(continued)
(1) Public exigency will not permit the delay incident to formally advertised procurement (e.g., an emergency procurement).
(2) The aggregate amount involved does not exceed $10,000 (see §35.936–19 for small purchases).
(3) The material or service to be procured is available from only one person or entity. If the procurement is expected to aggregate more than $10,000, the grantee must document its file with a justification of the need for noncompetitive procurement, and provide such documentation to the project officer on request.
(4) The procurement is for personal or professional services (including architectural or engineering services) or for any service that a university or other educational institution may render.
(5) No responsive, responsible bids at acceptable price levels have been received after formal advertising, and, with respect to procurement under §35.938–4, the Regional Administrator's prior written approval has been obtained.
(6) The procurement is for materials or services where the prices are established by law.
(7) The procurement is for technical items or equipment requiring standardization and interchangeability of parts with existing equipment.
(8) The procurement is for experimental, developmental or research services.
§ 35.936-19 Small purchases.
top
(a) A small purchase is the procurement of materials, supplies, and services when the aggregate amount involved in any one transaction does not exceed $10,000. The small purchase limitation of $10,000 applies to the aggregate total of an order, including all estimated handling and freight charges, overhead, and profit to be paid under the order. In arriving at the aggregate amount involved in any one transaction, all items which should properly be grouped together must be included. Reasonable competition shall be obtained.
(b) Subagreements for small purchases need not be in the form of a bilaterally executed written agreement. Where appropriate, unilateral purchase orders, sales slips, memoranda of oral price quotations, and the like may be used to minimize paperwork. Retention in the purchase files of these documents and of written quotations received, or references to catalogs or printed price lists used, will suffice as the record supporting the price paid.
§ 35.936-20 Allowable costs.
top
(a) Incurring costs under subagreements which are not awarded or administered in compliance with this part or part 33 of this subchapter, as appropriate, shall be cause for disallowance of those costs.
(b) Appropriate cost principles which apply to subagreements under EPA grants are identified in §30.710 of this subchapter. Under that section, the contractor's actual costs, direct and indirect, eligible for Federal participation in a cost reimbursement contract shall be those allowable under the applicable provisions of 41 CFR 1–15.2 (Principles and Procedures for Use in Cost-Reimbursement Type Supply and Research Contracts With Commercial Organizations) and 41 CFR 1–15.4 (Construction and Architect-Engineer Contracts).
(c) Reasonable costs of compliance with the procurement and project management requirements of these regulations are allowable costs of administration under the grant. Costs of announcement, selection, negotiation, and cost review and analysis in connection with procurement of architectural or engineering services are allowable, even when conducted before award of the grant. Legal and engineering costs which a grantee is required to incur in a protest action under §35.939 are allowable.
§ 35.936-21 Delegation to State agencies; certification of procurement systems.
top
(a) Under §35.912 and subpart F of this part, the Regional Administrator may delegate authority to a State agency to review and certify the technical and administrative adequacy of procurement documentation required under these sections.
(b) If a State agency believes that State laws which govern municipal procurement include the same requirements or operate to provide the same protections as do §§35.936, 35.937 and 35.938, the State may request the Administrator to approve the State system instead of the procedures of these sections. EPA shall review the State system to determine its adequacy.
(c) If a State agency determines that an applicant's procurement ordinances or applicable statutes include the same requirements or operate to provide the same protections as do §§35.936, 35.937 and 35.938, the State may certify (accompanied by appropriate documentation) the adequacy of the municipality's ordinances and statutes and request the Administrator to approve the municipality's system instead of the procedures of these sections. EPA shall conduct or may request the State to conduct a review of the municipality's system to determine its adequacy.
§ 35.936-22 Bonding and insurance.
top
(a) On contracts for the building and erection of treatment works or contracts for sewer system rehabilitation exceeding $100,000, each bidder must furnish a bid guarantee equivalent to 5 percent of the bid price. In addition, the contractor awarded a construction contract for the building and erection of treatment works or sewer system rehabilitation must furnish performance and payment bonds, each of which shall be in an amount not less than 100 percent of the contract price. Construction contracts less than $100,000 shall be subject to State and local requirements for bid guarantees, performance bonds, and payment bonds. For contracts or subcontracts in excess of $100,000 the Regional Administrator may authorize the grantee to use its own bonding policies and requirements if he determines, in writing, that the Government's interest is adequately protected.
(b) Contractors should obtain such construction insurance (e.g., fire and extended coverage, workmen's compensation, public liability and property damage, and “all risk” builder's risk or installation floater coverage) as is required by State or local law or the grantee or as is customary and appropriate. Under the Flood Disaster Protection Act of 1973, a contractor must purchase flood insurance to cover his risk of loss if the grantee has not purchased the insurance (see §30.405–10 of this subchapter).
§ 35.937 Subagreements for architectural or engineering services.
top
(a) Applicability. Except as §35.937–2 otherwise provides, the provisions of §§35.937 through 35.937–11 apply to all subagreements of grantees for architectural or engineering services where the aggregate amount of services involved is expected to exceed $10,000. The provisions of §§35.937–2, 35.937–3, and 35.937–4 are not required, but may be followed, where the population of the grantee municipality is 25,000 or less according to the most recent U.S. census. When $10,000 or less of services (e.g., for consultant or consultant subcontract services) is required, the small purchase provisions of §35.936–19 apply.
(b) Policy. Step 1, step 2, or administration or management of step 3 project work may be performed by negotiated procurement of architectural or engineering services. The Federal Government's policy is to encourage public announcement of the requirements for personal and professional services, including engineering services. Subagreements for engineering services shall be negotiated with candidates selected on the basis of demonstrated competence and qualifications for the type of professional services required and at fair and reasonable prices. All negotiated procurement shall be conducted in a manner that provides to the maximum practicable extent, open and free competition. Nothing in this subpart shall be construed as requiring competitive bids or price competition in the procurement of architectural or engineering services.
(c) Definitions. As used in §§35.937 through 35.937–11 the following words and terms mean:
(1) Architectural or engineering services. Those professional services associated with research, development, design and construction, alteration, or repair of real property, as well as incidental services that members of these professions and those in their employ may logically or justifiably perform, including studies, investigations, surveys, evaluations, consultations, planning, programing, conceptual designs, plans and specifications, cost estimates, inspections, shop drawing reviews, sample recommendations, preparation of operation and maintenance manuals, and other related services.
(2) Engineer. A professional firm or individual engaged to provide services as defined in paragraph (c)(1) of this section by subagreement under a grant.
§ 35.937-1 Type of contract (subagreement).
top
(a) General. Cost-plus-percentage-of-cost and percentage-of-construction-cost contracts are prohibited. Cost reimbursement, fixed price, or per diem contracts or combinations of these may be negotiated for architectural or engineering services. A fixed price contract is generally used only when the scope and extent of work to be performed is clearly defined. In most other cases, a cost reimbursement type of contract is more appropriate. A per diem contract may be used if no other type of contract is appropriate. An incentive fee may be used if the grantee submits an adequate independent cost estimate and price comparison under §35.937–6.
(b) Cost reimbursement contracts. Each cost reimbursement contract must clearly establish a cost ceiling which the engineer may not exceed without formally amending the contract and a fixed dollar profit which may not be increased except in case of a contract amendment to increase the scope of work.
(c) Fixed price contracts. An acceptable fixed price contract is one which establishes a guaranteed maximum price which may not be increased unless a contract amendment increases the scope of work.
(d) Compensation procedures. If, under either a cost reimbursement or fixed price contract, the grantee desires to use a multiplier type of compensation, all of the following must apply:
(1) The multiplier and the portions of the multiplier allocable to overhead and allocable to profit have been specifically negotiated;
(2) The portion of the multiplier allocable to overhead includes only allowable items of cost under the cost principles of 41 CFR 1–15.2 and 1–15.4;
(3) The portions of the multiplier allocable to profit and allocable to overhead have been separately identified in the contract; and
(4) The fixed price contract includes a guaranteed maximum price for completion of the specifically defined scope of work; the cost reimbursement contract includes a fixed dollar profit which may not be increased except in case of a contract amendment which increases the scope of work.
(e) Per diem contracts. A per diem agreement expected to exceed $10,000 may be utilized only after a determination that a fixed price or cost reimbursement type contract is not appropriate. Per diem agreements should be used only to a limited extent, e.g., where the first task under a step 1 grant involves establishing the scope and cost of succeeding step 1 tasks, or for incidental services such as expert testimony or intermittent professional or testing services. (Resident engineer and resident inspection services should generally be compensated under paragraph (b) or (c) of this section.) Cost and profit included in the per diem rate must be specifically negotiated and displayed separately in the engineer's proposal. The contract must clearly establish a price ceiling which may not be exceeded without formally amending the contract.
§ 35.937-2 Public notice.
top
(a) Requirement. Adequate public notice as paragraph (a)(1) or (2) of this section provide, must be given of the requirement for architectural or engineering services for all subagreements with an anticipated price in excess of $25,000 except as paragraph (b) of this section provides. In providing public notice under paragraphs (a)(1) and (2) of this section, grantees must comply with the policies in §§35.936–2(c), 35.936–3, and 35.936–7.
(1) Public announcement. A notice of request for qualifications should be published in professional journals, newspapers, or publications of general circulation over a reasonable area and, in addition, if desired, through posted public notices or written notification directed to interested person, firms, or professional organizations inviting the submission of statements of qualifications. The announcement must clearly state the deadline and place for submission of qualification statements.
(2) Prequalified list. As an alternative to publishing public notice as in paragraph (b) of this section, the grantee may secure or maintain a list of qualified candidates. The list must:
(i) Be developed with public notice procedures as in paragraph (a)(1) of this section;
(ii) Provide for continuous updating; and
(iii) Be maintained by the grantee or secured from the State or from a nearby political subdivision.
(b) Exceptions. The public notice requirement of this section and the related requirements of §§35.937–3 and 35.937–4 are not applicable, but may be followed, in the cases described in paragraphs (b) (1) through (3) of this section. All other appropriate provisions of this section, including cost review and negotiation of price, apply.
(1) Where the population of the grantee municipality is 25,000 or less according to the latest U.S. census.
(2) For step 2 or step 3 of a grant, if:
(i) The grantee is satisfied with the qualifications and performance of an engineer who performed all or any part of the step 1 or step 2 work;
(ii) The engineer has the capacity to perform the subsequent steps; and
(iii) The grantee desires the same engineer to provide architectural or engineering services for the subsequent steps.
(3) For subsequent segments of design work under one grant if:
(i) A single treatment works is segmented into two or more step 3 projects;
(ii) The step 2 work is accordingly segmented so that the initial contract for preparation of construction drawings and specifications does not cover the entire treatment works to be built under one grant; and
(iii) The grantee desires to use the same engineering firm that was selected for the initial segment of step 2 work for subsequent segments.
§ 35.937-3 Evaluation of qualifications.
top
(a) The grantee shall review the qualifications of firms which responded to the announcement or were on the prequalified list and shall uniformly evaluate the firms.
(b) Qualifications shall be evaluated through an objective process (e.g., the appointment of a board or committee which, to the extent practicable, should include persons with technical skills).
(c) Criteria which should be considered in the evaluation of candidates for submission of proposals should include:
(1) Specialized experience and technical competence of the candidate or firm and its personnel (including a joint venture, association or professional subcontract), considering the type of services required and the complexity of the project;
(2) Past record of performance on contracts with the grantee, other government agencies or public bodies, and with private industry, including such factors as control of costs, quality of work, and ability to meet schedules;
(3) The candidate's capacity to perform the work (including any specialized services) within the time limitations, considering the firm's current and planned workload;
(4) The candidate's familiarity with types of problems applicable to the project; and
(5) Avoidance of personal and organizational conflicts of interest prohibited under State and local law and §35.936–16.
§ 35.937-4 Solicitation and evaluation of proposals.
top
(a) Requests for professional services proposals must be sent to no fewer than three candidates who either responded to the announcement or who were selected from the prequalified list. If, after good faith effort to solicit qualifications in accordance with §35.937–2, fewer than three qualified candidates respond, all qualified candidates must be provided requests for proposals.
(b) Requests for professional services proposals must be in writing and must contain the information necessary to enable a prospective offeror to prepare a proposal properly. The request for proposals must include the solicitation statement in §35.937–9(a) and must inform offerors of the evaluation criteria, including all those in paragraph (c) of this section, and of the relative importance attached to each criterion (a numerical weighted formula need not be utilized).
(c) All proposals submitted in response to the request for professional services proposals must be uniformly evaluated. Evaluation criteria shall include, as a minimum, all criteria stated in §35.937–3(c) of this subpart. The grantee shall also evaluate the candidate's proposed method to accomplish the work required, including, where appropriate, demonstrated capability to explore and develop innovative or advanced techniques and designs. The grantee's evaluation shall comply with §35.936–7.
(d) Proposals shall be evaluated through an objective process (e.g., the appointment of a board or committee which, to the extent practicable, should include persons with technical skills. Oral (including telephone) or written interviews should be conducted with top rated proposers, and information derived therefrom shall be treated on a confidential basis, except as required to be disclosed under State or local law or to EPA under §35.937–6.
(e) At no point during the procurement process shall information be conveyed to any candidate which would provide an unfair competitive advantage.
§ 35.937-5 Negotiation.
top
(a) Grantees are responsible for negotiation of their contracts for architectural or engineering services. Contract procurement including negotiation may be performed by the grantee directly or by another non-Federal governmental body, person or firm retained for the purpose. Contract negotiations may include the services of technical, legal, audit, or other specialists to the extent appropriate.
(b) Negotiations may be conducted in accordance with State or local requirements, as long as they meet the minimum requirements as set forth in this section. In the absence of State or local statutory or code requirements, negotiations may be conducted by the grantee under procedures it adopts based upon Public Law 92–582, 40 U.S.C. 541–544 (commonly known as the “Brooks Bill”) or upon the negotiation procedures of 40 CFR 33.510–2.
(c) The object of negotiations with any candidate shall be to reach agreement on the provisions of the proposed contract. The grantee and the candidate shall discuss, as a minimum:
(1) The scope and extent of work and other essential requirements;
(2) Identification of the personnel and facilities necessary to accomplish the work within the required time, including where needed, employment of additional personnel, subcontracting, joint ventures, etc.;
(3) Provision of the required technical services in accordance with regulations and criteria established for the project; and
(4) A fair and reasonable price for the required work, to be determined in accordance with the cost and profit considerations set forth in §§35.937–6 and 35.937–7, and payment provisions.
§ 35.937-6 Cost and price considerations.
top
(a) General. EPA policy is that the cost or price of all subagreements and amendments to them must be considered. For each subagreement in excess of $10,000 but not greater than $100,000, grantees shall use the procedures described in paragraph (c) of this section, or an equivalent process.
(b) Subagreements over $100,000. For each subagreement expected to exceed $100,000, or for two subagreements which aggregate more than $100,000 awarded to an engineer for work on one step, or where renegotiation or amendment of a subagreement will result in a contract price in excess of $100,000, or where the amendment itself is in excess of $100,000, the provisions of this paragraph (b) shall apply.
(1) The candidate(s) selected for negotiation shall submit to the grantee for review sufficient cost and pricing data as described in paragraph (c) of this section to enable the grantee to ascertain the necessity and reasonableness of costs and amounts proposed, and the allowability and eligibility of costs proposed.
(2) The grantee shall submit to the EPA Project Officer for review (i) documentation of the public notice of need for architectural or engineering services, and selection procedures used, in those cases where §§35.937–2, 35.937–3 and 35.937–4 are applicable; (ii) the cost and pricing data the selected engineer submitted; (iii) a certification of review and acceptance of the selected engineer's cost or price; and (iv) a copy of the proposed subagreement. The EPA Project Officer will review the complete subagreement action and approve the grantee's compliance with appropriate procedures before the grantee awards the subagreement. The grantee shall be notified upon completion of review.
(c) Cost review. (1) The grantee shall review proposed subagreement costs.
(2) As a minimum, proposed subagreement costs shall be presented on EPA form 5700–41 on which the selected engineer shall certify that the proposed costs reflect complete, current, and accurate cost and pricing data applicable to the date of anticipated subagreement award.
(3) In addition to the specific elements of cost, the estimated amount of profit shall be set forth separately in the cost summary for fixed price contracts and a maximum total dollar amount of profit shall be set forth separately in the cost summary for cost reimbursement contracts.
(4) The grantee may require more detailed cost data than the form requires in order to substantiate the reasonableness of proposed subagreement costs. EPA normally requires more detailed documentation only when the selected engineer is unable to certify that the cost and pricing data used are complete, current, and accurate. EPA may, on a selected basis, perform a pre-award cost analysis on any subagreement. Normally, a provisional overhead rate will be agreed upon before contract award.
(5) Appropriate consideration should be given to §30.710 of this subchapter which contains general cost principles which must be used to determine the allowability of costs under grants. The engineer's actual costs, direct and indirect, allowable for Federal participation shall be determined in accordance with the terms and conditions of the subagreement, this subpart and the cost principles included in 41 CFR 1–15.2 and 1–15.4. Examples of cost which are not allowable under those cost principles include entertainment, interest on borrowed capital and bad debts.
(6) The engineer shall have an accounting system which accounts for costs in accordance with generally accepted accounting principles. This system shall provide for the identification, accumulation, and segregation of allowable and unallowable project costs among projects. Allowable project costs shall be determined in accordance with paragraph (c)(5) of this section. The engineer must propose and account for costs in a manner consistent with his normal accounting procedures.
(7) Subagreements awarded on the basis of review of a cost element summary and a certification of complete, current, and accurate cost and pricing data shall be subject to downward renegotiation or recoupment of funds where the Regional Administrator determines that such certification was not based on complete, current, and accurate cost and pricing data or not based on costs allowable under the appropriate FPR cost principles (41 CFR 1–15.2 and 1–15.4) at the time of award.
§ 35.937-7 Profit.
top
The objective of negotiations shall be the exercise of sound business judgment and good administrative practice including the determination of a fair and reasonable profit based on the firm's assumption of risk and input to total performance and not merely the application of a predetermined percentage factor. For the purpose of subagreements under EPA grants, profit is defined as the net proceeds obtained by deducting all allowable costs (direct and indirect) from the price. (Because this definition of profit is based on Federal procurement principles, it may vary from the firm's definition of profit for other purposes.) Profit on a subagreement and each amendment to a subagreement under a grant should be sufficient to attract engineers who possess talents and skills necessary to the accomplishment of project objectives, and to stimulate efficient and expeditious completion of the project. Where cost review is performed, the grantee should review the estimate of profit as he reviews all other elements of price.
§ 35.937-8 Award of subagreement.
top
After the close of negotiations and after review and approval by the EPA Project Officer if required under §35.937–6(b), the grantee may award the contract. Unsuccessful candidates should be notified promptly.
§ 35.937-9 Required solicitation and subagreement provisions.
top
(a) Required solicitation statement. Requests for qualifications or proposals must include the following statement, as well as the proposed terms of the subagreement.
Any contract awarded under this request for (qualifications/professional proposals) is expected to be funded in part by a grant from the United States Environmental Protection Agency. This procurement will be subject to regulations contained in 40 CFR 35.936, 35.937, and 35.939. Neither the United States nor the United States Environmental Protection Agency is nor will be a party to this request for (qualifications/professional proposals) or any resulting contract.
(b) Content of subagreement. Each subagreement must adequately define:
(1) The scope and extent of project work;
(2) The time for performance and completion of the contract work, including where appropriate, dates for completion of significant project tasks;
(3) Personnel and facilities necessary to accomplish the work within the required time;
(4) The extent of subcontracting and consultant agreements; and
(5) Payment provisions in accordance with §35.937–10.
If any of these elements cannot be defined adequately for later tasks or steps at the time of contract execution, the contract should not include the subsequent tasks or steps at that time.
(c) Required subagreement provisions. Each consulting engineering contract must include the provisions set forth in appendix C–1 to this subpart.
§ 35.937-10 Subagreement payments—architectural or engineering services.
top
The grantee shall make payment to the engineer in accordance with the payment schedule incorporated in the engineering agreement or in accordance with paragraph 7b of appendix C–1 to this subpart. Any retainage is at the option of the grantee. No payment request made by the Engineer under the agreement may exceed the estimated amount and value of the work and services performed.
§ 35.937-11 Applicability to existing contracts.
top
Some negotiated engineering subagreements already in existence may not comply with the requirements of §§35.936 and 35.937. Appendix D to this subpart contains EPA policy with respect to these subagreements and must be implemented before the grant award action for the next step under the grant.
§ 35.937-12 Subcontracts under subagreements for architectural or engineering services.
top
(a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in awarding such subcontracts are required to comply with any of the provisions, selection procedures, policies or principles set forth in §35.936 or §35.937 except as provided in paragraphs (b), (c), and (d) of this section.
(b) The award or execution of subcontracts in excess of $10,000 under a prime contract for architectural or engineering services and the procurement procedures used by the engineer in awarding such subcontracts must comply with the following:
(1) Section 35.936–2 (Grantee procurement systems; State or local law);
(2) Section 35.936–7 (Small and minority business);
(3) Section 35.936–15 (Limitations on subagreement award);
(4) Section 35.936–17 (Fraud and other unlawful or corrupt practices);
(5) Section 35.937–6 (Cost and price considerations);
(6) Section 35.937–7 (Profit);
(7) Prohibition of percentage-of-construction-cost and cost-plus-percentage-of-cost contracts (see §35.937–1); and
(8) Applicable subagreement clauses (see appendix C–1, clauses 9, 17, 18; note clause 10).
(c) The applicable provisions of this subpart shall apply to lower tier subagreements where an engineer acts as an agent for the grantee under a management subagreement (see §35.936–5(b)).
(d) If an engineer procures items or services (other than architectural or engineering services) which are more appropriately procured by formal advertising or competitive negotiation procedures, the applicable procedures of §35.938 or of part 33 shall be observed.
§ 35.938 Construction contracts (subagreements) of grantees.
top
§ 35.938-1 Applicability.
top
This section applies to construction contracts (subagreements) in excess of $10,000 awarded by grantees for any step 3 project.
§ 35.938-2 Performance by contract.
top
The project work shall be performed under one or more contracts awarded by the grantee to private firms, except for force account work authorized by §35.936–14.
§ 35.938-3 Type of contract.
top
Each contract shall be a fixed price (lump sum or unit price or a combination of the two) contract, unless the Regional Administrator gives advance written approval for the grantee to use some other acceptable type of contract. The cost-plus-percentage-of-cost contract shall not be used in any event.
§ 35.938-4 Formal advertising.
top
Each contract shall be awarded after formal advertising, unless negotiation is permitted in accordance with §35.936–18. Formal advertising shall be in accordance with the following:
(a) Adequate public notice. The grantee will cause adequate notice to be given of the solicitation by publication in newspapers or journals of general circulation beyond the grantee's locality (statewide, generally), inviting bids on the project work, and stating the method by which bidding documents may be obtained or examined. Where the estimated cost of step 3 construction is $10 million or more, the grantee must generally publish the notice in trade journals of nationwide distribution. The grantee should, in addition, solicit bids directly from bidders if it maintains a bidders list.
(b) Adequate time for preparing bids. Adequate time, generally not less than 30 days, must be allowed between the date when public notice under paragraph (a) of this section is first published and the date by which bids must be submitted. Bidding documents (including specifications and drawings) shall be available to prospective bidders from the date when such notice is first published.
(c) Adequate bidding documents. The grantee shall prepare a reasonable number of bidding documents (invitations for bids) and shall furnish them upon request on a first-come, first-served basis. The grantee shall maintain a complete set of bidding documents and shall make them available for inspection and copying by any party. The bidding documents shall include:
(1) A complete statement of the work to be performed, including necessary drawings and specifications, and the required completion schedule. (Drawings and specifications may be made available for inspection and purchase, instead of being furnished.);
(2) The terms and conditions of the contract to be awarded;
(3) A clear explanation of the method of bidding and the method of evaluation of bid prices, and the basis and method for award of the contract;
(4) Responsibility requirements or criteria which will be employed in evaluating bidders;
(5) The following statement:
Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a grant from the U.S. Environmental Protection Agency. Neither the United States nor any of its departments, agencies or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to regulations contained in 40 CFR 35.936, 35.938, and 35.939.;
and
(6) A copy of §§35.936, 35.938, and 35.939.
(d) Sealed bids. The grantee shall provide for bidding by sealed bid and for the safeguarding of bids received until public opening.
(e) Addenda to bidding documents. If a grantee desires to amend any part of the bidding documents (including drawings and specifications) during the period when bids are being prepared, the addenda shall be communicated in writing to all firms which have obtained bidding documents in time to be considered before the bid opening time.
(f) Bid modifications. A firm which has submitted a bid shall be allowed to modify or withdraw its bid before the time of bid opening.
(g) Public opening of bids. The grantee shall provide for a public opening of bids at the place, date and time announced in the bidding documents.
(h) Award to the low, responsive, responsible bidder. (1) After bids are opened, the grantee shall evaluate them in accordance with the methods and criteria set forth in the bidding documents.
(2) The grantee may reserve the right to reject all bids. Unless all bids are rejected for good cause, award shall be made to the low, responsive, responsible bidder.
(3) If the grantee intends to make the award to a firm which did not submit the lowest bid, he shall prepare a written statement before any award, explaining why each lower bidder was deemed nonresponsible or nonresponsive, and shall retain it in his files.
(4) State or local laws, ordinances, regulations or procedures which are designed or which operate to give local or in-State bidders preference over other bidders shall not be employed in evaluating bids.
(5) If an unresolved procurement review issue or a protest relates only to award of a subcontract or procurement of a subitem under the prime contract, and resolution of that issue or protest is unduly delaying performance of the prime contract, the Regional Administrator may authorize award and performance of the prime contract before resolution of the issue or protest, if the Regional Administrator determines that:
(i) Resolution of the protest—
(A) Will not affect the placement of the prime contract bidders; and
(B) Will not materially affect initial performance of the prime contract; and that
(ii) Award of the prime contract—
(A) Is in the Government's best interest;
(B) Will not materially affect resolution of the protest; and
(C) Is not barred by State law.
(6) The grantee shall not reject a bid as nonresponsive for failure to list or otherwise indicate the selection of a subcontractor(s) or equipment, unless the grantee has unambiguously stated in the solicitation documents that such failure to list shall render a bid nonresponsive and shall cause rejection of a bid.
§ 35.938-5 Negotiation of contract amendments (change orders).
top
(a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function may be performed by the grantee directly or, if authorized, by his engineer. During negotiations with the contractor the grantee shall:
(1) Make certain that the contractor has a clear understanding of the scope and extent of work and other essential requirements;
(2) Assure that the contractor demonstrates that he will make available or will obtain the necessary personnel, equipment and materials to accomplish the work within the required time; and
(3) Assure a fair and reasonable price for the required work.
(b) Changes in contract price or time. The contract price or time may be changed only by a change order. When negotiations are required, they shall be conducted in accordance with paragraph (c) or (d) of this section, as appropriate. The value of any work covered by a change order or of any claim for increase or decrease in the contract price shall be determined by the method set forth in paragraphs (b) (1) through (3) of this section which is most advantageous to the grantee.
(1) Unit prices—(i) Original bid items. Unit prices previously approved are acceptable for pricing changes of original bid items. However, when changes in quantities exceed 15 percent of the original bid quantity and the total dollar change of that bid item is significant, the grantee shall review the unit price to determine if a new unit price should be negotiated.
(ii) New items. Unit prices of new items shall be negotiated.
(2) A lump sum to be negotiated.
(3) Cost reimbursement—the actual cost for labor, direct overhead, materials, supplies, equipment, and other services necessary to complete the work plus an amount to be agreed upon to cover the cost of general overhead and profit to be negotiated.
(c) For each change order not in excess of $100,000 the contractor shall submit sufficient cost and pricing data to the grantee to enable the grantee to determine the necessity and reasonableness of costs and amounts proposed, and the allowability and eligibility of costs proposed.
(d) For each change order in excess of $100,000, the contractor shall submit to the grantee for review sufficient cost and pricing data as described in paragraphs (d) (1) through (6) of this section to enable the grantee to ascertain the necessity and reasonableness of costs and amounts proposed, and the allowability and eligibility of costs proposed.
(1) As a minimum, proposed change order costs shall be presented on EPA Form 5700–41 on which the contractor shall certify that proposed costs reflect complete, current, and accurate cost and pricing data applicable to the date of the change order.
(2) In addition to the specific elements of cost, the estimated amount of profit shall be set forth separately in the cost summary for fixed price change orders and a specific total dollar amount of profit will be set forth separately in the cost summary for cost reimbursement change orders.
(3) The grantee may require more detailed cost data than the form requires in order to substantiate the reasonableness of proposed change order costs. EPA normally requires more detailed documentation only when the contractor is unable to certify that proposed change order cost data are complete, current, and accurate. EPA may, on a selected basis, perform a detailed cost analysis on any change order.
(4) Appropriate consideration should be given to §30.710 of this subchapter which contains general cost principles which must be used for the determination and allowability of costs under grants. The contractor's actual costs, direct and indirect, allowable for Federal participation shall be determined in accordance with the terms and conditions of the contract, this subpart and the cost principles included in 41 CFR 1–15.2 and 1–15.4. Examples of costs which are not allowable under those cost principles include, but are not limited to, entertainment, interest on borrowed capital and bad debts.
(5) For costs under cost reimbursement change orders, the contractor shall have an accounting system which accounts for such costs in accordance with generally accepted accounting principles. This system shall provide for the identification, accumulation and segregation of allowable and unallowable change orders. Allowable change order costs shall be determined in accordance with paragraph (d)(4) of this section. The contractor must propose and account for such costs in a manner consistent with his normal accounting procedures.
(6) Change orders awarded on the basis of review of a cost element summary and a certification of complete, current, and accurate cost and pricing data shall be subject to downward renegotiation or recoupment of funds where subsequent audit substantiates that such certification was not based on complete, current and accurate cost and pricing data and on costs allowable under the appropriate FPR cost principles (41 CFR 1–15.2 and 1–15.4) at the time of change order execution.
(e) EPA review. In addition to the requirements of §§35.935–10 (copies of contract documents) and 35.935–11 (project changes), the grantee shall submit, before the execution of any change order in excess of $100,000, to the EPA Project Officer for review:
(1) The cost and pricing data the contractor submitted;
(2) A certification of review and acceptance of the contractor's cost or price; and
(3) A copy of the proposed change order.
(f) Profit. The objective of negotiations shall be the exercise of sound business judgment and good administrative practice including the determination of a fair and reasonable profit based on the contractor's assumption of risk and input to total performance and not merely the application of a predetermined percentage factor. For the purpose of negotiated change orders to construction contracts under EPA grants, profit is defined as the net proceeds obtained by deducting all allowable costs (direct and indirect) from the price. The grantee should review the estimate or profit as he reviews all other elements of price.
(g) Related work. Related work shall not be split into two amendments or change orders merely to keep it under $100,000 and thereby avoid the requirements of paragraph (d) of this section. For change orders which include both additive and deductive items:
(1) If any single item (additive or deductive) exceeds $100,000, the requirements of paragraph (d) of this section shall be applicable.
(2) If no single additive or deductive item has a value of $100,000, but the total price of the change order is over $100,000, the requirements of paragraph (d) of this section shall be applicable.
(3) If the total of additive items of work in the change order exceeds $100,000, or the total of deductive items of work in the change order exceeds $100,000, and the net price of the change order is less than $100,000, the requirements of paragraph (d) of this section shall apply.
§ 35.938-6 Progress payments to contractors.
top
(a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors should make prompt progress payment to subcontractors and suppliers for eligible construction, material, and equipment costs, including those of undelivered specifically manufactured equipment, incurred under a contract under an EPA construction grant.
(b) Conditions of progress payments. For purposes of this section, progress payments are defined as follows:
(1) Payments for work in place.
(2) Payments for materials or equipment which have been delivered to the construction site, or which are stockpiled in the vicinity of the construction site, in accordance with the terms of the contract, when conditional or final acceptance is made by or for the grantee. The grantee shall assure that items for which progress payments have been made are adequately insured and are protected through appropriate security measures. Costs of such insurance and security are allowable costs in accordance with §35.940.
(3) Payments for undelivered specifically manufactured items or equipment (excluding off-the-shelf or catalog items), as work on them progresses. Such payments must be made if provisions therefor are included in the bid and contract documents. Such provisions may be included at the option of the grantee only when all of the following conditions exist:
(i) The equipment is so designated in the project specifications;
(ii) The equipment to be specifically manufactured for the project could not be readily utilized on nor diverted to another job; and
(iii) A fabrication period of more than 6 months is anticipated.
(c) Protection of progress payments made for specifically manufactured equipment. The grantee will assure protection of the Federal interest in progress payments made for items or equipment referred to in paragraph (b)(3) of this section. This protection must be acceptable to the grantee and must take the form of:
(1) Securities negotiable without recourse, condition or restrictions, a progress payment bond, or an irrevocable letter of credit provided to the grantee through the prime contractor by the subcontractor or supplier; and,
(2) For items or equipment in excess of $200,000 in value which are manufactured in a jurisdiction in which the Uniform Commercial Code is applicable, the creation and perfection of a security interest under the Uniform Commercial Code reasonably adequate to protect the interests of the grantee.
(d) Limitations on progress payments for specifically manufactured equipment. (1) Progress payments made for specifically manufactured equipment or items shall be limited to the following:
(i) A first payment upon submission by the prime contractor of shop drawings for the equipment or items in an amount not exceeding 15 percent of the contract or item price plus appropriate and allowable higher tier costs; and
(ii) Subsequent to the grantee's release or approval for manufacture, additional payments not more frequently than monthly thereafter up to 75 percent of the contract or item price plus appropriate and allowable higher tier costs. However, payment may also be made in accordance with the contract and grant terms and conditions for ancillary onsite work before delivery of the specifically manufactured equipment or items.
(2) In no case may progress payments for undelivered equipment or items under paragraph (d)(1)(i) or (d)(1)(ii) of this section be made in an amount greater than 75 percent of the cumulative incurred costs allocable to contract performance with respect to the equipment or items. Submission of a request for any such progress payments must be accompanied by a certification furnished by the fabricator of the equipment or item that the amount of progress payment claimed constitutes not more than 75 percent of cumulative incurred costs allocable to contract performance, and in addition, in the case of the first progress payment request, a certification that the amount claimed does not exceed 15 percent of the contract or item price quoted by the fabricator.
(3) As used in this section, the term costs allocable to contract performance with respect to undelivered equipment or items includes all expenses of contract performance which are reasonable, allocable to the contract, consistent with sound and generally accepted accounting principles and practices consistently applied, and which are not excluded by the contract.
(e) Enforcement. A subcontractor or supplier which is determined by the Regional Administrator to have frustrated the intent of the provisions regarding progress payments for major equipment or specifically manufactured equipment through intentional forfeiture of its bond or failure to deliver the equipment may be determined nonresponsible and ineligible for further work under EPA grants.
(f) Contract provisions. Where applicable, appropriate provisions regarding progress payments must be included in each contract and subcontract. Grantees must use clauses acceptable to the EPA Regional Administrator.
(g) Implementation. The foregoing progress payments policy should be implemented in invitations for bids under step 3 grants. If provision for progress payments is made after contract award, it must be for consideration that the grantee deems adequate.
§ 35.938-7 Retention from progress payments.
top
(a) The grantee may retain a portion of the amount otherwise due the contractor. Except as State law otherwise provides, the amount the grantee retains shall be limited to the following:
(1) Withholding of not more than 10 percent of the payment claimed until work is 50 percent complete;
(2) When work is 50 percent complete, reduction of the withholding to 5 percent of the dollar value of all work satisfactorily completed to date, provided that the contractor is making satisfactory progress and there is no specific cause for greater withholding;
(3) When the work is substantially complete (operational or beneficial occupancy), the withheld amount shall be further reduced below 5 percent to only that amount necessary to assure completion.
(4) The grantee may reinstate up to 10 percent withholding if the grantee determines, at its discretion, that the contractor is not making satisfactory progress or there is other specific cause for such withholding.
(5) The grantee may accept securities negotiable without recourse, condition or restrictions, a release of retainage bond, or an irrevocable letter of credit provided by the contractor instead of all or part of the cash retainage.
(b) The foregoing retention policy shall be implemented with respect to all step 3 projects for which plans and specifications are approved after March 1, 1976. Appropriate provision to assure compliance with this policy must be included in the bid documents for such projects initially or by addendum before the bid submission date, and as a special condition in the grant agreement or in a grant amendment. For all previous active projects, the grantee may implement the foregoing policy through contract amendment upon written request to the grantee by the contractor upon consideration that the grantee deems adequate.
(c) Under §30.620–3 of this subchapter, a grantee who delays disbursement of grant funds will be required to credit to the United States all interest earned on those funds.
§ 35.938-8 Required construction contract provisions. (continued)