Loading (50 kb)...'
(continued)
Section 45-3-6................... Reports and Testing. 8/31/00 10/11/02, 67 FR 63270 (c)(48)
Section 45-3-7................... Variance............ 8/31/00 10/11/02, 67 FR 63270 (c)(48)
Section 45-3-8................... Circumvention....... 8/31/00 10/11/02, 67 FR 63270 (c)(48)
Section 45-3-9................... Inconsistency 8/31/00 10/11/02, 67 FR 63270 (c)(48)
Between Rules.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 5 To Prevent and Control Air Pollution From the Operation of Coal Preparation Plants, Coal
Handling Operations, and Coal Refuse Disposal Areas
----------------------------------------------------------------------------------------------------------------
Section 45-5-1................... General............. 8/31/00 10/07/02, 67 FR 63279 (c)(47)
Section 45-5-2................... Definitions......... 8/31/00 10/07/02, 67 FR 63279 (c)(47)
Section 45-5-3................... Emission of 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Particulate Matter
Prohibited and
Standards of
Measurement.
Section 45-5-4................... Control and 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Prohibition of
Particulate
Emissions from Coal
Thermal Drying
Operations of a
Coal Preparation
Plant.
Section 45-5-5................... Control and 10/22/93 7/13/99, 64 FR 37681 (c)(42)
Prohibition of
Particulate
Emissions From an
Air Table Operation
of a Coal
Preparation Plant.
Section 45-5-6................... Control and 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Prohibition of
Fugitive Dust
Emissions From Coal
Handling Operations
and Preparation
Plants.
Section 45-5-7................... Standards for Coal 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Refuse Disposal
Areas.
Section 45-5-8................... Burning coal Refuse 8/31/00 10/7/02 67 FR 62379 (c)(47)
Disposal Areas.
Section 45-5-9................... Monitoring of 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Operations.
Section 45-5-10.................. Construction, 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Modification, and
Relocation Permits.
Section 45-5-11.................. Operation Permits... 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Section 45-5-12.................. Reporting and 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Testing.
Section 45-5-13.................. Variance............ 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Section 45-5-14.................. Transfer of Permits. 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Section 45-5-15.................. Inconsistency 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Between Rules.
Appendix......................... Particulate Emission 8/31/00 10/7/02, 67 FR 62379 (c)(47)
Limitations and
Operational
Monitoring
Requirements
Applicable to
Thermal Dryers
Installed Before
October 24, 1974.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 6 To Prevent and Control Air Pollution From Combustion of Refuse
----------------------------------------------------------------------------------------------------------------
Section 45-6-1................... General............. 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-2................... Definitions......... 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-3................... Open Burning 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Prohibited.
Section 45-6-4................... Emission Standards 7/1/01 2/10/03, 68 FR 6627 (c)(51)
for Incinerators
and Incineration.
Section 45-6-5................... Registration........ 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-6................... Permits............. 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-7................... Reports and Testing. 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-8................... Variances........... 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-9................... Emergencies and 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Natural Disasters.
Section 45-6-10.................. Effect of the Rule.. 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Section 45-6-11.................. Inconsistency 7/1/01 2/10/03, 68 FR 6627 (c)(51)
Between Rules.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 7 To Prevent and Control Particulate Matter Air Pollution From Manufacturing Process Operations
----------------------------------------------------------------------------------------------------------------
Section 45-7-1................... General............. 8/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-2................... Definitions......... 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-3................... Emission of Smoke 08/31/00 06/03/03, 68 FR 33010 (c)(55)
and/or Particulate
Matter Prohibited
and Standards of
Measurement.
Section 45-7-4................... Control and 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Prohibition of
Particulate
Emissions by Weight
from Manufacturing
Process Source
Operations.
Section 45-7-5................... Control of Fugitive 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Particulate Matter.
Section 45-7-6................... Registration........ 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-7................... Permits............. 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-8................... Reporting and 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Testing.
Section 45-7-9................... Variance............ 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-10.................. Exemptions.......... 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Section 45-7-11.................. Alternative Emission 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Limits for
Duplicate Source
Operations.
Section 45-7-12.................. Inconsistency 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Between Rules.
TABLE 45-7A, TABLE 45-7B......... [Maximum Allowable 08/31/00 06/03/03, 68 FR 33010 (c)(55)
Emission Rates From
Sources Governed by
45 CFR Series 7].
----------------------------------------------------------------------------------------------------------------
[Ch. 16-20] TP-4 Compliance Test Procedures for Regulation VII_``To Prevent and Control Particulate Air
Pollution From Manufacturing Process Operations''
----------------------------------------------------------------------------------------------------------------
Section 1........................ General............. 2/23/84 6/28/85, 45 FR 26732 no (c) number;
Section 2........................ Visible Emission 2/23/84 6/28/85, 45 FR 26732 no (c) number;
Test Procedure.
Section 3........................ Mass Emission Test 2/23/84 6/28/85, 45 FR 26732 no (c) number;
Procedures.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 8 Ambient Air Quality Standards for Sulfur Oxides and Particulate Matter
----------------------------------------------------------------------------------------------------------------
Section 45-8-1................... General............. 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-8-2................... Definitions......... 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-8-3................... Ambient Air Quality 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Standards.
Section 45-8-4................... Methods of 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Measurement.
Section 45-8-5................... Inconsistency 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Between Regulations.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 9_Ambient Air Quality Standards for Carbon Monoxide and Ozone
----------------------------------------------------------------------------------------------------------------
Section 45-9-1................... General............. 6/1/00 10/7/02, 67 FR 62381 (c)(50)
Section 45-9-2................... Anti-Degradation 6/1/00 10/7/02, 67 FR 62381 (c)(50)
Policy.
Section 45-9-3................... Definitions......... 6/1/00 10/7/02, 67 FR 62381 (c)(50)
Section 45-9-4................... Ambient Air Quality 6/1/00 10/7/02, 67 FR 62381 (c)(50)
Standards.
Section 45-9-5................... Methods of 6/1/00 10/7/02, 67 FR 62381 (c)(50)
Measurement.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 10_To Prevent and Control Air Pollution from The Emission of Sulfur Oxides
----------------------------------------------------------------------------------------------------------------
Section 45-10-1.................. General............. 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-2.................. Definitions......... 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-3.................. Sulfur Dioxide 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Weight Emission
Standards for Fuel
Burning Units.
Section 45-10-4.................. Standards for 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Manufacturing
Process Source
Operations.
Section 45-10-5.................. Combustion of 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Refinery or Process
Gas Streams.
Section 45-10-6.................. Registration........ 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-7.................. Permits............. 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-8.................. Testing, Monitoring, 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Recordkeeping and
Reporting.
Section 45-10-9.................. Variance............ 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-10................. Exemptions and 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Recommendations.
Section 45-10-11................. Circumvention....... 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Section 45-10-12................. Inconsistency 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Between Rules.
TABLE 45-10A..................... [Priority 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Classifications].
TABLE 45-10B..................... [Allowable Percent 8/31/00 6/3/03, 68 FR 33002 (c)(53)
Sulfur Content of
Fuels].
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 11 Prevention of Air Pollution Emergency Episodes
----------------------------------------------------------------------------------------------------------------
Section 45-11-1.................. General............. 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-11-2.................. Definitions......... 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-11-3.................. Episode Criteria.... 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-11-4.................. Methods of 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Measurement.
Section 45-11-5.................. Preplanned Reduction 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Strategies.
Section 45-11-6.................. Emission Reduction 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Plans.
TABLE I.......................... Emission Reduction 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Plans_Alert Level.
TABLE II......................... Emission Reduction 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Plans_Warning Level.
TABLE III........................ Emission Reduction 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Plans_Emergency
Level.
Section 45-11-7.................. Air Pollution 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Emergencies;
Contents of Order;
Hearings; Appeals.
Section 45-11-8.................. Inconsistency 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Between Regulations.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 12 Ambient Air Quality Standard for Nitrogen Dioxide
----------------------------------------------------------------------------------------------------------------
Section 45-12-1.................. General............. 6/1/00 10/7/02, 67 FR 62378 (c)(49)
Section 45-12-2.................. Anti-Degradation 6/1/00 10/7/02, 67 FR 62378 (c)(49)
Policy.
Section 45-12-3.................. Definitions......... 6/1/00 10/7/02, 67 FR 62378 (c)(49)
Section 45-12-4.................. Ambient Air Quality 6/1/00 10/7/02, 67 FR 62378 (c)(49)
Standard.
Section 45-12-5.................. Methods of 6/1/00 10/7/02, 67 FR 62378 (c)(49)
Measurement.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 13 Permits for Construction, Modification, Relocation and Operation of Stationary Sources of Air
Pollutants, Notification Requirements, Temporary Permits, General Permits, and Procedures for Evaluation
----------------------------------------------------------------------------------------------------------------
Section 45-13-1.................. General............. 6/1/00 2/28/03 68 FR 9559 (c)(52)
Section 45-13-2.................. Definitions......... 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Section 45-13-3.................. Reporting 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Requirements for
Stationary Sources.
Section 45-13-4.................. Administrative 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Updates to Existing
Permits.
Section 45-13-5.................. Permit Application 6/1/00 2/28/03, 68 FR 9559 (c)(52)
and Reporting
Requirements for
Construction of and
Modifications to
Stationary Sources.
Section 45-13-6.................. Determination of 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Compliance of
Stationary Sources.
Section 45-13-7.................. Modeling............ 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Section 45-13-8.................. Public Review 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Procedures.
Section 45-13-9.................. Public Meetings..... 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Section 45-13-10................. Permit Transfer, 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Suspension,
Revocation and
Responsibility.
Section 45-13-11................. Temporary 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Construction or
Modification
Permits.
Section 45-13-12................. Permit Application 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Fees.
Section 45-13-13................. Inconsistency 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Between Rules.
Section 45-13-14................. Statutory Air 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Pollution.
Section 45-13-15................. Hazardous Air 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Pollutants.
TABLE 45-13A..................... Potential Emission 6/1/00 2/28/03, 68 FR 9559 (c)(52)
Rate.
TABLE 45-13B..................... De Minimus Sources.. 6/1/00 2/28/03, 68 FR 9559 (c)(52)
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 14 Permits for Construction and Major Modification of Major Stationary Sources of Air Pollution
for the Prevention of Significant Deterioration
----------------------------------------------------------------------------------------------------------------
Section 45-14-1.................. General............. 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
1/95
Section 45-14-2.................. Definitions......... 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
1/95
Section 45-14-3.................. Ambient Air Quality 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Increments and 1/95
Ceilings.
Section 45-14-4.................. Area Classification. 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Section 45-14-5.................. Prohibition of 5/1/95 10/22/96, 61 FR 54735 (c)(40)
Dispersion
Enhancement
Techniques.
Section 45-14-6.................. Registration, Report 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
and Permit 1/95
Requirements for
Major Stationary
Sources and Major
Modifications.
Section 45-14-7.................. Requirements 5/1/95 10/22/96, 61 FR 54735 (c)(40)
Relating to Control
Technology.
Section 45-14-8.................. Requirements 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Relating to the 1/95
Source's Impact on
Air Quality.
Section 45-14-9.................. Requirements for Air 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Quality Models. 1/95
Section 45-14-10................. Requirements for Air 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Quality Monitoring. 1/95
Section 45-14-11................. Requirements for 4/25/90 6/28/93, 58 FR 34526 (c)(28)
Additional Impacts
Analysis.
Section 45-14-12................. Additional 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Requirements and 1/95
Variances for
Sources Impacting
Federal Class I
Areas.
Section 45-14-13................. Procedures for 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Sources Employing 1/95
Innovative Control
Technology.
Section 45-14-14................. Exclusions From 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Increment 1/95
Consumption.
Section 45-14-15................. Exemptions From 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Specific 1/95
Requirements of
This Rule.
Section 45-14-16................. Public Review 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Procedures. 1/95
Section 45-14-17................. Public Meetings..... 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
1/95
Section 45-14-18................. Permit Transfer, 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Cancellation, and 1/95
Responsibility.
Section 45-14-19................. Disposition of 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Permits. 1/95
Section 45-14-20................. Conflict with Other 7/7/93, 5/ 10/22/96, 61 FR 54735 (c)(39), (c)(40)
Permitting Rules. 1/95
----------------------------------------------------------------------------------------------------------------
(Ch. 16-20) Series XIX Requirements for Pre-construction Review, Determination of Emission Offsets for Proposed
New or Modified Stationary Sources of Air Pollutants and Emission Trading for Intrasource Pollutants
----------------------------------------------------------------------------------------------------------------
Section 1........................ General............. 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Section 2........................ Definitions......... 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Section 3........................ Applicability....... 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Section 4........................ Conditions for a 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Permit Approval for
Proposed Major
Sources That Would
Contribute to a
Violation of NAAQS.
Section 5........................ Conditions for 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Permit Approval for
Sources Locating in
Attainment or
Unclassifiable
Areas That Would
Cause a New
Violation of a
NAAQS.
Section 6........................ Exemptions from 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Certain Conditions.
Section 7........................ Baseline for 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Determining Credit
for Emission
Offsets.
Section 8........................ Location of 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Offsetting
Emissions.
Section 9........................ Administrative 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Procedures for
Emission Offset
Proposals.
Section 10....................... Control of Fugitive 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Emissions.
Section 11....................... Offsetting of 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Secondary Emissions.
Section 12....................... Bubble Concept for 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Intrasource
Pollutants.
Section 13....................... Discretionary 5/27/83 7/2/85, 50 FR 27247 (c)(22)
Decisions Made by
the Director.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 20 Good Engineering Practice as Applicable to Stack Heights
----------------------------------------------------------------------------------------------------------------
Section 45-20-1.................. General............. 7/14/89 4/19/94, 59 FR 18489 (c)(27)
Section 45-20-2.................. Definitions......... 7/14/89 4/19/94, 59 FR 18489 (c)(27)
Section 45-20-3.................. Standards........... 7/14/89 4/19/94, 59 FR 18489 (c)(27)
Section 45-20-4.................. Public Review 7/14/89 4/19/94 59 FR 18489 (c)(27)
Procedures.
Section 45-20-5.................. Inconsistency 7/14/89 4/19/94, 59 FR 18489 (c)(27)
Between Regulations.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 21 Regulation to Prevent and Control Air Pollution From the Emission of Volatile Organic
Compounds
----------------------------------------------------------------------------------------------------------------
Section 45-21-1.................. General............. 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-2.................. Definitions......... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-3.................. Applicability....... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-4.................. Compliance 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Certification,
Recordkeeping, and
Reporting
Procedures for
Coating Sources.
Section 45-21-5.................. Compliance 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Certification,
Recordkeeping, and
Reporting
Requirements for
Non-Coating Sources.
Section 45-21-6.................. Requirements for 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Sources Complying
by Use of Control
Devices.
Section 45-21-7.................. Circumvention....... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-8.................. Handling, Storage, 7/7/93 2/1/95, 60 FR 6022 (c)(33)
and Disposal of
Volatile Organic
Compounds (VOCs).
Section 45-21-9.................. Compliance Programs, 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Registration,
Variance, Permits,
Enforceability.
Section 45-21-11................. Can Coating......... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-12................. Coil Coating........ 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-14................. Fabric Coating...... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-15................. Vinyl Coating....... 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-16................. Coating of Metal 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Furniture.
Section 45-21-17................. Coating of Large 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Appliances.
Section 45-21-18................. Coating of Magnet 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Wire.
Section 45-21-19................. Coating of 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Miscellaneous Metal
Parts.
Section 45-21-21................. Bulk Gasoline Plants 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Section 45-21-22................. Bulk Gasoline 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Terminals.
Section 45-21-23................. Gasoline Dispensing 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Facility_Stage I
Vapor Recovery.
Section 45-21-24................. Leaks From Gasoline 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Tank Trucks.
Section 45-21-25................. Petroleum Refinery 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Sources.
Section 45-21-26................. Leaks From Petroleum 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Refinery Equipment.
Section 45-21-27................. Petroleum Liquid 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Storage in External
Floating Roof Tanks.
Section 45-21-28................. Petroleum Liquid 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Storage in Fixed
Roof Tanks.
Section 45-21-29................. Leaks From Natural 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Gas/Gasoline
Processing
Equipment.
Section 45-21-31................. Cutback and 7/7/93 2/1/95 , 60 FR 6022 (c)(33)
Emulsified Asphalt.
Section 45-21-39................. Air Oxidation 7/7/93 2/1/95 , 60 FR 6022 (c)(33)
Processes in the
Synthetic Organic
Chemical
Manufacturing
Industry.
Section 45-21-41................. Test Methods and 7/7/93 2/1/95 , 60 FR 6022 (c)(33)
Compliance
Procedures: General
Provisions.
Section 45-21-42................. Test Methods and 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Compliance
Procedures:
Determining the
Volatile Organic
Compound (VOC)
Content of Coatings
and Inks.
Section 45-21-43................. Test Methods and 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Compliance
Procedures:
Alternative
Compliance Methods
for Surface Coating.
Section 45-21-44................. Test Methods and 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Compliance
Procedures:
Emission Capture
and Destruction or
Removal Efficiency
and Monitoring
Requirements.
Section 45-21-45................. Test Methods and 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Compliance
Procedures:
Determining the
Destruction or
Removal Efficiency
of a Control Device.
Section 45-21-46................. Test Methods and 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Compliance
Procedures: Leak
Detection Methods
for Volatile
Organic Compounds
(VOCs)..
Section 45-21-47................. Performance 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Specifications for
Continuous
Emissions
Monitoring of Total
Hydrocarbons.
Section 45-21-48................. Quality Control 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Procedures for
Continuous Emission
Monitoring Systems
(CEMS).
Appendix A....................... VOC Capture 7/7/93 2/1/95, 60 FR 6022 (c)(33)
Efficiency.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 26 NOX Budget Training Program as a Means of Control and Reduction of Nitrogen Oxides from
Electrical Generating Units
----------------------------------------------------------------------------------------------------------------
Section 45-26-1.................. General............. 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-2.................. Definitions......... 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-3.................. Measurements, 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Abbreviations and
Acronyms.
Section 45-26-4.................. NOX Budget Trading 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Program
Applicability.
Section 45-26-5.................. Retired Unit 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Exemption.
Section 45-26-6.................. NOX Budget Trading 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Program Standard
Requirements.
Section 45-26-7.................. Computation of Time. 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-10................. Authorization and 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Responsibilities of
the NOX Authorized
Account
Representative.
Section 45-26-11................. Alternate NOX 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Authorized Account
Representative.
Section 45-26-12................. Changing the NOX 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Authorized Account
Representative and
the Alternate NOX
Authorized Account
Representative;
Changes in Owners
and Operators.
Section 45-26-13................. Account Certificate 5/1/02 5/10/02, 67 FR 31733 (c)(46)
of Representation.
Section 45-26-14................. Objections 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Concerning the NOX
Authorized Account
Representative.
Section 45-26-20................. General NOX Budget 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Trading Program
Permit Requirements.
Section 45-26-21................. NOX Budget Permit 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Applications.
Section 45-26-22................. Information 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Requirements for
NOX Budget Permit
Applications.
Section 45-26-23................. NOX Budget Permit 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Contents.
Section 45-26-24................. NOX Budget Permit 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Revisions.
Section 45-26-30................. Compliance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Certification
Report.
Section 45-26-31................. Secretary's and 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Administrator's
Action on
Compliance
Certifications.
Section 45-26-40................. State NOX Trading 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Program Budget.
Section 45-26-41................. Timing Requirements 5/1/02 5/10/02, 67 FR 31733 (c)(46)
for State NOX
Allowance
Allocations.
Section 45-26-42................. State NOX Allowance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Allocations.
Section 45-26-43................. Compliance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Supplement Pool.
Section 45-26-50................. NOX Allowance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Tracking System
Accounts.
Section 45-26-51................. Establishment of 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Accounts.
Section 45-26-52................. NOX Allowance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Tracking System
Responsibilities of
NOX Authorized
Account
Representative.
Section 45-26-53................. Recordation of NOX 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Allowance
Allocations.
Section 45-26-54................. Compliance.......... 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-55................. NOX Allowance 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Banking.
Section 45-26-56................. Account Error....... 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-57................. Closing of General 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Accounts.
Section 45-26-60................. Submission of NOX 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Allowance Transfers.
Section 45-26-61................. Allowance Transfer 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Recordation.
Section 45-26-62................. Notification........ 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-70................. General Monitoring 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Requirements.
Section 45-26-71................. Initial 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Certification and
Recertification
Procedures.
Section 45-26-72................. Out of Control 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Periods.
Section 45-26-73................. Notifications....... 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-74................. Recordkeeping and 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Reporting.
Section 45-26-75................. Petitions........... 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Section 45-26-76................. Additional 5/1/02 5/10/02, 67 FR 31733 (c)(46)
Requirements to
Provide Heat Input
Data.
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 29 Rule Requiring the Submission of Emission Statements for Volatile Organic Compound Emissions
and Oxides of Nitrogen Emissions
----------------------------------------------------------------------------------------------------------------
Section 45-29-1.................. General............. 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Section 45-29-2.................. Definitions......... 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Section 45-29-3.................. Applicability....... 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Section 45-29-4.................. Compliance Schedule. 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Section 45-29-5.................. Emission Statement 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Requirements.
Section 45-29-6.................. Enforceability...... 7/7/93 8/4/95, 60 FR 39855 (c)(34)
Section 45-29-7.................. Severability........ 7/7/93 8/4/95, 60 FR 39855 (c)(34)
----------------------------------------------------------------------------------------------------------------
[45 CSR] Series 35 Requirements for Determining Conformity of General Federal Actions to Applicable Air Quality
Implementation Plans (General Conformity)
----------------------------------------------------------------------------------------------------------------
Section 45-35-1.................. General............. 5/1/95 9/5/95, 60 FR 46029 (c)(37)
Section 45-35-2.................. Definitions......... 5/1/95 9/5/95, 60 FR 46029 (c)(37)
Section 45-35-3.................. Adoption of 5/1/95 9/5/95, 60 FR 46029 (c)(37)
Criteria,
Procedures and
Requirements.
Section 45-35-4.................. Requirements........ 5/1/95 9/5/95, 60 FR 46029 (c)(37)
----------------------------------------------------------------------------------------------------------------
(d) EPA approved state source-specific requirements.
EPA-Approved Source Specific Requirements
----------------------------------------------------------------------------------------------------------------
Additional
Permit/order or State explanation/
Source name registration number effective EPA approval date citation at 40
date CFR 52.2560
----------------------------------------------------------------------------------------------------------------
Mountaineer Carbon Co............ Consent Order....... 7/2/82 9/1/82, 47 FR 38532 (c)(18)
National Steel Corp._Weirton Consent Order 7/6/82 12/9/82, 47 FR 55396 (c)(19)
Steel Division. (Bubble).
Columbia Gas Transmission Consent Order....... 9/12/90 4/24/91, 56 FR 18733 (c)(24)
Corporation_Lost River Station.
Wheeling-Pittsburgh Steel Corp... Consent Order CO-SIP- 11/14/91 7/25/94, 59 FR 37696 (c)(26)
91-29.
Standard Lafarge................. Consent Order CO-SIP- 11/14/91 7/25/94, 59 FR 37696 (c)(26) (continued)