(v) Project step number (step 1, 2, 3, or 2=3);
(vi) Relevant needs authority/facility number(s);
(vii) NPDES number (as appropriate);
(viii) Parent project number (i.e., EPA project number for predecessor project);
(ix) For step 2, 3, or 2=3 projects, indication of alternative system for small community;
(x) For step 2, 3, or 2=3 projects, that portion (if any) of eligible cost to apply to alternative techniques;
(xi) For step 2, 3, or 2=3 projects, that portion (if any) of eligible cost to apply to innovative processes;
(xii) For step 3 or 2=3 projects, the eligible costs in categories IIIB, IV, and V (see §35.915(a)(1)(ii));
(xiii) Total eligible cost;
(xiv) Date project is expected to be certified by State to EPA for funding;
(xv) Estimated EPA assistance (not including potential grant increase from the reserve in §35.9151(b)); and
(xvi) Indication that the project does or does not satisfy the enforceable requirements provision, including (as appropriate) funding estimates for those portions which do not meet the enforceable requirements of the Act.
(d) Public participation. Before the State submits its annual project priority list to the Regional Administrator, the State shall insure that adequate public participation (including a public hearing) has taken place as required by subpart G of this part. Before the public hearing, the State shall circulate information about the priority list including a description of each proposed project and a statement concerning whether or not it is necessary to meet the enforceable requirements of the Act. The information on the proposed priority list under paragraph (c)(2) of this section may be used to fulfill these requirements. This public hearing may be conducted jointly with any regular public meeting of the State agency. The public must receive adequate and timely statewide notice of the meeting (including publication of the proposed priority list) and attendees at the meeting must receive adequate opportunity to express their views concerning the list. Any revision of the State priority list (including project bypass and the deletion or addition of projects) requires circulation for public comment and a public hearing unless the State agency and the Regional Administrator determine that the revision is not significant. The approved State priority system shall describe the public participation policy and procedures applicable to any proposed revision to the priority list.
(e) Submission and review of project priority list. The State shall submit the priority list as part of the annual State program plan under subpart G of this part. A summary of State agency response to public comment and hearing testimony shall be prepared and submitted with the priority list. The Regional Administrator will not consider a priority list to be final until the public participation requirements are met and all information required for each project has been received. The Regional Administrator will review the final priority list within 30 days to insure compliance with the approved State priority system. No project may be funded until this review is complete.
(f) Revision of the project priority list. The State may modify the project priority list at any time during the program planning cycle in accordance with the public participation requirements and the procedures established in the approved State priority system. Any modification (other than clerical) to the priority list must be clearly documented and promptly reported to the Regional Administrator. As a minimum, each State's priority list management procedure must provide for the following conditions:
(1) Project bypass. A State may bypass a project on the fundable portion of the list after it gives written notice to the municipality and the NPDES authority that the State has determined that the project to be bypassed will not be ready to proceed during the funding year. Bypassed projects shall retain their relative priority rating for consideration in the future year allotments. The highest ranked projects on the planning portion of the list will replace bypassed projects. Projects considered for funding in accordance with this provision must comply with paragraph (g) of this section.
(2) Additional allotments. If a State receives any additional allotment(s), it may fund projects on the planning portion of the priority list without further public participation if:
(i) The projects on the planning portion have met all administrative and public participation requirements outlined in the approved State priority system; and
(ii) The projects included within the fundable range are the highest priority projects on the planning portion.
If sufficient projects that meet these conditions are not available on the planning portion of the list, the State shall follow the procedures outlined in paragraph (e) of this section to add projects to the fundable portion of the priority list.
(3) Project removal. A State may remove a project from the priority list only if:
(i) The project has been fully funded;
(ii) The project is no longer entitled to funding under the approved priority system;
(iii) The Regional Administrator has determined that the project is not needed to comply with the enforceable requirements of the Act; or
(iv) The project is otherwise ineligible.
(g) Regional Administrator review for compliance with the enforceable requirements of the Act. (1) Unless otherwise provided in paragraph (g)(2) of this section, the Regional Administrator may propose the removal of a specific project or portion thereof from the State project priority list during or after the initial review where there is reason to believe that it will not result in compliance with the enforceable requirements of the Act. Before making a final determination, the Regional Administrator will initiate a public hearing on this issue. Questioned projects shall not be funded during this administrative process. Consideration of grant award will continue for those projects not at issue in accordance with all other requirements of this section.
(i) The Regional Administrator shall establish the procedures for the public notice and conduct of any such hearing, or, as appropriate, the procedures may be adapted from existing agency procedures such as §6.400 or §§123.32 and 123.34 of this chapter. The procedures used must conform to minimum Agency guidelines for public hearings under part 25 of this chapter.
(ii) Within 30 days after the date of the hearing, the Regional Administrator shall transmit to the appropriate State agency a written determination about the questioned projects. If the Regional Administrator determines that the project will not result in compliance with the enforceable requirements of the Act, the State shall remove the project from the priority list and modify the priority list to reflect this action. The Regional Administrator's determination will constitute the final agency action, unless the State or municipality files a notice of appeal under part 30, subpart J of this subchapter.
(2) The State may use 25 percent of its funds during each fiscal year for projects or portions of projects in categories IIIB, IVA, IVB, and V (see §35.915(a)(1)(ii)). These projects must be eligible for Federal funding to be included on the priority list. EPA will generally not review these projects under paragraph (g)(1) of this section to determine if they will result in compliance with the enforceable requirements of the Act. The Regional Administrator will, however, review all projects or portions thereof which would use funds beyond the 25-percent level according to the criteria in paragraph (g)(1) of this section.
(h) Regional Administrator review for eligibility. If the Regional Administrator determines that a project on the priority list is not eligible for assistance under this subpart, the State and municipality will be promptly advised and the State will be required to modify its priority list accordingly. Elimination of any project from the priority list shall be final and conclusive unless the State or municipality files a notice of appeal under part 30, subpart J of this subchapter.
[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 37595, June 27, 1979; 44 FR 39339, July 5, 1979]
§ 35.915-1 Reserves related to the project priority list.
top
In developing the fundable portion of the priority list, the State shall provide for the establishment of the several reserves required or allowed under this section. The State shall submit a statement specifying the amount to be set aside for each reserve with the final project priority list.
(a) Reserve for State management assistance grants. The State may (but need not) propose that the Regional Administrator set aside from each allotment a reserve not to exceed 2 percent or $400,000, whichever is greater, for State management assistance grants under subpart F of this part. Grants may be made from these funds to cover the reasonable costs of administering activities delegated to a State. Funds reserved for this purpose that are not obligated by the end of the allotment period will be added to the amounts last allotted to a State. These funds shall be immediately available for obligation to projects in the same manner and to the same extent as the last allotment.
(b) Reserve for innovative and alternative technology project grant increase. Each State shall set aside from its annual allotment a specific percentage to increase the Federal share of grant awards from 75 percent to 85 percent of the eligible cost of construction (under §35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment processes and techniques. The set-aside amount shall be 2 percent of the State's allotment for each of fiscal years 1979 and 1980, and 3 percent for fiscal year 1981. Of this amount not less than one-half of 1 percent of the State's allotment shall be set aside to increase the Federal grant share for projects utilizing innovative processes and techniques. Funds reserved under this section may be expended on projects for which facilities plans were initiated before fiscal year 1979. These funds shall be reallotted if not used for this purpose during the allotment period.
(c) Reserve for grant increases. The State shall set aside not less than 5 percent of the total funds available during the priority list year for grant increases (including any funds necessary for development of municipal pretreatment programs) for projects awarded assistance under §35.93511. The funds reserved for this purpose shall be reallotted if not obligated. Therefore, if they are not needed for grant increases they should be released for funding additional projects before the reallotment deadline.
(d) Reserve for step 1 and step 2 projects. The State may (but need not) set aside up to 10 percent of the total funds available in order to provide grant assistance to step 1 and step 2 projects that may be selected for funding after the final submission of the project priority list. The funds reserved for this purpose shall be reallotted if not obligated. Therefore, they should be released for funding additional projects before the reallotment deadline.
(e) Reserve for alternative systems for small communities. Each State with a rural population of 25 percent or more (as determined by population estimates of the Bureau of Census) shall set aside an amount equal to 4 percent of the State's annual allotment, beginning with the fiscal year 1979 allotment. The set-aside amount shall be used for funding alternatives to conventional treatment works for small communities. The Regional Administrator may authorize, at the request of the Governor of any non-rural State, a reserve of up to 4 percent of that State's allotment for alternatives to conventional treatment works for small communities. For the purposes of this paragraph, the definition of a small community is any municipality with a population of 3,500 or less, or highly dispersed sections of larger municipalities, as determined by the Regional Administrator. In States where the reserve is mandatory, these funds shall be reallotted if not obligated during the allotment period. In States where the reserve is optional, these funds should be released for funding projects before the reallotment deadline.
§ 35.917 Facilities planning (step 1).
top
(a) Sections 35.917 through 35.9179 establish the requirements for facilities plans.
(b) Facilities planning consists of those necessary plans and studies which directly relate to the construction of treatment works necessary to comply with sections 301 and 302 of the Act. Facilities planning will demonstrate the need for the proposed facilities. Through a systematic evaluation of feasible alternatives, it will also demonstrate that the selected alternative is cost-effective, i.e., is the most economical means of meeting established effluent and water quality goals while recognizing environmental and social considerations. (See appendix A to this subpart.)
(c) EPA requires full compliance with the facilities planning provisions of this subpart before award of step 2 or step 3 grant assistance. (Facilities planning initiated before May 1, 1974, may be accepted under regulations published on February 11, 1974, if the step 2 or step 3 grant assistance is awarded before April 1, 1980.)
(d) Grant assistance for step 2 or step 3 may be awarded before approval of a facilities plan for the entire geographic area to be served by the complete waste treatment system of which the proposed treatment works will be an integral part if:
(1) The Regional Administrator determines that applicable statutory requirements have been met (see §§35.9257 and 35.9258); that the facilities planning related to the proposed step 2 or step 3 project has been substantially completed; and that the step 2 or step 3 project for which grant assistance is made will not be significantly affected by the completion of the facilities plan and will be a component part of the complete system; and
(2) The applicant agrees to complete the facilities plan on a schedule the State accepts (subject to the Regional Administrator's approval); the schedule shall be inserted as a special condition in the grant agreement.
(e) Facilities planning may not be initiated before award of a step 1 grant or written approval of a plan of study (see §35.9203(a)(1)) accompanied by reservation of funds for a step 1 grant (see §§35.92518 and 35.905). Facility planning must be based on load allocations, delineation of facility planning areas and population projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3) of appendix A.) After October 1, 1979, the Regional Administrator shall not approve grant assistance for any project under this subpart if such facility-related information is not available in an approved WQM plan, unless the Regional Administrator determines, in writing, based on information submitted by the State or the grantee, that the facility-related information was not within the scope of the WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act.
(f) If the information required as part of a facilities plan has been developed separately, the facilities plan should incorporate it by reference. Planning which has been previously or collaterally accomplished under local, State, or Federal programs will be utilized (not duplicated).
§ 35.917-1 Content of facilities plan.
top
Facilities planning must address each of the following to the extent considered appropriate by the Regional Administrator:
(a) A description of the treatment works for which construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for completion of design and construction. The preliminary engineering data may include, to the extent appropriate, information such as a schematic flow diagram, unit processes, design data regarding detention times, flow rates, sizing of units, etc.
(b) A description of the selected complete waste treatment system(s) of which the proposed treatment works is a part. The description shall cover all elements of the system, from the service area and collection sewers, through treatment, to the ultimate discharge of treated waste waters and management and disposal of sludge. Planning area maps must include major components of existing and proposed treatment works. For individual systems, planning area maps must include those individual systems which are proposed for funding under §35.918.
(c) Infiltration/inflow documentation in accordance with §35.927 et seq.
(d) A cost-effectiveness analysis of alternatives for the treatment works and for the complete waste treatment system(s) of which the treatment works is a part. The selection of the system(s) and the choice of the treatment works for which construction drawings and specifications are to be prepared shall be based on the results of the cost-effectiveness analysis. (See appendix A to this subpart.) This analysis shall include:
(1) The relationship of the size and capacity of alternative works to the needs to be served, including reserve capacity;
(2) An evaluation of alternative flow and waste reduction measures, including nonstructural methods;
(3) An evaluation of improved effluent quality attainable by upgrading the operation and maintenance and efficiency of existing facilities as an alternative or supplement to construction of new facilities;
(4) An evaluation of the capability of each alternative to meet applicable effluent limitations. (All step 2, step 3, or step 2=3 projects shall be based on application of best practicable waste treatment technology (BPWTT), as a minimum. Where application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining such standards. Such provision shall consider the alternative of treating combined sewer overflows.);
(5) An identification of, and provision for, applying BPWTT as defined by the Administrator, based on an evaluation of technologies included under each of the following waste treatment management techniques:
(i) Biological or physical-chemical treatment and discharge to receiving waters;
(ii) Systems employing the reuse of waste water and recycling of pollutants;
(iii) Land application techniques;
(iv) Systems including revenue generating applications; and
(v) Onsite and nonconventional systems;
(6) An evaluation of the alternative methods for the ultimate disposal of treated waste water and sludge materials resulting from the treatment process, and a justification for the method(s) chosen;
(7) An adequate assessment of the expected environmental impact of alternatives (including sites) under part 6 of this chapter. This assessment shall be revised as necessary to include information developed during subsequent project steps;
(8) For facilities planning begun after September 30, 1978, whether or not prepared under a step 1 grant, an analysis of innovative and alternative treatment processes and techniques that reclaim and reuse water, productively recycle waste water constituents, eliminate the discharge of pollutants, recover energy or otherwise achieve the benefits described in appendix E. The provisions of this paragraph are encouraged in all cases. They are required in facilities planning for new treatment works and for treatment works which are being acquired, altered, modified, improved, or extended either to handle a significant increase in the volume of treated waste or to reduce significantly the pollutant discharges from the system. Where certain categories of alternative technologies may not be generally applicable because of prevailing climatic or geological conditions, a detailed analysis of these categories of alternative technologies is not required. However, the reason for such a rejection must be fully substantiated in the facilities plan;
(9) For facilities planning begun after September 30, 1978, whether or not prepared under a step 1 grant, an analysis of the primary energy requirements (operational energy inputs) for each system considered. The alternative selected shall propose adoption of measures to reduce energy consumption or to increase recovery as long as such measures are cost-effective. Where processes or techniques are claimed to be innovative technology on the basis of energy reduction criterion contained in paragraph 6e(2) of appendix E to this subpart, a detailed energy analysis shall be included to substantiate the claim to the satisfaction of the Regional Administrator.
(e) An identification of effluent discharge limitations or, where a permit has been issued, the NPDES permit number, and a brief description of how the proposed project(s) will result in compliance with the enforceable requirements of the Act.
(f) Required comments or approvals of relevant State, interstate, regional, and local agencies (see §30.3058).
(g) A final responsiveness summary, consistent with 40 CFR 25.8 and §35.9175.
(h) A brief statement demonstrating that the authorities who will be implementing the plan have the necessary legal, financial, institutional, and managerial resources available to insure the construction, operation, and maintenance of the proposed treatment works.
(i) A statement specifying that the requirements of the Civil Rights Act of 1964 and of part 7 of this chapter have been met.
(j) For facilities planning begun after September 30, 1978, whether or not prepared under a step 1 grant, a description of potential opportunities for recreation, open space, and access to bodies of water analyzed in planning the proposed treatment works and the recommended actions. The facilities plan shall also describe measures taken to coordinate with Federal, State, and local recreational programs and with recreational elements of applicable approved areawide WQM plans.
(k) A municipal pretreatment program in accordance with §35.907,
(l) An estimate of total project costs and charges to customers, in accordance with guidance issued by the Administrator.
(m) A statement concerning the availability and estimated cost of proposed sites.
[43 FR 44049, Sept. 27, 1978, as amended at 44 FR 10302, Feb. 16, 1979]
§ 35.917-2 State responsibilities.
top
(a) Facilities planning areas. Facilities planning should focus upon the geographic area to be served by the waste treatment system(s) of which the proposed treatment works will be an integral part. The facilities plan should include the area necessary to prepare an environmental assessment and to assure that the most cost-effective means of achieving the established water quality goals can be implemented. To assure that facilities planning will include the appropriate geographic areas, the State shall:
(1) Delineate, as a preliminary basis for planning, the boundaries of the planning areas. In the determination of each area, appropriate attention should be given to including the entire area where cost savings, other management advantages, or environmental gains may result from interconnection of individual waste treatment systems or collective management of such systems;
(2) Include maps, which shall be updated annually, showing the identified areas and boundary determinations, as part of the State submission under section 106 of the act;
(3) Consult with local officials in making the area and boundary determinations; and
(4) Where individual systems are likely to be cost-effective, delineate a planning area large enough to take advantage of economies of scale and efficiencies in planning and management.
(b) Facilities planning priorities. The State shall establish funding priorities for facilities planning in accordance with §§35.915 and 35.9151.
§ 35.917-3 Federal assistance.
top
(a) Eligibility. Only an applicant which is eligible to receive grant assistance for subsequent phases of construction (steps 2 and 3) and which has the legal authority to subsequently construct and manage the facility may apply for grant assistance for step 1. If the area to be covered by the facilities plan includes more than one political jurisdiction, a grant may be awarded for a step 1 project, as appropriate, to:
(1) The joint authority representing such jurisdictions, if eligible;
(2) one qualified (lead agency) applicant; or
(3) two or more eligible jurisdictions. After a waste treatment management agency for an area has been designated in accordance with section 208(c) of the Act (see subpart G of this part) the Regional Administrator shall not make any grant for construction of treatment works within the area except to the designated agency.
(b) Reports. Where a grant has been awarded for facilities planning which is expected to require more than 1 year to complete, the grantee must submit a brief progress report to the Regional Administrator at 3-month intervals. The progress report shall contain a minimum of narrative description, and shall describe progress in completing the approved schedule of specific tasks for the project.
§ 35.917-4 Planning scope and detail.
top
(a) Initially, the geographic scope of step 1 grant assistance shall be based on the area delineated by the State under §35.9172, subject to the Regional Administrator's review. The Regional Administrator may make the preliminary delineation of the boundaries of the planning area, if the State has not done so, or may revise boundaries selected by the locality or State agency, after appropriate consultation with State and local officials.
(b) Facilities planning shall be conducted only to the extent that the Regional Administrator finds necessary in order to insure that facilities for which grants are awarded will be cost-effective and environmentally sound and to permit reasonable evaluation of grant applications and subsequent preparation of designs, construction drawings, and specifications.
§ 35.917-5 Public participation.
top
(a) General. Consistent with section 101(e) of the Clean Water Act and 40 CFR part 25, EPA, the States, and grantees shall provide for, encourage, and assist public participation in the facilities planning process and shall provide citizens with information about and opportunities to become involved in the following:
(1) The assessment of local water quality problems and needs;
(2) The identification and evaluation of locations for waste water treatment facilities and of alternative treatment technologies and systems including those which recycle and reuse waste water (including sludge), use land treatment, reduce waste water volume, and encourage multiple use of facilities;
(3) The evaluation of social, economic, fiscal, and environmental impacts; and
(4) The resolution of other significant facilities planning issues and decisions.
(b) Basic Public Participation Program. Since waste water treatment facilities vary in complexity and impact upon the community, these public participation requirements institute a two-tier public participation program for facilities planning consisting of a Basic Public Participation Program, suitable for less complex projects with only moderate community impacts, and a Full-Scale Public Participation Program, for more complex projects with potentially significant community impacts. All facilities planning projects, except those that qualify for the Full-Scale Public Participation Program under paragraph (c) of this section and those exempt under paragraph (d) of this section, require the Basic Public Participation Program. In conducting the Basic Public Participation Program, the grantee shall at a minimum:
(1) Institute, and maintain throughout the facilities planning process, a public information program (including the development and use of a mailing list of interested and affected members of the public), in accordance with 40 CFR 25.4 and §35.9175(a).
(2) Notify and consult with the public, during the preparation of the plan of study, about the nature and scope of the proposed facilities planning project. EPA encourages the grantee to consult with the public in the selection of the professional consulting engineer.
(3) Include in the plan of study, submitted with the Step 1 grant application, a brief outline of the public participation program, noting the projected staff and budget resources which will be devoted to public participation, a proposed schedule for public participation activities, the types of consultation and informational mechanisms that will be used, and the segments of the public that the grantee has targeted for involvement.
(4) Submit to EPA, within 45 days after the date of acceptance of the Step 1 grant award, a brief Public Participation Work Plan. In addition to meeting the requirements of 40 CFR 25.11, the Work Plan shall describe the method of coordination between the appropriate Water Quality Management public participation program under subpart G of this part and the grantee's public participation program as required by 40 CFR 35.9175(e). The grantee shall distribute the Work Plan, accompanied by a fact sheet on the project, to groups and individuals who may be interested in or affected by the project. The fact sheet shall describe the nature, scope and location of the project; identify the consulting engineer and grantee staff contact; and include a preliminary estimate of the total costs of the project, including debt service and operation and maintenance, and of the resulting charges to each affected household.
(5) Consult with the public, in accordance with 40 CFR 25.4, early in the facilities planning process when assessing the existing and future situations and identifying and screening alternatives, but before selecting alternatives for evaluation according to the Cost-Effectiveness Analysis Guidelines (see Appendix A, Cost-Effectiveness Analysis Guidelines, paragraph 5). After consultating with the public, the grantee shall prepare and distribute a responsiveness summary, in accordance with 40 CFR 25.8.
(6) Hold a meeting to consult with the public, in accordance with 40 CFR 25.6, when alternatives are largely developed but before an alternative or plan has been selected and then prepare and distribute a responsiveness summary, in accordance with 40 CFR 25.8.
(7) Hold a public hearing before final adoption of the facilities plan, in accordance with 40 CFR 25.5.
(8) Include in the final facilities plan a final responsiveness summary, in accordance with 40 CFR 25.8.
(c) Full-Scale Public Participation Program. (1) The Regional Administrator shall require a Full-Scale Public Participation Program for all Step 1 facilities planning projects that fulfill one or more of the following three conditions:
(i) Where EPA prepares or requires the preparation of an Environmental Impact Statement during facilities planning under 40 CFR part 6; or
(ii) Where advanced wastewater treatment (AWT) levels, as defined in EPA guidance, may be required; or
(iii) Where the Regional Administrator determines that more active public participation in decision-making is needed because of the possibility of particularly significant effects on matters of citizen concern, as indicated by one or more of the following:
(A) Significant change in land use or impact on environmentally sensitive areas;
(B) Significant increase in the capacity of treatment facilities or interceptors, significant increase in sewered area, or construction of wholly new treatment and conveyance systems;
(C) Substantial total cost to the community or substantial increased cost to users (i.e., cost not reimbursed under the grant);
(D) Significant public controversy;
(E) Significant impact on local population growth or economic growth;
(F) Substantial opportunity for implementation of innovative or alternative wastewater treatment technologies or systems.
(2) The grantee shall initiate a Full-Scale Public Participation Program as soon as the determination in paragraph (c)(1) of this section is made. Generally, the determination should be made before or at the time of award of the Step 1 grant. However, if the Regional Administrator's determination under paragraph (c)(1) of this section to require a Full-Scale Public Participation Program occurs after initiation of facilities planning because of newly discovered circumstances, the grantee shall initiate and expanded public participation program at that point. The Regional Administrator shall assure that the expanded program is at least as inclusive as a normal Full-Scale Public Participation Program, except for constraints imposed by facilities planning activities that have already been completed. If the project is segmented, the Regional Administrator shall look at the project as a whole when considering whether to require a Full-Scale Public Participation Program.
(3) In conducting the Full-Scale Public Participation Program, the grantee shall at a minimum:
(i) Institute and maintain, throughout the facilities planning process, a public information program, in accordance with 40 CFR 25.4 and §35.9175(a);
(ii) Notify and consult with the public, during the development of the plan of study, about the nature and scope of the proposed facilities planning project. EPA encourages the grantee to consult with the public in the selection of the professional consulting engineer;
(iii) Include, in the plan of study submitted with the Step 1 grant application, brief outline of the public participation program, noting the projected staff and budget resources which will be devoted to public participation, a proposed schedule for public participation activities, types of information and consultation mechanisms that will be used, and the segments of the public that the grantee has targeted for involvement;
(iv) Designate or hire a public participation coordinator and establish an advisory group, in accordance with 40 CFR 25.7, immediately upon acceptance of the Step 1 grant award.
(v) Submit to EPA, within 45 days after the date of acceptance of the step 1 grant award and after consultation with the advisory group, a brief Public Participation Work Plan. In addition to meeting the requirements of 40 CFR 25.11, the Work Plan shall describe the method for coordination between the appropriate Water Quality Management agency public participation program under subpart G of this part, and the grantee's public participation program as required by 40 CFR 35.9175(e). The grantee shall distribute the Work Plan, accompanied by a fact sheet on the project, to groups and individuals who may be interested in or affected by the project. The fact sheet shall describe the nature, scope and location of the project; identify the consulting engineer and grantee staff contact; and include a preliminary estimate of the total costs of the project, including debt service and operation and maintenance, and of the resulting costs to each affected household;
(vi) Hold a public meeting to consult with the public, in accordance with 40 CFR 25.6, early in the facilities planning process when assessing the existing and future situations, and identifying and screening alternatives, but before selection of alternatives for evaluation according to the Cost-Effectiveness Analysis Guidelines (see Appendix A, Cost-Effectiveness Analysis Guidelines, paragraph 5). Following the public meeting, the grantee shall prepare and distribute a responsiveness summary, in accordance with 40 CFR 25.8;
(vii) Hold a public meeting to consult with the public, in accordance with 40 CFR 25.6, when alternatives are largely developed but before an alternative or plan has been selected, and then prepare and circulate a responsiveness summary, in accordance with 40 CFR 25.8;
(viii) Hold a public hearing prior to final adoption of the facilities plan, in accordance with 40 CFR 25.5. This public hearing may be held in conjunction with the public hearing on the draft Environmental Impact Statement under 40 CFR part 6.
(ix) Include, in the final facilities plan, a final responsiveness summary, in accordance with 40 CFR 25.8.
(d) Exemptions from public participation requirements. (1) Upon written request of the grantee, the Regional Administrator may exempt projects in which only minor upgrading of treatment works or minor sewer rehabilitation is anticipated according to the State Project Priority List from the requirements of the Basic and Full-Scale Public Participation Programs under paragraphs (b) and (c) of this section, except for the public hearing and public disclosure of costs. Before granting any exemption, the Regional Administrator shall issue a public notice of intent to waive the above requirements containing the facts of the situation and shall allow 30 days for response. If responses indicate that serious local issues exist, then the Regional Administrator shall deny the exemption request.
(2) During the facilities planning process, if the Regional Administrator determines that the project no longer meets the exemption criteria stated above, the grantee, in consultation with the Regional Administrator, shall undertake public participation activities commensurate with the appropriate public participation program but adjusted for constraints imposed by facilities planning activities that have already been completed.
(3) If a project is segmented, the Regional Administrator shall look at the project as a whole when considering any petition for exemption.
(e) Relationship between facilities planning and other environmental protection programs. Where possible, the grantee shall further the integration of facilities planning and related environmental protection programs by coordinating the facilities planning public participation program with public participation activities carried out under other programs. At a minimum, the grantee shall provide for a formal liaison between the facilities planning advisory group (or the grantee, where there is no advisory group) and any areawide advisory group established under subpart G of this part. The Regional Administrator may request review of the facilities plan by any appropriate State or areawide advisory group in association with the facilities plan review required by 40 CFR 35.1522.
(f) Mid-project evaluation. In accordance with 40 CFR 25.12(a)(2), EPA shall, in conjunction with other regular oversight responsibilities, conduct a mid-project review of compliance with public participation requirements.
[44 FR 10302, Feb. 16, 1979]
§ 35.917-6 Acceptance by implementing governmental units.
top
A facilities plan submitted for approval shall include adopted resolutions or, where applicable, executed agreements of the implementing governmental units, including Federal facilities, or management agencies which provide for acceptance of the plan, or assurances that it will be carried out, and statements of legal authority necessary for plan implementation. The Regional Administrator may approve any departures from these requirements before the plan is submitted.
§ 35.917-7 State review and certification of facilities plan.
top
Each facilities plan must be submitted to the State agency for review. The State must certify that:
(a) The plan conforms with requirements set forth in this subpart;
(b) The plan conforms with any existing final basin plans approved under section 303(e) of the Act;
(c) Any concerned 208 planning agency has been given the opportunity to comment on the plan; and
(d) The plan conforms with any waste treatment management plan approved under section 208(b) of the Act.
§ 35.917-8 Submission and approval of facilities plan.
top
The State agency must submit the completed facilities plan for the Regional Administrator's approval. Where deficiencies in a facilities plan are discovered, the Regional Administrator shall promptly notify the State and the grantee or applicant in writing of the nature of such deficiencies and of the recommended course of action to correct such deficiencies. Approval of a plan of study or a facilities plan will not constitute an obligation of the United States for any step 2, step 3, or step 2=3 project.
§ 35.917-9 Revision or amendment of facilities plan.
top
A facilities plan may provide the basis for several subsequent step 2, step 3, or step 2=3 projects. A facilities plan which has served as the basis for the award of a grant for a step 2, step 3, or step 2=3 project shall be reviewed before the award of any grant for a subsequent project involving step 2 or step 3 to determine if substantial changes have occurred. If the Regional Administrator decides substantial changes have occurred which warrant revision or amendment, the plan shall be revised or amended and submitted for review in the same manner specified in this subpart.
§ 35.918 Individual systems.
top
(a) For references to individual systems, the following definitions apply:
(1) Individual systems. Privately owned alternative wastewater treatment works (including dual waterless/gray water systems) serving one or more principal residences or small commercial establishments which are neither connected into nor a part of any conventional treatment works. Normally, these are on-site systems with localized treatment and disposal of wastewater with minimal or no conveyance of untreated waste water. Limited conveyance of treated or partially treated effluents to further treatment or disposal sites can be a function of individual systems where cost-effective.
(2) Principal residence. Normally the voting residence, the habitation of the family or household which occupies the space for at least 51 percent of the time annually. Second homes, vacation, or recreation residences are not included in this definition. A commercial establishment with waste water flow equal to or smaller than one user equivalent (generally 300 gallons per day dry weather flows) is included.
(3) Small commercial establishments. Private establishments normally found in small communities such as restaurants, hotels, stores, filling stations, or recreational facilities with dry weather wastewater flows less than 25,000 gallons per day. Private, nonprofit entities such as churches, schools, hospitals, or charitable organizations are considered small commercial establishments. A commercial establishment with waste water flow equal to or smaller than one user equivalent (generally 300 gallons per day dry weather flow) shall be treated as a residence.
(4) Conventional system. A collection and treatment system consisting of minimum size (6 or 8 inch) gravity collector sewers normally with manholes, force mains, pumping and lift stations, and interceptors leading to a central treatment plant.
(5) Alternative waste water treatment works. A waste water conveyance and/or treatment system other than a conventional system. This includes small diameter pressure and vacuum sewers and small diameter gravity sewers carrying partially or fully treated waste water.
(b) A public body otherwise eligible for a grant under §35.9201 is eligible for a grant to construct privately owned treatment works serving one or more principal residences or small commercial establishments if the requirements of §§35.9181, 35.9182, and 35.9183 are met.
(c) All individual systems qualify as alternative systems under §35.908 and are eligible for the 4-percent set-aside (§35.9151(e)) where cost-effective.
§ 35.918-1 Additional limitations on awards for individual systems.
top
In addition to those limitations set forth in §35.925, the grant applicant shall:
(a) Certify that the principal residence or small commercial establishment was constructed before December 27, 1977, and inhabited or in use on or before that date;
(b) Demonstrate in the facility plan that the solution chosen is cost-effective and selected in accordance with the cost-effectiveness guidelines for the construction grants program (see appendix A to this subpart);
(c) Apply on behalf of a number of individual units located in the facility planning area;
(d) Certify that public ownership of such works is not feasible and list the reasons in support of such certification;
(e) Certify that such treatment works will be properly installed, operated, and maintained and that the public body will be responsible for such actions;
(f) Certify before the step 2 grant award that the project will be constructed and an operation and maintenance program established to meet local, State, and Federal requirements including those protecting present or potential underground potable water sources;
(g) Establish a system of user charges and industrial cost recovery in accordance with §§35.928 et seq., 35.929 et seq., 35.93513, and 35.93515;
(h) Obtain assurance (such as an easement or covenant running with the land), before the step 2 grant award, of unlimited access to each individual system at all reasonable times for such purposes as inspection, monitoring, construction, maintenance, operation, rehabilitation, and replacement. An option will satisfy this requirement if it can be exercised no later than the initiation of construction;
(i) Establish a comprehensive program for regulation and inspection of individual systems before EPA approval of the plans and specifications. Planning for this comprehensive program shall be completed as part of the facility plan. The program shall include as a minimum, periodic testing of water from existing potable water wells in the area. Where a substantial number of onsite systems exist, appropriate additional monitoring of the aquifer(s) shall be provided;
(j) Comply with all other applicable limitations and conditions which treatment works projects funded under this subpart must meet.
§ 35.918-2 Eligible and ineligible costs.
top
(a) Only the treatment and treatment residue disposal portions of toilets with composting tanks, oil-flush mechanisms or similar in-house systems are grant eligible.
(b) Acquisition of land in which the individual system treatment works are located is not grant eligible.
(c) Commodes, sinks, tubs, drains, and other wastewater generating fixtures and associated plumbing are not grant eligible. Modifications to homes or commercial establishments are also excluded from grant eligibility.
(d) Only reasonable costs of construction site restoration to preconstruction conditions are eligible. Costs of improvement or decoration associated with the installation of individual systems are not eligible.
(e) Conveyance pipes from wastewater generating fixtures to the treatment unit connection flange or joint are not eligible where the conveyance pipes are located on private property.
§ 35.918-3 Requirements for discharge of effluents.
top
Best practicable waste treatment criteria published by EPA under section 304(d)(2) of the Act shall be met for disposal of effluent on or into the soil from individual systems. Discharges to surface waters shall meet effluent discharge limitations for publicly owned treatment works.
§ 35.920 Grant application.
top
Grant applications will be submitted and evaluated in accordance with part 30, subpart B of this chapter.
§ 35.920-1 Eligibility.
top
Municipalities (see §35.905), intermunicipal agencies, States, or interstate agencies are eligible for grant assistance.
§ 35.920-2 Procedure.
top
(a) Preapplication assistance, including, where appropriate, a preapplication conference, should be requested from the State agency or the appropriate EPA Regional Office for each project for which State priority has been determined. The State agency must receive an application for each proposed treatment works. The basic application shall meet the project requirements in §35.9203. Submissions required for subsequent related projects shall be in the form of amendments to the basic application. The grantee shall submit each application through the State agency. It must be complete (see §35.9203), and must relate to a project for which priority has been determined under §35.915. If any information required by §35.9203 has been furnished with an earlier application, the applicant need only incorporate it by reference and, if necessary, revise such information using the previously approved application.
(b) Grant applications (and, for subsequent related projects, amendments to them) are considered received by EPA only when complete and upon official receipt of the State priority certification document (EPA form 570028) in the appropriate EPA Regional Office. In a State which has been delegated Federal application processing functions under §35.912 or under subpart F of this part, applications are considered received by EPA on the date of State certification. Preliminary or partial submittals may be made; EPA may conduct preliminary processing of these submittals.
§ 35.920-3 Contents of application.
top
(a) Step 1: Facilities plan and related step 1 elements. An application for a grant for step 1 shall include:
(1) A plan of study presenting
(i) The proposed planning area;
(ii) An identification of the entity or entities that will be conducting the planning;
(iii) The nature and scope of the proposed step 1 project and public participation program, including a schedule for the completion of specific tasks;
(iv) An itemized description of the estimated costs for the project; and
(v) Any significant public comments received.
(2) Proposed subagreements, or an explanation of the intended method of awarding subagreements for performance of any substantial portion of the project work;
(3) Required comments or approvals ofrelevant State, local and Federal agencies, including clearinghouse requirements of Office of Management and Budget Circular A95, as revised (see §30.305 of this subchapter). (continued)