(continued)
(5) An applicant may withdraw an application at any time prior to the permit decision. The notice of withdrawal must be in writing to the Department.
(6) Public Review Notice Process. Once the application has been deemed complete in accordance with OAR 141-085-0027 and the fee has been received, the Department shall provide notification of the availability of the application for review to:
(a) Adjacent property owners;
(b) Watershed Councils and public interest groups who have indicated a desire to receive such notices;
(c) Affected local government land use planning and zoning departments;
(d) Local and State agencies, including but not limited to: irrigation, diking and drainage districts, Soil and Water Conservation Districts, Oregon Department of Fish and Wildlife, Oregon Department of Environmental Quality, Oregon Department of Land Conservation and Development, Oregon Department of Agriculture, Oregon Water Resources Department, Oregon Department of Economic Development, Oregon State Parks and Recreation Department, Oregon State Historic Preservation Office, Oregon Natural Heritage Program and the Oregon Department of Geology and Mineral Industries;
(e) Federal agencies, including but not limited to: U.S. Army Corps of Engineers (Portland District), Environmental Protection Agency Department, U.S. Fish and Wildlife Service, National Marine Fisheries Service, NOAA-Fisheries, any affected unit of the U.S. Forest Service or Bureau of Land Management; and
(f) Affected Tribal governments.
(7) The notification of the availability of the application for review may be provided by U.S. mail or electronically (e.g. facsimile, e-mail, posting on the Internet).
(8) The Department shall furnish to any member of the public (persons not listed in OAR 141-085-0028(8)) upon written request and at the expense of the member of the public a printed copy of any application. The application will also be available for review at the Department office nearest the project location.
(9) The Department will review and consider substantive comments of local, state, and federal agencies, adjacent property owners, public interest groups, Tribal governments and individuals as well as conduct any necessary investigations to develop a factual basis for a permit decision. The Department may schedule a permit review coordination meeting with interested agencies/groups and the applicant to: clarify the review standards and process requirements; provide the applicant an opportunity to explain the project; and to identify issues. At the Department's discretion, the Department may hold a public hearing when necessary to gather information necessary to make a decision.
(10) All recommendations and comments regarding the application shall be submitted in writing to the Department within the period established by the Department, but not more than thirty (30) calendar days from the date of the notice. However, the Department of Environmental Quality shall comment within seventy-five (75) calendar days from the date of notice to comment if the application requires certification under the Federal Water Pollution Control Act (P.L. 92-500) as amended (i.e. 401 certification), unless the Department, based on a written request from the Director of the Department of Environmental Quality, grants an extension of time or as otherwise agreed to in an intergovernmental agreement between Department of Environmental Quality and the Department. In no case shall the extension granted be in excess of one year. If an agency or unit of government fails to comment on the application within the comment period, the Department shall assume the agency or other unit of government has no objection to the project.
(11) Applicant Response to Comments.
(a) Comments resulting from the public review process shall be forwarded to the applicant within seven (7) calendar days of the conclusion of the comment period.
(b) The applicant may, at his or her discretion, respond to public and agency comments. The response may be in the form of:
(A) Additional information to support the application; and/or
(B) Revisions to the project that address the comments and become part of the application.
(c) If no response is received from the applicant the Department will presume that the applicant intends to provide no additional supporting information or revisions to the application.
(d) The applicant may make a request, either orally or in writing, for additional time to respond to comments, and the Department shall agree to any extension of the time allowed to make a permit decision as described in OAR 141-085-0028(1).
(12) Supplemental Information. The Department may, as a result of the public review process and/or the Department's investigations, request that the applicant voluntarily submit supplemental information prior to the Department making the permit decision. The Department shall state the reason for requesting the additional information and why it is relevant to the permit decision.
(13) All documents in the applicant's permit file kept by the Department, unless otherwise restricted by law, shall be available for review by the applicant upon request and at reasonable times and location.
Stat. Auth.: ORS 196.815, 196.825 & 196.845
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 2-2003(Temp) f. & cert. ef. 11-26-03 thru 5-23-04; DSL 1-2004, f. & cert. ef. 5-21-04
141-085-0029
Review Standards and Permit Conditions for Individual Removal-Fill Authorizations
(1) In order to meet the requirements of OAR 141-085-0006(1), ORS 196.805 and 196.825 the Department shall evaluate the information provided in the application; conduct its own investigation; and review and consider the comments submitted during the public review process in order to apply the following standards to determine whether or not to issue an individual removal-fill authorization.
(2) Effective Date of Review Standards The Department may consider only standards and criteria in effect on the date the Department receives the complete application or renewal request (OAR 141-085-0036).
(3) Considerations for Approval To issue an individual removal-fill permit the Department must determine that the proposed removal-fill activity will not be inconsistent with the protection, conservation and best use of the water resources of this state and would not unreasonably interfere with the paramount public policy of this state to preserve the use of its waters for navigation, fishing and public recreation, by:
(a) Considering the public need for the project including the social, economic or other public benefits likely to result from the project. If the applicant is a public body, the Department may rely on the public body's findings as to local public need and benefit;
(b) Considering the economic cost to the public if the project is not accomplished;
(c) Considering whether the project would interfere with public health and safety;
(d) Considering whether the project is compatible with the local comprehensive land use plan. The Department will not issue an individual removal-fill permit for a project that is not consistent or compatible with the local comprehensive land use plan and/or zoning ordinance. The Department may issue an individual removal-fill permit requiring the applicant to obtain local land use approval prior to beginning the authorized activity;
(e) Determining the degree to which, if at all, the project, will unreasonably interfere with navigation, fishing and public recreation uses of the waters of the state;
(f) Considering the degree to which, if at all, the project will increase erosion or flooding upstream and downstream of the project or redirect water from the project site onto adjacent nearby lands.
(g) Considering the practicable alternatives for the project in accordance with (4) as presented in the application; and
(h) Considering practicable mitigation (including compensatory mitigation) for all reasonably expected adverse impacts of project development, as required by subsection (5).
(4) Alternatives Analysis The Department will issue a permit only upon the Department's determination that a fill or removal project represents the practicable alternative that would have the least adverse effects on the water resources and navigation, fishing and public recreation uses.
(5) In determining whether or not an alternative might be the practicable alternative with the least adverse effects, the Department will consider the type, size and relative cost of the project, the condition of the water resources, and navigation, fishing and public recreation uses as depicted in the application. The financial capabilities of the applicant are not the primary consideration. The basic project purpose, logistics, use of available technology and what constitutes a reasonable project expense are the most relevant factors in determining the most practicable alternative. The applicant bears the burden of providing the Department with all information necessary to make this determination.
(6) An alternatives analysis is required for all estuarine fills. No authorizations may be issued for a substantial fill in an estuary for a non-water dependent use unless the following apply:
(a) The fill is for a public use;
(b) The fill satisfies a public need that outweighs the harm, if any, to navigation, fishery and recreation; and
(c) The project meets all other review standards of these rules.
(7) Mitigation The Department will only issue an individual removal-fill permit for the practicable alternative with the least adverse effects to the water resources upon the Department's determination that the project includes appropriate and practicable steps to reduce (mitigate) reasonably expected adverse impacts of the project to the water resources and navigation, fishing and public recreation uses. Mitigation shall be considered in the following sequence:
(a) Avoidance. The Department shall first consider whether the project can be accomplished by avoiding removing material or placing fill material in or on waters of the state altogether (e.g., by moving the location of a proposed structure, either on-site or off-site, to avoid filling wetlands);
(b) Minimization. If the Department determines that the project cannot be accomplished without adverse impacts to water resources and/or navigation, fishing and public recreation uses, the Department shall then consider whether limiting the degree or magnitude of the removal fill and its implementation can minimize adverse impacts (e.g., bio-engineered and non-structural streambank stabilization techniques, such as bank sloping and revegetation, shall be installed instead of solutions relying primarily on concrete and riprap, whenever technically feasible, suitable and environmentally preferable);
(c) Rectification. If the Department determines that project impacts to the waters of the state cannot be further minimized, the Department shall then consider whether repairing, rehabilitating or restoring (e.g., restoring site conditions along a pipeline corridor after installation is complete) the removal fill impact area can rectify the impact;
(d) Reduction or elimination. When removal fill impacts have been minimized and rectified to the maximum extent practicable, the Department will consider whether the impacts can be further reduced or eliminated over time by monitoring and taking appropriate corrective measures (e.g., assure that site restoration methods have effectively revegetated the site); and
(e) Compensation. The Department shall then consider how the applicant's project would compensate for reasonably expected adverse impacts of project development by replacing or providing comparable substitute wetland or water resources and/or navigation, fishing and public recreation uses. Compensatory mitigation may not be used as a method to reduce environmental impacts in the evaluation of practicable alternatives.
(8) Direct and Indirect Effects The Department shall impose conditions that mitigate the direct effects of project development and conditions that mitigate the indirect effects that reach beyond the immediate project area (e.g., a condition requiring that equipment must be washed down away from any wetland) when necessary to mitigate the reasonably expected adverse impacts of project development to waters of the state.
(9) Permit Conditions If the project meets the requirements of this section, the Department shall impose applicable general conditions in order to reduce or eliminate the reasonably expected adverse impacts of project development to waters of the state.. The Department may also require additional, site-specific and/or project-specific conditions, or may modify these general conditions, as listed below, as appropriate:
(a) Conditions to assure compliance with state water quality and toxic effluent standards may be required in order mitigate for the reasonably expected adverse impacts of project development to waters of the state. Such conditions will be based on standards and/or comments of the Department of Environmental Quality.
(b) The removal fill shall be carried out in compliance with ORS 509.580 to 509.645 and related rules of the Oregon Department of Fish and Wildlife, concerning upstream and downstream passage at all artificial obstructions in which migratory native fish are currently or have historically been present.
(c) All in-water work, (i.e. removal fill conducted within the beds and banks of a water of the state) including temporary fills or structures, shall be conducted to avoid or minimize impacts to fish and wildlife resources. Such work will be authorized to occur within the Oregon Department of Fish and Wildlife recommended periods for in-water work as specified in Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife. Exceptions to recommended in-water work periods may be authorized by the Department based on the applicant's request and documentation of consultation with the Oregon Department of Fish and Wildlife that the reasonably expected adverse impacts to fish and wildlife resources will be avoided or minimized.
(d) When previously unknown occurrences of listed species are discovered during construction, the permit holder shall immediately cease work and contact the Department.
(e) The removal fill shall not disturb or destroy known archeological sites unless authorized under a permit issued by the State Historic Preservation Office. When previously unknown occurrences of archeological sites are discovered during construction to waters of the state, the permit holder shall immediately cease work at the discovery site and contact the Department and the State Historic Preservation Office.
(f) Equipment shall be fitted with fish screens if water is pumped from a fish-bearing stream during project work. Contact ODFW Screening and Passage staff for screen specifications. The Department, based on ODFW advice, may require gravity flow bypasses to provide fish passage if active migration is occurring. Sediment control shall be provided during dewatering, and culverts shall be installed only at dewatered sites. If endangered fish are likely to be present, fish salvage operation shall be conducted by qualified personnel prior to construction. The Department may require an ODFW District biologist or designee to be present during salvage operations.
(g) The project shall not use as fill in waters of the state any material defined as solid waste in ORS 459.005(24) unless the Department of Environmental Quality has authorized prior approval to do so. This includes tires, concrete rubble, and asphalt.
(h) The project shall not use in waters of the state any fill material such as chassis, body or shell of a motor vehicle as defined by ORS 801.590.
(i) Vegetated buffers may be required at compensatory mitigation sites in order to protect the mitigation from loss.
(j) The restoration or replacement of destroyed or damaged riparian or wetland vegetation may be required at compensatory mitigation and/or project sites in order to mitigate for the reasonably expected adverse impacts of project development. Priority will be given to the replacement of damaged or destroyed vegetation with native plants that will form a wetland or riparian community dominated by native plants within the project area. Conditions may include planting survival success standards (e.g. eighty percent (80%) of each plant species planted, after five (5) years). Protection (e.g. fencing) for replanted areas and control of invasive plants may also be required. Grass seed mixes or exotics certified weed seed free that will hold soil and not persist will be allowed.
(k) The project shall minimize: erosion upstream and downstream of the site; redirecting or relocating water flow beyond pre-project conditions; impoundment of water upstream of the project (unless approved by affected property owners); or additional water flow from the project site beyond pre-project conditions (unless part of the project purpose).
Stat. Auth.: ORS 196.825
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 2-2003(Temp) f. & cert. ef. 11-26-03 thru 5-23-04; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0031
Documentation of Individual Removal-Fill Permit Decision; Term of Certain Individual Removal-Fill Permits
(1) The Department shall prepare written findings documenting and supporting any decision to deny an individual removal-fill permit. In addition, the Department shall prepare written findings to support any decision to issue an individual removal-fill permit for the following:
(a) Projects involving fill of two acres or more in freshwater wetlands.
(b) Projects involving fill in estuaries (except cable crossings, pipelines, or bridge construction).
(c) Projects involving the removal from estuaries of more than 10,000 cubic yards of material (except for maintenance dredging).
(d) Projects involving placement of greater than 2,500 cubic yards riprap in coastal streams and estuaries.
(e) Projects in the Oregon territorial sea in accordance with Statewide Planning Goal 19 -- Ocean Resources.
(2) The Department shall prepare written findings documenting and supporting a permit decision that is contrary to the recommendation of a state agency.
(3) Terms of Permits The term for individual removal-fill authorizations shall be as described.
(a) The Department may issue an individual removal-fill authorization for up to five (5) years for projects that occur on a continuing basis or will take more than one year to complete as follows:
(A) For commercial aggregate removal including dredging and bar scalping when the Department determines that:
(i) There is sufficient aggregate resource or annual recharge to allow the proposed volumes to be removed; and
(ii) The applicant has conducted removal in compliance with any individual removal-fill authorization conditions for the same site for at least one year preceding the pending application.
(B) For projects associated with flood event recovery (e.g. streambank stabilization) when the Department determines that the project(s) are part of a comprehensive multidisciplinary flood recovery plan that specifically addresses and supports the type of treatment that is proposed in the removal-fill authorization application.
(C) For projects that are for the purpose of watershed restoration that are developed from a watershed assessment and identified as a priority in a watershed action plan.
(D) For other types of projects, when the Department determines that:
(i) The project is expected to require more than one year to complete; or
(ii) The project purpose requires annual activity or reconstruction (e.g. irrigation diversions); and
(iii) The project purpose, location or methods of construction or operation described in the application are not expected to change during the course of the project.
(E) Fees for a multi-year period permit, in accordance with ORS 196.9159(5), shall be paid annually on the anniversary date of the permit as established by the Department.
(F) The Department may modify conditions of a multi-year authorization based upon new information or project monitoring that indicate a need for different operating conditions.
(G) Before modifying any condition that significantly affects the scope and extent of the removal fill (e.g. amount of material to be filled/removed) of any individual removal-fill authorization authorized for more than one year, the Department shall give notice as described in OAR 141-085-0028(4) and treat the proposed notification in the same manner as described in OAR 141-085-0028(6) thru (12).
(H) If a person fails to comply with reporting requirements or any other condition of a multi-year authorization the Department may revoke the multi-year status and require annual renewal, suspend the permit pending correction, or take any other enforcement action available to the Department under the Removal-Fill Law and these rules.
Stat. Auth.: ORS 196.825
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0034
Transfer of Authorization/Waiver or Modification of Authorization Conditions
(1) The person or party listed on the authorization is responsible for complying with the conditions of the authorization, unless the authorization is transferred in writing by the Department to a different person or party through the following process:
(a) A transfer form shall be submitted by the authorization holder.
(b) If the original authorization has not expired, the authorization may be transferred by issuing a modification to the original authorization.
(c) If the authorized activity has been completed and/or the authorization expired, but mitigation monitoring is still required as a condition of the original authorization, that obligation shall be transferred to the new authorization holder.
(d) If a bond was required for the mitigation, a new bond must be provided prior to the transfer.
(2) Upon the written request of the authorization holder, the Department may grant a waiver or modification of any condition. The authorization holder shall have the burden to prove, to the satisfaction of the Department, that the waiver or modification will not result in adverse impacts on the water resources or otherwise be contrary to the policies in OAR 141-085-0006. Significant modifications of individual removal-fill permit conditions may require public review as specified in OAR 141-085-0028(6) thru (12).
(3) Exceptions to a permit condition regarding the in-water work period shall be authorized by the Department as described in OAR 141-085-0029(7)(C).
Stat. Auth.: ORS 196.825
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04
141-085-0036
Renewal and Extension of Individual Removal-Fill Permits
Permits may be renewed or extended by the Department under the following conditions:
(1) At least ninety (90) calendar days prior to the expiration of a valid removal or fill permit, the Department shall notify the permit holder of the expiration date and request that the applicant report to the Department in writing the status of project completion and the permit holder's desire to renew the permit.
(2) If the applicant submits a request in writing for renewal with the appropriate fee at least forty-five (45) calendar days prior to the permit expiration date, the Department may:
(a) Renew the permit, with or without modified conditions (consistent with OAR 141-085-0029); or
(b) Extend the permit for an additional time period but less than the original term, one time only, without modified conditions; or
(c) Extend the term of the permit with new or modified conditions for up to an additional one-hundred and twenty (120) calendar days, one time only; or
(d) Deny the request for permit renewal.
(3) In the event a permit holder does not respond forty-five (45) days prior to the date of permit expiration, the Department may extend the expiration date of the permit for not more than 120 days, if:
(a) The permit holder makes a written request to the Department prior to the expiration date of the permit;
(b) There is a reasonable likelihood that the project can be completed prior to the new expiration date; and
(c) All other conditions of the original permit are met or can be fulfilled.
(4) The Department may require a new permit application or additional information if:
(a) There is a proposed change in the project that may increase the reasonably expected adverse impacts of the project on the water resources;
(b) There is a change in the method of operation of the project that may increase the reasonably expected adverse impacts of the activity on the water resources of the state;
(c) There is a change in natural conditions at the project site that may increase the reasonably expected adverse impacts than previously identified in the application review process;
(d) New information becomes available indicating that additional adverse impacts may accrue as a result of the project; or
(e) Substantial adverse comments or comments requesting a change in substantive conditions are received.
(5) Requests for renewals shall be reviewed pursuant to the standards contained in the applicable rules in effect at the time of the request.
Stat. Auth.: ORS 196.825
Stats. Implemented: ORS 196.800 - 196.825
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0064
Removal-Fill Authorization Fees; Disposition of Fees
(1) Any application for an individual removal-fill authorization submitted as described in OAR 141-085-0025 of these rules must be accompanied by a base fee in accordance with the following schedule:
(a) For a removal by a private operator, or a person contracting to perform services for a private operator, $50.
(b) For a removal by a public body: $150.
(c) For a removal by a commercial operator: $150.
(d) For a fill by a private operator, or a person contracting to perform services for a private operator: $150.
(e) For a fill by a public body: $375.
(f) For a fill by a commercial operator: $375.
(g) For erosion-flood repair, including riprap, by a private landowner or public body, or a person contracting to perform services for such persons: no fee.
(2) In addition to the base fee for removal established under OAR 141-085-0064 (1)(a) of these rules each applicant shall also pay as part of the application fee the following fee based on the volume of removal material:
(a) For activities involving less than 500 cubic yards: no volume fee.
(b) For activities involving 500 to 4,999 cubic yards: $75 for private operator; $75 for public body; and $75 for commercial operator.
(c) For activities involving 5,000 to 50,000 cubic yards: $150 for private operator; $150 for public body; and $150 for commercial operator.
(d) For activities over 50,000 cubic yards: $225 for private operator; $225 for public body; and $225 for commercial operator.
(3) In addition to the base fee for fill established under OAR 141-085-0064(1)(a) of these rules each applicant shall also pay as part of the application fee the following fee based on the volume of fill material:
(a) For activities involving less than 500 cubic yards: no volume fee.
(b) For activities of 500 to 2,999 cubic yards: $75 for private operator; $75 for public body; and $75 for commercial operator.
(c) For activities involving 3,000 to 10,000 cubic yards: $150 for private operator; $150 for public body; and $150 for commercial operator.
(d) For activities of over 10,000 cubic yards: $225 for private operator; $225 for public body; and $225 for commercial operator.
(4) For each application that involves both removal and filling, the application fee assessed shall be either for removal or filling, whichever is higher, per ORS 196.815(4), according to the fee schedule described in section (1) to (3) of this rule.
(5) The annual fee for an individual removal-fill authorization is equivalent to the base fee according to the schedule set forth in section (1) of this rule. Fees for a multi-year period permit, in accordance with ORS 196.815(5), shall be paid annually on the anniversary date of the permit. Any authorization may be suspended during any period of delinquency of payment and shall be treated as though no authorization had been issued.
(6) There shall be no application fee for the issuance of an Emergency Authorization (OAR 141-085-0010(59) or Letter of Authorization (OAR 141-085-0010(119).
(7) Fees received under this section shall be credited to the Common School Fund for use by the Department in administration of these rules and ORS 196.600 to 196.905, 196.990 and 541.990 and as otherwise required by law.
Stat. Auth.: ORS 196.815
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0066
Emergency Authorization for Removal-Fill
(1) In the event an emergency exists, as described in OAR 141-085-0010, the Department may issue an emergency authorization. Activities covered by OAR 141-085-0020 are exempt from this section.
(2) Any person requesting an emergency authorization may apply orally or in writing. Written applications may be submitted in the same manner as described in OAR 141-085-0025 and sent via facsimile, e-mail or via U.S. mail. Any request submitted orally must be documented, in writing, by the Department and provided to the applicant.
(3) The application and review requirements described in OAR 141-085-0025, 0027, and 0028 do not apply to emergency authorizations. An application for an emergency authorization shall be reviewed pursuant to the standards in the applicable rules in effect at the time of the request.
(4) Applications for an emergency authorization shall contain enough information for the Department to determine:
(a) The applicant and responsible party planning and carrying out the activity;
(b) The physical area of the project;
(c) The nature of the emergency (specifically, the nature of the threat to public health, public safety or property and the immediacy of the threat and need to act promptly);
(d) The approximate volume of material to be removed and/or filled;
(e) The schedule for doing the work;
(f) The date and approximate time when the event that caused the emergency took place;
(g) The area of impact of the emergency and the proposed emergency action;
(h) A statement as to whether the emergency action is intended as a temporary or permanent response measure; and
(i) A description of how the work will be accomplished.
(5) In order to make a timely and legally defensible determination, the Department may request additional information from the applicant. The Department may authorize an Department employee or other person to act as a representative of the Department to conduct an on-site evaluation of the planned activity and make recommendations as to whether or not the application should be approved as requested, approved with conditions, denied or processed as an individual removal-fill authorization application.
(6) In determining whether or not to approve the application, the Department shall determine, as quickly as is reasonable and feasible, whether:
(a) An emergency, as defined in OAR 141-085-0010 exists, and the factual circumstances indicate:
(A) The emergency poses a direct threat to substantial property, including but not limited to a dwelling, farm or cropland;
(B) Some prompt removal-fill is required to reduce or eliminate the threat; and
(C) The nature of the threat does not allow the time necessary to obtain some other form of authorization as described in these rules.
(b) The removal-fill is planned for waters of the state, including wetlands and is an activity subject to these rules; and
(c) The planned minimizes, to the extent practicable, adverse impacts to aquatic life, water quality and navigation, fishing and public recreation uses of the waters of the state; and
(7) Based upon the review of the application as described in OAR 141-085-0066(6) the Department may:
(a) Approve the emergency authorization as requested;
(b) Approve the emergency authorization with conditions;
(c) Request additional information from the applicant and make a decision to reject, approve with conditions or approve the application without conditions; or
(d) Deny issuance of the emergency application.
(8) An emergency authorization shall contain conditions designed to minimize the reasonably expected adverse impacts of the activity to aquatic life, water quality and navigation, fishing and public recreation uses of the waters of the state while taking into account the impact of the emergency on persons and property. The Department may also require compensatory mitigation or compensatory wetland mitigation in some cases where significant loss of water resources and/or navigation, fishing and public recreation uses has resulted directly from the authorized removal fill.
(9) All conditions of an emergency authorization are enforceable on the permit holder beyond the expiration date of authorization.
(10) If a request for an emergency authorization is denied, the applicant may resubmit the application as an individual removal-fill authorization or general authorization in accordance with the procedures set out in these rules.
(11) If an emergency authorization is issued orally, the written form of the emergency authorization shall be sent to the applicant within five (5) calendar days confirming the issuance and setting forth the conditions of operation.
(12) The term of the emergency authorization shall be limited to the time necessary to complete the planned removal-fill activity and be specifically stated in the authorization. In no case shall the term exceed 60 days. A permitholder may request issuance of a new emergency authorization for the same activity upon expiration of the original emergency authorization.
Stat. Auth.: ORS 196.810
Stats. Implemented: ORS 196.800 - 196.990
Hist.: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0070
General Authorizations; Standards and Criteria; Process for Establishing General Authorizations (see OAR 141-089)
(1) A person may be exempt from the requirement to obtain an individual removal-fill permit through the use of an applicable general authorization. Any person proposing to conduct a removal-fill under a general authorization shall first notify the Department in writing in accordance with the requirements of the specific general authorizations being sought.
(2) General authorizations, are adopted, amended and repealed as administrative rules in accordance with the Administrative Procedure Act (ORS 183.310 to 183.550).
(3) The Department may propose to adopt a general authorization upon a finding that the category of removal-fill, as described in the proposed general authorization (including the applicable conditions):
(a) Are substantially similar in nature;
(b) Would cause only minimal individual and cumulative environmental impact;
(c) Will not result in long-term harm to the water resources of the state; and
(d) Are consistent with the policies of these rules as described in OAR 141-085-0006.
(4) The Department may amend or rescind any general authorization, through rulemaking, upon a determination that the removal-fill conducted under the general authorization has resulted in or would result in more than minimal environmental impact or long-term harm to the water resources of this state. Any person may request the Department invoke this provision. Such a request must include the specific general authorization to be rescinded or amended and clearly and convincingly state the reasons for the request. The Department may process the request in the same manner as described in OAR 141-085-0070(2).
(5) No general authorization is valid where the removal-fill is prohibited by the local comprehensive land use plan or implementing regulations or other applicable ordinance.
(6) The rule promulgating the general authorization shall be effective for up to a five-year term and shall be reviewed, every five years. Upon review, the general authorization shall be reissued in a similar or amended form or repealed.
(7) Failure of a person to adhere to the terms of any general authorization adopted under this section will be considered a violation of the removal-fill law and subject to appropriate enforcement in accordance with these rules.
Stat. Auth.: ORS 196.850
Stats. Implemented: ORS 196.800 - 196.990
Hist.: LB 6-1984, f. & ef. 12-17-84; LB 8-1991, f. & cert. ef. 9-13-91; LB 3-1992, f. & cert. ef. 6-15-92; DSL 2-1999, f. & cert. ef. 3-9-99; DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 1-2004, f. & cert. ef. 5-21-04
141-085-0075
Appeals/Contested Case Hearings Regarding Issuance or Denial of an Individual Removal-Fill Permit
(1) Alternative Dispute Resolution Process. An applicant or any other person aggrieved or adversely affected by an individual removal-fill permit decision by the Department may request the Department enter into an alternative dispute resolution process. The Department and all involved parties shall select a trained facilitator/mediator from a list of pre-qualified individuals and share the costs of the facilitator/mediator. The appellant may retain the right of formal appeal as described in these rules.
(2) Appeal by Applicant. Any applicant whose application for an individual removal-fill permit has been deemed incomplete, denied, or who objects to any of the conditions imposed by the Department under OAR 141-085-0029, may, within twenty-one (21) calendar days of the denial of the permit or the imposition of any condition, request a hearing from the Department. The request shall include the reasons for the appeal hearing.
(3) Appeals by Others. Any person who is aggrieved or adversely affected by the grant of an individual removal-fill permit by the Department may file a written request for a hearing with the Department within twenty-one (21) calendar days after the date the authorization was granted. The request shall include the reasons for the appeal hearing.
(4) Standing in Contested Case Hearings. For a person, other than the applicant/ permit holder to have standing to request a contested case as described in OAR 141-085-0075(2), the person must be either "adversely affected" or "aggrieved" as described as follows:
(a) To be "adversely affected" by the individual removal-fill permit the person must have a legally protected interest as defined in OAR 141-085-0010 that would be harmed, degraded or destroyed by the authorized removal-fill activity. This may include, but is not limited to, adjacent property owners.
(b) To be "aggrieved" by the individual removal-fill permit the person must have participated in the Department's review of the removal-fill activity application by submitting written or oral comments stating a position on the merits of the proposed removal-fill to the Department.
(5) Setting a Contested Case Hearing.
(a) If the written request for hearing is timely (in accordance with OAR 141-085-0075(2) or (3)), and made by a person who has a legally protected interest which is adversely affected by the grant of the permit, the matter shall be referred to the Hearing Officer Panel for hearing within thirty (30) calendar days after receipt of the request.
(b) The hearing shall be conducted as a contested case.
(c) The permit holder and any persons that have filed a written request and have a legally protected interest that may be adversely affected shall be parties to the proceeding.
(d) Persons that do not have legally protected interests that are adversely affected, but are aggrieved, may nevertheless petition to be included in the contested case hearing as a party under OAR 137-003-0535.
(6) Referral to the Hearing Officer Panel (Panel).
(a) The referral of a request for hearing to the Hearing Officer Panel by the Department shall include the individual removal-fill permit, or denial, and the request for hearing. The Hearing Officer Panel shall conduct a contested case hearing only on the issues raised in the request for hearing and the referral from the Department.
(b) Jurisdictional determinations of the existence, or boundaries, of the waters of the state on a parcel of property, as defined in OAR 141-090-0020, issued more than sixty (60) calendar days before a request for hearing are final.
(c) Jurisdictional determinations are judicially cognizable facts of which the Department may take official notice under ORS 183.450(3) in removal/fill contested cases. Challenges to jurisdictional determinations are only permitted under the process set out in OAR 141-090-0050.
(7) Discovery in Contested Cases. In contested cases conducted on matters relating to these rules, the Department delegates to the hearing officer the authority to rule on any issues relating to discovery (i.e. production of information), except that depositions will not be awarded unless it is likely that a witness will not be available at a hearing.
(8) The Proposed Order. The hearing officer who conducts the hearing shall issue a proposed order containing findings of fact and conclusions of law within twenty (20) calendar days of the hearing, and as required by ORS 183.460, provide an opportunity to file written exceptions with the Department.
(9) The Final Order. Within forty-five (45) calendar days after the hearing the Department shall consider the record, any exceptions, and enter an order containing findings of fact and conclusions of law. The final order shall rescind, affirm or modify the permit or proposed order.
(10) Pre-Hearing Suspension of Permits. A permit to fill granted by the Department may be suspended by the Department during the pendency of the contested case proceeding. Petitions for suspension shall be made to the Department and will be either granted or denied by the Department. The permit shall not be suspended unless the person aggrieved or adversely affected by grant of permit makes a showing before the Department by clear and convincing evidence that commencement or continuation of the fill would cause irremediable damage and would be inconsistent with ORS 196.000 to 196.905.
(11) Issuance or Denial of a Permit. Interested persons who request notification in writing of the Department 's decision on a permit will be notified at the time of issuance or denial. The Department's failure to notify an interested person will not extend the statutory sixty (60) calendar days timeframe for hearing requests. Contested case hearings concerning the issuance or denial of a permit will normally be held at the Department offices in Salem, Oregon, unless extraordinary circumstances require the hearing to be held in the vicinity of the project.
Stat. Auth.: ORS 196.835
Stats. Implemented: ORS 196.800 - 196.990
Hist.: LB 15, f. 2-1-74, ef. 2-25-74; LB 6-1984, f. & ef. 12-17-84, Renumbered from 141-085-0505; LB 3-1986, f. & ef. 3-31-86; LB 8-1991, f. & cert. ef. 9-13-91; LB 3-1992, f. & cert. ef. 6-15-92; DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2003, f. & cert. ef. 7-10-03; DSL 2-2003(Temp) f. & cert. ef. 11-26-03 thru 5-23-04; DSL 1-2004, f. & cert. ef. 5-21-04; DSL 1-2006, f. 3-21-06, cert. ef. 3-27-06
141-085-0079
Revoking or Suspending an Authorization; Allowing Corrective Action
(1) The Department may revoke or suspend an authorization if an alleged violator is not in compliance with any conditions of an authorization.
(2) The Department shall give notice of suspension to the permit holder and advise them as to the reasons and terms of the suspension.
(3) The Department may initiate the following proceedings to revoke an authorization:
(a) The Department shall issue a preliminary order to the alleged violator indicating the intent to revoke the authorization;
(b) The preliminary order shall include, but not be limited to, the following information:
(A) A statement of the alleged violator's right to a contested case hearing, as provided in ORS 196.865 before a hearings officer before the authorization may be revoked, and the time period in which such a request may be made;
(B) A statement of the authority and jurisdiction under which the contested case hearing is to be held;
(C) A reference to the particular portions of the removal-fill law and these rules involved; and
(D) A short and plain statement of the matters asserted or charged as constituting the violation(s).
(c) The preliminary order may include a statement of the action, if any, that may be taken by the alleged violator to correct or offset the effects of the violation including, but not limited to, removal of filled material:
(A) If such action is specified in the preliminary order, the order shall include a reasonable time period of not less than twenty (20) calendar days in which to complete the corrective action;
(B) If the alleged violator completes such action within the specified time period, the revocation procedure shall be terminated.
(d) If the authorization holder fails to request a contested case hearing as allowed under ORS 196.865, the Department may issue a final order revoking the authorization after presenting a prima facie case demonstrating that a violation has occurred.
Stat. Auth.: ORS 196.865
Stats. Implemented: ORS 196.800 - 196.990
Hist: DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04
141-085-0080
Violations and Investigations
(1) In its discretion, the Department shall conduct appropriate investigations of reported violations and make compliance inspections to determine whether violations of the removal-fill law, these rules (OAR 141-085) or the terms and conditions of any authorization have occurred.
(2) The Department shall make a reasonable effort to obtain permission from the landowner or agent, or a duly authorized representative of the landowner or agent, for the Department or its authorized representative to conduct a site visit. The Department shall document its efforts to obtain permission to conduct a site visit.
(3) As described in OAR 141-085-0080(1) a violation includes, but is not limited to:
(a) Fill, removal, or channel relocation without a valid authorization;
(b) Non-compliance with any condition of an authorization;
(c) Obtaining an authorization or reporting on conditions of an authorization by misrepresentation or by failure to fully disclose known material facts;
(d) Failing to comply with any terms of an enforcement order; or
(e) Violation of any condition of an approved wetlands conservation plan.
(4) Alleged or suspected violations may be reported to the Department by e-mail, facsimile, telephone or in writing.
(5) When reports of alleged or suspected violations are submitted to the Department in confidence and the information is not otherwise required by law to be submitted, the Department may keep the name of the person making the report confidential if the criteria set forth in ORS 192.501 or 192.502 are met.
Stat. Auth.: ORS 196.860
Stats. Implemented: ORS 196.800 - 196.990
Hist.: LB 15, f. 2-1-74, ef. 2-25-74; LB 6-1984, f. & ef. 12-17-84, Renumbered from 141-085-0405 and 141-085-0420; LB 2-1991, f. & cert. ef. 3-15-91; LB 3-1992, f. & cert. ef. 6-15-92; DSL 6-2002, f. 11-25-02 cert. ef. 1-15-03; DSL 1-2004, f. & cert. ef. 5-21-04
141-085-0085
Enforcement Actions and Procedures
(1) The Department is authorized to take such civil, criminal or administrative actions as are necessary to enforce the removal-fill law and these rules (OAR 141-085) including, but not limited to the following (ORS 196.870 and 196.890):
(a) Consent orders;
(b) Consent agreements (used for violations that do not require compensatory mitigation or compensatory wetland mitigation and are easily resolved);
(c) Cease and desist orders;
(d) Restoration orders;
(e) Civil penalties; and
(f) Liens.
(2) The Department shall give notice of any proposed order (except Consent Agreements or Consent Orders) relating to a violation by personal service or by mailing the notice by registered or certified mail to the person or governmental body affected. Any person aggrieved by a proposed order of the Department may request a hearing within 20 days of the date of personal service or mailing of the notice. Hearings shall be conducted under the provisions of ORS 183.310 to 183.550 applicable to contested cases, and judicial review of final orders shall be conducted in the Court of Appeals according to ORS 183.482. If no hearing is requested or if the party fails to appear, a final order shall be issued upon a prima facie case on the record of the agency. (continued)