(continued) If this notice is not given, the transfer is effective on the date specified in the agreement mentioned in (a) of this subsection.

(2) Unless a permit is automatically transferred according to subsection (1) of this section, a permit may be transferred only if modified or revoked and reissued to identify the new permittee and incorporate such other requirements as may be necessary.



[Statutory Authority: RCW 90.54.020 and chapter 90.48 RCW. 88-22-059 (Order 88-9), § 173-220-200, filed 11/1/88. Statutory Authority: RCW 90.48.035 and 90.48.260. 82-24-078 (Order DE 82-39), § 173-220-200, filed 12/1/82; Order DE 74-1, § 173-220-200, filed 2/15/74.]




--------------------------------------------------------------------------------

173-220-210
Monitoring, recording and reporting.
(1) Monitoring.

(a) Any discharge authorized by a permit may be subject to such monitoring requirements as may be reasonably required by the department, including the installation, use, and maintenance of monitoring equipment or methods (including, where appropriate, biological monitoring methods). These monitoring requirements would normally include:

(i) Flow (in gallons per day);

(ii) Pollutants (either directly or indirectly through the use of accepted correlation coefficients or equivalent measurements) which are subject to reduction or elimination under the terms and conditions of the permit;

(iii) Pollutants which the department finds could have a significant impact on the quality of surface waters; and

(iv) Pollutants specified by the administrator, in regulations issued pursuant to the FWPCA, as subject to monitoring.

(b) Each effluent flow or pollutant required to be monitored pursuant to (a) of this subsection shall be monitored at intervals sufficiently frequent to yield data which reasonably characterizes the nature of the discharge of the monitored effluent flow or pollutant.

Variable effluent flows and pollutant levels may be monitored at more frequent intervals than relatively constant effluent flows and pollutant levels which may be monitored at less frequent intervals.

(c) Monitoring of intake water, influent to treatment facilities, internal waste streams, and/or receiving waters may be required when determined necessary by the department to verify compliance with net discharge limitations or removal requirements, to verify that proper waste treatment or control practices are being maintained, or to determine the effects of the discharge on the surface waters of the state.

(2) Recording of monitoring activities and results. Any permit which requires monitoring of the authorized discharge shall require that:

(a) The permittee shall maintain records of all information resulting from any monitoring activities required of him in his permit;

(b) Any records of monitoring activities and results shall include for all samples:

(i) The date, exact place, and time of sampling;

(ii) The dates analyses were performed;

(iii) Who performed the analyses;

(iv) The analytical techniques/methods used; and

(v) The results of such analyses; and

(c) The permittee shall be required to retain for a minimum of three years any records of monitoring activities and results including all original strip chart recording for continuous monitoring instrumentation and calibration and maintenance records. This period of retention shall be extended during the course of any unresolved litigation regarding the discharge of pollutants by the permittee or when requested by the department or regional administrator.

(3) Reporting of monitoring results.

(a) The permittee shall periodically report (at a frequency of not less than once per year) on the proper reporting form, the monitoring results obtained pursuant to monitoring requirements in a permit. In addition to the required reporting form, the department at its discretion may require submission of such other results as it determines to be necessary.

(b) Monitoring reports shall be signed by:

(i) In the case of corporations, by a responsible corporate officer or his duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge originates.

(ii) In the case of a partnership, by a general partner.

(iii) In the case of a sole proprietorship, by the proprietor.

(iv) In the case of a municipal, state or other public facility, by either a principal executive officer, ranking elected official, or other duly authorized employee.

(4) Use of registered or accredited laboratories:

(a) Except as established in (c) of this subsection, monitoring data submitted to the department in accordance with this chapter shall be prepared by a laboratory accredited under the provisions of chapter 173-50 WAC no later than indicated by the appropriate date below:

July 1, 1992, major dischargers;

July 1, 1993, all permittees with a permitted average flow rate greater than five million gallons per day.

These requirements are effective and binding on all permittees under the authority of rule, regardless of whether they have been included as conditions of a permit.

(b) Except as established in (c) of this subsection, monitoring data submitted to the department in accordance with this chapter shall be prepared by a laboratory registered or accredited under the provisions of chapter 173-50 WAC no later than July 1, 1994, for all NPDES permittees not covered under (a) of this subsection.

These requirements are effective and binding on all permittees under the authority of rule, regardless of whether they have been included as conditions of a permit.

(c) The following parameters need not be accredited or registered:

(i) Flow;

(ii) Temperature;

(iii) Settleable solids;

(iv) Conductivity, except that conductivity shall be accredited if the laboratory must otherwise be registered or accredited;

(v) pH, except that pH shall be accredited if the laboratory must otherwise be registered or accredited;

(vi) Turbidity, except that turbidity shall be accredited if the laboratory must otherwise be registered or accredited; and

(vii) Parameters which are used solely for internal process control.



[Statutory Authority: RCW 90.48.035. 02-05-055 (Order 01-08), § 173-220-210, filed 2/15/02, effective 3/18/02. Statutory Authority: RCW 43.21A.230. 93-20-011 (Order 92-53), § 173-220-210, filed 9/22/93, effective 10/23/93; 90-21-090 (Order 90-21), § 173-220-210, filed 10/19/90, effective 11/19/90. Statutory Authority: RCW 90.54.020 and chapter 90.48 RCW. 88-22-059 (Order 88-9), § 173-220-210, filed 11/1/88. Statutory Authority: Chapter 90.48 RCW. 84-11-024 (Order DE 84-19), § 173-220-210, filed 5/11/84. Statutory Authority: RCW 90.48.035 and 90.48.260. 82-24-078 (Order DE 82-39), § 173-220-210, filed 12/1/82; Order DE 74-1, § 173-220-210, filed 2/15/74.]




--------------------------------------------------------------------------------

173-220-225
Appeals.
Individual permits are subject to appeals as specified in chapter 43.21B RCW.



[Statutory Authority: Chapter 90.48 RCW. 93-10-099 (Order 92-55), § 173-220-225, filed 5/5/93, effective 5/19/93. Statutory Authority: RCW 90.54.020 and chapter 90.48 RCW. 88-22-059 (Order 88-9), § 173-220-225, filed 11/1/88. Statutory Authority: RCW 90.48.035 and 90.48.260. 82-24-078 (Order DE 82-39), § 173-220-225, filed 12/1/82.]




--------------------------------------------------------------------------------

173-220-230
Enforcement.
(1) The department, with the assistance of the attorney general, may sue in courts of competent jurisdiction to enjoin any threatened or continuing violations of any permits or conditions thereof without the necessity of a prior revocation of the permit;

(2) The department may enter any premises in which an effluent source is located or in which records are required to be kept under terms or conditions of a permit, and otherwise be able to investigate, inspect, or monitor any suspected violations of water quality standards, or effluent standards and limitations, or of permits or terms or conditions thereof;

(3) The department may assess or, with the assistance of the attorney general, sue to recover in court, such civil fines, penalties, and other civil relief as may be appropriate for the violation by any person of (a) any effluent standards and limitations or water quality standards, (b) any permit or term or condition thereof, (c) any filing requirements, (d) any duty to permit or carry out inspection, entry, or monitoring activities, or (e) any rules, regulations, or orders issued by the department.

(4) The department may request the prosecuting attorney to seek criminal sanctions for the violation by such persons of (a) any effluent standards and limitations or water quality standards, (b) any permit or term or condition thereof, (c) any filing requirements.

(5) The department, with the assistance of the prosecuting attorney, may seek criminal sanctions against any person who knowingly makes any false statement, representation, or certification in any form or any notice or report required by the terms and conditions of any issued permit or knowingly renders inaccurate any monitoring device or method required to be maintained by the department.



[Order DE 74-1, § 173-220-230, filed 2/15/74.]




--------------------------------------------------------------------------------

173-220-240
Relationship of department of ecology to permits issued by the energy facility site evaluation council.
(1) The energy facility site evaluation council (EFSEC) shall be the state agency to receive applications for, issue, and modify permits for energy facilities subject to chapter 80.50 RCW. Processing of such applications shall be controlled by chapter 463-38 WAC. Application for issuance and modification of permits for all other energy facilities shall be the responsibility of the department.

(2) Monitoring, recording, and reporting activities required of operators of all energy facilities by the terms of a permit issued by EFSEC shall be supervised and enforced by the department.

(3) The department shall carry on an inspection program for the periodic inspection (to be performed not less than once every year) of discharges of pollutants from energy facilities authorized by a permit issued by EFSEC. Such inspections shall determine compliance or noncompliance with issued permits and, in particular, compliance or noncompliance with specific effluent limitations and schedules of compliance in such permits.

(4) The department shall carry on a surveillance program with respect to energy facility discharges for the random sampling and analysis of the discharge for the purpose of identifying occasional and continuing violations of permit conditions and the accuracy of information submitted by permittees in reporting forms.

(5) Enforcement activities regarding the NPDES program, including the levying of civil and criminal fines pertaining to all thermal power plants, whether the permit is issued by the department or EFSEC, shall be undertaken by the department, EFSEC, the attorney general, or the prosecuting attorney, as appropriate.

(6) Nothing in this section shall authorize the department to undertake enforcement or monitoring activities in a manner not consistent with the terms and conditions of any EFSEC-issued NPDES permit.



[Statutory Authority: RCW 90.48.035 and 90.48.260. 82-24-078 (Order DE 82-39), § 173-220-240, filed 12/1/82; Order DE 74-1, § 173-220-240, filed 2/15/74.]