CCLME.ORG - DIVISION 89 GENERAL AUTHORIZATIONS (General Authorization for Fish Habitat Enhancement)
Loading (50 kb)...'
(continued)

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03

141-089-0275

Appeals; Expiration; Review of General Authorization

(1) An applicant whose application for the general authorization is determined by the Department to be ineligible or otherwise not qualified for this general authorization may obtain an informal review of the Department's decision through the alternative dispute resolution process resolution process described in OAR 141-085-0075. However, this is only opportunity to review the Department's decision and does not give the person a right to a contested case hearing.

(2) No letter of authorization will be issued with an expiration date beyond January 1, 2011, at which time this General Authorization will be reviewed in accordance with the provisions of ORS 196.850(5). An approval issued prior to expiration of this General Authorization shall remain in effect until January 1, 2012.

(3) Any activities authorized by a letter of authorization issued prior to January 1, 2006 are authorized until the activity is completed or until January 1, 2012, whichever comes first. All conditions of issuance continue to be in force. Activities authorized by this General Authorization that are not completed by January 1, 2012, shall require the submittal of a new application in order to complete the proposed activities. However, a one time 90 day extension will be allowed by the Department, if the applicant provides the Department with a written Notice that states that the activities authorized by this General Authorization will be completed within 90 days of January 1, 2012. The Department shall acknowledge and approve in writing the one time 90 day extension.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

General Authorization for Removing and Disposing of Sediment Behind Tidegates for Channel Maintenance
141-089-0280

Purpose and Applicability

(1) These rules set forth conditions under which an applicant may, without an individual removal-fill permit from the Department, dispose (fill), and place (fill), remove (removal), or alter material in waters of the state for the purposes of removing and disposing of sediment while maintaining or cleaning natural or artificially created drainage ditches upstream from tidegates.

(2) This general authorization is exclusive to:

(a) The disposal of sediments within waters of the state (e.g. wetlands) removed as a result of ditch maintenance/cleaning in drainage ditches upstream of tidegates; and/or

(b) The removal of material from drainage ditches (cleaning) upstream of tidegates that does not meet the requirements described in OAR 141-089-0280(4) below.

(3) Drainage ditches that have a free and open connection (as defined in OAR 141-085-0010) to other natural waterways (as defined in OAR 141-085-0010) and are presumed to contain food and game fish are waters of the state.

(4) The regular maintenance of legally constructed or altered ditches upstream of tidegates is exempt from regulation under the removal-fill law, OAR 141-085-0020 and this general authorization if:

(a) The drainage ditch was serviceable within the past five (5) years; and

(b) The maintenance would not significantly adversely affect wetlands or other waters of this state to a greater extent than the wetlands or waters of this state were affected as a result of the original construction of the drainage ditches.

(5) The placement of sediment removed from drainage ditches on wetlands may be an activity subject to the removal-fill law, OAR 141-085 and this general authorization.

(6) A letter of authorization from the Department is required prior to any person commencing an activity authorized by this general authorization. The term and conditions of issuance shall be stated in the letter of authorization. The term shall not exceed the expiration date of this general authorization. A letter of authorization is transferable to another person in accordance with OAR 141-085-0034.

(7) This general authorization is made pursuant to ORS 196.850 and is based upon the determination that the authorized activities are similar in nature and when conducted in accordance with this general authorization rule will not result in long term harm to water resources of the state, and will cause only minimal individual and cumulative environmental impacts.

(8) This general authorization does not apply to activities or waters exempt from the removal-fill law as described in OAR 141-085-0015 and 141-085-0020.

(9) Other structures, uses or activities included in any application for this general authorization that are subject to another general authorization under OAR 141-089 or individual permit under OAR 141-085 will not be authorized or covered by this general authorization. An application encompassing multiple activities must be processed as an individual removal-fill permit under OAR 141-085.

(10) Unless otherwise specified, the terms used in this general authorization are defined in OAR 141-085-0010.

(11) Activities and/or projects, which qualify for this general authorization, are exempt from removal-fill permit fees as described in OAR 141-085-0064.

(12) In the event a dispute arises as to the applicability of this general authorization to any project application, the Department shall make the final determination. The Department shall rely upon the applicant's project application and supporting documentation for its decision.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0285

Eligibility Requirements; Ineligible Projects

(1) In order to issue a letter of authorization the Department shall determine that the project is eligible and meets the applicable mandatory requirements as described in this rule. To be eligible a project must:

(a) Be conducted for the specific purpose of disposal of sediments within waters of the state (e.g. wetlands) removed as a result of maintenance/cleaning of drainage ditches upstream of tidegates; and/or

(b) Be conducted for the specific purpose of the removal of material (cleaning) from drainage ditches upstream of tidegates that does not meet the requirements described in OAR 141-089-0280(4) above; and

(c) Remove, fill or alter more than fifty (50) cubic yards of material from waters of the state unless the activity is within an Essential Salmon Habitat stream or State Scenic Waterway where the no amount of material is to be removed, filled or altered without prior authorization of the Department.

(2) A project is not eligible for this general authorization if:

(a) The project fails to meet any eligibility or mandatory requirements.

(b) The project application includes any structure, use or activity subject to another general authorization under OAR 141-089 or individual permits under OAR 141-085.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0290

Mandatory Requirements

The Department shall review each application to ensure that a project complies with the following mandatory requirements:

(1) The removal of sediments from drainage ditches shall be kept to the minimum amount necessary to remove recently deposited materials. Additional channel widening or deepening beyond that amount is not allowed under this general authorization.

(2) The sediments removed from drainage ditches may be spread in a thin layer (three inches or less) on farmed wetland or wet pasture provided the impacts are temporary and there is no permanent conversion from wetland to upland. Freshwater wetland (other than farmed wetland or wet pasture mentioned above), salt marsh, tidal flats or permanent or semi-permanent open water areas shall not be used for sediment disposal.

(3) If the project is within a State Scenic Waterway, a scenic waterway removal-fill permit must have been obtained from the Department in accordance with OAR 141-100.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0295

Application Requirements; Public Notice; Review Process

(1) An application for general authorization under this rule shall be submitted on an application form available from the Department. A complete application is one that contains all the information required in the application packet provided by the Department.

(2) The Department shall notify the applicant within fifteen (15) calendar days of receipt of the application if the application is incomplete or ineligible; otherwise the application will be considered complete. If the application is deemed incomplete, the Department shall notify the applicant and identify the missing, inaccurate or insufficient information. The Department will not continue to process an incomplete application. To re-initiate the application review process the applicant may submit an amended application at any time within twelve (12) months of the original application date. The applicant must resubmit an entire amended application for reconsideration, unless instructed by the Department to do otherwise. Submission of an amended application commences a new review period.

(3) Once the application is deemed complete, the Department shall provide notice of the application to the adjacent property owners, the local planning department, the local Soil and Water Conservation District, the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality, the Oregon Department of Land Conservation and Development, affected Tribal government, the State Historic Preservation Office, the Oregon Water Resources Department, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service and National Marine Fisheries Service. Diking and drainage districts shall also be notified as applicable. If the project is on a federally designated Wild and Scenic River, the Department shall provide notice to the appropriate U.S. Forest Service or Bureau of Land Management office.

(4) The Department shall consider comments received with fifteen (15) calendar days of the notice date. In the event a party fails to comment within the (15) calendar day period, the Department shall assume the party has no objection to the application.

(5) The Department may waive or shorten the comment period described in (4) above upon a showing by the applicant in the application that the interested parties listed in (3) have previously reviewed and approved the project.

(6) Following the comment period and not more than forty (40) calendar days from the receipt of an application, the Department will determine if the project meets the eligibility and mandatory requirements set out in this general authorization and do one of the following:

(a) Approve the application and issue a letter of authorization to the applicant;

(b) Approve the application and issue a letter of authorization, with project specific conditions, to the applicant; or

(c) Deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization, the applicant may submit the project for processing and review as an individual permit under OAR 141-085.

(7) The Department may require an individual permit for projects that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0300

Conditions of Issuance of General Authorization

All holders of a letter of authorization (authorization holder) shall adhere to the conditions of the general authorization.

(1) The authorization holder shall conduct all work in compliance with the comprehensive plan, zoning requirements or other local, state, or federal regulations pertaining to the project. Local land use planning department approval shall be obtained if the project is located within a Federal Emergency Management Agency designated floodway. All other necessary approvals and permits shall be obtained before commencing with the authorized project. All necessary approvals and permits shall be obtained before commencing the project under this general authorization.

(2) The authorization holder shall obtain all necessary access permits or rights-of-way prior to entering lands owned by another for the purposes of completing a project authorized under this general authorization.

(3) The authorization holder shall conduct the activity during the time period recommended by the Oregon Department of Fish and Wildlife, unless after consultation with ODFW, a waiver is granted by Department for a longer or alternative time period.

(4) The authorization holder shall ensure that the activity will not interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(5) When listed species are present, the authorization holder shall comply with the state and Federal Endangered Species Acts. If previously unknown listed species are encountered during the project, the authorization holder shall contact the Department as soon as possible.

(6) The authorization holder shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during construction, the authorization holder shall immediately cease work at the discovery site and contact the Department.

(7) The authorization holder shall ensure that the authorized work does not unreasonably interfere with or create a hazard to recreational navigation.

(8) The authorization holder shall ensure that woody vegetation removal is limited to the minimum amount needed to complete the project including construction access.

(9) The authorization holder shall ensure that areas disturbed in the course of completing the authorized work are stabilized with the appropriate erosion control best management practices and revegetated with the same mix of native herbs, shrubs and/or trees in approximately the same numeric proportion as were removed from the site, unless otherwise approved by the Department, except that grass seed mixes of exotics certified free of noxious weeds that will hold the soil and not persist are permitted.

(10) The authorization holder shall ensure that no petroleum products, chemicals or deleterious materials are allowed to enter the waters of the state.

(11) The authorized work shall not cause turbidity of affected waters to exceed natural background turbidity by more than 10 percent, as measured 100 feet downstream from the work area.

(a) If all appropriate erosion/turbidity control measures, as described in the ODEQ Erosion and Sediment Control Manual (April 2005), are in place and functioning properly then this standard may be exceeded, in each 24-hour period, for only:

(A) One 2-hour period in fast moving water (>2% stream bed gradient).

(B) One 4-hour period in slow moving water (<2% stream bed gradient).

(b) Turbidity shall be monitored at least 100 feet up stream of the current work area to obtain a natural background level and 100 feet down stream of the current work area, in the visible plume if one is present, unless otherwise approved by DSL after consulting with DEQ. A turbidimeter is recommended for measuring; however, visual observation is acceptable. If a turbidimeter is not used, turbidity that is visible over background at a distance of 100 feet down stream of the current work area is a violation of the permit conditions.

(c) Monitoring of turbidity shall take place during daylight hours each day of in-water work and every 2 hours in fast moving waters and every 4 hours in slow moving waters as described above in (a). A written record of turbidity monitoring shall be kept.

(d) If the levels of turbidity are elevated at the time of the first compliance-monitoring interval, all practicable erosion control measures should be implemented to reduce the levels of turbidity. If the levels of turbidity are in exceedance during the second monitoring interval, the activity causing the elevated levels of turbidity must cease until the levels of turbidity return to background.

(12) The authorization holder shall ensure that all applicable Department of Environmental Quality water quality requirements are adhered to and permits and certifications are obtained prior to commencing construction activities.

(13) If a 401 Water Quality Certification (WQC) is issued by DEQ in conjunction with a US Army Corps of Engineers 404 permit for the same project, the turbidity condition in the 401 WQC will replace the above listed turbidity language (a copy of the 401 Water Quality Certification shall be retained on site).

(14) For drainage ditch cleaning activities, the authorization holder shall comply with the following:

(a) Removal of existing woody vegetation, other than that growing within the maintained channel bed is prohibited;

(b) Only sand and silt sediments may be removed. This authorization is not for the removal of gravel;

(c) Erosion of disturbed areas (i.e., drainage ditch banks and work areas) shall be minimized through revegetation with grass and/or planting of trees and shrubs; and

(d) Removal shall be conducted with land-based equipment from one side of the drainage ditch unless specifically authorized by the Department.

(e) At any time excavated material is placed on adjacent dikes it shall be stabilized to eliminate erosion back into the drainage ditch.

(f) If excavated material is to be thinly spread over adjacent wetland, wet pasture, or farmed wetland, it is to be spread prior to the onset of winter rains, and controlled from eroding back into the drainage ditch.

(15) The authorization holder shall not remove and/or dispose of sediments in violation of the applicable state water quality standards.

(16) The authorization holder shall keep a copy of the letter of authorization available at the work site whenever the activity is being conducted.

(17) Employees of the Department and all duly authorized representatives shall be permitted access to the project area at all reasonable times for the purpose of inspecting work performed under this authorization.

(18) The Department makes no representation regarding the quality or adequacy of the project design, materials, construction, or maintenance, except to approve the project's design and materials as satisfying the resource protection, scenic, safety, recreation, and public access requirements of ORS Chapters 196 and related administrative rules.

(19) The State of Oregon, and its officers, agents, and employees shall be held harmless from any claim, suit, or action for property damage or personal injury or death arising out of the design, material, construction, or maintenance of the permitted improvements.

(20) The Department may add other project-specific conditions to the letter of authorization as necessary to meet the requirements of the general authorization. Such additional conditions may be needed to ensure that the project will cause only minimal individual and cumulative environmental impacts and will not result in long term harm to water resources of the state.

(21) The Department may, at any time, by notice to affected authorization holders revoke or modify any letter of authorization granted under this general authorization if it determines the conditions of the general authorization are insufficient to minimize individual or cumulative environmental impacts.

(22) The authorization holder is responsible for the activities of all contractors or other operators involved in project work covered by the letter of authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0305

Violation of General Authorization; Enforcement

Violations of the terms and conditions of this general authorization are subject to administrative and/or legal action, which may result in revocation of the authorization. The authorization holder is responsible for the activities of all contractors or other operators involved in work done at the site or under the authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03

141-089-0310

Appeals; Expiration; Review of General Authorization

(1) An applicant whose application for the general authorization is determined by the Department to be ineligible or otherwise not qualified for this general authorization may obtain an informal review of the Department's decision through the alternative dispute resolution process resolution process described in OAR 141-085-0075. However, this is only opportunity to review the Department's decision and does not give the person a right to a contested case hearing.

(2) No letter of authorization will be issued with an expiration date beyond January 1, 2011, at which time this general authorization will be reviewed in accordance with the provisions of ORS 196.850(5). An approval issued prior to expiration of this General Authorization shall remain in effect until January 1, 2012.

(3) Any activities authorized by a letter of authorization issued prior to January 1, 2006 are authorized until the activity is completed or until January 1, 2012, whichever comes first. All conditions of issuance continue to be in force. Activities authorized by this General Authorization that are not completed by January 1, 2012, shall require the submittal of a new application in order to complete the proposed activities. However, a one time 90 day extension will be allowed by the Department, if the applicant provides the Department with a written Notice that states that the activities authorized by this General Authorization will be completed within 90 days of January 1, 2012. The Department shall acknowledge and approve in writing the one time 90 day extension.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

General Authorization for Piling Placement or Removal Within Waters of the State
141-089-0400

Purpose and Applicability

(1) These rules set forth conditions under which an applicant may, without an individual removal-fill permit from the Department, place or remove piling in waters of the state including areas designated as Essential Indigenous Anadromous Salmonid Habitat (Essential Salmon Habitat as described in OAR 141-102) for such purposes as over-water structure support or navigational aid.

(2) A letter of authorization from the Department is required prior to any person commencing an activity authorized by this general authorization. The term and conditions of issuance shall be stated in the letter of authorization. The term shall not exceed the expiration date of this general authorization. A letter of authorization is transferable to another person in accordance with OAR 141-085-0034.

(3) This general authorization is made pursuant to ORS 196.850 and is based upon the determination that the authorized activities are similar in nature and when conducted in accordance with this general authorization rule will not result in long term harm to water resources of the state, and will cause only minimal individual and cumulative environmental impacts.

(4) This general authorization does not apply to activities or waters exempt from the removal-fill law as described in OAR 141-085-0016 and 0021.

(5) Other structures, uses or activities included in any application for this general authorization that are subject to another general authorization under OAR 141-089 or individual permit under OAR 141-085 will not be authorized or covered by this general authorization. An application encompassing multiple activities must be processed as an individual removal-fill permit under OAR 141-085.

(6) Unless otherwise specified, the terms used in this general authorization are defined in OAR 141-085-0011.

(7) Activities and/or projects, which qualify for this general authorization, are exempt from removal-fill permit fees as described in OAR 141-085-0064.

(8) In the event a dispute arises as to the applicability of this general authorization to any project application, the Department shall make the final determination. The Department shall rely upon the applicant's project application and supporting documentation for its decision.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0405

Eligibility Requirements; Ineligible Projects

(1) In order to issue a letter of authorization the Department shall determine that the project is eligible and meets the applicable mandatory requirements as described in this rule. To be eligible a project must:

(a) Be placement of no more than five (5) piles or one (1) dolphin consisting of three (3) to five (5) piles;

(b) Be individual piles and piles placed for over-water structure support (e.g., pile associated with docks, piers), mooring and turning dolphins, or navigational aids not otherwise exempt from the removal-fill law as described in OAR 141-085-0015 and 0020);

(c) Be untreated wood, steel, fiberglass or plastic piles;

(d) Be piles fitted with devices to effectively prevent perching by piscivorous bird species;

(e) Be placed from a barge-mounted or above top-of-bank position. If barge-mounted, barge shall not at any time be grounded on the bed or banks.

(f) Be placed by means of impact or vibratory methods or removed (to the extent regulated as material pursuant to OAR 141-085-0010 (125)) by means of vibratory method only.

(2) A project is not eligible for this general authorization if:

(a) Piling is placed to construct headwalls or other bank treatment structure;

(b) Piling is placed to create new uplands;

(c) Piling is sheetpile;

(d) Piling is placed or removed by excavation (including hydraulic jet method) of streambed or banks;

(e) Piling is placed in wetlands;

(f) Piling is placed so as to impede normal water flow into or within wetlands or deflect water in a manner that causes erosion;

(g) Piling is placed so as to interfere with, or create hazard to, recreational or commercial navigation;

(h) Piling is placed as poured-in-place concrete;

(i) The project includes placement of footings or other support structure for piling;

(j) The project application includes any structure, use or activity subject to another general authorization under OAR 141-089 or individual permits under OAR 141-085; or

(k) The project fails to meet any eligibility or mandatory requirements.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0410

Mandatory Requirements

The Department shall review each application to ensure that a project complies with the following mandatory standards:

(1) If the project is within a State Scenic Waterway, a scenic waterway removal-fill permit must have been obtained from the Department (unless otherwise exempt) in accordance with OAR 141-100.

(2) No pile shall be placed in excess of the minimum necessary to fulfill its essential purpose or function.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0415

Application Requirements; Public Notice; Review Process

(1) An application for general authorization under this rule shall be submitted on an application form available from the Department. A complete application is one that contains all the information required in the application packet provided by the Department.

(2) The Department shall notify the applicant within fifteen (15) calendar days of receipt of the application if the application is incomplete or ineligible; otherwise the application will be considered complete. If the application is deemed incomplete, the Department shall notify the applicant and identify the missing, inaccurate or insufficient information. The Department will not continue to process an incomplete application. To re-initiate the application review process the applicant may submit an amended application at any time within twelve (12) months of the original application date. The applicant must resubmit an entire amended application for reconsideration, unless instructed by the Department to do otherwise. Submission of an amended application commences a new review period.

(3) Once the application is deemed complete, the Department shall provide notice of the application to the adjacent property owners, the local planning department, the local Soil and Water Conservation District, the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality, the Oregon Department of Land Conservation and Development, affected Tribal government, the State Historic Preservation Office, the Oregon Water Resources Department, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service and National Marine Fisheries Service. Diking and drainage districts shall also be notified as applicable. If the project is on a federally designated Wild and Scenic River, the Department shall provide notice to the appropriate U.S. Forest Service or Bureau of Land Management office.

(4) The Department shall consider comments received with fifteen (15) calendar days of the notice date. In the event a party fails to comment within the (15) calendar day period, the Department shall assume the party has no objection to the application.

(5) The Department may waive or shorten the comment period described in (4) above upon a showing by the applicant in the application that the interested parties listed in (3) have previously reviewed and approved the project.

(6) Following the comment period and not more than forty (40) calendar days from the receipt of an application, the Department will determine if the project meets the eligibility and mandatory requirements set out in this general authorization and do one of the following:

(a) Approve the application and issue a letter of authorization to the applicant;

(b) Approve the application and issue a letter of authorization, with project specific conditions, to the applicant; or

(c) Deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization, the applicant may submit the project for processing and review as an individual removal-fill permit as provided in OAR 141-085.

(7) The Department may require an individual removal-fill permit for a project that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual removal-fill permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the affected local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0420

Conditions of Issuance of General Authorization

All holders of a letter of authorization (authorization holder) shall adhere to the conditions of the general authorization.

(1) The authorization holder shall conduct all work in compliance with the comprehensive plan, zoning requirements or other local, state, or federal regulations pertaining to the project. Local land use planning department approval shall be obtained if the project is located within a Federal Emergency Management Department designated floodway. All other necessary approvals and permits shall be obtained before commencing with the authorized project. All necessary approvals and permits shall be obtained before commencing the project under this general authorization.

(2) The authorization holder shall obtain all necessary access permits or rights-of-way prior to entering lands owned by another for the purposes of completing a project authorized under this general authorization.

(3) The authorization holder shall conduct the activity during the time period recommended by the Oregon Department of Fish and Wildlife, unless after consultation with ODFW, a waiver is granted by Department for a longer or alternative time period.

(4) The authorization holder shall ensure that the activity will not interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(5) When listed species are present, the authorization holder shall comply with the state and Federal Endangered Species Acts. If previously unknown listed species are encountered during the project, the authorization holder shall contact the Department as soon as possible.

(6) The authorization holder shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during construction, the authorization holder shall immediately cease work at the discovery site and contact the Department.

(7) The authorization holder shall ensure that the authorized work does not unreasonably interfere with or create a hazard to recreational navigation.

(8) The authorization holder shall not disturb or destroy woody vegetation to complete the project.

(9) The authorization holder shall ensure that no petroleum products, chemicals or deleterious materials are allowed to enter the waters of the state.

(10) The authorized work shall not cause turbidity of affected waters to exceed natural background turbidity by more than 10 percent, as measured 100 feet downstream from the work area.

(a) If all appropriate erosion/turbidity control measures, as described in the ODEQ Erosion and Sediment Control Manual (April 2005), are in place and functioning properly then this standard may be exceeded, in each 24-hour period, for only:

(A) One 2-hour period in fast moving water (>2% slope).

(B) One 4-hour period in slow moving water (<2% slope).

(b) Turbidity shall be monitored at least 100 feet up current of work area to obtain a natural background level and 100 feet down current of work area, in the visible plume if one is present, unless otherwise approved by DSL after consulting with DEQ. A turbidimeter is recommended for measuring; however, visual gauging is acceptable. If a turbidimeter is not used, turbidity that is visible over background at a distance of 100 feet down current of the work area is considered an exceedance of the standard.

(c) Compliance monitoring shall take place during daylight hours each day of in-water activity every 2 hours in fast moving waters and every 4 hours in slow moving waters. A written record of monitoring shall be kept.

(d) If the levels of turbidity are elevated at the time of the first compliance-monitoring interval, all practicable erosion control measures should be implemented to reduce the levels of turbidity. If the levels of turbidity are in exceedance during the second monitoring interval, the activity causing the elevated levels of turbidity must cease until the levels of turbidity return to background.

(11) The authorization holder shall ensure that all applicable Department of Environmental Quality water quality requirements are adhered to and permits and certifications are obtained prior to commencing construction activities.

(12) If a 401 Water Quality Certification (WQC) is issued by DEQ in conjunction with a US Army Corps of Engineers 404 permit for the same project, the turbidity condition in the 401 WQC will replace the above listed turbidity language (a copy of the 401 Water Quality Certification shall be retained on site).

(13) The authorization holder shall ensure that all structures are placed in a manner that does not increase the upland surface area.

(14) The authorization holder shall keep a copy of the letter of authorization available at the work site whenever the activity is being conducted.

(15) Employees of the Department and all duly authorized representatives shall be permitted access to the project area at all reasonable times for the purpose of inspecting work performed under this authorization.

(16) The Department makes no representation regarding the quality or adequacy of the project design, materials, construction, or maintenance, except to approve the project's design and materials as satisfying the resource protection, scenic, safety, recreation, and public access requirements of ORS Chapters 196 and related administrative rules.

(17) The State of Oregon, and its officers, agents, and employees shall be held harmless from any claim, suit, or action for property damage or personal injury or death arising out of the design, material, construction, or maintenance of the permitted improvements.

(18) The Department may add other project-specific conditions to the letter of authorization as necessary to meet the requirements of the general authorization. Such additional conditions may be needed to ensure that the project will cause only minimal individual and cumulative environmental impacts and will not result in long term harm to water resources of the state.

(19) The Department may, at any time, by notice to affected authorization holders revoke or modify any letter of authorization granted under this general authorization if it determines the conditions of the general authorization are insufficient to minimize individual or cumulative environmental impacts.

(20) The authorization holder is responsible for the activities of all contractors or other operators involved in project work covered by the letter of authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0425

Violation of General Authorization; Enforcement

Violations of the terms and conditions of any general authorization are subject to administrative and/or legal action, which may result in revocation of the authorization. The authorization holder is responsible for the activities of all contractors or other operators involved in work done at the site or under the authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03

141-089-0430

Appeals; Expiration; Review of General Authorization

(1) An applicant whose application for the general authorization is determined by the Department to be ineligible or otherwise not qualified for this general authorization may obtain an informal review of the Department's decision through the alternative dispute resolution process resolution process described in OAR 141-085-0077. However, this is only opportunity to review the Department's decision and does not give the person a right to a contested case hearing.

(2) This general authorization shall be reviewed by the Department on or before January 1, 2011, at which time it shall be modified, reissued or rescinded. The review will include public notice and opportunity for public hearing. An approval issued prior to expiration of this General Authorization shall remain in effect until January 1, 2012.

(3) Any activities authorized by a letter of authorization issued prior to January 1, 2006 are authorized until the activity is completed or until January 1, 2012, whichever comes first. All conditions of issuance continue to be in force. Activities authorized by this General Authorization that are not completed by January 1, 2012, shall require the submittal of a new application in order to complete the proposed activities. However, a one time 90 day extension will be allowed by the Department, if the applicant provides the Department with a written Notice that states that the activities authorized by this General Authorization will be completed within 90 days of January 1, 2012. The Department shall acknowledge and approve in writing the one time 90 day extension.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

General Authorization for Minimal Disturbance Activities (Less Than Two Cubic Yards) Within Essential Indigenous Anadromous Salmonid Habitat
141-089-0500

Purpose and Applicability

(1) These rules set forth the conditions under which an applicant may, without an individual removal-fill permit from the Director, place or remove very small quantities of material within designated essential indigenous anadromous salmonid habitat areas for projects that have only minimal, temporary short-term adverse effects and no mid-term or long-term adverse effects. For purposes of this General Authorization "project" means the same as defined in OAR 141-085-0010(165).

(2) An authorization from the Department is required prior to any person commencing an activity authorized by this general authorization. An applicant is authorized to commence an activity under this general authorization by submitting a complete application on a form provided by the Department and by agreeing to the eligibility requirements (OAR 141-089-0505), mandatory requirements (141-089-0510) and the conditions for issuance (131-089-0520). The term and conditions of issuance shall be stated in the authorization. The term shall not exceed the expiration date of this general authorization. The authorization is not transferable to another person.

(3) This general authorization is made pursuant to ORS 196.850 and is based upon the determination that the authorized activities are similar in nature and when conducted in accordance with this general authorization rule will not result in long term harm to water resources of the state, and will cause only minimal individual and cumulative environmental impacts.

(4) This general authorization does not apply to activities or waters exempt from the removal-fill law as described in OAR 141-085-0015 and 141-085-0020.

(5) Unless otherwise specified, the terms used in this general authorization are defined in OAR 141-085-0010.

(6) Activities and/or projects, which qualify for this general authorization, are exempt from removal-fill permit fees as described in OAR 141-085-0064.

(7) In the event a dispute arises as to the applicability of this general authorization to any project application, the Department shall make the final determination. The Department shall rely upon the applicant's project application and supporting documentation for its decision.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0505

Eligibility Requirements; Ineligible Projects

(1) In order to authorize an activity under this general authorization the Department shall determine that the project is eligible and meets the applicable mandatory requirements as described in this rule. To be eligible a project must:

(a) Have only minimal, temporary short-term adverse effects and no mid-term or long-term adverse effects;

(b) Place or remove not more than two cubic yards of material at any individual site and, cumulatively, not more than ten cubic yards of material within a designated essential indigenous anadromous salmonid habitat stream in a single project year;

(c) Have no effect on any listed species; and

(d) Have no effect on known archeological sites.

(2) Examples of eligible projects include, but are not limited to, the following:

(a) Investigative drilling to gather necessary technical data for designing building and/or road foundations;

(b) Installation of scientific measurement devices whose purpose is to measure and record scientific data such as staff gages, tide gages, water recording devices, water quality testing and improvement devices and similar structures;

(c) Limited surveys for historic resources.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0510

Mandatory Requirements

The Department shall review each application to ensure that a project complies with the following mandatory requirements: If the project is within a State Scenic Waterway, a scenic waterway removal-fill permit must have been obtained from the Department in accordance with OAR 141-100.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0515

Application Requirements; Review and Approval Process

(1) Any person proposing to conduct an activity covered by this general authorization shall submit an application to do so on a form available from the Department. A complete application is one that contains all the information required in the application packet provided by the Department.

(2) The Department will review the application for eligibility and compliance with the mandatory requirements.

(3) If the application is deemed incomplete or ineligible, the Department shall notify the applicant and identify the missing, inaccurate or insufficient information.

(4) If the Department determines that the application does not meet all the requirements for this general authorization, it shall deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization, the applicant may submit the project for processing and review as an individual permit under OAR 141-085.

(5) The Department may require an individual permit for projects that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0520

Conditions for Issuance of General Authorization

All persons conducting activities under this general authorization shall adhere to the conditions of the general authorization.

(1) The authorization holder shall conduct all work in compliance with the comprehensive plan, zoning requirements or other local, state, or federal regulations pertaining to the project. Local land use planning department approval shall be obtained if the project is located within a Federal Emergency Management Agency designated floodway. All other necessary approvals and permits shall be obtained before commencing with the authorized project. All necessary approvals and permits shall be obtained before commencing the project under this general authorization.

(2) The authorization holder shall obtain all necessary access permits or rights-of-way prior to entering lands owned by another for the purposes of completing a project authorized under this general authorization.

(3) The authorization holder shall conduct the activity during the time period recommended by the Oregon Department of Fish and Wildlife, unless after consultation with ODFW, a waiver is granted by Department for a longer or alternative time period.

(4) The authorization holder shall ensure that the activity will not interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(5) If previously unknown listed species are encountered during the project, the authorization holder shall immediately cease work and contact the Department as soon as possible. (continued)