CCLME.ORG - 40 CFR PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
Loading (50 kb)...'
(continued)
6/30/77 9/29/78 43 FR 44840.......... (c) 8................ Describes air quality
surveillance
program.
22a-171........................... Small Business 1/12/93 5/19/94 59 FR 26123.......... (c) 65............... Established small
Assistance. business compliance
and technical
assistance program.
22a-174-1......................... Definitions.......... 03/15/02 02/27/03 68 FR 9011........... Adopting definitions
applicable to PSD/
NSR program..
22a-174-2......................... Registration 4/04/72 5/31/72 37 FR 23085.......... (b).
requirements for
existing stationary
sources of air
pollutants.
8/31/79 12/23/80 45 FR 84769.......... (c) 11............... In tandem with
changes to
Regulation 3,
sources existing
prior to 1972 must
register.
22a-174-2a........................ Procedural 03/15/02 02/27/03 68 FR 9011........... Provisions applicable
Requirements for New to PSD/NSR in
Source Review and consolidated permit
Title V Permitting. procedural
requirements..
22a-174-3......................... Permits for 4/04/72 5/31/72 37 FR 23085.......... (b).................. Conditional approval
construction and of NSR program.
operation of
stationary sources.
8/30/79 12/23/80 45 FR 84769.......... (c)11................ EPA conditionally
approved changes to
meet federal New
Source Review (NSR)
requirements. CT did
not submit
Prevention of
Significant
Determination
program.
8/31/79 1/07/82 47 FR 762............ (c) 20............... Final approval of NSR
Rules removing
conditions of 12/23/
80.
10/10/80 1/07/82 47 FR 762............ (c) 20............... Allows conditional
exemption of
resource recovery
facilities from
offset transactions.
10/10/80 1/07/82 47 FR 762............ (c) 20............... Replaces the word
``actual'' with word
``allowable''.
12/27/88 2/23/93 58 FR 10957.......... (c) 56............... Changes to NSR and
PSD requirements.
22a-174-3a........................ Permit to Construct 03/15/02 02/27/03 68 FR 9011........... PSD/NSR program
and Operate requirements as
Stationary Sources. revised by the CAAA..
22a-174-4......................... Source monitoring, 4/04/72 5/31/72 37 FR 23085.......... (b).
record keeping,
reporting and
authorization of
inspection of air
pollution sources.
10/31/77 12/23/80 45 FR 84769.......... (c) 11............... Clarifies record
keeping and
reporting
requirements and
rescinds smoke
monitoring
requirements for
small sources.
12/15/80 8/24/82 47 FR 36822.......... (c) 20............... Rescinded
requirements for
smoke monitors on
sources less than
250 mmBtu.
12/27/88 2/23/93 58 FR 10957.......... (c) 56............... Changes to opacity
continuous emission
monitoring (CEM)
requirements.
22a-174-5......................... Methods for sampling, 4/04/72 5/31/72 37 FR 23085.......... (b).
emission testing,
and reporting.
10/05/77 12/23/80 45 FR 84769.......... (c) 11............... Tied State testing
method requirement
to federal
requirements,
clarified
requirements for
stack testing, and
eliminated record
keeping and
reporting
requirements.
12/19/80 8/28/81 46 FR 43418.......... (c) 16............... Revisions to source
monitoring and stack
testing requirements
for SO2.
22a-174-6......................... Air Pollution 4/04/72 5/31/72 37 FR 23085.......... (b).
Emergency Episode
Procedures.
8/31/79 12/23/80 45 FR 84769.......... (c) 11............... Allows DEP to
separately limit
mobile and
stationary sources
depending upon the
cause of the
episode.
22a-174-7......................... Malfunction of 4/04/72 5/31/72 37 FR 23085.......... (b).
Control Equipment;
Reporting.
22a-174-8......................... Compliance Plans and 4/04/72 5/31/72 37 FR 23085.......... (b).
Schedules.
22a-174-9......................... Prohibition of air 4/04/72 5/31/72 37 FR 23085.......... (b).
pollution.
8/31/79 12/23/80 45 FR 84769.......... (c) 11............... Non-substantive
numbering change.
8/31/79 8/12/83 48 FR 36579.......... (c) 11............... Full authority
delegated for NSPS
and NESHAPS.
12/6/91 56 FR 63875.......... Delegation of new
subparts.
22a-174-10........................ Public Availability 4/04/72 5/31/72 37 FR 23085.......... (b).
of Information.
22a-174-11........................ Prohibition against 4/04/72 5/31/72 37 FR 23085.......... (b).
concealment of
circumvention.
22a-174-12........................ Violations and 4/4/72 5/31/72 37 FR 23085.......... (b).
enforcement.
22a-174-13........................ Variances............ 4/4/72 5/31/72 37 FR 23085.......... (b).
8/31/79 12/23/80 45 FR 84769.......... (c) 11............... Non-substantive
numbering change.
22a-174-14........................ Compliance with 4/04/72 5/31/72 37 FR 10842.......... (b).
regulation no
defense to nuisance
claim.
22a-174-15........................ Severability......... 4/4/72 5/31/72 37 FR 10842.......... (b).
22a-174-16........................ Responsibility to 4/4/72 5/31/72 37 FR 10842.......... (b).
comply with
applicable
regulations.
22a-174-17........................ Control of open 4/04/72 5/31/72 37 FR 10842.......... (b).
burning.
22a-174-18........................ Control of 4/4/72 5/31/72 37 FR 10842.......... (b).
particulate
emissions.
11/30/73 4/16/74 39 FR 13651.......... 52.375............... Allowed Hartford
Electric Light &
Connecticut Light
& Power Supplies
to use nonconforming
fuel from 12/3/73 to
1/1/74.
7/11/81 9/23/82 47 FR 41958.......... (c) 22............... Defines TSP RACT for
fuel burning
equipment and
process sources
including cupolas,
foundries, and hot
mix asphalt plants.
22a-174-19........................ Control of sulfur 4/4/72 5/31/72 37 FR 23085.......... (b).
compound emissions.
11/30/73 4/16/74 39 FR 13651.......... 52.375............... Allowed Hartford
Electric Light and
Connecticut Power
and Light to use
nonconforming fuel.
4/3/79 7/30/79 44 FR 44498.......... (c) 10............... Allowed Northeast
Utilities to
purchase, store, and
burn nonconforming
fuel.
9/8/80 4/27/81 46 FR 23412.......... (c) 12............... Variance for Federal
Paperboard, Inc.
12/19/80 8/28/81 46 FR 43418.......... (c) 14............... Amends sulfur control
& 3/11/ strategy.
81
3/11/81 8/28/81 46 FR 43418.......... (c) 15............... Amends New Source
& 7/15/ Ambient Impact
81 Analysis Guideline.
3/17/81 10/23/81 46 FR 51914.......... (c) 17............... Variance for
Uniroyal, Inc.
11/2/81 11/18/81 46 FR 56612.......... (c) 18............... Approval State Energy
Trade program.
11/14/75 11/18/81 46 FR 56612.......... 52.380 (e)(1)........ EPA disapproval
revision which
allows exemption for
home heating with
coal, historic
demonstrations, and
other small sources.
11/12/81 12/22/81 46 FR 62062.......... (c) 19............... Variances for United
Technologies Corp.,
Pratt & Whitney
Aircraft Division
facilities in New
Haven and
Middletown.
7/7/81 11/12/82 47 FR 51129.......... (c) 24............... Variance for Sikorsky
Aircraft_approved
under the State
Energy Trade
Program.
5/27/82 2/8/83 48 FR 5723........... (c) 26............... Variance for Dow
Chemical_approved
under the State
Energy Trade
Program.
12/15/82 5/4/83 48 FR 20051.......... (c) 27............... Variance for Lydall,
Inc._approved under
the State Energy
trade (SET) Program.
11/1/82 6/28/83 48 FR 29689.......... (c) 28............... Simkins
Industries_approved
under the State
Energy Trade
Program.
3/28/83 12/20/83 48 FR 56218.......... (c) 30............... Variance for Loomis
Institute_approved
under the State
Energy Trade
Program.
2/19/93 1/18/94 59 FR 2531........... (c) 63............... Changes requirements
at Himilton Standard
Division of UTC.
22a-174-20........................ Control of organic 4/4/72 5/31/72 37 FR 23085.......... (b).
compound emissions.
8/31/79 12/23/80 45 FR 84769.......... (c) 11............... Requirements for
certain Group I CTG
source categories.
Conditionally
approved cutback
asphalt and solvent
metal cleaning
categories.
10/10/80 1/17/82 47 FR 762............ (c) 20............... Requirements for
cutback asphalt
(Group I_CTG).
10/10/80 2/17/82 47 FR 6827........... (c) 25............... Requirements for
Group II CTGs
exclusive of
controlling gasoline
tank truck leaks,
petroleum liquid
storage external
floating roof tanks,
manufacture of
vegetable oil,
pneumatic rubber
tire categories.
Other VOC rules.
10/10/80 6/7/82 47 FR 24452.......... (c) 23............... Alternative emission
reduction
provisions.
12/10/82 2/1/84 49 FR 3989........... (c) 29............... Requirements for
small open top
degreasers (Group
I_CTG).
9/24/83 2/1/84 49 FR 3989........... (c) 29............... Exempts colds
cleaners at auto
repair facilities.
9/24/83 3/21/84 49 FR 10542.......... (c) 32............... Adds degreasing
requirements for
conveyorized and
cold cleaning
operations.
8/31/79 3/21/84 49 FR 10542.......... (c) 32............... Requirements for
solvent metal
cleaning (Group I
CTG).
9/24/83 3/21/84 49 FR 10542.......... (c) 32............... Exempts storage
vessels from
submerged fill.
Delays effective
date of Stage I
vapor recovery by 1
year. Requires RACT
for all major
sources of VOC not
covered under a CTG
document.
9/24/83 10/19/84 49 FR 41026.......... (c) 33............... Adds major non-ctg
sources covered by
20(ee) to
applicability,
compliance,
alternative emission
reduction and
seasonal operation
after burner
provisions.
12/13/84 7/18/85 50 FR 29229.......... (c) 34............... Revision to cutback
asphalt regulation.
Requires facilities
with external
floating roofs to
install secondary
seats. Changes to
gasoline tank truck
regulation.
4/23/86 11/20/86 51 FR 41963.......... (c) 36............... VOC RACT for
Connecticut Charcoal
Company.
4/28/86 2/19/87 52 FR 5104........... (c) 37............... VOC RACT for King
Industries.
8/8/87 12/17/87 52 FR 47925.......... (c) 39............... VOC RACT for Belding
Corticelli Thread
Company.
5/28/86 2/17/88 51 FR 4621........... (c) 41............... Effective date
clarification for
Connecticut
Charcoal.
9/24/87 4/11/88 53 FR 11847.......... (c) 42............... VOC RACT for Raymark
Industries, Inc.
2/2/87 5/19/88 53 FR 17934.......... (c) 38............... Clarifies
applicability of VOC
compliance methods
for surface coating
sources.
3/17/87 5/19/88 53 FR 17934.......... (c) 38............... Adds regulations for
SOCMI fugitive leaks
and polystyrene
resins.
8/21/87 7/12/88 53 FR 26256.......... (c) 44............... VOC RACT for Spongex
International Ltd.
12/26/86 8/1/88 53 FR 28884.......... (c) 43............... VOC RACT for American
Cyanamid Company.
10/27/88 3/8/89 54 FR 9781........... (c) 48............... VOC RACT for Dow
Chemical, U.S.A.
6/7/88 3/24/89 54 FR 12193.......... (c) 46............... VOC RACT for New
Departure Hyatt.
12/14/88 4/10/89 54 FR 14226.......... (c) 49............... VOC RACT for
Stanadyne.
3/22/89 5/30/89 54 FR 22891.......... (c) 51............... VOC RACT for Pratt
& Whitney
Division of UTC.
12/30/88 6/2/89 54 FR 23650.......... (c) 50............... Changes limit on
volatility of
gasoline.
10/19/87 11/28/89 54 FR 48885.......... (c) 47............... VOC RACT for Frismar,
Inc.
10/18/88 11/39/89 54 FR 49284.......... (c) 52............... VOC RACT for Pfizer,
Inc.
9/5/89 12/22/89 54 FR 52798.......... (c) 53............... VOC RACT for Uniroyal
Chemical Co.
11/29/89 3/12/90 55 FR 9121........... (c) 54............... VOC RACT for Hamilton
Standard Division of
United Technologies
Corp.
11/2/88 3/14/90 55 FR 9442........... (c) 55............... VOC RACT for Heminway
& Bartlett
Manufacturing
Company.
10/31/89 10/18/91 56 FR 52205.......... (c) 58............... Changes applicability
to facilities with
>=15 pounds VOC
per day.
10/31/89 10/18/91 56 FR 52205.......... (c) 58............... Various changes to
Section 20 approved.
9/1/93 11/19/93 58 FR 61041.......... ..................... Withdrawal of NPR for
Sikorsky Aircraft
Division of UTC,
Bridgeport.
1/29/90, 9/ 2/9/98 63 FR 6484........... (c) (60)............. VOC RACT for Sikorsky
29/95, Aircraft Corporation
& 2/7/in Stratford. (continued)