(c) A listing of other methods and facility locations available for payment of cash or urgent payments; and

(d) A listing of other methods and locations for obtaining business office and customer service center services.

(4) The utility must include on its regularly scheduled bills a statement referring its customers to a toll-free number for updated payment agency locations.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-188, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-193
Posting of tariffs for public inspection and review.
Each gas utility offering service under tariff must make available for public inspection and review all tariffs governing its provision of service, as required by RCW 80.28.050. To comply with this requirement, a utility must fulfill the provisions of either subsection (1) or (2) of this section.

(1) Web, telephone, and mail access. The utility must:

(a) Maintain a complete copy of its tariff or tariffs and all proposed tariff changes on an internet web site accessible to the public using generally available browser software;

(b) Provide a toll-free telephone number by which customers and applicants can obtain assistance during normal business hours from a company agent qualified to assist the customer in locating, interpreting, and applying tariff provisions;

(c) Upon written or oral request by any customer or applicant, deliver at no charge a copy of any current, proposed or most recently canceled tariff page that relates to the customer's or applicant's service; and

(d) Include on each customer bill and notice the address of the tariff web site and the toll-free telephone number.

(2) Physical access. The utility must make available for public inspection and copying a complete copy of its tariff or tariffs, all most recently canceled tariff sheets, and all proposed tariff changes at one or more offices in each county where it offers service, except: A single office may serve more than one county if the office is within twenty miles of all customers in the county where no tariff is posted. The utility must provide at each office either an agent qualified to assist the customer in locating, interpreting, and applying tariff provisions or access to such an agent by a toll-free telephone number.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-193, filed 5/14/02, effective 6/17/02. Statutory Authority: RCW 80.04.160 and 80.01.040. 01-09-002 (Docket No. U-991301, General Order No. R-481), § 480-90-193, filed 4/4/01, effective 5/5/01.]




--------------------------------------------------------------------------------

480-90-194
Publication of proposed tariff changes to increase charges or restrict access to services.
Each gas utility offering service under tariff must publish all proposed changes to its tariff for at least thirty days, as required by RCW 80.28.060. For any proposed tariff change that would increase recurring charges, except purchased gas adjustment (PGA) filings as provided in subsection (5) of this section, or restrict access to services (e.g., discontinue a service, or limit access to service by imposing a new usage level on existing services), a utility must fulfill the requirements of subsection (1), (2), or (3) of this section. For any other proposed tariffs, the utility must fulfill the requirements of WAC 480-90-195. The utility will not be required to accomplish publication under this section if it has agreed to suspend its tariff filing and to provide notice as provided under WAC 480-90-197.

(1) Thirty-day notice to individual customers. To comply under this method, the utility must, at least thirty days before the stated effective date of the proposed change, mail the posting to each customer that would be affected by the proposed change. The posting must include the information listed in subsection (4) of this section.

(2) Published notice. To comply under this method, the utility must, at least thirty days before the stated effective date of the proposed change, publish notice of the proposed change within the geographical areas where it offers service. To meet minimum publication requirements, a utility must:

(a) Distribute copies of the published notice to community agencies and organizations in the geographic area where the utility offers service for posting and publication by the agency or organization. The utility must include in its distribution list any agency or organization that requests these notices;

(b) Cause to be printed in large print, as a paid advertisement, a complete copy of the published notice in the daily newspaper of general circulation with the greatest number of subscribers in each geographic area or each of the areas affected by the proposed tariff;

(c) Provide to the news editor of every newspaper, television station, and radio station, in the geographic area within which it offers service a news release or public service announcement summarizing the published notice. The release or announcement must include a toll-free number that customers can use to obtain more information from the utility. The commission will maintain a list of area newspapers, television, and radio stations and will provide it on request to any utility; and

(d) Post a complete copy of the published notice on an Internet web site accessible to the public using generally available browser software.

(3) Reduced publication with shortened notice to individual customers. To comply under this method, the utility must:

(a) Mail the posting to each customer that would be affected by the proposed change at least fifteen days before the stated effective date of the proposed change;

(b) At the time of the utility's filing with the commission, distribute copies of the published notice in the same manner as provided in subsection (2)(a) of this section;

(c) At the time of the utility's filing with the commission, provide news media notice in the same manner as provided in subsection (2)(c) of this section; and

(d) At the time of the utility's filing with the commission, post a complete copy of the published notice in the same manner as provided in subsection (2)(d) of this section.

(4) Content of postings. The published notice required by this rule must include, when applicable:

(a) The date the notice is issued;

(b) The utility's name and address;

(c) A brief explanation of the reason(s) the utility has requested the rate change (e.g., increase in labor costs, recovery of new plant investment, and increased office expenses, such as postage and customer billing);

(d) A comparison of current and proposed rates by service;

(e) An example showing the monthly increase of the average customer's bill based on the proposed rates (e.g., "based on the proposed rates, a typical gas customer using an average of eighty therms per month would see an average monthly increase of $2.74.");

(f) When the rates will be billed (i.e., monthly or bimonthly);

(g) The requested effective date and, if different, the implementation date;

(h) A statement that the commission has the authority to set final rates that may vary from the utility's request, which may be either higher or lower depending on the results of the investigation;

(i) A description of how customers may contact the utility if they have specific questions or need additional information about the proposal; and

(j) Public involvement language. A utility may choose from:

(i) Commission-suggested language that is available from the commission's designated public affairs officer; or

(ii) Utility-developed language that must include the commission's mailing address, toll-free number, and docket number, if known, and a brief explanation of:

(A) How to participate in the commission's process by mailing or faxing a letter, or submitting an e-mail; and

(B) How to contact the commission for process questions or to be notified of the scheduled open meeting at which the proposal will be considered by the commission.

(5) Optional method of publication for purchase gas adjustment (PGA). A utility that publishes notice of a PGA filing pursuant to this subsection is not required to publish notice of the filing pursuant to subsection (1), (2), or (3) of this section.

(a) The utility must provide notice to affected customers before and after final commission disposition. Notice before commission disposition is to educate customers of a potential increase in natural gas prices. Notice after commission disposition is to inform customers of the new rates.

(b) Prior PGA notice. The notice must:

(i) Clearly define what a PGA is and explain how it works;

(ii) State whether the utility expects an increase or decrease in the upcoming filing; and

(iii) Include a utility contact phone number for additional information.

(c) The utility must mail the notice to each affected customer. The utility must also send the notice or a press release about the increase to every daily paper within its service territory.

(d) A newsletter, bill insert, bill message, or separate mailing to customers is permitted for prior notice.

(e) Customer notice after final commission disposition must be provided pursuant to WAC 480-90-195.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-194, filed 5/14/02, effective 6/17/02.]




--------------------------------------------------------------------------------

480-90-195
Notice of tariff changes other than increases in recurring charges and restrictions in access to services.
(1) This section applies to tariff changes for other than those that are subject to WAC 480-90-194.

(2) A utility that files a tariff change to increase any charge that a customer may incur without being quoted a rate or price (e.g., late payment fees, insufficient fund charges, or a one-time charge) must provide notice to each affected customer on or with the first bill after the change becomes effective.

(a) At a minimum, the notice must include the effective date, a clear description of changes to rates or services and a utility contact number where customers may seek additional information.

(b) Methods of notice permitted include a bill insert, bill message, printing on the billing envelope, a separate mailing to all affected customers or, if the utility has the capability and the customer has authorized, by e-mail.

(3) A utility that files a tariff change that decreases rates, including promotions that temporarily waive recurring or nonrecurring charges, or that changes terms or conditions without restricting access to the service, must publish the change in the manner it posts tariffs under WAC 480-90-193.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-195, filed 5/14/02, effective 6/17/02.]




--------------------------------------------------------------------------------

480-90-197
Adjudicative proceedings where public testimony will be taken.
(1) For adjudicated proceedings, when scheduling a hearing to take testimony from the public, the timing, location, and amount of notice to the public or to customers will be addressed in the prehearing conference order.

(2) The notice must include all information contained in WAC 480-90-194(4), except the public involvement information in WAC 480-90-194 (4)(j). A utility must include either of the following public involvement language:

(a) Commission-suggested language that is available from the commission's designated public affairs officer; or

(b) Utility-developed language that must include the commission's mailing address, toll-free number, docket number, and a brief explanation:

(i) How to participate in the commission's process by mailing or faxing a letter, or submitting an e-mail;

(ii) How to contact the commission for process questions; and

(iii) The date, time and location of the public hearing.

(3) Methods of notice permitted include a bill insert, bill message, printing on the billing envelope, a separate mailing to all affected customers or, if the utility has the capability and the customer has authorized, by e-mail.

(4) In addition to each affected customer, a utility must notify at least one newspaper of general circulation, and at least one radio station and at least one television station in the area or each of the areas affected.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-197, filed 5/14/02, effective 6/17/02.]




--------------------------------------------------------------------------------

480-90-198
Notice verification and assistance.
(1) Within ten days of making a filing requiring posting, publication, or customer notice under WAC 480-90-194, 480-90-195, or 480-90-197, but no sooner than when the tariff is filed with the commission, a utility must file a statement with the commission's records center that the required notice has been posted, published, and/or mailed. The declaration must include:

(a) The methods used to post, publish, and/or give notice to customers;

(b) When and how the notice was posted, published, and/or issued to customers;

(c) How many customers are affected; and

(d) A copy of the notice.

(2) A utility may request assistance from the commission's designated public affairs officer with efforts to comply with WAC 480-90-193 through 480-90-197.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-198, filed 5/14/02, effective 6/17/02.]




--------------------------------------------------------------------------------

480-90-199
Other customer notice.
The commission may require notice to customers of tariff changes other than those described in these rules when the commission determines that additional customer education is needed.



[Statutory Authority: RCW 80.01.040 and 80.04.180. 02-11-081 (Docket No. U-991301, General Order No. R-498), § 480-90-199, filed 5/14/02, effective 6/17/02.]




--------------------------------------------------------------------------------

480-90-203
Accounting system requirements.
(1) Gas utilities in the state of Washington must use the uniform system of accounts applicable to major and nonmajor gas utilities as published by the Federal Energy Regulatory Commission (FERC) in Title 18 of the Code of Federal Regulations, Part 201. Information about the Code of Federal Regulations regarding the version adopted and where to obtain it is set out in WAC 480-90-999, Adoption by reference.

(2) Gas utilities having multistate operations must maintain records in such detail that the costs of property located and business done in Washington can be readily ascertained in accordance with geographic boundaries.

(3) Any deviation from the uniform system of accounts, as prescribed by the FERC, will be accomplished only after due notice and order of this commission.

(4) This rule does not supercede any commission order regarding accounting treatments.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 02-18-033 (Docket No. A-020379, General Order No. R-501), § 480-90-203, filed 8/26/02, effective 9/26/02. Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-203, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-207
Filing information.
(1) Filing. The commission record center will accept any filing under WAC 480-90-242 (Issuing securities) delivered in person, by mail, telefacsimile, or electronic mail message. The commission records center will accept all other reports required in Part III in person, by mail, or when procedures are in place, electronic mail message.

(2) Commission may require additional information. The commission may require pertinent information in addition to that specified by statute or in this chapter.

(3) Information by reference. When any information required to support a filing is on file with the commission, it is sufficient to make specific reference to the information indicating the proceeding, report, or other filing that contains the referenced information.

(4) When information is unavailable. If any required information is unavailable at the time of the filing, the filing must include the reason why the information is not available and state when it will be available.



[Statutory Authority: RCW 80.01.040, 80.04.160, and 81.04.160. 05-17-026 (Docket No. A-021178 and TO-030288, General Order No. R-522), § 480-90-207, filed 8/5/05, effective 9/5/05. Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-207, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-209
Additional reports.
Part III does not supersede any reporting requirement specified in a commission order or limit the commission's ability to request additional information.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-209, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-213
Expenditures for political or legislative activities.
(1) The commission will not allow either direct or indirect expenditures for political or legislative activities for rate-making purposes.

(2) For purposes of this rule, political or legislative activities include, but are not limited to:

(a) Encouraging support or opposition to ballot measures, legislation, candidates for a public office, or current public office holders;

(b) Soliciting support for or contributing to political action committees;

(c) Gathering data for mailing lists that are generated for the purposes of encouraging support for or opposition to ballot measures, legislation, candidates for public office, or current office holders, or encouraging support for or contributions to political action committees;

(d) Soliciting contributions or recruiting volunteers to assist in the activities set forth in (a) through (c) of this subsection.

(3) Political or legislative activities do not include activities directly related to appearances before regulatory or local governmental bodies necessary for the utility's operations.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-213, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-223
Advertising.
(1) The commission will not allow expenses for promotional or political advertising for rate-making purposes. The term "promotional advertising" means advertising to encourage any person or business to select or use the service or additional services of a gas utility, to select or install any appliance or equipment designed to use the gas utility's service, or to influence consumers' opinions of the gas utility.

The term "political advertising" means any advertising for the purpose of influencing public opinion with respect to legislative, administrative, or electoral matters, or with respect to any controversial issue of public importance.

(2) As used in this section the terms "promotional advertising" and "political advertising" do not include:

(a) Advertising which informs customers how to conserve energy or how to reduce peak demand for energy;

(b) Advertising required by law or by regulation, including advertising under Part 1 of Title II, of the National Energy Conservation Policy Act;

(c) Advertising regarding service interruptions, safety measures, or emergency conditions;

(d) Advertising concerning employment opportunities with the gas utility;

(e) Advertising which promotes the use of energy efficient appliances, equipment, or services;

(f) Announcements or explanations of existing or proposed tariffs or rate schedules; and

(g) Notices of meetings or commission hearings concerning gas utility rates and tariffs.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-223, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-228
Retention and preservation of records and reports.
(1) Each gas utility must retain all records and reports for three years unless otherwise specified by the publication referenced in subsection (2) of this section. No records may be destroyed prior to the expiration of the time specified by the publication referenced in subsection (2) of this section.

(2) The commission adopts the publication, Regulations to Govern the Preservation of Records of Electric, Gas, and Water Companies, published by the National Association of Regulatory Utility Commissioners as the standards for utility records retention. Information about the Regulations to Govern the Preservation of Records of Electric, Gas, and Water Companies regarding the version adopted and where to obtain it is set out in WAC 480-90-999, Adoption by reference.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-228, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-233
Purchased gas adjustment.
(1) A purchased gas adjustment (PGA) clause is an accounting and rate adjustment procedure that gas utilities use to recover actual gas costs. Gas utilities must file with the commission for recovery of expected gas cost changes and amortization of accumulated book balances.

(2) A gas utility must include its PGA procedures in its tariff.

(3) A gas utility must make a PGA filing within a maximum of fifteen months since the effective date of the utility's last PGA. If the utility believes that a PGA filing is unnecessary within this time frame, then it must file supporting documents within thirteen months after the effective date of its last PGA demonstrating why a rate change is not necessary.

(4) A gas utility must accrue interest, compounded monthly, on deferred gas cost balances which accrue subsequent to the effective date of this rule at the previous quarter's average prime interest rate calculated as follows: The arithmetic mean of the prime rate values published in the Federal Reserve Bulletin for the fourth, third, and second months preceding the first month of the calendar quarter (also known as the "FERC interest rate").

(5) A gas utility must file a monthly report of the activity in account 191, Unrecovered purchased gas costs, for Washington within thirty days after the end of each month. The report must show the beginning balance, monthly entry and ending balances for each Washington subaccount included in account 191, Unrecovered purchased gas costs. PGA incentive amounts must be shown separately.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-233, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-238
Integrated resource planning.
(1) Purpose. Each natural gas utility regulated by the commission has the responsibility to meet system demand with the least cost mix of natural gas supply and conservation. In furtherance of that responsibility, each natural gas utility must develop an "integrated resource plan."

(2) Definitions.

(a) "Integrated resource plan" or "plan" means a plan describing the mix of natural gas supply and conservation designated to meet current and future needs at the lowest reasonable cost to the utility and its ratepayers.

(b) "Lowest reasonable cost" means the lowest cost mix of resources determined through a detailed and consistent analysis of a wide range of commercially available sources. At a minimum, this analysis must consider resource costs, market-volatility risks, demand-side resource uncertainties, the risks imposed on ratepayers, resource effect on system operations, public policies regarding resource preference adopted by Washington state or the federal government, the cost of risks associated with environmental effects including emissions of carbon dioxide, and the need for security of supply.

(c) "Conservation" means any reduction in natural gas consumption that results from increases in the efficiency of energy use or distribution.

(3) Content. At a minimum, integrated resource plans must include:

(a) A range of forecasts of future natural gas demand in firm and interruptible markets for each customer class that examine the effect of economic forces on the consumption of natural gas and that address changes in the number, type and efficiency of natural gas end-uses.

(b) An assessment of commercially available conservation, including load management, as well as an assessment of currently employed and new policies and programs needed to obtain the conservation improvements.

(c) An assessment of conventional and commercially available nonconventional gas supplies.

(d) An assessment of opportunities for using company-owned or contracted storage.

(e) An assessment of pipeline transmission capability and reliability and opportunities for additional pipeline transmission resources.

(f) A comparative evaluation of the cost of natural gas purchasing strategies, storage options, delivery resources, and improvements in conservation using a consistent method to calculate cost-effectiveness.

(g) The integration of the demand forecasts and resource evaluations into a long-range (e.g., at least ten years; longer if appropriate to the life of the resources considered) integrated resource plan describing the mix of resources that is designated to meet current and future needs at the lowest reasonable cost to the utility and its ratepayers.

(h) A short-term plan outlining the specific actions to be taken by the utility in implementing the long-range integrated resource plan during the two years following submission.

(i) A report on the utility's progress towards implementing the recommendations contained in its previously filed plan.

(4) Timing. Unless otherwise ordered by the commission, each natural gas utility must submit a plan within two years after the date on which the previous plan was filed with the commission. Not later than twelve months prior to the due date of a plan, the utility must provide a work plan for informal commission review. The work plan must outline the content of the integrated resource plan to be developed by the utility and the method for assessing potential resources.

(5) Public participation. Consultations with commission staff and public participation are essential to the development of an effective plan. The work plan must outline the timing and extent of public participation. In addition, the commission will hear comment on the plan at a public hearing scheduled after the utility submits its plan for commission review.

(6) The commission will consider the information reported in the integrated resource plan, when it evaluates the performance of the utility in rate and other proceedings.



[Statutory Authority: RCW 80.01.040 and 80.04.160. 06-03-001 (Docket Nos. UE-030311 and UG-030312, General Order No. R-526), § 480-90-238, filed 1/4/06, effective 2/4/06; 01-11-003 (Docket No. UG-990294, General Order No. R-484), § 480-90-238, filed 5/3/01, effective 6/3/01.]




--------------------------------------------------------------------------------

480-90-242
Issuing securities.
For the purpose of this section:

"Securities" means stocks, stock certificates, other evidence of interest or ownership, bonds, notes other than those notes exempted from reporting under RCW 80.08.043, or other evidence of indebtedness, or any obligation or liability as guarantor subject to reporting under RCW 80.08.130.

(1) Before a gas utility issues a security, it must file with the commission:

(a) A description of the purposes for which the issuance will be made, including a certification by an officer authorized to do so, that the proceeds from any such financing is for one or more of the purposes allowed by RCW 80.08.030;

(b) A description of the proposed issuance, including the terms of financing; and

(c) A statement as to why the transaction is in the public interest.

(2) A commission order is not required for such a filing. The utility may request a written order affirming that the utility has complied with the requirements of RCW 80.08.040. The utility must submit the request for a commission order, along with the information required in subsection (1) of this section, at least fifteen business days before the requested effective date for the order. Requests for supplemental orders may be exempt from the fifteen business day requirement.

(3) Filing a Registration Statement with the Securities and Exchange Commission using a shelf registration process does not constitute undertaking the issuance of a security, and therefore a filing with the commission is not required under the provisions of RCW 80.08.040. A shelf registration filing is defined under the General Rules and Regulations promulgated under the Securities Act of 1933, Rule 415 -Delayed or Continuous Offering and Sale of Securities.

(4) An authorized representative must sign and date the filing and include a certification or declaration that the information is true and correct under penalty of perjury as set forth in chapter 9A.72 RCW. The certificate or declaration must be in substantially the following form:


"I certify (or declare) under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct."

(5) Filings under this section may be submitted with portions designated confidential pursuant to WAC 480-07-160 (Confidential information).

(6) Within sixty days after the issuance of any securities, except for dividend reinvestment and employee benefit plans, a utility must file with the commission a verified statement:

(a) Outlining the final terms and conditions of the transaction; and

(b) Setting forth actual proceeds from the issuance and, to the extent known, the disposition of proceeds stating the final amount to be used for each purpose allowed by RCW 80.08.030.



[Statutory Authority: RCW 80.01.040, 80.04.160, and 81.04.160. 05-17-026 (Docket No. A-021178 and TO-030288, General Order No. R-522), § 480-90-242, filed 8/5/05, effective 9/5/05.]




--------------------------------------------------------------------------------

480-90-244
Transferring cash or assuming obligations.
(1) At least five business days before a gas utility whose corporate/issuer rating is not in one of the four highest rating categories of either Standard & Poor's L.L.C. or Moody's Investors Service, Inc., or its subsidiary transfers cash to any of its affiliated interests or subsidiaries or assumes an obligation or liability of any of its affiliated interests or any of its subsidiaries, the utility must report to the commission an estimate of the amount to be transferred and the terms of the transaction when the transaction will exceed thresholds described in (a) or (b) of this subsection.

(a) The utility must report if the cumulative transactions to a subsidiary or affiliated interest for the prior twelve months exceed a threshold of two percent, which is based on the utility's common shareholders equity.

(b) When the threshold in (a) of this subsection has been reached, the utility must report each subsequent transaction exceeding a threshold of one percent for the prior twelve-month period, which is based on the utility's common shareholders equity.

A utility's common shareholder equity is determined according to the latest annual report filed pursuant to WAC 480-90-252 (Federal Energy Regulatory Commission (FERC) Form No. 2). Information about the FERC Form No. 2 regarding the version adopted and where to obtain it is set out in WAC 480-90-999 (Adoption by reference).

(2) The reporting requirements in subsection (1) of this section do not include payments for:

(a) Federal and state taxes;

(b) Goods, services, or commodities, including fuel supplies (e.g., gas, coal, or oil);

(c) Transactions, attributed to the regulated entity, previously approved or ordered by the commission, other regulatory agencies, or the court;

(d) Dividends to the extent the level of such dividends over a twelve-month period does not exceed the larger of:

(i) Net income during such period; or

(ii) The average level of dividends over the preceding three years; or

(e) Sweep or cash management accounts used to transfer funds to or from a subsidiary or affiliate as part of the customary and routine cash management functions between or among the utility and its subsidiary or affiliate.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-244, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-245
Affiliated interests — Contracts or arrangements.
Prior to the effective date of any contract or arrangement described in RCW 80.16.020, each gas utility must file a verified copy or a verified summary, if unwritten, of contracts or arrangements, except for transactions provided at tariff rates, with any affiliated interest. Prior to the effective date of any modification or amendment, the utility must file verified copies of the modifications or amendments to the contracts or arrangements. If the contract or arrangement is unwritten, the utility must file a verified summary of any modification or amendment. The commission may institute an investigation and disapprove the contract or arrangement if the commission finds the utility has failed to prove that it is reasonable and consistent with the public interest.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-245, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-248
Transfers of property.
Before selling, leasing, or assigning any of its property or facilities which are necessary or useful in the performance of its duties to the public, or before acquiring property or facilities of another public utility, a gas utility must obtain from the commission an order authorizing such transaction in accordance with chapter 80.12 RCW (Transfers of property) and chapter 480-143 WAC (Commission general -- Transfers of property).



[Statutory Authority: RCW 80.01.040, 80.04.160, and 81.04.160. 05-17-026 (Docket No. A-021178 and TO-030288, General Order No. R-522), § 480-90-248, filed 8/5/05, effective 9/5/05. Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-248, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-252
Federal Energy Regulatory Commission (FERC) Form No. 2.
(1) Each gas utility must use the annual report form (FERC Form No. 2) promulgated by the Federal Energy Regulatory Commission in Title 18 of the Code of Federal Regulations, Part 260, for purposes of this report to the commission. Data required by RCW 80.04.080 (Annual reports), but not included in the FERC Form No. 2, must also be submitted with the annual report. The utility must submit the annual report for the preceding calendar year, along with the regulatory fee, by May 1st of each year. If not presented in the prescribed FERC Form No. 2, the annual report must include the following data per customer class for the calendar year: Revenues, average customer count, and total unit sales. Information about the FERC Form No. 2 regarding the version adopted and where to obtain it is set out in WAC 480-90-999 (Adoption by reference).

(2) Each utility must also submit to this commission, in essentially the same format and content as the FERC Form No. 2, a report that documents the costs incurred and the property necessary to furnish utility service to its customers and the revenues obtained in the state of Washington. The report must include the following data per customer class for the calendar year: Revenues, average customer count, and total unit sales.

(3) Combination and multistate utilities must submit with the annual report their cost allocation methods necessary to develop results of operations for the state of Washington. Approval of cost allocation methods for rate-making purposes is accomplished only by commission order.

(4) The total utility results of operations reported by each utility in its annual report to the commission must agree with the results of operations shown on the utility's books and records.

(5) Regulatory fees. The gas utility annual regulatory fee is set by statute at one-tenth of one percent of the first fifty thousand dollars of gross intrastate operating revenue plus two-tenths of one percent of any gross intrastate operating revenue in excess of fifty thousand dollars.

(a) The maximum regulatory fee is assessed each year, unless the commission issues an order establishing the regulatory fee at an amount less than the statutory maximum.

(b) The minimum regulatory fee that a gas utility must pay is twenty dollars.

(c) The twenty-dollar minimum regulatory fee is waived for any gas utility with less than twenty thousand dollars in gross intrastate operating revenue.

(d) The commission does not grant extensions for payment of regulatory fees.

(e) If a company does not pay its regulatory fee by May 1, the commission will assess an automatic late fee of two percent of the amount due, plus one percent interest for each month the fee remains unpaid.



[Statutory Authority: 80.01.040(4), 81.04.160, and 34.05.353. 06-08-057 (Docket A-060085, General Order No. R-531), § 480-90-252, filed 3/31/06, effective 5/1/06. Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-21-022 (Docket No. A-050271, General Order No. R-521), § 480-90-252, filed 10/10/05, effective 11/10/05; 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-252, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-257
Commission basis report.
(1) Commission basis reports are due within four months of the end of a utility's fiscal year.

(2) The intent of the commission basis report is to depict the gas operations of a gas utility under normal temperature and power supply conditions during the reporting period. The commission basis report must include:

(a) Booked results of gas operations and rate base, and all the necessary adjustments as accepted by the commission in the utility's most recent general rate case or subsequent orders;

(b) Results of operations adjusted for any material out-of-period, nonoperating, nonrecurring, and extraordinary items or any other item that materially distorts reporting period earnings and rate base; and

(c) Booked revenues and power supply expenses adjusted to reflect operations under normal temperature and power supply conditions before the achieved return on rate base is calculated.

(3) Commission basis reports should not include adjustments that annualize price, wage, or other cost changes during a reporting period, nor new theories or approaches that have not been previously addressed and resolved by the commission.

(4) Each utility must submit the basis of any cost allocations and the allocation factors necessary to develop the commission basis results of gas operations for the state of Washington.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-257, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-262
Securities report.
Each gas utility that has issued securities must file with the commission an annual securities transaction report. The report is due five months from the end of the utility's reporting period, whether a fiscal or calendar year. At a minimum, the report must contain:

(1) A schedule of the securities issued during the reporting period including a detailed description of the final agreements;

(2) A description of the use of proceeds stating the amounts used for each purpose allowed by RCW 80.08.030;

(3) The level of expenses for each of the securities transactions for the reporting period;

(4) A schedule of securities retired, refunded, repurchased, or otherwise removed from the utility's capitalization; and

(5) A schedule of securities scheduled to mature in the fiscal or calendar year following the reporting period.



[Statutory Authority: RCW 80.01.040, 80.04.160, and 81.04.160. 05-17-026 (Docket No. A-021178 and TO-030288, General Order No. R-522), § 480-90-262, filed 8/5/05, effective 9/5/05.]




--------------------------------------------------------------------------------

480-90-264
Affiliated interest and subsidiary transactions report.
(1) Each gas utility must file an annual report summarizing all transactions, except transactions provided at tariff rates, that occurred between the utility and its affiliated interests, and the utility and its subsidiaries. The report is due one hundred twenty days from the end of the utility's fiscal or calendar year (reporting period). The report must include a corporate organization chart of the utility and its affiliated interests and subsidiaries.

(2) When total transactions with an affiliated interest or a subsidiary are less than one hundred thousand dollars for the reporting period, the utility must provide the name of the affiliated interest or subsidiary participating in the transactions and the total dollar amounts of the transactions. When total transactions with an affiliated interest or subsidiary equal or exceed one hundred thousand dollars for the reporting period, the utility must provide:

(a) A balance sheet and income statement for such affiliated interest;

(b) A description of the products or services provided to or from the utility and each such affiliated interest or subsidiary;

(c) A description of the pricing basis or costing method, and procedures for allocating costs for such products or services, and the amount and accounts charged during the year;

(d) A description of the terms of any loans between the utility and each such affiliated interest or subsidiary and a listing of the year-end loan amounts and maximum loan amounts outstanding during the year;

(e) A description of the terms and total amount of any obligation or liability assumed by the utility for each such affiliated interest or subsidiary;

(f) A description of the activities of each such affiliated interest or subsidiary with which the utility has transactions; and

(g) A list of all common officers and directors between the gas utility and each such affiliated interest or subsidiary, along with their titles in each organization.

(3) The report required in this section supersedes the reporting requirements contained in previous commission orders authorizing affiliated interest transactions pursuant to chapter 80.16 RCW.

(4) The utility is obligated to file verified copies of affiliated interest contracts and arrangements as stated in WAC 480-90-245 (Affiliated interest -- Contracts and arrangements).



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-264, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-268
Essential utilities services contracts report.
(1) When the annual value to a vendor exceeds one and one-half percent of total company sales to ultimate customers as reported in the utility's most recent Federal Energy Regulatory Commission (FERC) Form No. 2 (or combined Forms No. 1 and No. 2 for combined utilities), each gas utility must report the total contracts with that vendor for essential utility services specifying the relevant terms of the contract or contracts, along with anticipated associated charges. Information about the FERC Form No. 2 regarding the version adopted and where to obtain it is set out in WAC 480-90-999 (Adoption by reference).

(2) The report of essential service vendors is due one hundred twenty days from the end of each reporting period, whether a fiscal or calendar year.

(3) For each vendor the report must include:

(a) The parties to the contract;

(b) The type of contract;

(c) The essential obligations of each party to the contract;

(d) The length of the contract;

(e) The budgeted annual dollar value of the contract during the reporting period; and

(f) The actual payments for services rendered under the contract during the reporting period.

(4) Essential utility services are those services necessary to provide gas service such as:

(a) Operation or maintenance of gas system infrastructure;

(b) Operation or maintenance of computer systems;

(c) Purchase of gas for classes of customer service regulated by the commission; and

(d) Construction of gas system infrastructure.

(5) The requirements under this section may be satisfied in whole or in part by cross-reference to the applicable portions of other documents that the utility has on file with the commission.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-268, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-275
Actual results for Washington operations report.
Within forty-five days of the end of each quarter, each gas utility must file a report of actual results for Washington operations. The results of operations report must contain each of the three monthly balances and the latest twelve months' ending balance for all accounts of the uniform system of accounts. The report must include the average customer count and total unit sales per customer class for each reported period.



[Statutory Authority: RCW 80.01.040, 80.04.160, 81.04.160 and 34.05.353. 05-06-051 (Docket No. A-021178 and TO-030288, General Order No. R-518), § 480-90-275, filed 2/28/05, effective 3/31/05.]




--------------------------------------------------------------------------------

480-90-303
Heating value of gas.
(1) A gas utility must state in its tariff the minimum heating value of gas delivered to customers. The minimum heating value of the gas must be sufficient to operate an appliance uniformly.

(2) Testing equipment. If a gas utility provides and maintains its own gas calorimeter, the calorimeter and accessories must be installed in a suitable area. The calorimeter and its location and accuracy must be approved by the commission.

(3) If a gas utility does not maintain its own gas calorimeter, the utility's supplier must provide the calorimetric results to the commission on request.

(4) A gas utility may use a caloroptic indicator to determine the heat value when a mixture of liquified petroleum gas and air is used.

(5) Testing requirements. Each gas utility must take at least one daily heat value test of the gas supplied to its customers.

(6) The total heating value must be stated in British thermal units per cubic foot.

(7) The average daily heating values must be determined by taking the average of all daily heating values measured throughout the day. The average monthly heating value must be the average of all daily average values for the calendar month.

(8) For billing purposes, the gas utility may apply the average heating value for a given month to the following month provided the procedure is written in the utility's tariff.

(9) Testing records. Each gas utility must keep complete records of each heat value test. These records must be accessible to the commission and its authorized representatives.

(10) The utility must adopt standard forms that record the heating value, gas analysis, and specific gravity results. The forms are subject to commission approval. Each form must be retained as a record for at least two years at the station where the tests were made. (continued)