(continued)

(b) Step 2: Preparation of construction drawings and specifications. Before the award of a grant or grant amendment for a step 2 project, the applicant must furnish the following:

(1) A facilities plan (including the environmental assessment portion in accordance with part 6 of this chapter) in accordance with §§35.917 through 35.917–9;

(2) Adequate information regarding availability of proposed site(s), if relevant;

(3) Proposed subagreements or an explanation of the intended method of awarding subagreements for performance of any substantial portion of the project work;

(4) Required comments or approvals of relevant State, local, and Federal agencies, including clearinghouse requirements of Office and Management and Budget Circular A–95, as revised (see §30.305 of this subchapter);

(5) A value engineering (VE) commitment in compliance with §35.926(a) for all step 2 grant applications for projects with a projected total step 3 grant eligible construction cost of $10 million or more excluding the cost for interceptor and collector sewers. For those projects requiring VE, the grantee may propose, subject to the Regional Administrator's approval, to exclude interceptor and collector sewers from the scope of the VE analysis;

(6) Proposed or executed (as determined appropriate by the Regional Administrator) intermunicipal agreements necessary for the construction and operation of the proposed treatment works, for any treatment works serving two or more municipalities;

(7) A schedule for initiation and completion of the project work (see §35.935–9), including milestones; and

(8) Satisfactory evidence of compliance with:

(i) Sections 35.925–11, 35.929 et seq. and 35.935–13 regarding user charges;

(ii) Sections 35.925–11, 35.928 et seq. and 35.935–15, regarding industrial cost recovery, if applicable;

(iii) Section 35.925–16, regarding costs allocable to Federal facilities, if applicable;

(iv) Section 35.927–4 regarding a sewer use ordinance;

(v) Section 30.405–2 and part 4 of this chapter, regarding compliance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, if applicable; and,

(vi) Other applicable Federal statutory and regulatory requirements (see subpart C of part 30 of this chapter).

(9) After June 30, 1980, for grantees subject to pretreatment requirements under §35.907(b), the items required by §35.907(d)(1), (2), and (4).

(10) A public participation work plan, in accordance with §35.917–5(g), if the grantee, after consultation with the public and its advisory group (if one exists), determines that additional public participation activities are necessary.

(c) Step 3. Building and erection of a treatment works. Prior to the award of a grant or grant amendment for a step 3 project, the applicant must furnish the following:

(1) Each of the items specified in paragraph (b) of this section (in compliance with paragraph (b)(6) of this section, the final intermunicipal agreements must be furnished);

(2) Construction drawings and specifications suitable for bidding purposes (in the case of an application for step 3 assistance solely for acquisition of eligible land, the grantee must submit a plat which shows the legal description of the property to be acquired, a preliminary layout of the distribution and drainage systems, and an explanation of the intended method of acquiring the property);

(3) A schedule for or evidence of compliance with §§35.925–10 and 35.935–12 concerning an operation and maintenance program, including a preliminary plan of operation; and

(4) After December 31, 1980, the items required by §35.907(d)(1) through (d)(9), as applicable, for grantees subject to pretreatment requirements under §35.907(b).

(5) A public participation work plan, in accordance with §35.917–5(g), if the grantee determines, after consultation with the public, that additional public participation activities are necessary.

(d) Step 2+3. Combination design and construction of a treatment works. Before the award of a grant or grant amendment for a step 2=3 project, the grantee must furnish:

(1) Each of the items specified in paragraph (b) of this section, and (2) a schedule for timely submission of plans and specifications, operation and maintenance manual, user charge and industrial cost recovery systems, sewer use ordinance, and a preliminary plan of operation.

(e) Training facility project. An application for grant assistance for construction and support of a training facility, facilities or training programs under section 109(b) of the Act shall include:

(1) A statement concerning the suitability of the treatment works facility, facilities or training programs for training operations and maintenance personnel for treatment works throughout one or more States;

(2) A written commitment from the State agency or agencies to carry out at such facility a program of training approved by the Regional Administrator;

(3) An engineering report (required only if a facility is to be constructed) including facility design data and cost estimates for design and construction;

(4) A detailed outline of the training programs, including (for 1-, 3-, and 5-year projections):

(i) An assessment of need for training,

(ii) How the need was determined,

(iii) Who would be trained,

(iv) What curriculum and materials would be used,

(v) What type of delivery system will be used to conduct training, (i.e., State vocational education system, State environmental agency, universities or private organizations),

(vi) What resources are available for the program,

(vii) A budget breakdown on the cost of the program, and

(viii) The relationship of the facility or programs to other training programs.

[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 10304, Feb. 16, 1979; 44 FR 37595, June 27, 1979; 44 FR 39339, July 5, 1979]

§ 35.925 Limitations on award.
top
Before awarding initial grant assistance for any project for a treatment works through a grant or grant amendment, the Regional Administrator shall determine that all of the applicable requirements of §35.920–3 have been met. He shall also determine the following:

§ 35.925-1 Facilities planning.
top
That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in §35.917 et seq. have been met.

§ 35.925-2 Water quality management plans and agencies.
top
That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the Act; and that the applicant is the wastewater management agency designated in any WQM plan certified by the Governor and approved by the Regional Administrator.

§ 35.925-3 Priority determination.
top
That such works are entitled to priority in accordance with §35.915, and that the award of grant assistance for the proposed project will not jeopardize the funding of any treatment works of higher priority.

§ 35.925-4 State allocation.
top
That the award of grant assistance for a particular project will not cause the total of all grant assistance which applicants within a State received, including grant increases, to exceed the total of all allotments and reallotments available to the State under §35.910.

§ 35.925-5 Funding and other capabilities.
top
That the applicant has:

(a) Agreed to pay the non-Federal project costs, and

(b) The legal, institutional, managerial, and financial capability to insure adequate construction, operation, and maintenance of the treatment works throughout the applicant's jurisdiction. (Also see §30.340–3 of this subchapter.)

§ 35.925-6 Permits.
top
That the applicant has, or has applied for, the permit or permits as required by the national pollutant discharge elimination system (NPDES) with respect to existing discharges affected by the proposed project.

§ 35.925-7 Design.
top
That the treatment works design will be (in the case of projects involving step 2) or has been (in the case of projects for step 3) based upon:

(a) Appendix A to this subpart, so that the design, size, and capacity of such works are cost-effective and relate directly to the needs they serve, including adequate reserve capacity;

(b) Subject to the limitations set forth in §35.930–4, achievement of applicable effluent limitations established under the Act, or BPWTT (see §35.917–1(d)(5)), including consideration, as appropriate, for the application of technology which will provide for the reclaiming or recycling of water or otherwise eliminate the discharge of pollutants;

(c) The sewer system evaluation and rehabilitation requirements of §35.927; and

(d) The value engineering requirements of §35.926 (b) and (c).

§ 35.925-8 Environmental review.
top
(a) That, if the award is for step 2, step 3, or step 2=3, the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) applicable to the project step have been met. The grantee or grant applicant must prepare an adequate assessment of expected environmental impacts, consistent with the requirements of part 6 of this chapter, as part of facilities planning, in accordance with §35.917–1(d)(7). The Regional Administrator must insure that an environmental impact statement or a negative declaration is prepared in accordance with part 6 of this chapter (particularly §§6.108, 6.200, 6.212, and 6.504) in conjunction with EPA review of a facility plan and issued before any award of step 2 or step 3 grant assistance.

(b) The Regional Administrator may not award step 2 or step 3 grant assistance if the grantee has not made, or agreed to make, pertinent changes in the project, in accordance with determinations made in a negative declaration or environmental impact statement. He may condition a grant to ensure that the grantee will comply, or seek to obtain compliance, with such environmental review determinations. The conditions may address secondary impacts to the extent deemed appropriate by the Regional Administrator.

§ 35.925-9 Civil rights.
top
That if the award of grant assistance is for a project involving step 2 or step 3, the applicable requirements of the Civil Rights Act of 1964 and part 7 of this chapter have been met.

§ 35.925-10 Operation and maintenance program.
top
If the award of grant assistance is for a step 3 project, that the applicant has made satisfactory provision to assure proper and efficient operation and maintenance of the treatment works (including the sewer system), in accordance with §35.935–12, and that the State will have an effective operation and maintenance monitoring program to assure that treatment works assisted under this subpart comply with applicable permit and grant conditions.

§ 35.925-11 User charges and industrial cost recovery.
top
That, in the case of grant assistance for a project involving step 2 or step 3, the grantee has complied or will comply with the requirements for user charge and industrial cost recovery systems. (See §§35.928 et seq., 35.929 et seq., 35.935–13, and 35.935–15.)

(a) Grants awarded before July 1, 1979. Grantees must submit a schedule of implementation to show that their user charge and industrial cost recovery systems will be approved in accordance with the requirements of §§35.935–13 and 35.935–15.

(b) Grants awarded after June 30, 1979. The grantee's user charge and industrial cost recovery systems must be approved before the award of step 3 grant assistance.

(c) Letters of intent. In the case of any grant assistance for a project involving step 2 or step 3, the applicant must have received signed letters of intent from each significant industrial user stating that it will pay that portion of the grant amount allocable to the treatment of its wastes. Each such letter shall also include a statement of the industrial user's intended period of use of the treatment works. A significant industrial user is one that will contribute greater than 10 percent of the design flow or design pollutant loading of the treatment works. In addition, the applicant must agree to require all industrial users to pay that portion of the grant amount allocable to the treatment of wastes from such users.

§ 35.925-12 Property.
top
That the applicant has demonstrated to the satisfaction of the Regional Administrator that it has met or will met the property requirements of §35.935–3.

§ 35.925-13 Sewage collection system.
top
That, if the project involves sewage collection system work, such work (a) is for the replacement or major rehabilitation of an existing sewer system under §35.927–3(a) and is necessary to the total integrity and performance of the waste treatment works serving the community, or (b) is for a new sewer system in a community in existence on October 18, 1972, which has sufficient existing or planned capacity to adequately treat such collected sewage. Replacement or major rehabilitation of an existing sewer system may be approved only if cost-effective; the result must be a sewer system design capacity equivalent to that of the existing system plus a reasonable amount for future growth. For purposes of this section, a community would include any area with substantial human habitation on October 18, 1972, as determined by an evaluation of each tract (city blocks or parcels of 5 acres or less where city blocks do not exist). No award may be made for a new sewer system in a community in existence on October 18, 1972, unless the Regional Administrator further determines that:

(a) The bulk (generally two-thirds) of the expected flow (flow from existing plus projected future habitations) from the collection system will be for waste waters originating from the community (habitations) in existence on October 18, 1972;

(b) The collection system is cost-effective;

(c) The population density of the area to be served has been considered in determining the cost-effectiveness of the proposed project:

(d) The collection system conforms with any approved WQM plan, other environmental laws in accordance with §35.925–14, Executive Orders on Wetlands and Floodplains and Agency policy on wetlands and agricultural lands; and

(e) The system would not provide capacity for new habitations or other establishments to be located on environmentally sensitive land such as wetlands, floodplains or prime agricultural lands. Appropriate and effective grant conditions, (e.g., restricting sewer hook-up) should be used where necessary to protect these resources from new development.

§ 35.925-14 Compliance with environmental laws.
top
That the treatment works will comply with all pertinent requirements of applicable Federal, State and local environmental laws and regulations. (See §30.101 and subpart C of part 30 of this chapter and the Clean Air Act.)

§ 35.925-15 Treatment of industrial wastes.
top
That the allowable project costs do not include (a) costs of interceptor or collector lines constructed exclusively, or almost exclusively, to serve industrial sources or (b) costs allocable to the treatment for control or removal of pollutants in wastewater introduced into the treatment works by industrial sources, unless the applicant is required to remove such pollutants introduced from nonindustrial sources. The project must be included in a complete waste treatment system, a principal purpose of which project (as defined by the Regional Administrator; see §§35.903 (d) and 35.905) and system is the treatment of domestic wastes of the entire community, area, region or the district concerned. See the pretreatment regulations in part 403 of this chapter and §35.907.

[44 FR 39340, July 5, 1979]

§ 35.925-16 Federal activities.
top
That the allowable step 2 or step 3 project costs do not include the proportional costs allocable to the treatment of wastes from major activities of the Federal Government. A “major activity” includes any Federal facility which contributes either (a) 250,000 gallons or more per day or (b) 5 percent or more of the total design flow of waste treatment works, whichever is less.

§ 35.925-17 Retained amounts for reconstruction and expansion.
top
That the allowable project costs have been reduced by an amount equal to the unexpended balance of the amounts the applicant retains for future reconstruction and expansion under §35.928–2(a)(2)(ii), together with interest earned.

§ 35.925-18 Limitation upon project costs incurred prior to award.
top
That project construction has not been initiated before the approved date of initiation of construction (as defined in §35.905), unless otherwise provided in this section.

(a) Step 1 or Step 2: No grant assistance is authorized for step 1 or step 2 project work performed before award of a step 1 or step 2 grant. However, payment is authorized, in conjunction with the first award of grant assistance, for all preaward allowable project costs in the following cases:

(1) Step 1 work begun after the date of approval by the Regional Administrator of a plan of study, if the State requests and the Regional Administrator has reserved funds for the step 1 grant. However, the step 1 grant must be applied for and awarded within the allotment period of the reserved funds.

(2) Step 1 or step 2 work begun after October 31, 1974, but before June 30, 1975, in accordance with an approved plan of study or an approved facilities plan, as appropriate, but only if a grant is awarded before April 1, 1981.

(3) Step 1 or step 2 work begun before November 1, 1974, but only if a grant is awarded before April 1, 1980.

(b) Step 3: Except as otherwise provided in this paragraph, no grant assistance for a step 3 project may be awarded unless the award precedes initiation of the step 3 construction. Preliminary step 3 work, such as advance acquisition of major equipment items requiring long lead times, acquisition of eligible land or of an option for the purchase of eligible land, or advance construction of minor portions of treatment works, including associated engineering costs, in emergencies or instances where delay could result in significant cost increases, may be approved by the Regional Administrator after completion of environmental review, but only if (1) the applicant submits a written and adequately substantiated request for approval and (2) written approval by the Regional Administrator is obtained before initiation of the advance acquisition or advance construction. (In the case of authorization for acquisition of eligible land, the applicant must submit a plat which shows the legal description of the property to be acquired, a preliminary layout of the distribution and drainage systems, and an explanation of the intended method of acquiring the property.)

(c) The approval of a plan of study, a facilities plan, or advance acquisition of equipment or advance construction will not constitute a commitment for approval of grant assistance for a subsequent treatment works project, but will allow payment for the previously approved costs as allowable project costs upon subsequent award of grant assistance, if requested before grant award (see §35.945(a)). In instances where such approval is obtained, the applicant proceeds at its own risk, since payment for such costs cannot be made unless grant assistance for the project is awarded.

[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 39340, July 5, 1979]

§ 35.925-19 [Reserved]
top
§ 35.925-20 Procurement.
top
That the applicant has complied or will comply with the applicable provisions of §§35.935 through 35.939 with respect to procurement actions taken before the award of step 1, 2, or 3 grant assistance, such as submission of the information required under §35.937–6.

§ 35.925-21 Storm sewers.
top
That, under section 211(c) of the Act, the allowable project costs do not include costs of treatment works for control of pollutant discharges from a separate storm sewer system (as defined in §35.905).

§ 35.926 Value engineering (VE).
top
(a) Value engineering proposal. All step 2 grant applications for projects having a projected total step 3 grant eligible cost of $10 million or more, excluding the cost for interceptor and collector sewers, will contain a VE commitment. The VE proposal submitted during step 2 must contain enough information to determine the adequacy of the VE effort and the justification of the proposed VE fee. Essential information shall include:

(1) Scope of VE analysis;

(2) VE team and VE coordinator (names and background);

(3) Level of VE effort;

(4) VE cost estimate;

(5) VE schedule in relation to project schedule (including completion of VE analysis and submittal of VE summary reports).

(b) Value engineering analysis. For projects subject to the VE requirements of paragraph (a) of this section, a VE analysis of the project design shall be performed. When the VE analysis is completed, a preliminary report summarizing the VE findings and a final report describing implementation of the VE recommendations must be submitted to the project officer on a schedule approved by him.

(c) Implementation. For those projects for which a VE analysis has been performed in accordance with paragraph (b) of this section, VE recommendations shall be implemented to the maximum extent feasible, as determined by the grantee, subject to the approval of the EPA project officer. Rejection of any recommendation shall be on the basis of cost-effectiveness, reliability, extent of project delays, and other factors that may be critical to the treatment processes and the environmental impact of the project.

§ 35.927 Sewer system evaluation and rehabilitation.
top
(a) All applicants for step 2 or step 3 grant assistance must demonstrate to the Regional Administrator's satisfaction that each sewer system discharging into the treatment works project for which grant application is made is not or will not be subject to excessive infiltration/inflow. A determination of whether excessive infiltration/inflow exists may take into account, in addition to flow and related data, other significant factors such as cost-effectiveness (including the cost of substantial treatment works construction delay, see appendix A to this subpart), public health emergencies, the effects of plant bypassing or overloading, or relevant economic or environmental factors.

(b) A sewer system evaluation will generally be used to determine whether or not excessive infiltration/inflow exists. It will consist of:

(1) Certification by the State agency, as appropriate; and, when necessary,

(2) An infiltration/inflow analysis; and, if appropriate,

(3) A sewer system evaluation survey and, if appropriate, a program, including an estimate of costs, for rehabilitation of the sewer system to eliminate excessive infiltration/inflow identified in the sewer system evaluation. Information submitted to the Regional Administrator for such determination should be the minimum necessary to enable him to make a judgment.

(c) Guidelines on sewer system evaluation published by the Administrator provide further advisory information (see §35.900(c)). Also see §§35.925–7(c) and 35.935–16.

§ 35.927-1 Infiltration/inflow analysis.
top
(a) The infiltration/inflow analysis shall demonstrate the nonexistence or possible existence of excessive infiltration/inflow in the sewer system. The analysis should identify the presence, flow rate, and type of infiltration/inflow conditions which exist in the sewer system.

(b) For determination of the possible existence of excessive infiltration/inflow, the analysis shall include an estimate of the cost of eliminating the infiltration/inflow conditions. These costs shall be compared with estimated total costs for transportation and treatment of the infiltration/inflow. Cost-effectiveness analysis guidelines (Appendix A to this subpart) should be consulted with respect to this determination.

(c) If the infiltration/inflow analysis demonstrates the existence or possible existence of excessive infiltration/inflow a detailed plan for a sewer system evaluation survey shall be included in the analysis. The plan shall outline the tasks to be performed in the survey and their estimated costs.

§ 35.927-2 Sewer system evaluation survey.
top
(a) The sewer system evaluation survey shall identify the location, estimated flow rate, method of rehabilitation and cost of rehabilitation versus cost of transportation and treatment for each defined source of infiltration/inflow.

(b) A report shall summarize the results of the sewer system evaluation survey. In addition, the report shall include:

(1) A justification for each sewer section cleaned and internally inspected.

(2) A proposed rehabilitation program for the sewer system to eliminate all defined excessive infiltration/inflow.

§ 35.927-3 Rehabilitation.
top
(a) Subject to State concurrence, the Regional Administrator may authorize the grantee to perform minor rehabilitation concurrently with the sewer system evaluation survey in any step under a grant if sufficient funding can be made available and there is no adverse environmental impact. However, minor rehabilitation work in excess of $10,000 which is not accomplished with force account labor (see §35.936–14(a)(2)), must be procured through formal advertising in compliance with the applicable requirements of §§35.938 et seq. and 35.939, the statutory requirements referenced in §§30.415 through 30.415–4 of this subchapter, and other applicable provisions of part 30.

(b) Grant assistance for a step 3 project segment consisting of major rehabilitation work may be awarded concurrently with step 2 work for the design of the new treatment works.

(c) The scope of each treatment works project defined within the facilities plan as being required for implementation of the plan, and for which Federal assistance will be requested, shall define (1) any necessary new treatment works construction and (2) any rehabilitation work (including replacement) determined by the sewer system evaluation to be necessary for the elimination of excessive infiltration/inflow. However, rehabilitation which should be a part of the applicant's normal operation and maintenance responsibilities shall not be included within the scope of a step 3 treatment works project.

(d) Only rehabilitation of the grantee's sewage collection system is eligible for grant assistance. However, the grantee's costs of rehabilitation beyond “Y” fittings (see definition of “sewage collection system” in §35.905) may be treated on an incremental cost basis.

§ 35.927-4 Sewer use ordinance.
top
Each applicant for grant assistance for a step 2 or step 3 project shall demonstrate to the satisfaction of the Regional Administrator that a sewer use ordinance or other legally binding requirement will be enacted and enforced in each jurisdiction served by the treatment works project before the completion of construction. The ordinance shall prohibit any new connections from inflow sources into the sanitary sewer portions of the sewer system and shall insure that new sewers and connections to the sewer system are properly designed and constructed.

§ 35.927-5 Project procedures.
top
(a) State certification. The State agency may (but need not) certify that excessive infiltration/inflow does or does not exist. The Regional Administrator will determine that excessive infiltration/inflow does not exist on the basis of State certification, if he finds that the State had adequately established the basis for its certification through submission of only the minimum information necessary to enable a judgment to be made. Such information could include a preliminary review by the applicant or State, for example, of such parameters as per capita design flow, ratio of flow to design flow, flow records or flow estimates, bypasses or overflows, or summary analysis of hydrological, geographical, and geological conditions, but this review would not usually be equivalent to a complete infiltration/inflow analysis. State certification must be on a project-by-project basis. If, on the basis of State certification, the Regional Administrator determines that the treatment works is or may be subject to excessive infiltration/inflow, no step 2 or step 3 grant assistance may be awarded except as paragraph (c) of this section provides.

(b) Pre-award sewer system evaluation. Generally, except as otherwise provided in paragraph (c) of this section, an adequate sewer system evaluation, consisting of a sewer system analysis and, if required, an evaluation survey, is an essential element of step 1 facilities planning. It is a prerequisite to the award of step 2 or 3 grant assistance. If the Regional Administrator determines through State Certification or an infiltration/inflow analysis that excessive infiltration/inflow does not exist, step 2 or 3 grant assistance may be awarded. If on the basis of State certification or the infiltration/inflow analysis, the Regional Administrator determines that possible excessive infiltration/inflow exists, an adequate sewer system evaluation survey and, if required, a rehabilitation program must be furnished, except as set forth in paragraph (c) of this section before grant assistance for step 2 or 3 can be awarded. A step 1 grant may be awarded for the completion of this segment of step 1 work, and, upon completion of step 1, grant assistance for a step 2 or 3 project (for which priority has been determined under §35.915) may be awarded.

(c) Exception. If the Regional Administrator determines that the treatment works would be regarded (in the absence of an acceptable program of correction) as being subject to excessive infiltration/inflow, grant assistance may be awarded if the applicant establishes to the Regional Administrator's satisfaction that the treatment works project for which grant application is made will not be significantly changed by any subsequent rehabilitation program or will be a component part of any rehabilitated system. The applicant must agree to complete the sewer system evaluation and any resulting rehabilitation on an implementation schedule the State accepts (subject to approval by the Regional Administrator), which shall be inserted as a special condition in the grant agreement.

(d) Regional Administrator review. Municipalities may submit through the State agency the infiltration/inflow analysis and, when appropriate, the sewer system evaluation survey to the Regional Administrator for his review at any time before application for a treatment works grant. Based on such a review, the Regional Administrator shall provide the municipality with a written response indicating either his concurrence or nonconcurrence. In order for the survey to be an allowable cost, the Regional Administrator must concur with the sewer system evaluation survey plan before the work is performed.

§ 35.928 Requirements for an industrial cost recovery system.
top
(a) The Regional Administrator shall approve the grantee's industrial cost recovery system and the grantee shall implement and maintain it in accordance with §35.935–15 and the requirements in §§35.928–1 through 35.928–4. The grantee shall be subject to the noncompliance provisions of §35.965 for failure to comply.

(b) Grantees awarded step 3 grants under regulations promulgated on February 11, 1974, or grantees who obtained approval of their industrial cost recovery systems before April 25, 1978, may amend their systems to correspond to the definition of industrial users in §35.905 or to provide for systemwide industrial cost recovery under §35.928–1(g).

§ 35.928-1 Approval of the industrial cost recovery system.
top
The Regional Administrator may approve an industrial cost recovery system if it meets the following requirements:

(a) General. Each industrial user of the treatment works shall pay an annual amount equal to its share of the total amount of the step 1, 2, and 3 grants and any grant amendments awarded under this subpart, divided by the number of years in the recovery period. An industrial user's share shall be based on factors which significantly influence the cost of the treatment works. Volume of flow shall be a factor in determining an industrial user's share in all industrial cost recovery systems; other factors shall include strength, volume, and delivery flow rate characteristics, if necessary, to insure that all industrial users of the treatment works pay a proportionate distribution of the grant assistance allocable to industrial use.

(b) Industrial cost recovery period. The industrial cost recovery period shall be equal to 30 years or to the useful life of the treatment works, whichever is less.

(c) Frequency of payment. Except as provided in §35.928–3, each industrial user shall pay not less often than annually. The first payment by an industrial user shall be made not later than 1 year after the user begins use of the treatment works.

(d) Reserve capacity. If an industrial user enters into an agreement with the grantee to reserve a certain capacity in the treatment works, the user's industrial cost recovery payments shall be based on the total reserved capacity in relation to the design capacity of the treatment works. If the discharge of an industrial user exceeds the reserved capacity in volume, strength or delivery flow rate characteristics, the user's industrial cost recovery payment shall be increased to reflect the actual use. If there is no reserve capacity agreement between the industrial user and the grantee, and a substantial change in the strength, volume, or delivery flow rate characteristics of an industrial user's discharge share occurs, the user's share shall be adjusted proportionately.

(e) Upgrading and expansion. (1) If the treatment works are upgraded, each existing industrial user's share shall be adjusted proportionately.

(2) If the treatment works are expanded, each industrial user's share shall be adjusted proportionately, except that a user with reserved capacity under paragraph (d) of this section shall incur no additional industrial cost recovery charges unless the user's actual use exceeded its reserved capacity.

(f) [Reserved]

(g) Collection of industrial cost recovery payments. Industrial cost recovery payments may be collected on a systemwide or on a project-by-project basis. The total amount collected from all industrial users on a systemwide basis shall equal the sum of the amounts which would be collected on a project-by-project basis.

(h) Adoption of system. One or more municipal legislative enactments or other appropriate authority must incorporate the industrial cost recovery system. If the project is a regional treatment works accepting waste-waters from other municipalities, the subscribers receiving waste treatment services from the grantee shall adopt industrial cost recovery systems in accordance with section 204(b)(1)(B) of the Act with §§35.928 through 35.928–4. These industrial cost recovery systems shall also be incorporated in appropriate municipal legislative enactments or other appropriate authority of all municipalities contributing wastes to the treatment works. The public shall be consulted prior to adoption of the industrial cost recovery system, in accordance with 40 CFR part 25.

(i) Inconsistent agreements. The grantee may have pre-existing agreements which address (1) the reservation of capacity in the grantee's treatment works or (2) the charges to be collected by the grantee in providing waste water treatment services or reserving capacity. The industrial cost recovery system shall take precedence over any terms or conditions of agreements or contracts between the grantee and industrial users which are inconsistent with the requirements of section 204(b)(1)(B) of the Act and these industrial cost recovery regulations.

[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 10304, Feb. 16, 1979; 44 FR 39340, July 5, 1979]

§ 35.928-2 Use of industrial cost recovery payments.
top
(a) The grantee shall use industrial cost recovery payments received from industrial users as follows:

(1) The grantee shall return 50 percent of the amounts received from industrial users, together with any interest earned, to the U.S. Treasury annually.

(2) The grantee shall retain 50 percent of the amount recovered from industrial users.

(i) A portion of the amounts which the grantee retains may be used to pay the incremental costs of administration of the industrial cost recovery system. The incremental costs of administration are those costs remaining after deducting all costs reasonably attributable to the administration of the user charge system. The incremental costs shall be segregated from all other administrative costs of the grantee.

(ii) A minimum of 80 percent of the amounts the grantee retains after paying the incremental costs of administration, together with any interest earned, shall be used for the allowable costs (see §35.940) of any expansion, upgrading or reconstruction of treatment works necessary to meet the requirements of the Act. The grantee shall obtain the written approval of the Regional Administrator before the commitment of the amounts retained for expansion, upgrading, or reconstruction.

(iii) The remainder of the amounts retained by the grantee may be used as the grantee sees fit, except that they may not be used for construction of industrial pretreatment facilities or rebates to industrial users for costs incurred in complying with user charge or industrial cost recovery requirements.

(b) Pending the use of industrial cost recovery payments, as described in paragraph (a) of this section, the grantee shall:

(1) Invest the amounts received in obligations of the U.S. Government or in obligations guaranteed as to principal and interest by the U.S. Government or any agency thereof; or

(2) Deposit the amounts received in accounts fully collateralized by obligations of the U.S. Government or any agency thereof.

§ 35.928-3 Implementation of the industrial cost recovery system.
top
(a) When a grantee's industrial cost recovery system is approved, implementation of the approved system shall become a condition of the grant.

(b) The grantee shall maintain all records that are necessary to document compliance with these regulations.

§ 35.928-4 Moratorium on industrial cost recovery payments.
top
(a) EPA does not require that industrial users defined in paragraphs (a) and (b) of the definition in §35.905 pay industrial cost recovery for charges incurred during the period after December 31, 1977, and before July 1, 1979. Any industrial cost recovery charges incurred for accounting periods or portions of periods ending before January 1, 1978, shall be paid by industrial users. These funds are to be used as described in §35.928–2.

(b) Grantees may either defer industrial cost recovery payments, or require industrial users as defined in paragraphs (a) and (b) of the definition in §35.905 to pay industrial cost recovery payments for the period after December 31, 1977, and before July 1, 1979. If grantees require payment, the amount held by the municipality for eventual return to the U.S. Treasury under §35.928–2(a)(1) shall be invested as required under §35.928–2(b) until EPA advises how such sums shall be distributed. Grantees shall implement or continue operating approved industrial cost recovery systems and maintain their activities of monitoring flows, calculating payments due, and submitting bills to industrial users informing them of their current or deferred obligation.

(c) Industrial users as defined in paragraphs (a) and (b) of the definition in §35.905 who are served by grantees who defer payment during the 18-month period ending June 30, 1979, shall make industrial cost recovery payments for that period in a lump sum by June 30, 1980, or in equal annual installments prorated from July 1, 1979, over the remaining industrial cost recovery period.

§ 35.929 Requirements for user charge system.
top
The Regional Administrator shall approve the grantee's user charge system and the grantee shall implement and maintain it in accordance with §35.935–13 and the requirements in §§35.929–1 through 35.929–3. The grantee shall be subject to the noncompliance provisions of §35.965 for failure to comply.

§ 35.929-1 Approval of the user charge system.
top
The Regional Administrator may approve a user charge system based on either actual use under paragraph (a) of this section or ad valorem taxes under paragraph (b) of this section. The general requirements in §§35.929–2 and 35.929–3 must also be satisfied.

(a) User charge system based on actual use. A grantee's user charge system based on actual use (or estimated use) of waste water treatment services may be approved if each user (or user class) pays its proportionate share of operation and maintenance (including replacement) costs of treatment works within the grantee's service area, based on the user's proportionate contribution to the total waste water loading from all users (or user classes). To insure a proportional distribution of operation and maintenance costs to each user (or user class), the user's contribution shall be based on factors such as strength, volume, and delivery flow rate characteristics.

(b) User charges based on ad valorem taxes. A grantee's user charge system (or the user charge system of a subscriber, i.e., a constituent community receiving waste treatment services from the grantee) which is based on ad valorem taxes may be approved if it meets the requirements of paragraphs (b)(1) through (b)(7) of this section. If the Regional Administrator determines that the grantee did not have a dedicated ad valorem tax system on December 27, 1977, meeting the requirements of paragraphs (b)(1) through (b)(3) of this section, the grantee shall develop a user charge system based on actual use under §35.929–1(a).

(1) The grantee (or subscriber) had in existence on December 27, 1977, a system of ad valorem taxes which collected revenues to pay the cost of operation and maintenance of waste water treatment works within the grantee's service area and has continued to use that system.

(2) The grantee (or subscriber) has not previously obtained approval of a user charge system on actual use.

(3) The system of ad valorem taxes in existence on December 27, 1977, was dedicated ad valorem tax system.

(i) A grantee's system will be considered to be dedicated if the Regional Administrator determines that the system meets all of the following criteria:

(A) The ad valorem tax system provided for a separate tax rate or for the allocation of a portion of the taxes collected for payment of the grantee's costs of waste water treatment services;

(B) The grantee's budgeting and accounting procedures assured that a specified portion of the tax funds would be used for the payment of the costs of operation and maintenance;

(C) The ad valorem tax system collected tax funds for the costs of waste water treatment services which could not be or historically were not used for other purposes; and

(D) The authority responsible for the operation and maintenance of the treatment works established the budget for the costs of operation and maintenance and used those specified amounts solely to pay the costs of operation and maintenance.

(ii) A subscriber's system based on ad valorem taxes will be considered to be dedicated if a contractual agreement or a charter established under State law existed on December 27, 1977, which required the subscriber to pay its share of the cost of waste water treatment services.

(4) A user charge system funded by dedicated ad valorem taxes shall establish, as a minimum, the classes of users listed below:

(i) Residential users, including single-family and multifamily dwellings, and small nonresidential users, including nonresidential commercial and industrial users which introduce no more than the equivalent of 25,000 gallons per day of domestic sanitary wastes to the treatment works:

(ii) Industrial and commercial users;

(A) Any nongovernmental user of publicly owned treatment works which discharges more than 25,000 gallons per day (gpd) of sanitary waste; or a volume of process waste, or combined process and sanitary waste, equivalent to 25,000 gpd of sanitary waste. The grantee, with the Regional Administrator's approval, shall define the strength of the residential discharges in terms of parameters including, as a minimum, biochemical oxygen demand (BOD) and suspended solids (SS) per volume of flow. Dischargers with a volume exceeding 25,000 gpd or the weight of BOD or SS equivalent to that weight found in 25,000 gpd of sanitary waste are considered industrial users.

(B) Any nongovernmental user of a publicly owned treatment works which discharges wastewater to the treatment works which contains toxic pollutants or poisonous solids, liquids, or gases in sufficient quantity either singly or by interaction with other wastes, to contaminate the sludge of any municipal systems, or to injure or to interfere with any sewage treatment process, or which constitutes a hazard to humans or animals, creates a public nuisance, or creates any hazard in or has an adverse effect on the waters receiving any discharge from the treatment works.

(iii) Users which pay no ad valorem taxes or receive substantial credits in paying such taxes, such as tax exempt institutions or governmental users, but excluding publicly owned facilities performing local governmental functions (e.g., city office building, police station, school) which discharge solely domestic wastes.

(5) The grantee must be prepared to demonstrate for the Regional Administrator's approval that its system of evaluating the volume, strength, and characteristics of the discharges from users or categories of users classified within the subclass of small nonresidential users is sufficient to assure that such users or the average users in such categories do not discharge either toxic pollutants or more than the equivalent of 25,000 gallons per day of domestic wastewater.

(6) The ad valorem user charge system shall distribute the operation and maintenance costs for all treatment works in the grantee's jurisdiction to the residential and small nonresidential user class, in proportion to the use of the treatment works by this class. The proportional allocation of costs for this user class shall take into account the total waste water loading of the treatment works, the constituent elements of the wastes from this user class and other appropriate factors. The grantee may assess one ad valorem tax rate to this entire class of users or, if permitted under State law, the grantee may assess different ad valorem tax rates for the subclass of residential users and the subclass of small nonresidential users provided the operation and maintenance costs are distributed proportionately between these subclasses.

(7) Each member of the industrial and commercial user class described under paragraph (b)(4)(ii) of this section and of the user class which pays no ad valorem taxes or receives substantial credits in paying such taxes described under paragraph (b)(4)(iii) of this section shall pay its share of the costs of operation and maintenance of the treatment works based upon charges for actual use (in accordance with §35.929–1(a)). The grantee may use its ad valorem tax system to collect, in whole or in part, those charges from members of the industrial and large commercial class where the following conditions are met:

(i) A portion or all of the ad valorem tax rate assessed to members of this class has been specifically designated to pay the costs of operation and maintenance of the treatment works, and that designated rate is uniformly applied to all members of this class:

(ii) A system of surcharges and rebates is employed to adjust the revenues from the ad valorem taxes collected from each user of this class in accordance with the rate designated under paragraph (b)(7)(i) of this section, such that each member of the class pays a total charge for its share of the costs of operation and maintenance based upon actual use.

§ 35.929-2 General requirements for all user charge systems.
top
User charge systems based on actual use under §35.929–1(a) or ad valorem taxes under §35.929–1(b) shall also meet the following requirements:

(a) Initial basis for operation and maintenance charges. For the first year of operation, operation and maintenance charges shall be based upon past experience for existing treatment works or some other method that can be demonstrated to be appropriate to the level and type of services provided.

(b) Biennial review of operation and maintenance charges. The grantee shall review not less often than every 2 years the waste water contribution of users and user classes, the total costs of operation and maintenance of the treatment works, and its approved user charge system. The grantee shall revise the charges for users or user classes to accomplish the following:

(1) Maintain the proportionate distribution of operation and maintenance costs among users and user classes as required herein;

(2) Generate sufficient revenue to pay the total operation and maintenance costs necessary to the proper operation and maintenance (including replacement) of the treatment works; and

(3) Apply excess revenues collected from a class of users to the costs of operation and maintenance attributable to that class for the next year and adjust the rate accordingly.

(c) Toxic pollutants. The user charge system shall provide that each user which discharges any toxic pollutants which cause an increase in the cost of managing the effluent or the sludge of the grantee's treatment works shall pay for such increased costs. (continued)