporate the permit process established in section 3 of this act." [1998 c 249 § 2.]


Finding -- Report -- 1998 c 249: "The legislature finds that, while the process created in this act can improve the speed with which fish habitat enhancement projects are put into place, additional efforts can improve the review and approval process for the future. The legislature directs the department of fish and wildlife, the conservation commission, local governments, fish habitat enhancement project applicants, and other interested parties to work together to continue to improve the permitting review and approval process. Specific efforts shall include the following:

(1) Development of common acceptable design standards, best management practices, and standardized hydraulic project approval conditions for each type of fish habitat enhancement project;

(2) An evaluation of the potential for using technical evaluation teams in evaluating specific project proposals or stream reaches;

(3) An evaluation of techniques appropriate for restoration and enhancement of pasture and crop land adjacent to riparian areas;

(4) A review of local government shoreline master plans to identify and correct instances where the local plan does not acknowledge potentially beneficial instream work;

(5) An evaluation of the potential for local governments to incorporate fish habitat enhancement projects into their comprehensive planning process; and

(6) Continued work with the federal government agencies on federal permitting for fish habitat enhancement projects.

The department of fish and wildlife shall coordinate this joint effort and shall report back to the legislature on the group's progress by December 1, 1998." [1998 c 249 § 15.]


Effective date -- 1998 c 249: "This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately [April 1, 1998]." [1998 c 249 § 18.]







--------------------------------------------------------------------------------

77.55.191
Columbia river anadromous fish sanctuary — Restrictions.
(1) Except for the north fork of the Lewis river and the White Salmon river, all streams and rivers tributary to the Columbia river downstream from McNary dam are established as an anadromous fish sanctuary. This sanctuary is created to preserve and develop the food fish and game fish resources in these streams and rivers and to protect them against undue industrial encroachment.

(2) Within the sanctuary area:

(a) The department shall not issue a permit to construct a dam greater than twenty-five feet high within the migration range of anadromous fish as determined by the department.

(b) A person shall not divert water from rivers and streams in quantities that will reduce the respective stream flow below the annual average low flow, based upon data published in United States geological survey reports.

(3) The commission may acquire and abate a dam or other obstruction, or acquire any water right vested on a sanctuary stream or river, which is in conflict with the provisions of subsection (2) of this section.

(4) Subsection (2)(a) of this section does not apply to the sediment retention structure to be built on the North Fork Toutle river by the United States army corps of engineers.


[2005 c 146 § 506; 1998 c 190 § 89; 1995 1st sp.s. c 2 § 27 (Referendum Bill No. 45, approved November 7, 1995); 1993 sp.s. c 2 § 36; 1988 c 36 § 36; 1985 c 307 § 5; 1983 1st ex.s. c 46 § 76; 1961 c 4 § 1; Initiative Measure No. 25, approved November 8, 1960. Formerly RCW 77.55.160, 75.20.110.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Referral to electorate -- 1995 1st sp.s. c 2: See note following RCW 77.04.013.


Effective date -- 1995 1st sp.s. c 2: See note following RCW 43.17.020.


Effective date -- 1993 sp.s. c 2 §§ 1-6, 8-59, and 61-79: See RCW 43.300.900.


Severability -- 1993 sp.s. c 2: See RCW 43.300.901.


Severability -- 1961 c 4: "If any section or provision or part thereof of this act shall be held unconstitutional or for any other reason invalid, the invalidity of such section, provision or part thereof shall not affect the validity of the remaining sections, provisions or parts thereof which are not judged to be invalid or unconstitutional." [1961 c 4 § 3 (Initiative Measure No. 25, approved November 8, 1960).]







--------------------------------------------------------------------------------

77.55.201
Landscape management plan.
A landscape management plan approved by the department and the department of natural resources under RCW 76.09.350(2) shall serve as a permit for the life of the plan if fish are selected as one of the public resources for coverage under such a plan.


[2005 c 146 § 507.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.211
Informational brochure.
The department, the department of ecology, and the department of natural resources shall jointly develop an informational brochure that describes when permits and any other authorizations are required for flood damage prevention and reduction projects, and recommends ways to best proceed through the various regulatory permitting processes.


[2005 c 146 § 406; 1993 sp.s. c 2 § 28; 1991 c 322 § 21. Formerly RCW 77.55.010, 75.20.005.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Effective date -- 1993 sp.s. c 2 §§ 1-6, 8-59, and 61-79: See RCW 43.300.900.


Severability -- 1993 sp.s. c 2: See RCW 43.300.901.


Findings -- Intent -- 1991 c 322: See note following RCW 86.12.200.







--------------------------------------------------------------------------------

77.55.221
Flood damage repair and reduction activities — Five-year maintenance permit agreements.
The department shall, at the request of a county, develop five-year maintenance permit agreements, consistent with comprehensive flood control management plans adopted under the authority of RCW 86.12.200, or other watershed plan approved by a county legislative authority, to allow for work on public and private property for bank stabilization, bridge repair, removal of sandbars and debris, channel maintenance, and other flood damage repair and reduction activity under agreed-upon conditions and times without obtaining permits for specific projects.


[2005 c 146 § 508.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.






--------------------------------------------------------------------------------

77.55.231
Conditions imposed upon a permit — Reasonably related to project.
(1) Conditions imposed upon a permit must be reasonably related to the project. The permit conditions must ensure that the project provides proper protection for fish life, but the department may not impose conditions that attempt to optimize conditions for fish life that are out of proportion to the impact of the proposed project.

(2) The permit must contain provisions allowing for minor modifications to the plans and specifications without requiring reissuance of the permit.


[2005 c 146 § 601; 2002 c 368 § 5. Formerly RCW 77.55.350.]

Notes: Part headings not law -- 2005 c 146: See note following RCW 77.55.011.

Finding -- Intent -- 2002 c 368: See note following RCW 77.55.340.







--------------------------------------------------------------------------------

77.55.241
Off-site mitigation.
(1) The legislature finds that the construction of hydraulic projects may require mitigation for the protection of fish life, and that the mitigation may be most cost-effective and provide the most benefit to the fish resource if the mitigation is allowed to be applied in locations that are off-site of the hydraulic project location. The department may approve off-site mitigation plans that are submitted by permit applicants. (continued)