CCLME.ORG - Growth management act — procedural criteria for adopting comprehensive plans and development regulations
Loading (50 kb)...'
(continued)

(iii) If probable funding falls short of meeting identified needs, a discussion of how additional funding will be raised or how land use assumptions will be reassessed to ensure that level of service standards will be met;

(d) Intergovernmental coordination efforts, including an assessment of the impacts of the transportation plan and land use assumptions on the transportation systems of adjacent jurisdictions;

(e) Demand-management strategies.

(2) Recommendations for meeting requirements. The following steps are recommended in preparing the transportation element:

(a) Local and regional transportation goals and policies for the following transportation modes, where applicable:

(i) Roadways;

(ii) Transit: Fixed route and demand response;

(iii) Nonmotorized travel: Bicycle and pedestrian;

(iv) Port and intermodal facilities: Water, rail, air, and industrial;

(v) Rail: Passenger and freight;

(vi) Freight mobility: Truck, rail, and barge.

(b) A discussion of how the transportation element implements the land use element, how the transportation and land use elements are consistent, and how the transportation element is consistent with the regional transportation plan. Discussion concerning regional development strategies which promote the regional transportation plan and an efficient transportation system should be included.

(c) Inventories, incorporating the level of detail appropriate for the planning jurisdiction:

(i) Air transportation facilities inventory can include but not necessarily be limited to: A description of the services provided by the facilities and location of the air transportation facilities; a capacity analysis to compare current and projected airport needs; a capacity analysis of roads, rail, and navigational routes to assess freight and passenger access to airport facilities. Consideration of the current and projected surrounding land uses should be made with respect to uses that are compatible and available for projected airport needs.

(ii) Inventory of water transportation can include but not necessarily be limited to:

(A) A description of the ferry service, ownership, a map of the routes, the number of vessels, frequency of the service, passenger capacity, and vehicle capacity impacting the planning area; a capacity analysis of ferry service compared to current and projected needs. Consideration of the current and projected surrounding land use should be made with respect to uses that are compatible and available for current and projected ferry needs.

(B) A description of the port facilities, service and location of the facilities; an analysis of freight movement showing the proportion of freight which is moved by rail and by truck to determine access adequacy. Consideration of the current and projected surrounding land use should be made in terms of compatibility and availability for current and projected port needs.

(iii) Inventory of land transportation can include but not necessarily be limited to:

(A) A map of arterials and limited access facilities; a description of the general travel market (i.e., commuter, tourist, farm to market, etc.) served by the transportation network; traffic volumes, functional classification, ownership and physical and operational condition. Consideration of current and projected surrounding land use should be made with respect to uses that are compatible and available for current and projected transportation needs.

(B) A map of the rail lines and intermodal facilities; a description of ownership, condition, and identification of whether the rail lines are for passenger and/or freight movement. Consideration of current and projected surrounding land use should be made with respect to uses that are compatible and available for current and future projected land transportation needs.

(iv) Inventory of transit facilities and services within the planning area can include but not necessarily be limited to, a description of the service, service area, routes, major transfer centers, population base, passengers carried, number of vehicles including seating capacity, miles of route and vehicle hours within the local jurisdiction's boundaries. Analysis of projected transit needs should be made based on projected land use assumptions. For example, transit improvements should be planned in areas of projected residential and/or employment centers. Consideration of current and projected surrounding land use should be made with respect to uses that are compatible and available for current and projected transit needs.

(d) If the planning area is within a National Ambient Air Quality Standards nonattainment area, compliance with the Clean Air Act Amendments of l990 is required. The following should be included in the transportation element of the comprehensive plan as applicable to locally generated mobile sources of pollutants: A map of the area designated as the nonattainment area for ozone, carbon monoxide, and particulate matter (PM10); a discussion of the severity of the violation(s) contributed by transportation-related sources causing nonattainment and a description of measures that will be implemented consistent with the state implementation plan for air quality, in order to comply with the national standards for the air, land, water, and transit sections of the transportation element. Local jurisdictions should refer to local air quality agencies and metropolitan planning organizations for assistance.

(e) Provide a definition of the level of service (LOS) to be adopted for the transportation system that includes at least arterials and transit routes. The definition of level of service is not restricted to the traditional Highway Capacity Manual approach, but could include district, area-wide, corridor, or other nontraditional level of service standards. Provide an inventory of the current level of service of at least arterial and transit routes. Adopted level of service standards should reflect access, mobility, mode-split, or capacity goals for the transportation facility depending upon the surrounding development density and community goals, and should be developed in consultation with transit agencies serving the planning area.

(f) System expansion needs should include considerations for: Repair, replacement, or enhancement, and/or expansion.

(g) Transportation system management (TSM) and transportation demand management (TDM) implementation measures can include, but not necessarily be limited to: Signal coordination, channelization, high occupancy vehicle (HOV) lanes, ridesharing, trip substitution, trip shifting, increased public transportation, parking policies and high occupancy subsidy programs. Provision should be made for evaluating the effectiveness of these strategies, and funding sources should be identified.

(h) The finance subelement should include, but not necessarily be limited to:

(i) Results of the identification study of current and projected deficiencies;

(ii) Development of cost estimates to alleviate deficiencies;

(iii) Assessment of revenue forecasts/shortfalls;

(iv) Development of financing policies; and

(v) Development of a financing schedule which matches projects and funding availability.

If sufficient public and/or private funding cannot be found, land use assumptions will be reassessed to ensure that level of service standards will be met, or level of service standards will be adjusted.

(i) Intergovernmental coordination.

(i) Jurisdictions should assess the impacts of their transportation and land use decisions on adjacent jurisdictions. Impacts of those decisions should be identified and discussion of strategies to address inconsistencies should be included.

(A) A discussion of how the local transportation and land use goals relate to adjacent jurisdictions' transportation and land use goals, county-wide policies, regional land use and transportation strategies, and statewide goals outlined in the act.

(B) Local jurisdictions should refer to the Washington state transportation policy plan for guidance on statewide transportation policy.

(C) Local jurisdictions should refer to the regional transportation plan produced by the regional transportation planning organization for guidance concerning the designated regional transportation system. Local jurisdictions should also define their community's role in the regional transportation and land use strategy and produce transportation and land use plans, and development regulations which promote that role.

(D) Local jurisdictions should refer to the responsible transportation agencies for information concerning current and projected plans for air, land, and water transportation facilities and services. Local jurisdictions and agencies responsible for air, land, and water transportation facilities and services should cooperate in identifying and resolving land use and transportation linkage issues.

(ii) All transportation projects which have an impact on the regional transportation system must be consistent with the regional transportation plan as defined by RCW 47.80.030. A regional transportation planning organization shall certify that the transportation elements of the adopted county, city, and town comprehensive plans within the region conform with RCW 36.70A.070. Regional transportation plans, state transportation plans, and county and city comprehensive plans shall be consistent with one another.

(iii) Traffic forecasts should be based on adopted regional growth strategies, the regional transportation plan, and comprehensive plans within the region to ensure consistency between jurisdictions. The forecast of at least ten years of travel demand should include vehicular, transit, and nonmotorized modes of transportation.

(iv) The state department of transportation and the transportation commission will develop a state transportation plan as required by RCW 47.01.071, and identify and jointly plan improvements and strategies within corridors of regional or statewide significance coordinated and consistent with the RTPO's.

Local jurisdictions should refer to the Systems Plan produced by the department of transportation for service objectives on state-owned transportation facilities, proposed improvements, and identification of deficiencies for the state-owned transportation facilities.

The department of transportation should be involved with the regionally coordinated effort to set level of service standards for arterials and transit routes.

(v) Key coordination efforts between interested public, private, and citizen groups should include: Transportation plan development; identification of needs; land use coordination; capital program development; prioritization of projects, financial plan, LOS standards development; capacity accounting procedures; development review process; timing of concurrency review; analysis methods; legal requirements (vesting, appeals); concurrency management system ordinance; LOS monitoring.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-325, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-330
Rural element.
(1) Requirements. This element is required only of counties. This element shall include lands that are not designated for urban growth, agriculture, forest, or mineral resources. The rural element shall permit land uses that are compatible with the rural character of such lands and provide for a variety of rural densities.

(2) Recommendations for meeting requirements. The following steps are recommended in preparing the rural element:

(a) Identification of rural lands.

(b) Identification of the amount of population growth within the twenty-year planning period which will be permitted to live or work on rural lands. This population should be consistent with an area of low-density where the full array of urban governmental services is not available.

(c) Adoption of policies for the development of such lands, including:

(i) Identification of the general type of uses to be permitted;

(ii) Provision for a variety of densities for residential, commercial, and industrial development consistent with maintenance of the rural character of the area. Consideration should be given to policies allowing the approval of planned unit developments, density averaging, cluster housing, and innovative techniques of managing development within overall parameters of rural density.

(iii) Establishment of a definition of rural governmental services which identifies the limited public facilities and services which should be provided to persons living or working in rural areas.

(iv) Determination of appropriate buffers between agricultural, forest, and mineral resource lands of long-term commercial significance and rural lands.

(v) Provisions regulating development at the boundary of urban growth areas so as not to foreclose the possible eventual orderly inclusion of such areas within urban growth areas.

(d) Adoption of policies for preservation of the rural character of such lands, including:

(i) Preservation of critical areas, consistent with private property rights;

(ii) Continuation of agricultural uses, the cultivation of timber, and excavation of mineral resources on lands not designated as possessing long-term commercial significance for such uses;

(iii) Encouragement of the use of rural lands for recreational pursuits which preserve open space and are environmentally benign;

(iv) Adoption of strategies for the acquisition of natural areas of high scenic value;

(v) Establishment of criteria for environmental protection, including programs to control nonpoint sources of water pollution and to preserve and enhance habitat for fish and wildlife.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-330, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-335
Urban growth areas.
(1) Requirements.

(a) Each county planning under the Act shall designate an urban growth area or areas within which urban growth shall be encouraged and outside of which growth can occur only if it is not urban in nature.

(b) Each city that is located in such a county shall be included within an urban growth area. An urban growth area may include more than a single city.

(c) An urban growth area may include territory that is located outside a city if such territory already is characterized by urban growth or is adjacent to territory already characterized by urban growth.

(d) Based upon the population growth management planning population projection made for the county by the office of financial management, the urban growth areas in the county shall include areas and densities sufficient to permit the urban growth that is projected to occur in the county for the succeeding twenty-year period. Each urban growth area shall permit urban densities and shall include greenbelt and open space areas.

(e) Urban growth should be located first in areas already characterized by urban growth that have existing public facility and service capacities to serve such development.

(f) Urban growth should be located second in areas already characterized by urban growth that will be served by a combination of both existing public facilities and services and any additional needed public facilities and services that are provided by either public or private sources.

(g) It is appropriate that urban government services be provided by cities and urban government services should not be provided in rural areas.

(2) General procedure.

(a) The designation process shall include consultation by the county with each city located within its boundaries.

(b) Each city shall propose the location of an urban growth area.

(c) The county shall attempt to reach agreement with each city on the location of an urban growth area within which the city is located.

(d) If an agreement is not reached with each city located within the urban growth area, the county shall justify in writing why it so designated an urban growth area.

(3) Recommendations for meeting requirements. The following steps are recommended in developing urban growth areas:

(a) County-wide planning policies. In adopting urban growth areas, each county should be guided by the applicable county-wide (and in some cases multicounty) planning policies. To the maximum extent possible, the creation of urban growth areas should result from a cooperative effort among the jurisdictions involved.

(b) General considerations. For all jurisdictions planning under the act, the urban growth area should represent the physical area within which that jurisdiction's vision of urban development can be realized over the next twenty years. The urban growth area should be based on densities selected to promote goals of the act -densities which accommodate urban growth served by adequate public facilities and discourage sprawl.

(c) Development of city proposals. In developing the proposal for its urban growth area, each city should engage in a process of analysis which involves the steps set forth in (d), (e), and (f) of this subsection.

(d) Determination of the amount of land necessary to accommodate likely growth. This process should involve at least:

(i) A forecast of the likely future growth of employment and population in the community, utilizing the twenty-year population projection for the county in conjunction with data on current community population, recent trends in population, and employment in and near the community and assumptions about the likelihood of continuation of such trends. Where available, regional population and employment forecasts should be used.

(ii) Selection of community growth goals with respect to population, commercial and industrial development and residential development.

(iii) Selection of the densities the community seeks to achieve in relation to its growth goals.

(iv) Estimation of the amount of land needed to accommodate the likely level of development at the densities selected.

(v) Identification of the amount of land needed for the public facilities, public services, and utilities necessary to support the likely level of development.

(vi) Identification of the appropriate amount of greenbelt and open space to be preserved or created in connection with the overall growth pattern.

(e) Determination of the geographic area to be encompassed to provide the necessary land. This process should involve at least:

(i) An inventory of lands within existing municipal boundaries which is available for development, including vacant land, partially used land, and land where redevelopment is likely.

(ii) An estimate of lands within existing municipal boundaries which are potentially available for public capital facilities and utilities necessary to support anticipated growth.

(iii) An estimate of lands which should be allocated to greenbelts and open space and lands which should be protected as critical areas.

(iv) If the lands within the existing municipal boundaries are not sufficient to provide the land area necessary to accommodate likely growth, similar inventories and estimates should be made of lands in adjacent unincorporated territory already characterized by urban growth, if any such territory exists.

(v) The community's proposed urban growth area should encompass a geographic area which matches the amount of land necessary to accommodate likely growth. If there is physically no territory available into which a city might expand, it may need to revise its proposed densities or population levels in order to accommodate growth on its existing land base.

(f) Evaluation of the determination of geographic requirements. The community should perform a check on the realism of the area proposed by evaluating:

(i) The anticipated ability to finance by all means the public facilities, public services, and open space needed in the area over the planning period.

(ii) The effect that confining urban growth within the areas defined is likely to have on the price of property and the impact thereof on the ability of residents of all economic strata to obtain housing they can afford.

(iii) Whether the level of population and economic growth contemplated can be achieved within the capacity of available land and water resources and without environmental degradation.

(iv) The extent to which the plan of the county and of other communities will influence the area needed.

If, as a result of these evaluations, the area appears to have been drawn too small or too large, the city's proposal should be adjusted accordingly.

(g) County actions in adopting urban growth areas. The designation of urban growth areas should ultimately be incorporated into the comprehensive plan of each county that plans under the act. However, every effort should be made to complete the urban growth area designation process earlier, so that the comprehensive plans of both the county and the cities can be completed in reliance upon it. Before completing the designation process, counties should engage in a process which involves the steps set forth in (h) through (j) of this subsection.

(h) The county should determine how much of its twenty-year population projection is to be allocated to rural areas and other areas outside urban growth areas and how much should be allocated to urban growth.

(i) The county should attempt to define urban growth areas so as to accommodate the growth plans of the cities, while recognizing that physical location or existing patterns of service make some unincorporated areas which are characterized by urban growth inappropriate for inclusion in any city's potential growth area. The option of incorporation should be preserved for some unincorporated communities upon the receipt of additional growth.

(j) The total area designated as urban growth area in any county should be sufficient to permit the urban growth that is projected to occur in the county for the succeeding twenty-year period, unless some portion of that growth is allocated to a new community reserve established in anticipation of a proposal for one or more new fully contained communities.

(k) Actions which should accompany designation of urban growth areas. Consistent with county-wide planning policies, cities and counties consulting on the designation of urban growth areas should make every effort to address the following as a part of the process:

(i) Establishment of agreements regarding land use regulations and the providing of services in that portion of the urban growth area outside of an existing city into which it is eventually expected to expand.

(ii) Negotiation of agreements for appropriate allocation of financial burdens resulting from the transition of land from county to city jurisdiction.

(iii) Provision for an ongoing collaborative process to assist in implementing county-wide planning policies, resolving regional issues, and adjusting growth boundaries.

(l) Urbanized areas outside of urban growth areas.

(i) New fully contained communities. A county may establish a process, as part of its urban growth area designation, for reviewing proposals to authorize new fully contained communities located outside the initially designated urban growth areas. If such a process is established, the criteria for approval are as set forth in RCW 36.70A.350. The approval procedures shall be adopted as a development regulation. However, such communities may be approved only if a county reserves a portion of the twenty-year population projection for allocation to such communities. When a county establishes a new community reserve it shall reduce the urban growth area accordingly. The approval of an application for a new fully contained community shall have the effect of amending the comprehensive plan to include the new community as an urban growth area.

(ii) Master planned resorts. A county may establish procedures for approving master planned resorts constituting urban growth outside of an urban growth area. Such a resort may be authorized only if the comprehensive plan and development regulations of the county comply with the requirements of RCW 36.70A.360.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-335, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-340
Siting essential public facilities.
(1) Requirements. Each comprehensive plan shall include a process for identifying and siting essential public facilities.

(a) Essential public facilities include those facilities that are typically difficult to site, such as airports, state education facilities, state and local correctional facilities, state or regional transportation facilities, solid waste handling facilities, and in-patient facilities including substance abuse facilities, mental health facilities, and group homes.

(b) The office of financial management shall maintain a list of those essential state public facilities that are required or likely to be built within the next six years. Facilities may be added to this list at any time.

(c) No local comprehensive plan may preclude the siting of essential public facilities.

(2) Recommendations for meeting requirements. Each comprehensive plan should include a process for siting essential public facilities. Where such facilities are of a county-wide or statewide nature this process should conform to the applicable county-wide planning policy.

(a) Identifying facilities.

(i) In the identification of essential public facilities, the broadest view should be taken of what constitutes a public facility, involving the full range of services to the public provided by government, substantially funded by government, contracted for by government, or provided by private entities subject to public service obligations.

(ii) The comprehensive plans should contain local criteria for the identification of essential public facilities, focusing on the public need for the services involved. There are three sources from which local lists of essential public facilities should be drawn:

(A) The state list. This is the list of essential state public facilities that are required or likely to be built within the next six years maintained by the office of financial management.

(B) The county-wide list. This is a list of essential public facilities of a county-wide or regional nature, made part of or pursuant to the county-wide planning policies adopted by counties in consultation with cities.

(C) The city or county list. This is a list of locally essential facilities, adopted by each planning jurisdiction. It is irrelevant to this listing that a facility may be funded by or operated by the state or another public or private entity other than the planning jurisdiction. The critical concern is that the facility be needed locally.

(iii) Not all essential public facilities are always difficult to site. Conversely, sometimes essential public facilities of a type usually easy to site will present siting difficulties. The initial step in the siting process should be a determination as a threshold matter of whether the essential public facility in question presents siting difficulties.

(A) If the facility does not present siting difficulties, it should be relegated to the normal siting process otherwise applicable to a facility of its type.

(B) If the facility does present siting difficulties, it should be subjected to the siting process called for below.

(b) Siting process.

(i) The comprehensive plan should describe the components of a siting process for essential public facilities which are difficult to site to be implemented on a case-by-case basis through development regulations.

(ii) The process should provide for a cooperative interjurisdictional approach to siting of essential public facilities of a county-wide, regional, or statewide nature, consistent with county-wide planning policies.

(iii) Agreements among jurisdictions should be sought to mitigate any disproportionate financial burden which may fall on the jurisdiction which becomes the site of a facility of a statewide, regional, or county-wide nature.

(iv) Where essential public facilities may be provided by special districts, the plans under which those districts operate must be consistent with the comprehensive plan of the city or county. Cities and counties should adopt provisions for consultation to ensure that such districts exercise their powers in a way that does not conflict with the relevant comprehensive plan.

(v) The siting process should take into consideration the need for county-wide, regional, or statewide uniformity in connection with the kind of facility under review.

(vi) The siting process should include criteria which address the issues which make essential public facilities difficult to site, and involve a public participation component. Consideration should be given to the extent to which design conditions can be used to make a facility compatible with its surroundings, and to adoption of provisions for amenities or incentives for neighborhoods or jurisdictions in which facilities are sited.

(c) No preclusion. While it is clear that essential public facilities of a county-wide or statewide nature will not be sited within the jurisdictional boundaries of every jurisdiction planning under the act, no comprehensive plan may directly or indirectly preclude the siting of essential public facilities. Provision therefore should be made to establish a general use category which will provide for the siting of such facilities, should the occasion arise.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-340, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-345
Optional elements.
(1) A comprehensive plan may include additional elements, items, or studies dealing with other subjects relating to the physical development within its jurisdiction, including, but not limited to:

(a) Conservation;

(b) Solar energy;

(c) Recreation.

(2) A comprehensive plan may include, where appropriate, subarea plans, each of which is consistent with the comprehensive plan.

(3) The department recommends that strong consideration be given to including elements on the following within comprehensive plans:

(a) Economic development;

(b) Environmental protection (including critical areas);

(c) Natural resource lands (where applicable);

(d) Design.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-345, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-400
Natural resource lands.
(1) Requirements. Prior to the development of comprehensive plans, cities and counties planning under the act ought to have designated natural resource lands of long-term commercial significance and adopted development regulations to assure their conservation. Such lands include agricultural lands, forest lands, and mineral resource lands. The previous designations and development regulations shall be reviewed in connection with the comprehensive plan adoption process and where necessary be altered to ensure consistency. Forest land and agricultural land located within urban growth areas shall not be designated as forest land or agricultural land of long-term commercial significance unless the city or county has enacted a program authorizing transfer or purchase of development rights.

(2) Recommendations for meeting requirements. Much of the analysis which is the basis for the comprehensive plan will come later than the initial identification and regulation of natural resource lands. The result may be plan features which conflict with previous natural resource land provisions.

(a) The department has issued guidelines for the classification of natural resource lands which are contained in chapter 365-190 WAC.

(b) Generally natural resource lands should be located beyond the boundaries of urban growth areas. In most cases, the designated purposes of such lands are incompatible with urban densities.

(c) The review of existing designations should, in most cases, be limited to the question of consistency with the comprehensive plan, rather than a revisiting the entire prior designation and regulation process. However, to the extent that new information is available or errors have been discovered, the review process should take this information into account.

(d) Review for consistency in this context should include whether the planned use of lands adjacent to agricultural, forest, or mineral resource lands will interfere with the continued use in an accustomed manner and in accordance with the best management practices of the designated lands for the production of food, agricultural products, or timber or for the extraction of minerals.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-400, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-410
Critical areas.
(1) Requirements. Prior to the development of comprehensive plans, cities and counties ought to have designated critical areas and adopted regulations protective of them. Such areas are defined to include:

(a) Wetlands;

(b) Areas of critical recharging effect on aquifers used for potable water;

(c) Fish and wildlife habitat conservation areas;

(d) Frequently flooded areas; and

(e) Geologically hazardous areas.

The previous designations and regulations shall be reviewed in the comprehensive plan process to ensure consistency.

(2) Recommendations for meeting requirements. Much of the analysis which is the basis for the comprehensive plan will come later than the initial identification and regulation of critical areas. The result may be plan features which conflict with the previous critical area provisions.

(a) The department has issued guidelines for the classification of critical areas which are contained in chapter 365-190 WAC.

(b) Critical areas should be designated and protected wherever the applicable natural conditions exist, whether within or outside of urban growth areas.

(c) The review of existing designations should, in most cases, be limited to the question of consistency with the comprehensive plan, rather than a revisiting of the entire prior designation and regulation process. However, to the extent that new information is available or errors have been discovered, the review process should take this information into account.

(d) In connection with critical area protection, the department recommends that planning jurisdictions identify the policies by which decisions are made on when and how police powers will be used (regulation) and when and how other means will be employed (purchases, development rights, etc.).



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-410, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-420
Identification of open space corridors.
(l) Requirements.

(a) Each county or city planning under the act shall identify open space corridors within and between urban growth areas. They shall include lands useful for recreation, wildlife habitat, trails, and connection of critical areas as defined in RCW 36.70A.030.

(b) The city or county may seek to acquire by purchase the fee simple or lesser interests in these open space corridors using funds authorized by RCW 84.34.230 or other sources.

(2) Recommendations for meeting requirements. The data for meeting this requirement should be acquired by the analysis which goes into developing the urban growth area designation and the land use element of comprehensive plans.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-420, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-430
Identification of lands useful for public purposes.
(1) Requirements. Each county and city planning under the act shall identify land useful for public purposes such as utility corridors, transportation corridors, landfills, sewage treatment facilities, storm water management facilities, recreation, schools, and other public uses. The county shall work with the state and with the cities within the county's borders to identify areas of shared need for public facilities. The jurisdictions within the county shall prepare a prioritized list of lands necessary for the identified public uses including an estimated date by which the acquisition will be needed. The respective capital acquisition budgets for each jurisdiction shall reflect the jointly agreed upon priorities and time schedule.

(2) Recommendations for meeting requirements. The data for meeting this requirement should be acquired by the analysis which goes into developing the urban growth area designations and the land use, utilities and transportation elements of comprehensive plans. The department recommends that the information derived in meeting this requirement be made generally available only to the extent necessary to meet the requirements of the public disclosure laws.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-430, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-500
Internal consistency.
Each comprehensive plan shall be an internally consistent document and all elements shall be consistent with the future land use map. This means that each part of the plan should be integrated with all other parts and that all should be capable of implementation together. Internal consistency involves at least two aspects:

(1) Ability of physical aspects of the plan to coexist on the available land.

(2) Ability of the plan to provide that adequate public facilities are available when the impacts of development occur (concurrency).

Each plan should provide mechanisms for ongoing review of its implementation and adjustment of its terms whenever internal conflicts become apparent.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-500, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-510
Concurrency.
(1) Transportation. The aim of transportation planning for local jurisdictions is to achieve concurrency for transportation facilities. If concurrency for transportation facilities is not achieved, development may not be approved.

(2) Other public facilities. Each comprehensive plan should designate those public facilities in addition to transportation facilities for which concurrency is required.

(3) Levels of service. The concept of concurrency is based on the maintenance of specified levels of service with respect to each of the public facilities to which concurrency applies. For all such facilities, planning jurisdictions should designate appropriate levels of service.

(a) Transportation. The designation of levels of service in the transportation area will be influenced by regional considerations. For transportation facilities subject to regional transportation plans under RCW 47.80.030, local levels of service should conform to the regional plan. Other transportation facilities, however, may reflect local priorities.

(b) Levels of service should be set to reflect realistic expectations consistent with the achievement of growth aims. Setting such levels too high could, under some regulatory strategies, result in no growth. As a deliberate policy, this would be contrary to the act.

(4) Regulatory response to the absence of concurrency. The plan should provide a strategy for what happens when approval of any particular development would cause levels of service for concurrency to fall below the locally adopted standards. Denial of approval is statutorily required only in the area of transportation facilities. To the extent that any jurisdiction uses denial of development as its regulatory response to the absence of concurrency, consideration should be given to defining this as an emergency for the purposes of the ability to amend or revise the comprehensive plan.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-510, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-520
Interjurisdictional consistency.
Adopted county-wide planning policies are designed to ensure that city and county comprehensive plans are consistent. Each local comprehensive plan should demonstrate that such policies have been followed in its development.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-520, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-530
Coordination with other plans.
Each planning jurisdiction should circulate its proposed comprehensive plan to other jurisdictions with which it shares a common border or has related regional issues. The proposed plan should be accompanied by the environmental documents concerning it. Reviewing jurisdictions should be considered to have concurred in the provisions of a plan, unless within a reasonable period of time, they provide written comment identifying plan features which will preclude or interfere with the achievement of any features of their own plans. All jurisdictions should attempt to resolve conflicts over interjurisdictional consistency through consultation and negotiation.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-530, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-540
Analysis of cumulative effects.
It is recognized that the growth of each jurisdiction will have ripple effects which will reach across jurisdictional boundaries. Each city or county planning under the act should analyze what such effects are likely to be if the development it anticipates occurs. This analysis should be made as a part of the process of complying with the State Environmental Policy Act (SEPA) in connection with comprehensive plan adoption. Affected jurisdictions should be given an opportunity to comment on this analysis.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-540, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-600
Public participation.
(l) Requirements. Each county and city planning under the act shall establish procedures for early and continuous public participation in the development and amendment of comprehensive land use plans and development regulations implementing such plans. The procedures shall provide for broad dissemination of proposals and alternatives, opportunity for written comments, public meetings after effective notice, provision for open discussion, communication programs, information services, and consideration of and response to public comments. Errors in exact compliance with the established procedures shall not render the comprehensive plan or development regulations invalid if the spirit of the procedures is observed.

(2) Recommendations for meeting requirements. The recommendations made in this subsection are intended as a list of possible choices, but it is recognized that meaningful public participation can be accomplished without using all of the suggestions made here or by adopting other methods.

(a) Public involvement in plan and regulation development.

(i) In designing its public participation program, each planning jurisdiction should endeavor to involve the broadest cross-section of the community, so that groups not previously involved in planning become involved. The programs should include efforts to explain that citizen input is an essential part of the planning process and provide a framework for advising citizens about timelines for steps in the process and when citizen input will be sought.

(ii) Visioning. The public should be involved at the earliest possible time in the process of comprehensive planning under the act. This should begin with a visioning process in which the public is invited to participate in a broad definition of the kind of future to be sought for the community. The results of this process should then be incorporated into the plan features, including, but not limited to, locally adopted levels of service and densities selected for commercial, industrial, and residential development.

(iii) Planning commission. In the process of plan development, full use should be made of the planning commission as a liaison with the public.

(iv) Public meetings on draft plan. Once the plan is completed in draft form, or as parts of it are drafted, a series of public meetings or workshops should be held at various locations throughout the jurisdiction to obtain public reaction and suggestions.

(v) Public hearings. When the final draft of the plan has been completed, at least one public hearing should be held prior to the presentation of the final draft to the legislative authority of the jurisdiction adopting it. When the plan is proposed for adoption, the legislative authority should conduct another public hearing prior to voting on adoption.

(vi) Written comment. At each stage of the process when public input is sought, opportunity should be provided to make written comment.

(vii) Communication programs and information services. Each jurisdiction should make every effort to collect and disseminate public information explaining the act and the process involved in complying with it. In addition, locally relevant information packets and brochures should be developed and disseminated. Planners should actively seek to appear before community groups to explain the act and the plan development process.

(viii) Proposals and alternatives. Whenever public input is sought on proposals and alternatives, the relevant drafts should be reproduced and made available to interested persons.

(ix) Notice. Notice of all events at which public input is sought should be broadly disseminated in advance through all available means, including flyers and press releases to print and broadcast media. Notice should be published in a newspaper of general circulation at least one week in advance of any public hearing. When appropriate, notices should announce the availability of relevant draft documents on request.

(x) All meetings and hearings to which the public is invited should be free and open. At hearings all persons desiring to speak should be allowed to do so, consistent with time constraints.

(xi) Consideration of and response to public comments. All comments and recommendations of the public should be reviewed. Adequate time should be provided between the time of any public hearing and the date of adoption of all or any part of the comprehensive plan to evaluate and respond to public comments. The proceedings and all public hearings should be recorded. A summary of public comments and an explanation of what action was taken in response to them should be made in writing and included in the record of adoption of the plan.

(xii) Every effort should be made to incorporate public involvement efforts into the SEPA process.

(xiii) Except for the visioning effort, the same steps should precede the adoption of development regulations as was used for the comprehensive plan.

(b) Continuous public involvement. The planning commission should monitor development of both the plan and the development regulations. After these are adopted, the commission should monitor compliance. The commission should report to the city or county at least annually on possible amendments to the plan or development regulations. In addition at least annually, the commission should convene a public meeting to provide information on how implementation is progressing and to receive public input on changes that may be needed. When any amendments are proposed for adoption, the same public hearing procedure should be followed as attended initial adoption.



[Statutory Authority: RCW 36.70A.190 (4)(b). 92-23-065, § 365-195-600, filed 11/17/92, effective 12/18/92.]




--------------------------------------------------------------------------------

365-195-610
State Environmental Policy Act (SEPA).
Adoption of comprehensive plans and development regulations are "actions" as defined underSEPA. This means that SEPA compliance is necessary. When a complete new plan is being written, in most instances, the preparation of an environmental impact statement (EIS) will be required prior to its adoption. SEPA compliance should be considered as part of the planning process rather than as a separate exercise. Indeed, the SEPA analysis and documentation can serve, in significant part, to fulfill the need to compile a record showing the considerations which went into the plan and why one alternative was chosen over another. SEPA compliance for development regulations should concentrate on the impact difference among alternative means of successfully implementing the plan. Detailed discussion of SEPA compliance is contained in Department of Ecology Publication No. 92-07, "The Growth Management Act and the State Environmental Policy Act, A Guide to Interrelationships." (continued)