Loading (50 kb)...'
(continued)
(ii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following the findings under paragraphs (c)(2) and (c)(3)(ii) of this section, if the State has submitted a revised plan to correct the deficiency prompting the finding and after 18 but before 24 months from the finding the Administrator has proposed to fully or conditionally approve the revised plan and has issued an interim final determination that the revised plan corrects the deficiency prompting the finding, application of the offset sanction under paragraph (e)(1) of this section shall be stayed and application of the highway sanction under paragraph (e)(2) of this section shall be deferred unless and until the Administrator proposes to or takes final action to disapprove the plan in whole or in part. If the Administrator issues such a proposed or final disapproval of the plan, the offset sanction under paragraph (e)(1) of this section shall reapply in the affected area on the date the Administrator issues such a proposed or final disapproval. The highway sanction under paragraph (e)(2) of this section shall apply in the affected area on the later of 6 months from the date the offset sanction under paragraph (e)(1) of this section first applied in the affected area, unless the Administrator determines that the deficiency forming the basis of the finding has been corrected, or immediately if the proposed or final disapproval occurs more than 6 months after initial application of the offset sanction under paragraph (e)(1) of this section.
(iii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following the findings under paragraphs (c)(2) and (c)(3)(ii) of this section, if the State has submitted a revised plan to correct the deficiency prompting the finding and more than 24 months after the finding the Administrator has proposed to fully or conditionally approve the revised plan and has issued an interim final determination that the revised plan corrects the deficiency prompting the finding, application of the offset sanction under paragraph (e)(1) of this section and application of the highway sanction under paragraph (e)(2) of this section shall be stayed unless and until the Administrator proposes to or takes final action to disapprove the plan in whole or in part. If the Administrator issues such a proposed or final disapproval, the offset sanction under paragraph (e)(1) of this section and the highway sanction under paragraph (e)(2) of this section shall reapply in the affected area on the date the Administrator issues such proposed or final disapproval.
(3)(i) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following the findings under paragraphs (c)(2) and (c)(3)(ii) of this section, if the State has submitted a revised plan to correct the deficiency prompting the finding and the Administrator, prior to 18 months from the finding, has conditionally-approved the revised plan and has issued an interim final determination that the revised plan corrects the deficiency prompting the finding, application of the offset sanction under paragraph (e)(1) of this section shall be deferred unless and until the conditional approval converts to a disapproval or the Administrator proposes to or takes final action to disapprove in whole or in part the revised SIP the State submits to fulfill the commitment in the conditionally-approved plan. If the conditional approval so becomes a disapproval or the Administrator issues such a proposed or final disapproval, the offset sanction under paragraph (e)(1) of this section shall apply in the affected area on the later of the date the approval becomes a disapproval or the Administrator issues such a proposed or final disapproval, whichever is applicable, or 18 months following the finding that started the sanctions clock. The highway sanction under paragraph (e)(2) of this section shall apply in the affected area 6 months after the date the offset sanction under paragraph (e)(1) of this section applies, unless the Administrator determines that the deficiency forming the basis of the finding has been corrected.
(ii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following the findings under paragraphs (c)(2) and (c)(3)(ii) of this section, if the State has submitted a revised plan to correct the deficiency prompting the finding and after 18 but before 24 months from the finding the Administrator has conditionally approved the revised plan and has issued an interim final determination that the revised plan corrects the deficiency prompting the finding, application of the offset sanction under paragraph (e)(1) of this section shall be stayed and application of the highway sanction under paragraph (e)(2) of this section shall be deferred unless and until the conditional approval converts to a disapproval or the Administrator proposes to or takes final action to disapprove in whole or in part the revised SIP the State submits to fulfill the commitment in the conditionally-approved plan. If the conditional approval so becomes a disapproval or the Administrator issues such a proposed or final disapproval, the offset sanction under paragraph (e)(1) of this section shall reapply in the affected area on the date the approval becomes a disapproval or the Administrator issues such a proposed or final disapproval, whichever is applicable. The highway sanction under paragraph (e)(2) of this section shall apply in the affected area on the later of 6 months from the date the offset sanction under paragraph (e)(1) of this section first applied in the affected area, unless the Administrator determines that the deficiency forming the basis of the finding has been corrected, or immediately if the conditional approval becomes a disapproval or the Administrator issues such a proposed or final disapproval, whichever is applicable, more than 6 months after initial application of the offset sanction under paragraph (e)(1) of this section.
(iii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following the findings under paragraphs (c)(2) and (c)(3)(ii) of this section, if the State has submitted a revised plan to correct the deficiency prompting the finding and after 24 months from the finding the Administrator has conditionally approved the revised plan and has issued an interim final determination that the revised plan corrects the deficiency prompting the finding, application of the offset sanction under paragraph (e)(1) of this section and application of the highway sanction under paragraph (e)(2) of this section shall be stayed unless and until the conditional approval converts to a disapproval or the Administrator proposes to or takes final action to disapprove in whole or in part the revised SIP the State submits to fulfill its commitment in the conditionally-approved plan. If the conditional approval so becomes a disapproval or the Administrator issues such a proposed or final disapproval, the offset sanction under paragraph (e)(1) of this section and the highway sanction under paragraph (e)(2) of this section shall reapply in the affected area on the date the conditional approval becomes a disapproval or the Administrator issues such a proposed or final disapproval, whichever is applicable.
(4)(i) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following findings under paragraph (c)(4) of this section, if the Administrator, prior to 18 months from the finding, has proposed to find that the State is implementing the approved plan and has issued an interim final determination that the deficiency prompting the finding has been corrected, application of the offset sanction under paragraph (e)(1) of this section shall be deferred unless and until the Administrator preliminarily or finally determines, through a proposed or final finding, that the State is not implementing the approved plan and that, therefore, the State has not corrected the deficiency. If the Administrator so preliminarily or finally determines that the State has not corrected the deficiency, the offset sanction under paragraph (e)(1) of this section shall apply in the affected area on the later of the date the Administrator proposes to take action or takes final action to find that the finding of nonimplementation has not been corrected, or 18 months following the finding that started the sanctions clock. The highway sanction under paragraph (e)(2) of this section shall apply in the affected area 6 months after the date the offset sanction under paragraph (e)(1) of this section first applies, unless the Administrator preliminarily or finally determines that the deficiency forming the basis of the finding has been corrected.
(ii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following findings under paragraph (c)(4) of this section, if after 18 months but before 24 months from the finding the Administrator has proposed to find that the State is implementing the approved plan and has issued an interim final determination that the deficiency prompting the finding has been corrected, application of the offset sanction under paragraph (e)(1) of this section shall be stayed and application of the highway sanction under paragraph (e)(2) of this section shall be deferred unless and until the Administrator preliminarily or finally determines, through a proposed or final finding, that the State is not implementing the approved plan and that, therefore, the State has not corrected the deficiency. If the Administrator so preliminarily or finally determines that the State has not corrected the deficiency, the offset sanction under paragraph (e)(1) of this section shall reapply in the affected area on the date the Administrator proposes to take action or takes final action to find that the finding of nonimplementation has not been corrected. The highway sanction under paragraph (e)(2) of this section shall apply in the affected area on the later of 6 months from the date the offset sanction under paragraph (e)(1) of this section first applied in the affected area, unless the Administrator preliminarily or finally determines that the deficiency forming the basis of the finding has been corrected, or immediately if EPA's proposed or final action finding the deficiency has not been corrected occurs more than 6 months after initial application of the offset sanction under paragraph (e)(1) of this section.
(iii) Notwithstanding paragraph (d)(1) of this section, to further implement 42 U.S.C. 7509(a), following findings under paragraph (c)(4) of this section, if after 24 months from the finding the Administrator has proposed to find that the State is implementing the approved plan and has issued an interim final determination that the deficiency prompting the finding has been corrected, application of the offset sanction under paragraph (e)(1) of this section and the highway sanction under paragraph (e)(2) of this section shall be stayed unless and until the Administrator preliminarily or finally determines, through a proposed or final finding, that the State is not implementing the approved plan, and that, therefore, the State has not corrected the deficiency. If the Administrator so preliminarily or finally determines that the State has not corrected the deficiency, the offset sanction under paragraph (e)(1) of this section and the highway sanction under paragraph (e)(2) of this section shall reapply in the affected area on the date the Administrator proposes to take action or takes final action to find that the finding of nonimplementation has not been corrected.
(5) Any sanction clock started by a finding under paragraph (c) of this section will be permanently stopped and sanctions applied, stayed or deferred will be permanently lifted upon a final EPA finding that the deficiency forming the basis of the finding has been corrected. For a sanctions clock and applied sanctions based on a finding under paragraphs (c)(1) and (c)(3)(i) of this section, a finding that the deficiency has been corrected will occur by letter from the Administrator to the State governor. For a sanctions clock or applied, stayed or deferred sanctions based on a finding under paragraphs (c)(2) and (c)(3)(ii) of this section, a finding that the deficiency has been corrected will occur through a final notice in the Federal Register fully approving the revised SIP. For a sanctions clock or applied, stayed or deferred sanctions based on a finding under paragraph (c)(4) of this section, a finding that the deficiency has been corrected will occur through a final notice in the Federal Register finding that the State is implementing the approved SIP.
(6) Notwithstanding paragraph (d)(1) of this section, nothing in this section will prohibit the Administrator from determining through notice-and-comment rulemaking that in specific circumstances the highway sanction, rather than the offset sanction, shall apply 18 months after the Administrator makes one of the findings under paragraph (c) of this section, and that the offset sanction, rather than the highway sanction, shall apply 6 months from the date the highway sanction applies.
(e) Available sanctions and method for implementation—(1) Offset sanction. (i) As further set forth in paragraphs (e)(1)(ii)–(e)(1)(vi) of this section, the State shall apply the emissions offset requirement in the timeframe prescribed under paragraph (d) of this section on those affected areas subject under paragraph (d) of this section to the offset sanction. The State shall apply the emission offset requirements in accordance with 42 U.S.C. 7503 and 7509(b)(2), at a ratio of at least two units of emission reductions for each unit of increased emissions of the pollutant(s) and its (their) precursors for which the finding(s) under paragraph (c) of this section is (are) made. If the deficiency prompting the finding under paragraph (c) of this section is not specific to one or more particular pollutants and their precursors, the 2-to-1 ratio shall apply to all pollutants (and their precursors) for which an affected area within the State listed in paragraph (e)(1)(i) of this section is required to meet the offset requirements of 42 U.S.C. 7503.
(ii) Notwithstanding paragraph (e)(1)(i) of this section, when a finding is made with respect to a requirement for the criteria pollutant ozone or when the finding is not pollutant-specific, the State shall not apply the emissions offset requirements at a ratio of at least 2-to-1 for emission reductions to increased emissions for nitrogen oxides where, under 42 U.S.C. 7511a(f), the Administrator has approved an NOX exemption for the affected area from the Act's new source review requirements under 42 U.S.C. 7501–7515 for NOX or where the affected area is not otherwise subject to the Act's new source review requirements for emission offsets under 42 U.S.C. 7501–7515 for NOX.
(iii) Notwithstanding paragraph (e)(1)(i) of this section, when a finding under paragraph (c) of this section is made with respect to PM–10, or the finding is not pollutant-specific, the State shall not apply the emissions offset requirements, at a ratio of at least 2-to-1 for emission reductions to increased emissions to PM–10 precursors if the Administrator has determined under 42 U.S.C. 7513a(e) that major stationary sources of PM–10 precursors do not contribute significantly to PM–10 levels which exceed the NAAQS in the affected area.
(iv) For purposes of applying the emissions offset requirement set forth in 42 U.S.C. 7503, at the 2-to-1 ratio required under this section, the State shall comply with the provisions of a State-adopted new source review (NSR) program that EPA has approved under 42 U.S.C. 7410(k)(3) as meeting the nonattainment area NSR requirements of 42 U.S.C. 7501–7515, as amended by the 1990 Amendments, or, if no plan has been so approved, the State shall comply directly with the nonattainment area NSR requirements specified in 42 U.S.C. 7501–7515, as amended by the 1990 Amendments, or cease issuing permits to construct and operate major new or modified sources as defined in those requirements. For purposes of applying the offset requirement under 42 U.S.C. 7503 where EPA has not fully approved a State's NSR program as meeting the requirements of part D, the specifications of those provisions shall supersede any State requirement that is less stringent or inconsistent.
(v) For purposes of applying the emissions offset requirement set forth in 42 U.S.C. 7503, any permit required pursuant to 42 U.S.C. 7503 and issued on or after the date the offset sanction applies under paragraph (d) of this section shall be subject to the enhanced 2-to-1 ratio under paragraph (e)(1)(i) of this section.
(2) Highway funding sanction. The highway sanction shall apply, as provided in 42 U.S.C. 7509(b)(1), in the timeframe prescribed under paragraph (d) of this section on those affected areas subject under paragraph (d) of this section to the highway sanction, but shall apply only to those portions of affected areas that are designated nonattainment under 40 CFR part 81.
[59 FR 39859, Aug. 4, 1994]
§ 52.32 Sanctions following findings of SIP inadequacy.
top
For purposes of the SIP revisions required by §51.120, EPA may make a finding under section 179(a) (1)–(4) of the Clean Air Act, 42 U.S.C. 7509(a) (1)–(4), starting the sanctions process set forth in section 179(a) of the Clean Air Act. Any such finding will be deemed a finding under §52.31(c) and sanctions will be imposed in accordance with the order of sanctions and the terms for such sanctions established in §52.31.
[60 FR 4737, Jan. 24, 1995]
§ 52.33 Compliance certifications.
top
(a) For the purpose of submitting compliance certifications, nothing in this part or in a plan promulgated by the Administrator shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate performance or compliance test had been performed.
(b) For all federal implementation plans, paragraph (a) of this section is incorporated into the plan.
[62 FR 8328, Feb. 24, 1997]
§ 52.34 Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.
top
(a) Definitions. For purposes of this section, the following definitions apply:
(1) Administrator means the Administrator of the United States Environmental Protection Agency or the Administrator's duly authorized representative.
(2) Large Electric Generating Units (large EGUs) means:
(i) For units that commenced operation before January 1, 1997, a unit serving during 1995 or 1996 a generator that had a nameplate capacity greater than 25 MWe and produced electricity for sale under a firm contract to the electric grid.
(ii) For units that commenced operation on or after January 1, 1997 and before January 1, 1999, a unit serving at any time during 1997 or 1998 a generator that had a nameplate capacity greater than 25 MWe and produced electricity for sale under a firm contract to the electric grid.
(iii) For units that commence operation on or after January 1, 1999, a unit serving at any time a generator that has a nameplate capacity greater than 25 MWe and produces electricity for sale.
(3) Large Non-Electric Generating Units (large non-EGUs) means:
(i) For units that commenced operation before January 1, 1997, a unit that has a maximum design heat input greater than 250 mmBtu/hr and that did not serve during 1995 or 1996 a generator producing electricity for sale under a firm contract to the electric grid.
(ii) For units that commenced operation on or after January 1, 1997 and before January 1, 1999, a unit that has a maximum design heat input greater than 250 mmBtu/hr and that did not serve at any time during 1997 or 1998 a generator producing electricity for sale under a firm contract to the electric grid.
(iii) For units that commence operation on or after January 1, 1999, a unit with a maximum design heat input greater than 250 mmBtu/hr that:
(A) At no time serves a generator producing electricity for sale; or
(B) At any time serves a generator producing electricity for sale, if any such generator has a nameplate capacity of 25 MWe or less and has the potential to use 50 percent or less of the potential electrical output capacity of the unit.
(4) New sources means new and modified sources.
(5) NOX means oxides of nitrogen.
(6) OTAG means the Ozone Transport Assessment Group (active 1995–1997), a national work group that addressed the problem of ground-level ozone and the long-range transport of air pollution across the Eastern United States. The OTAG was a partnership between EPA, the Environmental Council of the States, and various industry and environmental groups.
(7) Ozone season means the period of time beginning May 1 of a year and ending on September 30 of the same year, inclusive.
(8) Potential electrical output capacity means, with regard to a unit, 33 percent of the maximum design heat input of the unit.
(9) Unit means a fossil-fuel fired stationary boiler, combustion turbine, or combined cycle system.
(b) Purpose and applicability. Paragraphs (c), (e)(1) and (e)(2), (g), and (h)(1) and (h)(2) of this section set forth the Administrator's findings with respect to the 1-hour national ambient air quality standard (NAAQS) for ozone that certain new and existing sources of emissions of nitrogen oxides (“NOX”) in certain States emit or would emit NOX in violation of the prohibition in section 110(a)(2)(D)(i) of the Clean Air Act (CAA) on emissions in amounts that contribute significantly to nonattainment in certain States that submitted petitions in 1997–1998 addressing such NOX emissions under section 126 of the CAA. Paragraphs (d), (e)(3) and (e)(4), (f), and (h)(3) and (h)(4) of this section set forth the Administrator's affirmative technical determinations with respect to the 8-hour NAAQS for ozone that certain new and existing sources of emissions of NOX in certain States emit or would emit NOX in violation of the prohibition in section 110(a)(2)(D)(i) of the CAA on emissions in amounts that contribute significantly to nonattainment in, or interfere with maintenance by, certain States that submitted petitions in 1997–1998 addressing such NOX emissions under section 126 of the CAA. (As used in this section, the term new source includes modified sources, as well.) Paragraph (i) of this section explains the circumstances under which the findings for sources in a specific State would be withdrawn. Paragraph (j) of this section sets forth the control requirements that apply to the sources of NOX emissions affected by the findings. Paragraph (k) of this section indefinitely stays the effectiveness of the affirmative technical determinations with respect to the 8-hour ozone standard.
(1) The States that submitted such petitions are Connecticut, Maine, Massachusetts, New Hampshire, New York, Pennsylvania, Rhode Island, and Vermont (each of which, hereinafter in this section, may be referred to also as a “petitioning State”).
(2) The new and existing sources of NOX emissions covered by the petitions that emit or would emit NOX emissions in amounts that make such significant contributions are large electric generating units (EGUs) and large non-EGUs.
(c) Section 126(b) findings relating to impacts on ozone levels in Connecticut—(1) Section 126(b) findings with respect to the 1-hour ozone standard in Connecticut. The Administrator finds that any existing or new major source or group of stationary sources emits or would emit NOX in violation of the Clean Air Act section 110(a)(2)(d)(i) prohibition with respect to the 1-hour ozone standard in the State of Connecticut if it is or will be:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (c)(2) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Connecticut.
(2) States or portions of States that contain sources for which the Administrator is making section 126(b) findings with respect to the 1-hour ozone standard in Connecticut. The States, or portions of States, that contain sources of NOX emissions for which the Administrator is making section 126(b) findings under paragraph (c)(1) of this section are:
(i) Delaware.
(ii) District of Columbia.
(iii) Portion of Indiana located in OTAG Subregions 2 and 6, as shown in appendix F, Figure F–2, of this part.
(iv) Portion of Kentucky located in OTAG Subregion 6, as shown in appendix F, Figure F–2, of this part.
(v) Maryland.
(vi) Portion of Michigan located south of 44 degrees latitude in OTAG Subregion 2, as shown in appendix F, Figure F–2, of this part.
(vii) Portion of North Carolina located in OTAG Subregion 7, as shown in appendix F, Figure F–2, of this part.
(viii) New Jersey.
(ix) Portion of New York extending west and south of Connecticut, as shown in appendix F, Figure F–2, of this part.
(x) Ohio.
(xi) Pennsylvania.
(xii) Virginia.
(xiii) West Virginia.
(d) Affirmative technical determinations relating to impacts on ozone levels in Maine—(1) Affirmative technical determinations with respect to the 8-hour ozone standard in Maine. The Administrator of EPA finds that any existing or new major source or group of stationary sources emits or would emit NOX in amounts that contribute significantly to nonattainment in the State of Maine, with respect to the 8-hour NAAQS for ozone if it is or will be:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (d)(2) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 of appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Maine.
(2) States or portions of States that contain sources for which EPA is making an affirmative technical determination with respect to the 8-hour ozone standard in Maine. The States that contain sources for which EPA is making an affirmative technical determination are:
(i) Connecticut.
(ii) Delaware.
(iii) District of Columbia.
(iv) Maryland.
(v) Massachusetts.
(vi) New Jersey.
(vii) New York.
(viii) Pennsylvania.
(ix) Rhode Island.
(x) Virginia.
(e) Section 126(b) findings and affirmative technical determinations relating to impacts on ozone levels in Massachusetts—(1) Section 126(b) findings with respect to the 1-hour ozone standard in Massachusetts. The Administrator finds that any existing major source or group of stationary sources emits NOX in violation of the Clean Air Act section 110(a)(2)(d)(i) prohibition with respect to the 1-hour ozone standard in the State of Massachusetts if it is:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (e)(2) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Massachusetts.
(2) States that contain sources for which the Administrator is making section 126(b) findings with respect to the 1-hour ozone standard in Massachusetts. The portions of States that contain sources of NOX emissions for which the Administrator is making section 126(b) findings under paragraph (e)(1) of this section are:
(i) All counties in West Virginia located within a 3-county-wide band of the Ohio River, as shown in appendix F, Figure F–4, of this part.
(ii) [Reserved]
(3) Affirmative technical determinations with respect to the 8-hour ozone standard in Massachusetts. The Administrator of EPA finds that any existing major source or group of stationary sources emits NOX in amounts that contribute significantly to nonattainment in, or interfere with maintenance by, the State of Massachusetts, with respect to the 8-hour NAAQS for ozone if it is:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (e)(4) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Massachusetts.
(4) States or portions of States that contain sources for which EPA is making an affirmative technical determination with respect to the 8-hour ozone standard in Massachusetts. The portions of States that contain sources for which EPA is making an affirmative technical determination are:
(i) All counties in Ohio located within a 3-county-wide band of the Ohio River, as shown in appendix F, Figure F–4, of this part.
(ii) All counties in West Virginia located within a 3-county-wide band of the Ohio River, as shown in appendix F, Figure F–4, of this part.
(f) Affirmative technical determinations relating to impacts on ozone levels in New Hampshire—(1) Affirmative technical determinations with respect to the 8-hour ozone standard in New Hampshire. The Administrator of EPA finds that any existing or new major source or group of stationary sources emits or would emit NOX in amounts that contribute significantly to nonattainment in, or interfere with maintenance by, the State of New Hampshire, with respect to the 8-hour NAAQS for ozone if it is or will be:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (f)(2) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 of appendix F of this part describing the sources of NOX emissions covered by the petition of the State of New Hampshire.
(2) States or portions of States that contain sources for which EPA is making an affirmative technical determination with respect to the 8-hour ozone standard in New Hampshire. The States that contain sources for which EPA is making an affirmative technical determination are:
(i) Connecticut.
(ii) Delaware.
(iii) District of Columbia.
(iv) Maryland.
(v) Massachusetts.
(vi) New Jersey.
(vii) New York.
(viii) Pennsylvania.
(ix) Rhode Island.
(g) Section 126(b) findings relating to impacts on ozone levels in the State of New York—(1) Section 126(b) findings with respect to the 1-hour ozone standard in the State of New York. The Administrator finds that any existing or new major source or group of stationary sources emits or would emit NOX in violation of the Clean Air Act section 110(a)(2)(d)(i) prohibition with respect to the 1-hour ozone standard in the State of New York if it is or will be:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (g)(2) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of New York.
(2) States or portions of States that contain sources for which the Administrator is making section 126(b) findings with respect to the 1-hour ozone standard in New York. The States, or portions of States, that contain sources of NOX emissions for which the Administrator is making section 126(b) findings under paragraph (g)(1) of this section are:
(i) Delaware.
(ii) District of Columbia.
(iii) Portion of Indiana located in OTAG Subregions 2 and 6, as shown in appendix F, Figure F–6, of this part.
(iv) Portion of Kentucky located in OTAG Subregion 6, as shown in appendix F, Figure F–6, of this part.
(v) Maryland.
(vi) Portion of Michigan located south of 44 degrees latitude in OTAG Subregion 2, as shown in appendix F, Figure F–6, of this part.
(vii) Portion of North Carolina located in OTAG Subregions 6 and 7, as shown in appendix F, Figure F–6, of this part.
(viii) New Jersey.
(ix) Ohio.
(x) Pennsylvania.
(xi) Virginia.
(xii) West Virginia.
(h) Section 126(b) findings and affirmative technical determinations relating to impacts on ozone levels in the State of Pennsylvania—(1) Section 126(b) findings with respect to the 1-hour ozone standard in the State of Pennsylvania. The Administrator finds that any existing or new major source or group of stationary sources emits or would emit NOX in violation of the Clean Air Act section 110(a)(2)(d)(i) prohibition with respect to the 1-hour ozone standard in the State of Pennsylvania if it is or will be:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (h)(2) of this section; and (iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Pennsylvania.
(2) States that contain sources for which the Administrator is making section 126(b) findings with respect to the 1-hour ozone standard in Pennsylvania. The States that contain sources of NOX emissions for which the Administrator is making section 126(b) findings under paragraph (h)(1) of this section are:
(i) North Carolina.
(ii) Ohio.
(iii) Virginia.
(iv) West Virginia.
(3) Affirmative technical determinations with respect to the 8-hour ozone standard in Pennsylvania. The Administrator of EPA finds that any existing or new major source or group of stationary sources emits or would emit NOX in amounts that contribute significantly to nonattainment in, or interfere with maintenance by, the State of Pennsylvania, with respect to the 8-hour NAAQS for ozone:
(i) In a category of large EGUs or large non-EGUs;
(ii) Located in one of the States (or portions thereof) listed in paragraph (h)(4) of this section; and
(iii) Within one of the “Named Source Categories” listed in the portion of Table F–1 in appendix F of this part describing the sources of NOX emissions covered by the petition of the State of Pennsylvania.
(4) States or portions of States that contain sources for which EPA is making an affirmative technical determination with respect to the 8-hour ozone standard in Pennsylvania. The States that contain sources for which EPA is making an affirmative technical determination are:
(i) Alabama.
(ii) Illinois.
(iii) Indiana.
(iv) Kentucky.
(v) Michigan.
(vi) Missouri.
(vii) North Carolina.
(viii) Ohio.
(ix) Tennessee.
(x) Virginia.
(xi) West Virginia.
(i) Withdrawal of section 126 findings. Notwithstanding any other provision of this subpart, a finding under paragraphs (c), (e)(1) and (e)(2), (g), and (h)(1) and (h)(2) of this section as to a particular major source or group of stationary sources in a particular State will be deemed to be withdrawn, and the corresponding part of the relevant petition(s) denied, if the Administrator issues a final action putting in place implementation plan provisions that comply with the requirements of §§51.121 and 51.122 of this chapter for such State.
(j) Section 126 control remedy. The Federal NOX Budget Trading Program in part 97 of this chapter applies to the owner or operator of any new or existing large EGU or large non-EGU as to which the Administrator makes a finding under section 126(b) of the Clean Air Act pursuant to the provisions of paragraphs (c), (e)(1) and (e)(2), (g), and (h)(1) and (h)(2) of this section.
(k) Stay of findings with respect to the 8-hour ozone standard. Notwithstanding any other provisions of this subpart, the effectiveness of paragraphs (d), (e)(3) and (e)(4), (f), (h)(3) and (h)(4) of this section is stayed.
(l) Temporary stay of rules. Notwithstanding any other provisions of this subpart, the effectiveness of this section is stayed from July 26, 1999 until February 17, 2000.
[64 FR 28318, May 25, 1999, as amended at 64 FR 33961, June 24, 1999; 65 FR 2042, Jan. 13, 2000; 65 FR 2726, Jan. 18, 2000; 69 FR 31505, June 3, 2004]
Subpart B—Alabama
top
§ 52.50 Identification of plan.
top
Link to an amendment published at 71 FR 12140, Mar. 9, 2006.
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Alabama under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraph (c) and (d) of this section with an EPA approval date prior to January 1, 2003, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after January 1, 2003, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of January 1, 2003.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303; the EPA, Office of Air and Radiation Docket and Information Center, Room B–108, 1301 Constitution Avenue, (Mail Code 6102T) NW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(c) EPA approved Alabama regulations.
EPA Approved Alabama Regulations
----------------------------------------------------------------------------------------------------------------
State
State citation Title/subject effective EPA approval date Explanation
date
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-1 General Provision
----------------------------------------------------------------------------------------------------------------
Section 335-3-1-.01............. Purpose.............. 06/22/89 03/19/90
55 FR 10062
Section 335-3-1-.02............. Definitions.......... 08/10/00 12/08/00
65 FR 76940
Section 335-3-1-.03............. Ambient Air Quality 10/13/98 03/01/99
Standards. 64 FR 9918
Section 335-3-1-.04............. Monitoring, Records, 10/15/96 06/06/97
and Reporting. 62 FR 30991
Section 335-3-1-.05............. Sampling and Test 06/22/89 03/19/90
Methods. 55 FR 10062
Section 335-3-1-.06............. Compliance Schedule.. 10/15/96 06/06/97
62 FR 30991
Section 335-3-1-.07............. Maintenance and 10/15/89 03/19/90
Malfunctioning of 55 FR 10062
Equipment; Reporting.
Section 335-3-1-.08............. Prohibition of Air 08/10/00 12/08/00
Pollution. 65 FR 76940
Section 335-3-1-.09............. Variances............ 10/15/96 06/06/97
62 FR 30991
Section 335-3-1-.10............. Circumvention........ 06/22/89 03/19/90
55 FR 10062
Section 335-3-1-.11............. Severability......... 10/15/96 06/06/97
62 FR 30991
Section 335-3-1-.12............. Bubble Provision..... 06/22/89 03/19/90
55 FR 10062
Section 335-3-1-.13............. Credible Evidence.... 04/13/99 11/03/99
64 FR 59633
Section 335-3-1-.14............. Emissions Reporting 04/06/01 07/16/01
Requirements 66 FR 36921
Relating to Budgets
for NOX Emissions.
Section 335-3-1-.15............. Emissions Inventory 04/03/03 04/24/03
Reporting 68 FR 20077
Requirements.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-2 Air Pollution Emergency
----------------------------------------------------------------------------------------------------------------
Section 335-3-2-.01............. Air Pollution 06/22/89 03/19/90
Emergency. 55 FR 10062
Section 335-3-2-.02............. Episode Criteria..... 08/10/00 12/08/00
65 FR 76940
Section 335-3-2-.03............. Special Episode 06/22/89 03/19/90
Criteria. 55 FR 10062
Section 335-3-2-.04............. Emission Reduction 06/22/89 03/19/90
Plans. 55 FR 10062
Section 335-3-2-.05............. Two Contaminant 06/22/89 03/19/90
Episode. 55 FR 10062
Section 335-3-2-.06............. General Episodes..... 06/22/89 03/19/90
55 FR 10062
Section 335-3-2-.07............. Local Episodes....... 06/22/89 03/19/90
55 FR 10062
Section 335-3-2-.08............. Other Sources........ 10/15/96 06/06/97
62 FR 30991
Section 335-3-2-.09............. Other Authority Not 06/22/89 03/19/90
Affected. 55 FR 10062
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-3 Control of Open Burning and Incineration
----------------------------------------------------------------------------------------------------------------
Section 335-3-3-.01............. Open Burning......... mm/dd/yy 12/28/05
70 FR 76694
Section 335-3-3-.02............. Incinerators......... 06/22/89 03/19/90
55 FR 10062
Section 335-3-3-.03............. Incineration of Wood, 08/10/00 12/08/00
Peanut, and Cotton 65 FR 76940
Ginning Waste.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-4 Control of Particulate Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-4-.01............. Visible Emissions.... 10/15/96 06/06/97
62 FR 30991
Section 335-3-4-.02............. Fugitive Dust and 10/15/96 06/06/97
Fugitive Emissions. 62 FR 30991
Section 335-3-4-.03............. Fuel Burning 10/15/96 06/06/97
Equipment. 62 FR 30991
Section 335-3-4-.04............. Process 10/15/96 06/06/97
Industries_General. 62 FR 30991
Section 335-3-4-.05............. Small Foundry Cupola. 06/22/89 03/19/90
55 FR 10062
Section 335-3-4-.06............. Cotton Gins.......... 06/22/89 03/19/90
55 FR 10062
Section 335-3-4-.07............. Kraft Pulp Mills..... 10/15/96 06/06/97
62 FR 30991
Section 335-3-4-.08............. Wood Waste Boilers... 08/10/00 12/08/00
65 FR 76940
Section 335-3-4-.09............. Coke Ovens........... 08/10/00 12/08/00
65 FR 76940
Section 335-3-4-.10............. Primary Aluminum 06/22/89 03/19/90
Plants. 55 FR 10062
Section 335-3-4-.11............. Cement Plants........ 10/15/96 06/06/97
62 FR 30991
Section 335-3-4-.12............. Xylene Oxidation 06/22/89 03/19/90
Process. 55 FR 10062
Section 335-3-4-.13............. Sintering Plants..... 06/22/89 03/19/90
55 FR 10062
Section 335-3-4-.14............. Grain Elevators...... 10/15/96 06/06/97
62 FR 30991
Section 335-3-4-.15............. Secondary Lead 10/15/96 06/06/97
Smelters. 62 FR 30991
Section 335-3-4-.17............. Steel Mills Located 10/15/96 06/06/97
in Etowah County. 62 FR 30991
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-5 Control of Sulfur Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-5-.01............. Fuel Combustions..... 10/15/96 06/06/97
62 FR 30991
Section 335-3-5-.02............. Sulfuric Acid Plants. 10/15/96 06/06/97
62 FR 30991
Section 335-3-5-.03............. Petroleum Production. 08/10/00 12/08/00
65 FR 76940
Section 335-3-5-.04............. Kraft Pulp Mills..... 08/10/00 12/08/00
65 FR 76940
Section 335-3-5-.05............. Process 06/22/89 03/19/90
Industries_General. 55 FR 10062
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-6 Control of Organic Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-6-.01............. Applicability........ 10/15/96 06/06/97
62 FR 30991
Section 335-3-6-.02............. VOC Water Separation. 06/22/89 03/19/90
55 FR 10062
Section 335-3-6-.03............. Loading and Storage 06/22/89 03/19/90
of VOC. 55FR 10062 (continued)