CCLME.ORG - General rules. Oil and gas conservation committee
Loading (50 kb)...'
(continued) thereof from any well without first obtaining prior written approval from the supervisor. In a request to remove casing, the applicant must describe the condition of the well, the proposed casing to be removed, all casing in the hole, location of existing and proposed cement plugs, and perforations.

(2) Approval to recover casing will be given in the abandonment of wells where subsurface plugging can be done to the satisfaction of the supervisor.

(3) The hole shall be full of fluid prior to the detonation of any explosives in the hole. Such explosives shall be utilized only by a licensed handler with the required permits.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-107, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-112
Agents to have access to all wells, well records, witness tests or well production.
All operators of oil and gas exploratory and producing wells are required to permit the agents of the supervisor and the committee to witness all tests that may be required by the supervisor on any and all wells. The agents of the supervisor shall have access to all well records, and shall be permitted to come upon any lease or property to inspect any and all wells and to witness gauging of production therefrom at all times. All such information, at the moment obtained, shall be presumed to have been required, filed, and requested to be kept confidential within the meaning of RCW 78.52.260, and shall by all such persons so obtaining such information, be reported only to the supervisor and the committee, and shall be kept confidential in the same manner as provided in RCW 78.52.260 and WAC 344-12-070(2).



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-112, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-112, filed 6/1/82. Formerly WAC 344-12-120.]




--------------------------------------------------------------------------------

344-12-116
Sump pits.
(1) An earthen pit, or sump used for the handling, storage, or disposal of any deleterious substance produced, obtained, or used in conjunction with drilling or operation of wells, shall be constructed of, or sealed with, an impervious material, and shall be used and operated at all times so as to prevent any escape of any deleterious substances.

(2) Every earthen pit, or sump shall be emptied and leveled within three months after drilling operations cease. For good cause shown by the operator, the supervisor may extend the period for emptying and leveling, but not to exceed six months.

(3) Except as to surface runoff from surface facilities, no earthen pit or sump shall be constructed or maintained so as to receive surface runoff and such pit shall be maintained at all times to provide reasonable safe fluid level control.

(4) An earthen pit or sump, at the discretion of the supervisor shall be flagged, screened, or otherwise protected from intrusions by wildlife before drilling operations begin and be maintained after operations cease, until such pits or sumps are reclaimed.

(5) No pit or sump shall be used for the ultimate disposal of salt water. Salt water and oil shall be periodically drained or removed, and properly disposed of, in accordance with methods and at locations approved by the department of ecology, from any pit or sump that is retained so the pit is kept reasonably free of salt water and oil.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-116, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-125
Notice of intention to abandon and plug (Form-3).
(1) The owner or operator shall not permit any well drilled for oil, gas, salt-water disposal, injection or any other purpose in connection with the exploration or production of oil and gas, to remain unplugged, except as otherwise provided in WAC 344-12-140, after such well is no longer to be used for the purpose for which it was drilled or converted.

(2) Before any work is commenced to abandon any well drilled for oil or gas, including any well drilled below the underground source of drinking water, the owner or operator thereof shall, prior to beginning operations of plugging the well, give notice to the supervisor or his representative of his intention to abandon such well, such notice shall be written, on Form-3 (Notice of intention to abandon and plug well), except that it shall be permissible to give oral notice followed within 24 hours by written confirmation on Form-3. Upon receipt of such notice, the supervisor or his duly authorized representative may elect to be present at the time indicated in such notice, to witness the plugging of the well.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-125, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-125, filed 6/1/82; Rule 23, filed 3/23/60.]




--------------------------------------------------------------------------------

344-12-131
Procedure for plugging.
Each abandoned well drilled for the discovery of oil or gas or for any other purpose related to the exploration including seismic and core holes or production of oil and gas shall be plugged by or on behalf of the owner, operator, or producer who is in charge of the well or wells and responsible therefor. In general, cement plugs will be placed across specified intervals to protect oil and gas zones, to prevent degradation of potentially usable waters, and to protect surface conditions. Subject to approval of the supervisor, cement may be mixed with or replaced by other substances with adequate physical properties. The owner shall submit the proposed method and procedure for plugging to the supervisor on Form-3 (Notice of intention to abandon and plug well). Unless otherwise approved by the supervisor the method and procedure shall be as follows:

(1) Hole fluid. Drilling fluid having the proper weight and consistency to prevent movement of other fluids into the wellbore shall be placed in all intervals not plugged with cement, and shall be surface poured into all open annuli where required.

(2) Plugging by bailer. Placing of a cement plug by bailer shall not be permitted at a depth greater than 3,000 feet (914 meters). Water is the only permissible hole fluid in which a cement plug shall be placed by bailer.

(3) Surface pours. A surface cement-pour shall be permitted in an empty hole with a diameter of not less than 5 inches (12.7 centimeters). Depth limitations shall be determined on an individual well basis by the supervisor.

(4) Blowout prevention equipment. Blowout prevention equipment may be required during plugging and abandonment operations. Any blowout prevention equipment and inspection requirements deemed necessary by the supervisor shall appear on the approval issued by the supervisor.

(5) Junk in hole. Diligent effort shall be made to recover junk when such junk may prevent proper abandonment either in open hole or inside casing. In the event that junk cannot be removed from the hole and freshwater-saltwater contacts or oil or gas zones penetrated below cannot therefore be properly abandoned, cement shall be down-squeezed through or past the junk or a 100-foot (30-meter) cement plug shall be placed on top of the junk.

(6) A cement plug not less than 25 feet (7.6 meters) shall be placed in the hole and all annuli at the surface. All well casing shall be cut off at least 5 feet (1.5 meters) below the surface of the ground.

(7) Open hole.

(a) A cement plug shall be placed to extend from the total depth or at least 100 feet (30 meters) below the bottom of each oil or gas zone, whichever is less, to at least 100 feet (30 meters) above the top of each zone.

(b) A minimum 200-foot (61-meter) cement plug shall be placed across all underground source of drinking water-saltwater interfaces.

(c) An interface plug may be placed wholly within a thick shale if such shale separates the freshwater sands from the brackish or saltwater sands.

(d) The hole may be filled between plugs up to the base of the surface string, if this reaches below the freshwater zone, with approved heavy mud.

(8) Cased hole.

(a) All perforations shall be plugged with cement, and the plug shall extend 100 feet (30 meters) above the top of a landed liner, the uppermost perforations, the casing cementing point, or water shut-off holes, whichever is highest.

(b) If there is cement behind the casing across the underground source of drinking water-saltwater interface, a 100-foot (30-meter) cement plug shall be placed inside the casing across the interface.

(c) If the top of the cement behind the casing is below the top of the highest saltwater sands, squeeze-cementing shall be required through perforations to protect the underground source of drinking water. In addition, a 100-foot (30-meter) cement plug shall be placed inside the casing across the underground source of drinking water-saltwater interface. Notwithstanding other provisions of this section, the supervisor may approve a cavity shot followed by cementing operations at the base of the underground source of drinking water sands. The cavity shall be filled with cement and capped with a cement plug extending 100 feet (30 meters) above the cavity shot.

(9) Special requirements.

(a) Where geologic or ground water conditions dictate, special plugging procedures shall be required to prevent contamination of potentially usable waters by downward percolation of poor quality waters, and to separate water zones of varying quality, or varying hydrostatic pressure, and to isolate dry permeable strata that are brought into hydraulic continuity with ground water aquifers.

(b) The supervisor may set forth other plugging and abandonment requirements or may establish field rules for the plugging and abandonment of wells. Such cases include, but are limited to:

(i) The plugging of a high-pressure saltwater zone.

(ii) Perforating and squeeze-cementing previously uncemented casing within and above a hydrocarbon zone.

(10) In all holes open below the casing shoe, a cement plug shall extend from at least 50 feet (15 meters) below to at least 50 feet (15 meters) above the shoe of any cemented casing. If the hole cannot be cleaned out to 50 feet (15 meters) below the shoe, a 100-foot (30-meter) cement plug shall be placed as deep as possible.

(11) A steel plate at least one-quarter inch (0.64 centimeter) thick shall be welded to the top of the surface string of casing. The steel plate shall bear the drilling permit number and date of abandonment.

(12) Within thirty days after plugging of any well, the owner, operator, or producer responsible therefor who plugged or caused to be plugged the well shall file with the supervisor an affidavit on Form-4 (report on results of plugging well) setting forth in detail the method used in plugging the well.

(13) Inspection of plugging and abandonment operations. All plugging and abandonment operations shall be witnessed and approved as deemed necessary by the supervisor.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-131, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-131, filed 6/1/82. Formerly WAC 344-12-130.]




--------------------------------------------------------------------------------

344-12-133
Unlawful abandonment.
A well shall be deemed unlawfully abandoned if not plugged and the lands involved are not reclaimed in compliance with the rules and regulations or orders of the supervisor or when operations on or at any well shall have ceased for a period of six months or more. If a determination of unlawful abandonment is made by the supervisor, the supervisor shall inform the owner, operator, or producer in writing directing immediate compliance with proper abandonment procedures. Failure to comply shall be cause for the supervisor to order proper abandonment utilizing the drilling and production bond on file with the supervisor. For good cause shown by the operator, the supervisor may extend the period for plugging and reclamation.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-133, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-140
Wells used for underground source of drinking water.
When the well to be plugged may safely be used as an underground source of drinking water well and such utilization is desired by the landowner and is authorized by the operator, the cement plug normally required at the top of the surface casing may be waived, and the well need not be filled above the required sealing plug set below underground source of drinking water: Provided, That written authority for such conversion is supplied by the landowner and authorization is obtained by the landowner from the state department of ecology and filed with the supervisor. Approval by the supervisor of the plugging accomplished or notice from the department of ecology of approval of the landowner's authorization as provided herein shall relieve the operator of further responsibility under the Oil and Gas Conservation Act and the supervisor shall release the bond once a water well has been satisfactorily completed.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-140, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-140, filed 6/1/82; Rule 26, filed 3/23/60.]




--------------------------------------------------------------------------------

344-12-145
Reclamation.
The supervisor shall establish guidelines for the reclamation of land impacted by oil and gas drilling and production activities.

The owner, operator, or producer of the well or wells shall develop a reclamation plan for the area disturbed in site preparation, drilling, completing, or producing a well or wells, and submit the reclamation plan to the supervisor for approval. The owner, operator, or producer shall, before the reclamation plan is implemented, consult affected state agencies, including the department of wildlife, before submitting the reclamation plan to the supervisor. Reclamation shall be accomplished in accordance with the reclamation plan and the following:

(1) Within three months after the completion or abandonment of a well the operator shall fill all pits containing mud, cuttings, salt water and oil that are not needed for production purposes, or are not required or allowed by state or federal law or rule or regulation, and remove all concrete bases, drilling supplies, and drilling equipment. Within such period the operator shall grade or terrace, and plant, seed, or sod the area disturbed, that is not required in production of the well, to bind the soil and prevent substantial erosion and sedimentation.

(2) Within three months after the plugging of a well, the operator shall remove all production and storage structures, supplies and equipment, and any oil, saltwater and debris and fill any remaining excavations. Within such period the operator shall grade or terrace, and plant, seed, or sod the area disturbed to bind the soil and prevent substantial erosion and sedimentation.

(3) Ground water and soil resources on and adjacent to seismic surveys shall be provided the greatest practical protection on a continuing basis. The minimum reclamation program for seismic surveys shall provide for:

(a) Successful revegetation of disturbed ground to prevent substantial erosion and sedimentation within three months of cessation of operations;

(b) Removal of refuse and discarded equipment to a licensed landfill;

(c) Plugging of all shot holes that encountered water upon completion of each day's work with a nontoxic plug-mud or cement;

(d) Regrading, when appropriate, of areas where disruption of topography has occurred, such as deep tire tracks, such that reclaimed topography conforms with adjacent, undisturbed topography;

(e) Installation of erosion elimination devices where drainage or soil conditions indicate erosion may occur.

The supervisor may, upon written application by an operator, find reasonable cause to extend the period in which reclamation shall be completed, but not to exceed one year.



[Statutory Authority: RCW 78.52.120, 78.52.155, 78.52.040 and 78.52.050. 88-14-026 (Order 11), § 344-12-145, filed 6/29/88. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-145, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-150
Permit cancellation — Failure to drill.
A permit will be cancelled if drilling operations have not commenced within twelve months of date of issuance of the permit. Such cancellation will take effect thirty days after written notice has been sent to the operator by the supervisor. The supervisor may, for good cause, grant a reasonable extension, not to exceed six months.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-150, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-155
Permit suspension.
Drilling operations in violation of any applicable rules of law, rules or regulations, permit conditions, or any order of the committee shall be subject to suspension by order of the supervisor. A suspension shall remain in effect until the violations are corrected to the satisfaction of the supervisor. Any person adversely affected by a suspension order may apply for a hearing before the committee as provided in RCW 78.52.470.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-155, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-200
Well-head fittings.
Christmas-tree fittings or well-head connections shall have a working pressure in keeping with the expected pressure of the well.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-200, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-205
Tubing.
Each flowing well shall be produced through tubing and shall be equipped with a master valve; however, a multiple completion is permissible when the production from each zone is kept separate.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-205, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-205, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-210
Separators.
When good operating practice so requires, all flowing wells must be produced through suitable oil and gas separators or treaters.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-210, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-215
Chokes.
Each flowing well shall be equipped with an adequate choke or bean to control properly the flowing therefrom.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-215, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-225
Disposal of salt water or brine.
Disposal of salt water or other water containing minerals in such amount as to be unfit for domestic, stock, irrigation, or other general uses must be by means or methods specified and approved by the state department of ecology.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-225, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-230
Notification of fire, breaks, leaks, or blowouts.
All persons controlling or operating any oil and gas wells, or receiving tanks, storage tanks, or receiving and storage receptacles into which crude oil is produced, received, or stored, shall make all reasonable efforts to immediately notify the supervisor by telephone followed by a letter giving full details concerning all fires which occur at such oil or gas wells or tanks or receptacles on their property, and all such persons shall make all reasonable efforts to immediately report all tanks or receptacles struck by lightning and any other fire which destroys oil or gas, and shall make all reasonable efforts to immediately report any breaks, blowouts, or leaks in or from tanks or receptacles and gathering pipe lines from which oil or gas is escaping or has escaped. In all such reports of fires, breaks, leaks, or escapes, or other accidents of this nature, the location of the well, tank receptacle, or line break shall be given by section, township, range, and property so that the exact location thereof can be readily located on the ground. Such report shall likewise specify what steps have been taken or are in progress to remedy the situation reported and shall detail the quantity of oil or gas lost, destroyed, or permitted to escape. In case any tank or receptacle is permitted to run over, the escape thus occurring shall be reported as in the case of a leak. The report hereby required as to oil losses shall be necessary only in case such oil loss exceeds ten barrels in the aggregate. Compliance with this section does not relieve such persons from taking appropriate action and reporting oil or chemical spills or leaks as required by chapter 90.48 RCW and other applicable state and federal laws.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-230, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-230, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-235
Producing from different strata through the same casing string.
No well shall be permitted to produce either oil or gas from different strata through the same string of casing without first receiving written permission from the committee.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-235, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-235, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-245
Determining and naming pools.
Wells shall be classified as to the pool from which they produce, and pools shall be determined by the committee and named by the supervisor: Provided, That in the event any person is dissatisfied with any such classification or determination, an application may be made to the committee for such reclassification or determination as the applicant deems proper, and the committee will hear and determine the same.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-245, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-245, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-250
Report of production.
The producer or operator of each and every well or proration unit in all pools shall each month submit to the supervisor a sworn statement showing the amount of production made by each such well and by each such proration unit upon forms furnished therefor.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-250, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-255
Reservoir surveys.
By special order of the supervisor periodic surveys shall be made of the reservoirs in this state containing oil and gas. The condition of the reservoirs containing oil and gas and the practices and methods employed by the operators shall be investigated. The volume and source of crude oil and natural gas; the reservoir pressure of the reservoir as an average; the areas of regional or differential pressure; stabilized gas-oil ratios, and the producing characteristics of the field as a whole and the individual wells within the field shall be specifically included.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-255, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-260
Disposing of unwanted fluids encountered in oil and gas drilling and production.
Prior to disposing of unwanted fluids the operator shall identify geological formations to be used, maximum bottom hole pressure in pounds per square inch or bars and maximum rate of injection in barrels of liquid per day or cubic feet of gas per day, detailed identification of materials to be injected, including additives, filters, if any, the entire casing and cementing record of the wells to be used for injection, packers, and any special downhole equipment, certification that the mechanical integrity of the well has been tested, and facilities or systems to protect the integrity of geological target formation or to prevent fracturing of the confining strata. Prior to injection, the operator shall notify the supervisor. On acceptance of a completed permit application by the supervisor, the Washington department of ecology shall review, evaluate, and act upon the application in accordance with the rules of WAC 173-218-060. The applicant shall have approval to operate when the Washington department of ecology has approved the permit.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-260, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-260, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-262
Underground injection control.
Injection of any fluids to enhance recovery of oil or gas or for storage of liquid hydrocarbons is prohibited until such time as an application is made to do so. At that time the oil and gas conservation committee will promulgate rules and regulations that will conform with the underground injection control (UIC) program, chapter 173-218 WAC, which implement portions of the Safe Drinking Water Act (Public Law 93-523 as amended by Public Law 96-502).



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-262, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-262, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-265
Gas well open flow potential test.
Initial potential tests may be reported on forms furnished by the supervisor using the "one-point" method with a 45 degree slope for the plot. After a market is obtained and a pipe line is connected to the well, upon request of the supervisor, an operator shall make a "four-point" potential test and report on forms furnished by the supervisor. To establish comparable open flow capacity the "four-point" back pressure flows shall be taken in sequence from low to high flow. In the event the supervisor approves an alternate method of testing, all wells producing from a pool shall be tested in a uniform and comparable manner. In a like manner all natural gas wells hereafter completed shall be tested and the potential test reported. Where it has been determined that a natural gas well in any pool has a potential of 400,000 cubic feet per day or less, further potential tests shall not be required provided the operator periodically reports the shut-in pressure of the well.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-265, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-265, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-270
Notice of tests.
Open-flow and pressure tests of gas wells may be witnessed or observed by a representative of any producer in the field. The supervisor and the owners of the adjoining or offset leases must be notified by the owner of the well on which the test is to be taken, stating the time when such test will commence provided that such notification will be made at least seventy-two hours in advance of such test.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-270, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-275
Gas to be metered.
(1) Meters. All gas when produced or sold shall be metered with an approved meter of sufficient capacity, provided that gas may be metered from a lease or unitized property as a whole if it is shown that ratable taking can be maintained.

(2) Meter charts and records. Purchasers shall keep, in a permanent file, for a period of at least two years, meter charts and records on gas purchased, and such information shall be made available to the supervisor.

(3) Bypasses. Bypasses shall not be connected around meters in such manner as to permit the improper taking of gas.



[Statutory Authority: RCW 78.52.050. 85-03-018 (Order 6, Resolution No. 10), § 344-12-275, filed 1/8/85. Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-275, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-280
Gas-oil ratio.
No well shall be permitted to produce gas in excess of the maximum ratio determined for a pool unless all gas produced in excess thereof is returned to the pool from which it was produced.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-280, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-290
Gas-oil ratio surveys and reports.
Gas-oil ratios and surveys shall be taken in the manner prescribed by the supervisor for individual fields which have established gas-oil ratio limits and in accordance with the rules prescribed for each individual pool.

(1) Flowing wells intermittently (stop-cocked) produced. In computing the operating gas-oil ratio, the total volume of gas and the total barrels of oil that are produced in order to obtain the daily oil allowable must be used regardless of the flowing time in the 24-hour period.

(2) Gas lift or jet wells. The total volume of gas to be used in computing the operating gas-oil ratio is the total output volume minus the total input volume.

(3) Pumping wells. In computing the gas-oil ratio, all gas withdrawn from the casing in an attempt to maintain a fluid seal, or for any other reason, must be added to gas produced through tubing.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-290, filed 6/1/82.]




--------------------------------------------------------------------------------

344-12-295
Prior approval — Storage and pipelines.
An operator shall submit a request and plans for approval to the supervisor prior to constructing any storage facilities, gathering lines, or pipelines not covered by chapter 80.50 RCW.



[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. 82-12-052 (Order 3, Resolution No. 7), § 344-12-295, filed 6/1/82.]