CCLME.ORG - DIVISION 89 GENERAL AUTHORIZATIONS (General Authorization for Fish Habitat Enhancement)
Loading (50 kb)...'
(continued)

(3) Once the application is deemed complete, the Department shall provide notice of the application to the adjacent property owners, the local planning department, the local Soil and Water Conservation District, the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality, the Oregon Department of Land Conservation and Development, affected Tribal government, the State Historic Preservation Office, the Oregon Water Resources Department, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service and National Marine Fisheries Service. Diking and drainage districts shall also be notified as applicable. If the project is on a federally designated Wild and Scenic River, the Department shall provide notice to the appropriate U.S. Forest Service or Bureau of Land Management office.

(4) The Department shall consider comments received with fifteen (15) calendar days of the notice date. In the event a party fails to comment within the (15) calendar day period, the Department shall assume the party has no objection to the application.

(5) The Department may waive or shorten the comment period described in (4) above upon a showing by the applicant in the application that the interested parties listed in (3) have previously reviewed and approved the project.

(6) Following comment period and not more than forty (40) calendar days from the receipt of an application, the Department will determine if the project meets the eligibility requirements set out in this general authorization and do one of the following:

(a) Approve the application and issue a letter of authorization to the applicant;

(b) Approve the application and issue a letter of authorization, with project specific conditions, to the applicant; or

(c) Deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization the applicant may submit the project for processing and review as an application for an individual removal-fill permit, as provided in OAR 141-085.

(7) The Department may require an individual removal-fill permit for projects that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual removal-fill permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the affected local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0190

Conditions of Issuance of General Authorization

All holders of a letter of authorization (authorization holder) shall adhere to the conditions of the general authorization.

(1) The authorization holder shall conduct all work in compliance with the comprehensive plan, zoning requirements or other local, state, or federal regulations pertaining to the project. Local land use planning department approval shall be obtained if the project is located within a Federal Emergency Management Agency designated floodway. All other necessary approvals and permits shall be obtained before commencing with the authorized project. All necessary approvals and permits shall be obtained before commencing the project under this general authorization.

(2) The authorization holder shall obtain all necessary access permits or rights-of-way prior to entering lands owned by another for the purposes of completing a project authorized under this general authorization.

(3) The authorization holder shall conduct the activity during the time period recommended by the Oregon Department of Fish and Wildlife, unless after consultation with ODFW, a waiver is granted by Department for a longer or alternative time period.

(4) The authorization holder shall ensure that the activity will not interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(5) When listed species are present, the authorization holder shall comply with the state and Federal Endangered Species Acts. If previously unknown listed species are encountered during the project, the authorization holder shall contact the Department as soon as possible.

(6) The authorization holder shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during construction, the authorization holder shall immediately cease work at the discovery site and contact the Department.

(7) The authorization holder shall ensure that the authorized work does not unreasonably interfere with or create a hazard to recreational navigation.

(8) The authorization holder shall ensure that woody vegetation removal is limited to the minimum amount needed to complete the project including construction access and keying in of structures.

(9) The authorization holder shall ensure that areas disturbed in the course of completing the authorized work are revegetated with the same mix of native herbs, shrubs and/or trees in approximately the same numeric proportion as were removed from the site, unless otherwise approved by the Department, except that grass seed mixes of exotics certified free of noxious weeds that will hold the soil and not persist are permitted.

(10) The authorization holder shall ensure that no petroleum products, chemicals or deleterious materials are allowed to enter the waters of the state.

(11) The authorized work shall not cause turbidity of affected waters to exceed natural background turbidity by more than 10 percent, as measured 100 feet downstream from the work area.

(a) If all appropriate erosion/turbidity control measures, as described in the ODEQ Erosion and Sediment Control Manual (April 2005), are in place and functioning properly then this standard may be exceeded, in each 24-hour period, for only:

(A) One 2-hour period in fast moving water (>2% stream bed gradient).

(B) One 4-hour period in slow moving water (<2% stream bed gradient).

(b) Turbidity shall be monitored at least 100 feet up stream of the current work area to obtain a natural background level and 100 feet down stream of the current work area, in the visible plume if one is present, unless otherwise approved by DSL after consulting with DEQ. A turbidimeter is recommended for measuring; however, visual observation is acceptable. If a turbidimeter is not used, turbidity that is visible over background at a distance of 100 feet down stream of the current work area is a violation of the permit conditions.

(c) Monitoring of turbidity shall take place during daylight hours each day of in-water work and every 2 hours in fast moving waters and every 4 hours in slow moving waters as described above in (a). A written record of turbidity monitoring shall be kept.

(d) If the levels of turbidity are elevated at the time of the first compliance-monitoring interval,, all practicable erosion control measures should be implemented to reduce the levels of turbidity. If the levels of turbidity are in exceedance during the second monitoring interval, the activity causing the elevated levels of turbidity must cease until the levels of turbidity return to background.

(12) The authorization holder shall ensure that all applicable Department of Environmental Quality water quality requirements are adhered to and permits and certifications are obtained prior to commencing construction activities.

(13) If a 401 Water Quality Certification (WQC) is issued by DEQ in conjunction with a US Army Corps of Engineers 404 permit for the same project, the turbidity condition in the 401 WQC will replace the above listed turbidity language (a copy of the 401 Water Quality Certification shall be retained on site).

(14) Stormwater from any authorized activity, conveyed or discharged to a water of the state, including wetlands, must be treated by a facility specifically designed to remove stormwater contaminants before entering streams, wetlands, or other waters of the state, including mitigation wetlands, so as to minimize pollutants entering those water bodies.

(15) The authorization holder shall ensure that all structures are constructed using equipment operating outside the waterway or wetland unless otherwise approved by the Department as a part of the project plan.

(16) The authorization holder shall ensure that nonstructural approaches to bank stabilization such as slope pull-back, willow mats, rock barbs, revegetation with localized native plant species, log and boulder deflectors, are utilized unless otherwise approved by Department. Where, riprap and/or

other structural techniques are unavoidable, they shall be used in combination with nonstructural approaches. Where riprap is used, the toe material shall be placed in an irregular pattern using large boulders or rock clusters. Only clean, durable rock shall be used as riprap. No concrete or asphalt shall be used.

(17) In the case of road removal, the authorization holder shall ensure that all affected stream and bank areas are restored to their approximate original contour.

(18) The authorization holder shall keep a copy of the letter of authorization available at the work site whenever the activity is being conducted.

(19) Employees of the Department and all duly authorized representatives shall be permitted access to the project area at all reasonable times for the purpose of inspecting work performed under this authorization.

(20) The Department makes no representation regarding the quality or adequacy of the project design, materials, construction, or maintenance, except to approve the project's design and materials as satisfying the resource protection, scenic, safety, recreation, and public access requirements of ORS Chapters 196 and related administrative rules.

(21) The State of Oregon, and its officers, agents, and employees shall be held harmless from any claim, suit, or action for property damage or personal injury or death arising out of the design, material, construction, or maintenance of the permitted improvements.

(22) The Department may add other project-specific conditions to the letter of authorization as necessary to meet the requirements of the general authorization. Such additional conditions may be needed to ensure that the project will cause only minimal individual and cumulative environmental impacts and will not result in long term harm to water resources of the state.

(23) The Department may, at any time, by notice to affected authorization holders revoke or modify any letter of authorization granted under this general authorization if it determines the conditions of the general authorization are insufficient to minimize individual or cumulative environmental impacts.

(24) The authorization holder is responsible for the activities of all contractors or other operators involved in project work covered by the letter of authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0195

Violation of General Authorization; Enforcement

Violations of the terms and conditions of any general authorization are subject to administrative and/or legal action which may result in revocation of the authorization. The authorization holder is responsible for the activities of all contractors or other operators involved in work done at the site or under the authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03

141-089-0200

Appeals; Expiration; Review of General Authorization

(1) An applicant whose application for the general authorization is determined by the Department to be ineligible or otherwise not qualified for this general authorization may obtain an informal review of the Department's decision through the alternative dispute resolution process resolution process described in OAR 141-085-0075. However, this is only opportunity to review the Department's decision and does not give the person a right to a contested case hearing.

(2) This general authorization shall be reviewed by the Department on or before January 1, 2011, at which time it shall be modified, reissued or rescinded. The review will include public notice and opportunity for public informational hearing. An approval issued prior to expiration of this General Authorization shall remain in effect until January 1, 2012.

(3) Any activities authorized by a letter of authorization issued prior to January 1, 2006 are authorized until the activity is completed or until January 1, 2012, whichever comes first. All conditions of issuance continue to be in force. Activities authorized by this General Authorization that are not completed by January 1, 2012, shall require the submittal of a new application in order to complete the proposed activities. However, a one time 90 day extension will be allowed by the Department, if the applicant provides the Department with a written Notice that states that the activities authorized by this General Authorization will be completed within 90 days of January 1, 2012. The Department shall acknowledge and approve in writing the one time 90 day extension.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

General Authorization for Wetland Restoration and Enhancement
141-089-0205

Purpose and Applicability

(1) This rule sets forth conditions under which an applicant may, without an individual permit from the Department, place or remove material within waters of the state for the purposes of wetland restoration or enhancement as defined in OAR 141-085-0010.

(2) A letter of authorization from the Department is required prior to any person commencing an activity authorized by this general authorization. The term and conditions of issuance shall be stated in the letter of authorization. The term shall not exceed the expiration date of this general authorization. A letter of authorization is transferable to another person in accordance with OAR 141-085-0034.

(3) This general authorization is made pursuant to ORS 196.850 and is based upon the determination that the authorized activities are similar in nature and when conducted in accordance with this general authorization rule will not result in long term harm to water resources of the state, and will cause only minimal individual and cumulative environmental impacts.

(4) This general authorization does not apply to activities or waters exempt from the removal-fill law as described in OAR 141-085-0015 and 141-085-0020.

(5) Other structures, uses or activities included in any application for this general authorization that are subject to another general authorization under OAR 141-089 or individual permit under OAR 141-085 will not be authorized or covered by this general authorization. An application encompassing multiple activities must be processed as an individual removal-fill permit under OAR 141-085, except a single application for activities eligible for General Authorizations for Fish Enhancement and Wetland Restoration and Enhancement may be used in combination to authorize the same project.

(6) Unless otherwise specified, the terms used in this general authorization are defined in OAR 141-085-0010.

(7) Activities and/or projects, which qualify for this general authorization, are exempt from removal-fill permit fees as described in OAR 141-085-0064.

(8) In the event a dispute arises as to the applicability of this general authorization to any project application, the Department shall make the final determination. The Department shall rely upon the applicant's project application and supporting documentation for its decision.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0210

Eligibility Requirements; Ineligible Projects

(1) In order to issue a letter of authorization the Department shall determine that the project is eligible and meets the applicable mandatory requirements as described in this rule. To be eligible a project must:

(a) Be constructed for the specific purpose of restoring or enhancing a wetland such as a project developed and funded by the Wetland Reserve Program, the Oregon Conservation Reserve Enhancement Program, Coastal Wetlands Protection and Enhancement Program or the North American Waterfowl Conservation Act; and

(b) Restore wetland types historically found in the region; and

(c) Restore or enhance wetland functional attributes such as fish and wildlife habitat, water quality and quantity; or

(d) Support the purposes of waterfowl or wetland management within a state or federally designated management area as identified in a management plan for the area.

(2) A project is not eligible for this general authorization if:

(a) The project fails to meet any eligibility or mandatory requirements.

(b) The project application includes any structure, use or activity subject to another general authorization under OAR 141-089 or individual permits under OAR 141-085 except as provided for in OAR 141-089-0100(6) Fish Habitat Enhancement.

(c) The project is proposed primarily for the purpose of storm or waste water management, stock ponds, or aquaculture; or

(d) The project is proposed for the purpose of complying with the requirements of compensatory wetland mitigation under OAR 141-085 unless the project is included in a Wetland Conservation Plan approved by the Department under ORS 196.678; or

(e) The project is for restoring a wetland previously constructed, restored or enhanced for the purpose of complying with the requirements for compensatory wetland mitigation under OAR 141-085; or

(f) The project is proposed within a Wetland Conservation Plan area and is not in conformance with the approved plan; or

(g) The project is designed to restore or enhance wetlands used as amenities in golf courses, subdivisions or similar settings where their purpose is primarily aesthetic.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0215

Mandatory Requirements

The Department shall review each application to ensure that a project complies with the following mandatory requirements:

(1) The project shall have only minimal adverse impact to existing wetlands and result in a measurable increase in wetland functional attributes;

(2) The project may not include clearing or removal of trees from forested wetlands to convert the forested wetland to emergent or open water wetlands, unless the resultant wetland type was historically abundant but currently scarce within the basin;

(3) If the project is within a State Scenic Waterway, a scenic waterway removal-fill permit must have been obtained from the Department in accordance with OAR 141-100.

(4) When necessary to protect and conserve the water resources of the state, the Department may waive and/or modify any conflicting guidelines, mandatory requirements or conditions in either the Fish Habitat Enhancement or Wetland Restoration and Enhancement General Authorizations.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0220

Project Guidelines

(1) The wetland restoration or enhancement project should use techniques identified in An Introduction and Users' Guide to Wetland Restoration, Creation and Enhancement developed by the Interagency Work Group on Wetland Restoration.

(2) The following activities are specifically allowed under this general authorization:

(a) Water diversion structures. Water diversion structures may be used to direct flow into restoration or enhancement sites. The diversion structure will be consistent with the fish passage and screening requirements of ODFW.

(b) Water impoundment structures. Water depth, duration and degree of fluctuation in the restored wetland should be characteristic of similar wetlands in the eco-region. Water control structures may be used to manipulate water levels to simulate historical conditions, including complete drying out of the wetland.

(c) Dikes and ditches. Dikes and/or ditches may be altered or constructed. Relocating existing dikes to expand the floodplain and enlarge wetlands is an appropriate use of this general authorization. All spoil materials should be removed from the wetland or floodplain portion of the wetland site, but some material may be used within the restoration area as long as it assists in accomplishing the objectives of the restoration. Dike and levee slopes should be constructed at between 6:1 and 20:1 unless the wetland site does not allow it due to shape/size.

(d) Dike removal or breaching. For the purposes of restoring seasonal, tidal or other periodic flooding or saturation, dikes may be removed or breached under this General Authorization. Any breach should be sized sufficiently to prevent hydraulic interference in tidal and/or other flooding and to prevent scour. Dike material may be used in the restoration project or moved to an offsite, upland location.

(e) Filling of drainage ditches and or removal of drain tile. Drainage ditches may be filled and drain tile removed or broken under this general authorization.

(f) Streambank excavation. Expanding the surface area of areas subject to seasonal inundation in order to expand the wetland fringes of adjacent wetland areas by removal of bank material may be authorized under this general authorization.

(g) Surface excavation and recontouring. Restoring the uneven topographic surface to lands that have been subject to excavation and historical degradation may be authorized. All materials removed must be placed on uplands.

(h) Blasting. Blasting to create depressions or recreate habitat channels is allowed. A blasting permit may be required by the Oregon Department of Fish and Wildlife.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0225

Application Requirements; Public Notice; Review Process

(1) An application for general authorization under this rule shall be submitted on an application form available from the Department. A complete application is one that contains all the information required in the application packet provided by the Department.

(2) The Department shall notify the applicant within fifteen (15) calendar days of receipt of the application if the application is incomplete or ineligible; otherwise the application will be considered complete. If the application is deemed incomplete, the Department shall notify the applicant and identify the missing, inaccurate or insufficient information. The Department will not continue to process an incomplete application. To re-initiate the application review process the applicant may submit an amended application at any time within twelve (12) months of the original application date. The applicant must resubmit an entire amended application for reconsideration, unless instructed by the Department to do otherwise. Submission of an amended application commences a new review period.

(3) Once the application is deemed complete, the Department shall provide notice of the application to the adjacent property owners, the local planning department, the local Soil and Water Conservation District, the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality, the Oregon Department of Land Conservation and Development, affected Tribal government, the State Historic Preservation Office, the Oregon Water Resources Department, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service and National Marine Fisheries Service. Diking and drainage districts shall also be notified as applicable. If the project is on a federally designated Wild and Scenic River, the Department shall provide notice to the appropriate U.S. Forest Service or Bureau of Land Management office.

(4) The Department shall consider comments received with fifteen (15) calendar days of the notice date. In the event a party fails to comment within the (15) calendar day period, the Department shall assume the party has no objection to the application.

(5) The Department may waive or shorten the comment period described in (4) above upon a showing by the applicant in the application that the interested parties listed in (3) have previously reviewed and approved the project.

(6) Following the comment period and not more than forty (40) calendar days from the receipt of an application, the Department will determine if the project meets the eligibility and mandatory requirements set out in this general authorization and do one of the following:

(a) Approve the application and issue a letter of authorization to the applicant;

(b) Approve the application and issue a letter of authorization, with project specific conditions, to the applicant; or

(c) Deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization, the applicant may submit the project for processing and review as an individual permit under OAR 141-085.

(7) The Department may require an individual permit for projects that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0230

Conditions for Issuance of General Authorization

All holders of a letter of authorization (authorization holder) shall adhere to the conditions of the general authorization.

(1) The authorization holder shall conduct all work in compliance with the comprehensive plan, zoning requirements or other local, state, or federal regulations pertaining to the project. Local land use planning department approval shall be obtained if the project is located within a Federal Emergency Management Agency designated floodway. All other necessary approvals and permits shall be obtained before commencing with the authorized project. All necessary approvals and permits shall be obtained before commencing the project under this general authorization.

(2) The authorization holder shall obtain all necessary access permits or rights-of-way prior to entering lands owned by another for the purposes of completing a project authorized under this general authorization.

(3) The authorization holder shall conduct the activity during the time period recommended by the Oregon Department of Fish and Wildlife, unless after consultation with ODFW, a waiver is granted by Department for a longer or alternative time period.

(4) The authorization holder shall ensure that the activity will not interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(5) When listed species are present, the authorization holder shall comply with the state and Federal Endangered Species Acts. If previously unknown listed species are encountered during the project, the authorization holder shall contact the Department as soon as possible.

(6) The authorization holder shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during construction, the authorization holder shall immediately cease work at the discovery site and contact the Department.

(7) The authorization holder shall ensure that the authorized work does not unreasonably interfere with or create a hazard to recreational navigation.

(8) The authorization holder shall ensure that woody vegetation removal is limited to the minimum amount needed to complete the project including construction access and keying in of structures.

(9) The authorization holder shall ensure that areas disturbed in the course of completing the authorized work are revegetated with the same mix of native herbs, shrubs and/or trees in approximately the same numeric proportion as were removed from the site, unless otherwise approved by the Department, except that grass seed mixes of exotics certified free of noxious weeds that will hold the soil and not persist are permitted.

(10) The authorization holder shall ensure that no petroleum products, chemicals or deleterious materials are allowed to enter the waters of the state.

(11) The authorized work shall not cause turbidity of affected waters to exceed natural background turbidity by more than 10 percent, as measured 100 feet downstream from the work area.

(a) If all appropriate erosion/turbidity control measures, as described in the ODEQ Erosion and Sediment Control Manual (April 2005), are in place and functioning properly then this standard may be exceeded, in each 24-hour period, for only:

(A) One 2-hour period in fast moving water (>2% stream bed gradient).

(B) One 4-hour period in slow moving water (<2% stream bed gradient).

(b) Turbidity shall be monitored at least 100 feet up stream of the current work area to obtain a natural background level and 100 feet down stream of the current work area, in the visible plume if one is present, unless otherwise approved by DSL after consulting with DEQ. A turbidimeter is recommended for measuring; however, visual observation is acceptable. If a turbidimeter is not used, turbidity that is visible over background at a distance of 100 feet down stream of the current work area is a violation of the permit conditions.

(c) Monitoring of turbidity shall take place during daylight hours each day of in-water work and every 2 hours in fast moving waters and every 4 hours in slow moving waters as described above in (a). A written record of turbidity monitoring shall be kept.

(d) If the levels of turbidity are elevated at the time of the first compliance-monitoring interval, all practicable erosion control measures should be implemented to reduce the levels of turbidity. If the levels of turbidity are in exceedance during the second monitoring interval, the activity causing the elevated levels of turbidity must cease until the levels of turbidity return to background.

(12) The authorization holder shall ensure that all applicable Department of Environmental Quality water quality requirements are adhered to and permits and certifications are obtained prior to commencing construction activities.

(13) If a 401 Water Quality Certification (WQC) is issued by DEQ in conjunction with a US Army Corps of Engineers 404 permit for the same project, the turbidity condition in the 401 WQC will replace the above listed turbidity language (a copy of the 401 Water Quality Certification shall be retained on site).

(15) The authorization holder shall provide a vegetated buffer of at least 50 feet to be maintained on uplands adjacent to the wetland enhancement or restoration project area, unless otherwise authorized by the Department.

(16) Upon completion of the project, the project shall be reported to the Oregon Watershed Enhancement Board and the Department on a Restoration Inventory Report form provided by the Department.

(17) The authorization holder shall keep a copy of the letter of authorization available at the work site whenever the activity is being conducted.

(18) Employees of the Department and all duly authorized representatives shall be permitted access to the project area at all reasonable times for the purpose of inspecting work performed under this authorization.

(19) The Department makes no representation regarding the quality or adequacy of the project design, materials, construction, or maintenance, except to approve the project's design and materials as satisfying the resource protection, scenic, safety, recreation, and public access requirements of ORS Chapters 196 and related administrative rules.

(20) The State of Oregon, and its officers, agents, and employees shall be held harmless from any claim, suit, or action for property damage or personal injury or death arising out of the design, material, construction, or maintenance of the permitted improvements.

(21) The Department may add other project-specific conditions to the letter of authorization as necessary to meet the requirements of the general authorization. Such additional conditions may be needed to ensure that the project will cause only minimal individual and cumulative environmental impacts and will not result in long term harm to water resources of the state.

(22) The Department may, at any time, by notice to affected authorization holders revoke or modify any letter of authorization granted under this general authorization if it determines the conditions of the general authorization are insufficient to minimize individual or cumulative environmental impacts.

(23) The authorization holder is responsible for the activities of all contractors or other operators involved in project work covered by the letter of authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0235

Violation of General Authorization; Enforcement

Violations of the terms and conditions of this general authorization are subject to administrative and/or legal action, which may result in revocation of the authorization. The authorization holder is responsible for the activities of all contractors or other operators involved in work done at the site or under the authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03

141-089-0240

Appeals; Expiration; Review of General Authorization

(1) An applicant whose application for the general authorization is determined by the Department to be ineligible or otherwise not qualified for this general authorization may obtain an informal review of the Department's decision through the alternative dispute resolution process resolution process described in OAR 141-085-0075. However, this is only opportunity to review the Department's decision and does not give the person a right to a contested case hearing.

(2) This general authorization shall be reviewed by the Department on or before January 1, 2011, at which time it shall be modified, reissued or rescinded. The review will include public notice and opportunity for public informational hearing. An approval issued prior to expiration of this General Authorization shall remain in effect until January 1, 2012.

(3) Any activities authorized by a letter of authorization issued prior to January 1, 2006 are authorized until the activity is completed or until January 1, 2012, whichever comes first. All conditions of issuance continue to be in force. Activities authorized by this General Authorization that are not completed by January 1, 2012, shall require the submittal of a new application in order to complete the proposed activities. However, a one time 90 day extension will be allowed by the Department, if the applicant provides the Department with a written Notice that states that the activities authorized by this General Authorization will be completed within 90 days of January 1, 2012. The Department shall acknowledge and approve in writing the one time 90 day extension.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

General Authorization for Recreational and Small Scale Placer Mining Within Essential Indigenous Anadromous Salmonid Habitat (Essential Salmon Habitat)
141-089-0245

Purpose and Applicability

(1) These rules set forth conditions under which an applicant may, without an individual removal-fill permit from the Department, place (fill), remove (removal), alter material in waters of the state within areas designated as Essential Indigenous Anadromous Salmonid Habitat (Essential Salmon Habitat as described in OAR 141-102) for the purposes of recreational and small scale placer mining.

(2) "Prospecting" as defined by law and OAR 141-085-0010; "non-motorized methods" as defined in OAR 141-085-0010; and "Highbanking" as defined in OAR 141-085-0010, conducted beyond the jurisdiction of the removal-fill law, as described in OAR 141-085-0015 are all activities exempt from regulation under the removal-fill law, OAR 141-085 and this general authorization.

(3) A letter of authorization from the Department is required prior to any person commencing an activity authorized by this general authorization. The term and conditions of issuance shall be stated in the letter of authorization. The term shall not exceed the expiration date of this general authorization. This letter of authorization is not transferable to another person.

(4) This general authorization is made pursuant to ORS 196.850 and is based upon the determination that the authorized activities are similar in nature and when conducted in accordance with this general authorization rule will not result in long term harm to water resources of the state, and will cause only minimal individual and cumulative environmental impacts.

(5) This general authorization does not apply to activities or waters exempt from the removal-fill law as described in OAR 141-085-0015 and 141-085-0020.

(6) This general authorization is exclusive to recreational and small scale placer mining.

(7) Other structures, uses or activities included in any application for this general authorization that are subject to another general authorization under OAR 141-089 or individual permit under OAR 141-085 will not be authorized or covered by this general authorization. An application encompassing multiple activities must be processed as an individual removal-fill permit under OAR 141-085.

(8) Unless otherwise specified, the terms used in this general authorization are defined in OAR 141-085-0010.

(9) Activities and/or projects, which qualify for this general authorization, are exempt from removal-fill permit fees as described in OAR 141-085-0064.

(10) In the event a dispute arises as to the applicability of this general authorization to any project application, the Department shall make the final determination. The Department shall rely upon the applicant's project application and supporting documentation for its decision.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0250

Eligibility Requirements; Ineligible Projects

(1) In order to issue a letter of authorization the Department shall determine that the project is eligible and meets the applicable mandatory requirements as described in this rule. To be eligible a project must:

(a) Be for the specific purpose of recreational or small scale placer mining;

(b) Be conducted within Essential Salmon Habitat; and

(c) Remove, fill or alter less than twenty-five (25) cubic yards of material annually from the bed of a stream designated as Essential Salmon Habitat; and

(2) A project is not eligible for this general authorization if:

(a) The project does not meet the eligibility and mandatory requirements;

(b) The project involves the construction of permanent dams; or

(c) The project involves excavation from the streambank.

(d) The project involves the use of a suction dredge within a Scenic Waterway.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0255

Mandatory Requirements

The Department shall review each application to ensure that a project complies with the following mandatory requirements: If the project is within a state Scenic Waterway the use of a suction dredge is not permitted.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0260

Application Requirements; Review and Approval Process

(1) An application for a general authorization under this rule shall be submitted on an application form available from the Department. A complete application is one that contains all the information required in the application packet provided by the Department.

(2) Within ten (10) calendar days of receipt of an application, the Department will review the application for eligibility and compliance with the mandatory requirements and notify the applicant of approval, denial, or modification.

(3) If the application is deemed incomplete, the Department shall notify the applicant, return the application and identify the missing, inaccurate or insufficient information.

(4) If the Department determines that the application meets all the requirements for this general authorization, it shall do one of the following:

(a) Approve the application and issue a letter of authorization to the applicant;

(b) Approve the application and issue a letter of authorization, with project specific conditions, to the applicant; or

(c) Deny the application and notify the applicant. If the Department determines that the proposed project is ineligible or otherwise does not qualify for the general authorization, the applicant may submit the project for processing and review as an individual permit under OAR 141-085.

(5) The Department may require an individual permit for projects that would otherwise be authorized by this general authorization, if the Department determines that the activity might cause more than minimal individual or cumulative environmental impacts or might result in long-term harm to the water resources of the state. The Department may also require an individual permit if requested to do so by the Oregon Department of Fish and Wildlife, the Oregon Department of Environmental Quality or the local land use planning department.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04

141-089-0265

Conditions of Issuance of General Authorization

All holders of a letter of authorization (authorization holder) shall adhere to the conditions of the general authorization.

(1) An authorization holder may construct a temporary low rise dam if the structure:

(a) Does not extend across the entire width of waterway, and allows the free passage of water in an amount sufficient to enable fish to travel unimpeded up and down the stream;

(b) Creates only the minimal area of impounded water necessary to operate the dredge; and

(c) Is removed upon completion of the mining activity unless otherwise instructed by the Department.

(2) The general authorization does not allow nozzling, sluicing, or digging to occur outside the wet perimeter, nor extend the wet perimeter.

(3) The general authorization does not allow disturbance of rooted or embedded woody plants including trees and shrubs, regardless of their location (for example, on gravel bars).

(4) The general authorization does not allow movement of boulders, logs, stumps, or other woody material from within the wet perimeter other than movement by hand and non-motorized equipment.

(5) The general authorization requires that the authorization holder upon completion of the project, and to the greatest extent possible, level all piles outside the main channel of the waterway created by the activity. In addition, all furrows, potholes, or other depressions outside the main channel of the waterway created by the activity shall, if practical, have at least one open side to prevent fish entrapment as the water level falls.

(6) The authorization holder shall obtain landowner permission before operating on public or private property.

(7) If the authorization holder intends to use a motorized suction dredge, a suction dredge waste discharge permit (700 PM) from the Department of Environmental Quality, must be obtained, as applicable.

(8) The authorization holder shall conduct the activity only during the recommended in-water work period identified in the Oregon Department of Fish and Wildlife's "Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife Resources", unless after consultation with ODFW, a waiver is granted by the Department for a longer or alternative time period.

(9) The authorization holder shall not allow petroleum products, chemicals or deleterious materials to enter the water.

(10) The authorization holder shall ensure that all applicable Department of Environmental Quality water quality requirements are adhered to and permits and certifications are obtained prior to commencing construction activities.

(11) The authorization holder must ensure that the activity complies with other applicable local, state, and federal laws and regulations, including the state and federal Endangered Species Act.

(12) The authorization holder shall not allow the project to interfere with fish passage, as required by the Oregon Department of Fish and Wildlife.

(13) The authorization holder shall adhere to the following conditions:

(a) The activity shall not impede recreational boating.

(b) Use of motorized suction dredges shall be restricted to the hours between 8 a.m. and 6 p.m. within five hundred (500) feet of a residence or within five hundred (500) feet of a campground except within a federally designated recreational mining site.

(c) The activity shall not occur within the marked or posted swimming area of a designated campground or day use area except within a federally designated recreational mining site.

(14) The authorization holder shall report, on a form provided by the Department, the estimated amount of material removed, placed, or altered in each waterway operated in during the preceding calendar year. The Department must receive this report no later than January 31st of each year that this general authorization is valid.

(15) The project shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during the authorized activity, the authorization holder shall immediately cease work at the discovery site and contact the Department.

(16) The Department may, at any time, by notice to affected authorization holders revoke or modify any letter of authorization granted under this general authorization if it determines the conditions of the general authorization are insufficient to minimize individual or cumulative environmental impacts.

(17) The authorization holder shall keep a copy of the letter of authorization available at the work site whenever the activity is being conducted.

(18) Employees of the Department and all duly authorized representatives shall be permitted access to the project area at all reasonable times for the purpose of inspecting work performed under this authorization.

(19) The Department may add other project-specific conditions to the letter of authorization as necessary to meet the requirements of the general authorization. Such additional conditions may be needed to ensure that the project will cause only minimal individual and cumulative environmental impacts and will not result in long term harm to water resources of the state.

(20) The authorization holder is responsible for the activities of all contractors or other operators involved in project work covered by the letter of authorization.

Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990 & 390.805 - 390.925
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 5-2005, f. 12-30-05, cert. ef.1-3-06

141-089-0270

Violation of Authorization; EnforcementViolations of the terms and conditions of this general authorization are subject to administrative and/or legal action, which may result in revocation of the authorization. The authorization holder is responsible for the activities of all contractors or other operators involved in work done at the site or under the authorization. (continued)