CCLME.ORG - 40 CFR PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
Loading (50 kb)...'
(continued)

(b) The Lane Regional Air Pollution Authority rules for permitting new and modified major stationary sources (Title 38 New Source Review) are approved, in conjunction with the Oregon Department of Environmental Quality rules, in order for the Lane Regional Air Pollution Authority to issue prevention of significant deterioration permits within Lane County.

(c) The requirements of sections 160 through 165 of the Clean Air Act are not met for Indian reservations since the plan does not include approvable procedures for preventing the significant deterioration of air quality on Indian reservations and, therefore, the provisions of §52.21 except paragraph (a)(1) are hereby incorporated and made part of the applicable plan for Indian reservations in the State of Oregon.

[58 FR 47391, Sept. 9, 1993, as amended at 62 FR 10462, Mar. 7, 1997; 68 FR 11324, Mar. 10, 2003; 68 FR 2909, Jan. 22, 2003; 68 FR 11324, Mar. 10, 2003; 68 FR 20072, Apr. 24, 2003; 68 FR 74490, Dec. 24, 2003]

§ 52.1988 Air contaminant discharge permits.
top
(a) Except for compliance schedules under OAR 340–200–0050, emission limitations and other provisions contained in Air Contaminant Discharge Permits issued by the State in accordance with the provisions of the Federally-approved rules for Air Contaminant Discharge Permits (OAR chapter 340, Division 216), Plant Site Emission Limit (OAR chapter 340, Division 222), Alternative Emission Controls (OAR 340–226–0040) and Public Participation (OAR chapter 340, Division 209), shall be applicable requirements of the Federally-approved Oregon SIP (in addition to any other provisions) for the purposes of section 113 of the Clean Air Act and shall be enforceable by EPA and by any person in the same manner as other requirements of the SIP. Plant site emission limits and alternative emission limits (bubbles) established in Federal Operating Permits issued by the State in accordance with the Federally-approved rules for Plant Site Emission Limit (OAR chapter 340, Division 222) and Alternative Emission Controls (OAR 340–226–0040), shall be applicable requirements of the Federally-approved Oregon SIP (in addition to any other provisions) for the purposes of section 113 of the Clean Air Act and shall be enforceable by EPA and by any person in the same manner as other requirements of the SIP.

(b) Emission limitations and other provisions contained in Air Contaminant Discharge Permits and Federal Operating Permits established by the Lane Regional Air Pollution Authority pursuant to the rules applicable to sources required to have ACDP or Title V Operating Permits (Title 34, Sections 050, 060 (except for 060(6) “Plant Site Emission Limits for Sources of Hazardous Air Pollutants” and 060(8) “Alternative Emission Controls (Bubble)”), and 070) and the rules applicable to sources required to have air contaminant discharge permits (ACDP) (Title 34, Sections 090 through 150), shall be applicable requirements of the Federally-approved Oregon SIP (in addition to any other provisions) for the purposes of Section 113 of the Clean Air Act and shall be enforceable by EPA and by any person in the same manner as other requirements of the SIP.

[62 FR 10462, Mar. 7, 1997, as amended at 66 FR 40622, Aug. 3, 2001; 68 FR 2909, Jan. 22, 2003]

Subpart NN—Pennsylvania
top
§ 52.2020 Identification of plan.
top
Link to an amendment published at 71 FR 16237, Mar. 31, 2006.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Pennsylvania under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after February 10, 2005, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region III certifies that the rules/regulations provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State implementation plan as of February 10, 2005.

(3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103; the EPA, Air and Radiation Docket and Information Center, Air Docket (6102), 1301 Constitution Avenue, NW., Room B108, Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741–6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(c) EPA-Approved Regulations.


(1) EPA-Approved Pennsylvania Regulations
----------------------------------------------------------------------------------------------------------------
State Additional
State citation Title subject effective EPA approval date explanation/§
date 52.2063 citation
----------------------------------------------------------------------------------------------------------------
Title 25. Environmental Protection Article III. Air Resources
----------------------------------------------------------------------------------------------------------------
Chapter 121 General Provisions
----------------------------------------------------------------------------------------------------------------
Section 121.1.................... Definitions........... 12/27/97 2/25/03, 68 FR 8723 (c)(197).
Section 121.2.................... Purpose............... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 121.3.................... Applicability......... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 121.4.................... Regional Organization 5/23/92 12/22/94, 59 FR (c)(94).
of the Department. 65971.
Section 121.7.................... Prohibition of Air 3/20/72 5/31/72, 37 FR (c)(1).
Pollution. 10842.
Section 121.8.................... Compliance 8/13/77 12/17/79, 44 FR (c)(21); correction
responsibilities. 73031. published 8/22/80
(45 FR 56060).
Section 121.9.................... Circumvention......... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 121.10................... Existing orders....... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 121.11................... Severability clause... 3/20/72 5/31/72, 37 FR (c)(1); no longer
10842. in PA DEP rules.
----------------------------------------------------------------------------------------------------------------
Chapter 123 Standards for Contaminants
----------------------------------------------------------------------------------------------------------------
Fugitive Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.1(a) through (c)..... Prohibition of certain 8/29/77 12/17/79, 44 FR (c)(21); Paragraph
fugitive emissions. 73031. 123.1(d) is not in
the SIP.
Section 123.2.................... Fugitive particulate 8/13/83 7/27/84, 49 FR (c)(60).
matter. 30183.
----------------------------------------------------------------------------------------------------------------
Particulate Matter Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.11................... Combusion units....... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Appendix A [Graph]............... Particulate Matter- 3/20/72 5/31/72, 37 FR (c)(1).
Combustion Units. 10842.
Section 123.12................... Incinerators.......... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 123.13(a) through (c).... Processes............. 8/27/80 11/13/81, 46 FR (c)(39) paragraph
55971. 123.13(d) is not
in the SIP.
Appendix B [Graph]............... Particulate Matter- 3/20/72 5/31/72, 37 FR (c)(1).
Processes Listed in 10842.
Table 1.
Appendix C [Graph]............... Particulate Matter- 3/20/72 5/31/72, 37 FR (c)(1).
Processes Not Listed 10842.
in Table 1.
----------------------------------------------------------------------------------------------------------------
Sulfur Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.21................... General............... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 123.22................... Combustion units. 3/20/72 5/31/72, 37 FR (c)(1).
[General 10842.
provisions_air basins
and non-air basins].
Section 123.22(a)................ Combustion units_non 8/1/79 8/18/81, 46 FR (c)(36); approved
Air basins. 43423. as part of the
control strategy
for the Armstrong
County sulfur
dioxide
nonattainment
area.
Section 123.22(b)................ Combustion units_Erie 8/1/79 8/8/79, 44 FR 46465 (c)(20); correction
Air Basin. published 1/23/80
(45 FR 5303).
Section 123.22(c)................ Combustion 10/1/78 6/4/79, 44 FR 31980 (c)(18).
units_Southeast PA
Air Basin.
Section 123.22(c)................ Combustion units_Upper 8/21/82 7/5/83, 48 FR 30630 (c)(53).
Beaver Valley Air
Basin.
Section 123.22(d)................ Combustion units_Lower 1/1/81 12/16/81, 46 FR (c)(40).
Beaver Valley Air 61267.
Basin.
Figure 4 [Graph]................. Sulfur 3/20/72 5/31/72, 37 FR (c)(1).
Oxides_Combustion 10842.
Units.
Section 123.24................... Primary zinc smelters. 8/11/75 4/30/76, 41 FR (c)(14).
18077.
Section 123.25................... Monitoring 10/27/90 6/30/93, 58 FR (c)(81).
requirements. 34911.
----------------------------------------------------------------------------------------------------------------
Odor Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.31................... Limitations........... 3/20/72 5/31/72, 37 FR (c)(1); SIP version
10842. of Section 123.31
is different from
State version.
----------------------------------------------------------------------------------------------------------------
Visible Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.41................... Limitations........... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 123.42 (Except paragraph Exceptions............ 3/20/72 5/31/72, 37 FR (c)(1); Paragraph
123.42(4)). 10842. 123.42(4) is
declared not in
SIP at (c)(21).
Section 123.43................... Measuring Techniques.. 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 123.44................... Limitations of visible 12/27/97 6/11/02, 67 FR (c)(189).
fugitive air 39854.
contaminants from
operation of any coke
oven battery.
Section 123.45................... Alternative opacity 6/20/81 1/19/83, 48 FR 2319 (c)(48).
limitations.
Appendix D [Chart]............... Alternative Opcaity 6/20/81 1/19/83, 48 FR 2319 (c)(48).
Limitation_Applicatio
n.
Section 123.46................... Monitoring 6/20/81 1/19/83, 48 FR 2319 (c)(48).
requirements.
----------------------------------------------------------------------------------------------------------------
Nitrogen Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.51................... Monitoring 10/20/90 9/23/92, 57 FR (c)(74).
requirements. 43905.
----------------------------------------------------------------------------------------------------------------
NOX Allowance Requirements
----------------------------------------------------------------------------------------------------------------
Section 123.101.................. Purpose............... 3/11/00 6/6/00, 65 FR 35840 (c)(145).
Section 123.102.................. Source NOX allowance 3/11/00 6/6/00, 65 FR 35840 (c)(145).
requirements and NOX
allowance control
period.
Section 123.103.................. General NOX allowance 3/11/00 6/6/00, 65 FR 35840 (c)(145).
provisions.
Section 123.104.................. Source authorized 3/11/00 6/6/00, 65 FR 35840 (c)(145).
account
representative
requirements.
Section 123.105.................. NATS provisions....... 3/11/00 6/6/00, 65 FR 35840 (c)(145).
Section 123.106.................. NOX allowance transfer 3/11/00 6/6/00, 65 FR 35840 (c)(145).
protocol.
Section 123.107.................. NOX allowance transfer 3/11/00 6/6/00, 65 FR 35840 (c)(145).
procedures.
Section 123.108.................. Source emissions 3/11/00 6/6/00, 65 FR 35840 (c)(145).
monitoring
requirements.
Section 123.109.................. Source emissions 3/11/00 6/6/00, 65 FR 35840 (c)(145).
reporting
requirements.
Section 123.110.................. Source compliance 3/11/00 6/6/00, 65 FR 35840 (c)(145).
requirements.
Section 123.111.................. Failure to meet source 3/11/00 6/6/00, 65 FR 35840 (c)(145).
compliance
requirements.
Section 123.112.................. Source operating 3/11/00 6/6/00, 65 FR 35840 (c)(145).
permit provision
requirements.
Section 123.113.................. Source recordkeeping 3/11/00 6/6/00, 65 FR 35840 (c)(145).
requirements.
Section 123.114.................. General NOX allocation 3/11/00 6/6/00, 65 FR 35840 (c)(145).
provisions.
Section 123.115.................. Initial NOX allowance 3/11/00 6/6/00, 65 FR 35840 (c)(145).
NOX allocations.
Section 123.116.................. Source opt-in 3/11/00 6/6/00, 65 FR 35840 (c)(145).
provisions.
Section 123.117.................. New NOX affected 3/11/00 6/6/00, 65 FR 35840 (c)(145).
source provisions.
Section 123.118.................. Emission reduction 3/11/00 6/6/00, 65 FR 35840 (c)(145).
credit provisions.
Section 123.119.................. Bonus NOX allowance 3/11/00 6/6/00, 65 FR 35840 (c)(145).
awards.
Section 123.120.................. Audit................. 3/11/00 6/6/00, 65 FR 35840 (c)(145).
Appendix E [Chart]............... Appendix E [NOX 3/11/00 6/6/00, 65 FR 35840 (c)(145).
Allowances Chart].
----------------------------------------------------------------------------------------------------------------
Chapter 126 Standard for Motor Fuels
Subchapter A. Oxygenate Content
of Gasoline
----------------------------------------------------------------------------------------------------------------
Section 126.101.................. General............... 8/19/95 12/17/99, 64 FR (c)(142).
70589.
Section 126.102.................. Sampling and testing.. 8/19/95 12/17/99, 64 FR (c)(142).
70589.
Section 126.103.................. Recordkeeping and 8/19/95 12/17/99, 64 FR (c)(142).
reporting. 70589.
Section 126.104.................. Labeling requirements. 8/19/95 12/17/99, 64 FR (c)(142).
70589.
----------------------------------------------------------------------------------------------------------------
Subchapter C. Gasoline Volatility Requirements
----------------------------------------------------------------------------------------------------------------
Section 126.301 (a) through (c).. Compliant fuel 11/1/97 6/8/98, 63 FR 31116 (c)(131).
requirement.
Section 126.302 (Except paragraph Recordkeeping and 11/1/97 6/8/98, 63 FR 31116 (c)(131).
(a)(6) pertaining to RFG). reporting.
Section 126.303(a)............... Compliance and test 11/1/97 6/8/98, 63 FR 31116 (c)(131).
methods.
----------------------------------------------------------------------------------------------------------------
Subchapter D. Motor Vehicle Emissions Control Program
General Provisions
----------------------------------------------------------------------------------------------------------------
Section 126.401.................. Purpose............... 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.402.................. NLEV scope and 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
applicability. 72564.
----------------------------------------------------------------------------------------------------------------
Pennsylvania Clean Vehicles Program
----------------------------------------------------------------------------------------------------------------
Section 126.411.................. General Requirements.. 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.412.................. Emission requirements. 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.413.................. Exemptions............ 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
----------------------------------------------------------------------------------------------------------------
Applicable Motor Vehicle Testing
----------------------------------------------------------------------------------------------------------------
Section 126.421.................. New motor vehicle 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
certification testing. 72564.
Section 126.422.................. New motor vehicle 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
compliance testing. 72564.
Section 126.423.................. Assembly line testing. 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.424.................. In-use motor vehicle 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
enforcement testing. 72564.
Section 126.425.................. In-use surveillance 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
testing. 72564.
----------------------------------------------------------------------------------------------------------------
Motor Vehicle Manufacturers' Obligations
----------------------------------------------------------------------------------------------------------------
Section 126.431.................. Warranty and recall... 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.432.................. Reporting requirements 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
----------------------------------------------------------------------------------------------------------------
Motor Vehicle Dealer Responsibilities
----------------------------------------------------------------------------------------------------------------
Section 126.441.................. Responsibilities of 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
motor-vehicle dealers. 72564.
----------------------------------------------------------------------------------------------------------------
Chapter 127 Construction, Modification, Reactivation, and Operation of Sources
Subchapter A. General
----------------------------------------------------------------------------------------------------------------
Section 127.1.................... Purpose............... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.3.................... Operational 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
flexibility. 39497.
----------------------------------------------------------------------------------------------------------------
Subchapter B. Plan Approval Requirements
----------------------------------------------------------------------------------------------------------------
Section 127.11................... Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.11a.................. Reactivation of 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
sources. 39497.
Section 127.12................... Content of application 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.12a.................. Compliance review..... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.12b.................. Plan approval terms 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
and conditions. 39497.
Section 127.12c.................. Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
reporting 39497.
requirements.
Section 127.13................... Extensions............ 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.13a.................. Plan approval changes 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
for cause. 39497.
Section 127.13b.................. Denial of Plan 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
approval application. 39497.
Section 127.13c.................. Notice of basis for 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
certain plan approval 39497.
decisions.
Section 127.14................... Exemptions............ 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.25................... Compliance requirement 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.32................... Transfer of plan 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
approvals. 39497.
Section 127.35................... Maximum achievable 11/26/94 7/30/96, 61 FR (c)(110)(i)(C)
control technology 39497.
standards for
hazardous air
pollutants.
Section 127.36................... Health risk-based 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
emission standards 39497.
and operating
practice requirements.
Section 127.44................... Public Notice......... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.45................... Contents of notice.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.46................... Filing protests....... 8/13/83 7/27/84, 49 FR (c)(60).
30183.
Section 127.47................... Consideration of 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
protests. 39497.
Section 127.48................... Conferences and 8/13/83 7/27/84, 49 FR (c)(60).
hearings. 30183.
Section 127.49................... Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
procedure. 39497.
Section 127.50................... Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
record. 39497.
Section 127.51................... Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
disposition. 39497.
----------------------------------------------------------------------------------------------------------------
Subchapter D. Prevention of Significant Deterioration of Air Quality
----------------------------------------------------------------------------------------------------------------
Section 127.81................... Purpose............... 6/18/83 8/21/84, 49 FR (c)(57).
33127.
Section 127.82................... Scope................. 6/18/83 8/21/84, 49 FR (c)(57).
33127.
Section 127.83................... Adoption of Program... 6/18/83 8/21/84, 49 FR (c)(57).
33127.
----------------------------------------------------------------------------------------------------------------
Subchapter E. New Source Review
----------------------------------------------------------------------------------------------------------------
Section 127.201.................. General requirements.. 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.202.................. Effective date........ 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.203.................. Facilities subject to 1/15/94 12/9/97, 62 FR (c)(107).
special permit 64722.
requirements.
Section 127.204.................. Emissions subject to 1/15/94 12/9/97, 62 FR (c)(107).
this subchapter. 64722.
Section 127.205.................. Special permit 1/15/94 12/9/97, 62 FR (c)(107).
requirements. 64722.
Section 127.206.................. ERC general 1/15/94 12/9/97, 62 FR (c)(107).
requirements. 64722.
Section 127.207.................. ERC generation and 1/15/94 12/9/97, 62 FR (c)(107).
creation. 64722.
Section 127.208.................. ERC use and transfer 1/15/94 12/9/97, 62 FR (c)(107).
requirements. 64722.
Section 127.209.................. ERC registry system... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.210.................. Offset ratios......... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.211.................. Applicability 1/15/94 12/9/97, 62 FR (c)(107).
determination. 64722.
Section 127.212.................. Portable facilities... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.213.................. Construction and 1/15/94 12/9/97, 62 FR (c)(107).
demolition. 64722.
Section 127.214.................. Exemption............. 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.215.................. Reactivation.......... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.216.................. Circumvention......... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.217.................. Clean Air Act Titles 1/15/94 12/9/97, 62 FR (c)(107).
III-V applicability. 64722.
----------------------------------------------------------------------------------------------------------------
Subchapter F. Operating Permit Requirements
General
----------------------------------------------------------------------------------------------------------------
Section 127.401.................. Scope................. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.402.................. General provisions.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.403.................. Permitting of sources 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
operating lawfully 39497.
without a permit.
Section 127.404.................. Compliance schedule 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
for repermitting. 39497.
----------------------------------------------------------------------------------------------------------------
Permit Applications
----------------------------------------------------------------------------------------------------------------
Section 127.411.................. Content of 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
applications. 39497.
Section 127.412.................. Compliance review 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
forms. 39497.
Section 127.413.................. Municipal notification 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.414.................. Supplemental 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
information. 39497.
----------------------------------------------------------------------------------------------------------------
Review of Applications
----------------------------------------------------------------------------------------------------------------
Section 127.421.................. Review of Applications 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.422.................. Denial of permits..... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.423.................. Notice of basis for 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
certain operation 39497.
permit decisions.
Section 127.424.................. Public notice......... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.425.................. Contents of notice.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.426.................. Filing protests....... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.427.................. Consideration of 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
protest. 39497.
Section 127.428.................. Conferences and 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
hearings. 39497.
Section 127.429.................. Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
procedure. 39497.
Section 127.430.................. Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
record. 39497.
Section 127.431.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
disposition. 39497.
----------------------------------------------------------------------------------------------------------------
Operating Permit Conditions
----------------------------------------------------------------------------------------------------------------
Section 127.441.................. Operating permit terms 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
and conditions. 39497.
Section 127.442.................. Reporting requirements 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.443.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.444.................. Compliance 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.445.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
compliance schedules. 39497.
Section 127.446.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
duration. 39497.
Section 127.447.................. Alternate operating 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
scenarios. 39497.
Section 127.448.................. Emissions trading at 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
facilities with 39497.
Federally enforceable
emissions cap.
Section 127.449.................. De minimis emission 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
increases. 39497.
Section 127.450.................. Administrative 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
operating permit 39497.
amendments.
----------------------------------------------------------------------------------------------------------------
Operating Permit Modifications
----------------------------------------------------------------------------------------------------------------
Section 127.461.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
changes for cause. 39497.
Section 127.462.................. Minor operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
modifications. 39497.
Section 127.463.................. Operating permit 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
revisions to 39497.
incorporate
applicable standards.
Section 127.464.................. Transfer of operating 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
permits. 39497.
----------------------------------------------------------------------------------------------------------------
Subchapter H. General Plan Approvals and Operating Permits
General
----------------------------------------------------------------------------------------------------------------
Section 127.601.................. Scope................. 11/26/94 7/30/96, 61 FR (c)(111).
39494.
----------------------------------------------------------------------------------------------------------------
Issuance of General Plan Approvals and General Operating Permits
----------------------------------------------------------------------------------------------------------------
Section 127.611.................. General plan approvals 11/26/94 7/30/96, 61 FR (c)(111).
and general operating 39494.
permits.
Section 127.612.................. Public notice and 11/26/94 7/30/96, 61 FR (c)(111).
review period. 39494.
----------------------------------------------------------------------------------------------------------------
Use of General Plan Approvals and Permits
----------------------------------------------------------------------------------------------------------------
Section 127.621.................. Application for use of 11/26/94 7/30/96, 61 FR (c)(111).
general plan 39494.
approvals and general
operating permits.
Section 127.622.................. Compliance with 11/26/94 7/30/96, 61 FR (c)(111).
general plan 39494.
approvals and general
operating permits.
----------------------------------------------------------------------------------------------------------------
Subchapter I. Plan Approval and Operating Permit Fees
----------------------------------------------------------------------------------------------------------------
Section 127.701.................. General provisions.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.702.................. Plan approval fees.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.703.................. Operating permit fees 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
under Subchapter F. 39497.
Section 127.707.................. Failure to pay fee.... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
----------------------------------------------------------------------------------------------------------------
Subchapter J. General Conformity
----------------------------------------------------------------------------------------------------------------
Section 127.801.................. Purpose............... 11/9/96 9/29/97, 62 FR (c)(126).
50870.
Section 127.802.................. Adoption of Standards. 11/9/96 9/29/97, 62 FR (c)(126).
50870.
----------------------------------------------------------------------------------------------------------------
Chapter 129 Standards for Sources
Miscellaneous Sources
----------------------------------------------------------------------------------------------------------------
Section 129.11................... Nitric acid plants.... 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 129.12................... Sulfuric acid plants.. 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Section 129.13................... Sulfur recovery plants 3/20/72 5/31/72, 37 FR (c)(1).
10842.
Appendix A....................... Allowable emissions, 4/23/94 3/23/98, 63 FR (c)(129).
sulfur oxides_sulfur 13789.
recovery plants.
Section 129.14................... Open burning 8/9/76 8/19/80, 45 FR (c)(33).
operations. 55178.
Section 129.15................... Coke pushing 8/29/77; 12/17/79, 44 FR (c)(21); correction (continued)