CCLME.ORG - Uses and limitations of the water pollution control revolving fund
Loading (50 kb)...'
(continued) (c) The problem cannot be corrected through more efficient operation and maintenance of an existing wastewater disposal system or systems.

(4) For the purposes of this chapter, a substantial environmental degradation related to a loan or grant must be documented by a letter signed by the director of the department or his or her designee and addressed to the public official who signed the loan or grant application.

"Substantial environmental degradation" means that:

(a) There is a situation causing real, documented, critical environmental contamination that:

(i) Contributes to violations of the state's water quality standards; or

(ii) Interferes with beneficial uses of the waters of the state; and

(b) The problem generally involves a serviceable area including, but not limited to, a subdivision, town, city, or county, or an area serviced by on-site sewage disposal systems; and

(c) The problem cannot be corrected through more efficient operation and maintenance of an existing wastewater disposal system or systems.

(5) A county, city, or town that has been offered a loan or grant for a water pollution control facilities project may not receive loan or grant funds while the county, city, or town is not in compliance with the Growth Management Act unless:

(a) Documentation showing that a public health need has been provided by the Washington state department of health; or documentation showing that a substantial environmental degradation exists has been provided by the department of ecology; and

(b) The county, city, or town has provided documentation to the department that actions or measures are being implemented to address the public health need or substantial environmental degradation; and

(c) The department has determined that the project is designed to address only the public health need or substantial environmental degradation described in the documentation, and does not address unrelated needs including, but not limited to, provisions for additional growth.



[Statutory Authority: Chapter 90.50A RCW. 01-01-043 (Order 00-11), § 173-98-075, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-98-080
Indemnification.
(1) The department shall in no way be held responsible for payment of salaries, consultant's fees, and other overhead costs related to an SRF loan agreement issued to a recipient.

(2) To the extent that the Constitution and laws of the state of Washington permit, the recipient shall indemnify and hold the department harmless from and against any liability for any or all injuries to persons or property arising out of an SRF loan agreement except for such damage, claim, or liability resulting from the negligent act or omission of the department.



[Statutory Authority: RCW 43.21.080 and chapters 34.05 and 90.50A RCW. 98-24-036 (Order 98-10), § 173-98-080, filed 11/24/98, effective 12/25/98. Statutory Authority: Chapter 90.50A RCW. 89-18-019 (Order 89-34), § 173-98-080, filed 8/29/89, effective 9/29/89.]




--------------------------------------------------------------------------------

173-98-090
How are loans managed?
(1) Timely use of funds: Projects funded with loans must be spent in a timely fashion so that funds are put to work for the water quality of the state as soon as possible. To accomplish this, certain time restrictions are placed on the use of funds as follows:

(a) Work on a project must be started within sixteen months of the publication date of the final intended use plan on which the project was proposed.

(i) Any expenditure of funds which is eligible for reimbursement under the terms of the loan agreement constitutes starting the project.

(ii) No more than one time extension of no more than twelve months may be made when there are valid reasons for the extension and when the extension is included in the signed funding agreement with the department.

(iii) Valid reasons for a time extension allowing a start date more than sixteen months after the publication date of the final intended use plan are limited to:

(A) Schedules included in water quality permits, consent decrees, or enforcement orders; or

(B) The recipient and the department agree that there is a need to do work during an environmental window in a specific season of the year.

(iv) If the funding recipient has one of these valid reasons to wait longer than sixteen months to start the project, the reasons why it will take longer and the schedule the recipient will follow must both be stated clearly in a signed loan agreement.

(b) Work on a project must be completed within five years of the publication date of the final intended use plan on which the project was proposed or within a shorter time period if the shorter period is identified in the funding agreement for the project. When all work identified in the funding agreement scope of work is finished, the project is deemed to be completed. After the five-year time limit is reached, no further expenditures may be reimbursed unless an extension is made.

(i) No more than one time extension of no more than twelve months may be made when there are valid reasons for the extension; and

(A) The extension is requested no less than three months before the funding agreement is due to expire; and

(B) The department's water quality program manager agrees that the extension is for a valid reason.

(ii) Valid reasons for a time extension are limited to:

(A) Schedules included in water quality permits, consent decrees, or enforcement orders; or

(B) The recipient and the department agree that there is a need to do work during an environmental window in a specific season of the year.

(iii) If the funding recipient has one of these valid reasons to be allowed a time extension, the reasons why it will take longer and the schedule the recipient will follow must both be stated clearly in a signed amendment to the existing loan agreement.

(2) Prior authorization to incur costs. In cases where a project has been identified on a final intended use plan, the applicant may make a written request to the water quality program manager, asking to begin incurring costs related to a loan for which there is not yet a signed loan agreement. If the department concurs with this request, the water quality program manager will send the applicant a letter authorizing the costs. The applicant incurs the costs at their own risk. When an agreement is signed, previously incurred costs that are not eligible under the terms of the agreement are the sole responsibility of the applicant.

(3) The administration of all loans will be subject to all terms and conditions in a funding agreement signed by the department and by the recipient.

(4) Ongoing management of most aspects of loan projects is subject to the most recent edition of Administrative Requirements for Ecology Grants and Loans, copies of which will be provided to all recipients.



[Statutory Authority: Chapter 90.50A RCW. 01-01-043 (Order 00-11), § 173-98-090, filed 12/8/00, effective 1/8/01. Statutory Authority: RCW 43.21.080 and chapters 34.05 and 90.50A RCW. 98-24-036 (Order 98-10), § 173-98-090, filed 11/24/98, effective 12/25/98. Statutory Authority: Chapter 90.50A RCW. 89-18-019 (Order 89-34), § 173-98-090, filed 8/29/89, effective 9/29/89.]




--------------------------------------------------------------------------------

173-98-100
How do recipients comply with the state environmental review process?
(1) All recipients which receive SRF loans must meet the provisions of the State Environmental Policy Act (SEPA), chapter 43.21C RCW, and the SEPA rules, chapter 197-11 WAC. Additional provisions are currently needed by federal law under Title VI of the act to satisfy the state's responsibility to help ensure that recipients comply with the National Environmental Policy Act (NEPA) and other applicable environmental laws, regulations, and executive orders. The lead agency (WAC 197-11-050(2)) responsible for SEPA compliance for each project under the SRF program shall also comply with the following additional provisions. When a categorical exclusion, finding of no significant impact, or a record of decision has been issued under NEPA for the same project scope of work, no additional environmental documentation is required. Applicants will need to adopt the federal environmental documentation to meet their responsibilities as required by SEPA rules WAC 197-11-600, 197-11-610, and 197-11-630. If federal environmental documentation has not been submitted for approval to the appropriate federal agency, applicants and designated lead agencies must:

(a) Consult with the department before determining that the project is categorically exempt from SEPA and obtain concurrence that the project meets the criteria for a categorical exemption (WAC 197-11-305) and give public notice of the categorical exemption by publishing a notice in a newspaper of area-wide circulation. This notice shall include the locations where the public may review the facilities plan and other environmental information.

(b) Consult with the department prior to issuing a threshold determination (WAC 197-11-330), and submit a copy of the environmental checklist (WAC 197-11-315) and a recommended threshold determination to the department.

(c) Obtain written concurrence from the director with the recommended threshold determination as to whether a determination of nonsignificance (DNS) (WAC 197-11-340) or an environmental impact statement (EIS) is to be issued prior to issuing the actual document.

(d) Issue the threshold determination, determination of nonsignificance (DNS) or determination of significance (DS) (WAC 197-11-360) and submit copies to the department; two copies shall be sent to the department's environmental review section and one copy to the regional water quality program (WQ) of the department. The director must concur in writing with the findings of the checklist and DNS if a DNS is issued.

(e) Give public notice of the threshold determination by publishing a notice in a newspaper of area-wide circulation. This notice shall include the locations where the public may review the threshold determination, facilities plan, and other environmental information.

(f) Distribute copies of the threshold determination and supporting documents to other affected local, state, and federal agencies, Indian tribes, and the public.

(g) When a DS is issued, the lead agency will develop the final scope of elements to be addressed in the environmental impact statement (EIS) and obtain written concurrence from the director. The department shall be consulted throughout the EIS process.

(h) Distribute copies of the draft and final EIS to the department; two copies shall be sent to both the environmental review section and the department's water quality program.

(i) Give public notice of the draft and final EIS by publishing notices in a newspaper of area-wide circulation. Notices shall include the locations where the public may review the draft and final EIS or obtain copies.

(j) Distribute copies of the draft and final EIS to other affected local, state, and federal agencies, Indian tribes, and the public.

(k) The director must concur in writing with the finding of the final EIS.

(2) The lead agency shall issue a notice of action for the final EIS regarding the preferred alternative in accordance with RCW 43.21C.080, WAC 197-11-680, and 197-11-990.

(3) A cost-effectiveness analysis will be required for all SRF projects. Planning must include a comparison of the total cost, i.e., capital, operation and maintenance, and replacement costs of the project with other alternatives, including the no action alternative. The comparison of the total costs, e.g., total present worth or annual equivalent costs of projects for the planning period, must be included. Cost-effective analyses must also include nonmonetary cost of the project, i.e., the environmental impact, resource utilization, implementability, etc. This analysis must be included in the planning document and must be summarized in the EIS or DNS. Financial assistance under the SRF program will be offered to the cost-effective solution to the water pollution control problem.

(4) All mitigation measures committed to in the environmental checklist or state EIS, or in the finding of no significance impact/environmental assessment or record of decision/federal EIS (for federally approved projects) will become SRF loan agreement conditions. Applicants must complete all mitigation measures required. Failure to abide by these conditions will result in withholding of payments and may result in immediate repayment of the loan.

(5) The applicant must comply with the requirements of applicable environmental laws, regulations, and executive orders. Concurrence from the director will be based on best available information provided by the applicant. The department is not responsible for concurrence based on erroneous information.



[Statutory Authority: RCW 43.21.080 and chapters 34.05 and 90.50A RCW. 98-24-036 (Order 98-10), § 173-98-100, filed 11/24/98, effective 12/25/98. Statutory Authority: Chapter 90.50A RCW. 89-18-019 (Order 89-34), § 173-98-100, filed 8/29/89, effective 9/29/89.]




--------------------------------------------------------------------------------

173-98-110
What are the repayment options and schedules?
(1) General provisions.

When the scope of work identified in the SRF loan agreement has been fully completed and/or the initiation of operation date has been determined:

(a) The department and recipient will execute a final SRF loan agreement amendment which details the final loan amount. This amount will include the principal from disbursements made to recipients and accrued interest. Interest will accrue on each disbursement as it is paid to the recipient.

(b) The department will prepare according to the SRF loan agreement, a repayment schedule which fully amortize the final loan amount within twenty years of project completion. The first repayment of principal and interest will be due no later than one year after the initiation of operation date or at project completion date, whichever occurs first. Equal payments will be due every six months after this first payment. Loan balances may be repaid or additional principal payments may be made at any time without penalty.

(c) If any amount of the final loan amount or any other amounts owed to the department remains unpaid after it becomes due and payable, the department may assess a late charge. The late charge shall be additional interest at the rate of one percent per month, or fraction thereof, starting on the date the debt becomes past due and until it is paid in full.

(d) If the due date for any semiannual payment falls on a Saturday, Sunday, or designated holiday for Washington state agencies, the payment shall be due on the next business day for Washington state agencies.

(2) Phased or segmented project. Where a project has been phased or segmented, the general provisions for repayment shall apply to the completion of individual phases or segments.

(3) More than five years to complete project. When a project approved by the department takes longer than five years to complete, loan repayment must begin within five years of the first disbursement for the project, unless the director determines that the fund is fiscally sound without this repayment schedule. Repayments for these loans must follow the general provisions as outlined in subsection (1)(b) of this section.

(4) Security for loan repayment. Loans shall be secured by a general obligation pledge or a revenue pledge of the recipient. The obligation of the recipient to make loan repayments from the sources identified in its SRF loan agreement shall be absolute and unconditional, and shall not be subject to diminution by setoff, counterclaim, or abatement of any kind.

(a) General obligation. When repayment of a loan is secured by a general obligation pledge, the recipient shall pledge for so long as the loan is outstanding, to include in its budget and levy taxes annually within the constitutional and statutory tax limitations provided by law without a vote of its electors, on all of the taxable property within its boundaries in an amount sufficient, together with other money legally available and to be used for loan repayment, to pay when due the principal of and interest on the loan, and the full faith, credit, and resources of the recipient shall be pledged irrevocably for the annual levy and collection of those taxes and the prompt payment of the principal of and interest on the loan.

(b) Revenue obligation. Repayment of a loan may be secured by an irrevocable pledge of the net revenues of the recipient's utility and, in appropriate cases, utility local improvement district assessments. In such cases:

(i) Lien position. Repayment of a loan shall constitute a lien and charge (A) upon the net revenues of the recipient's utility prior and superior to any other charges whatsoever, except that the lien and charge shall be junior and subordinate to the lien and charge of any senior lien obligations and, (B) if applicable, upon utility local improvement district assessments prior and superior to any other charges whatsoever.

(ii) Reserve requirement. For loans that are revenue-secured debt with terms greater than five years, the recipient must accumulate a reserve for the loan equivalent to at least the average annual debt service on the loan during the first five years of the repayment period of the loan. This amount shall be deposited in a reserve account in the loan fund in approximately equal annual payments commencing within one year after the initiation of operation or the project completion date, whichever comes first. "Reserve account" means, for a loan that constitutes revenue-secured debt, an account of that name created in the loan fund to secure the payment of the principal of and interest on the loan. The amount on deposit in the reserve account may be applied by the recipient (A) to make, in part or in full, the final repayment to the department of the loan amount or, (B) if not so applied, for any other lawful purpose of the recipient once the loan amount, plus interest and any other amounts owing to the department hereunder, have been paid in full.

(5) Repayment from other than pledged sources. A recipient may repay any portion of its loan from any legally available funds other than those pledged in its SRF loan agreement to repay the loan.

(6) No defeasance or advance refunding. So long as the department holds a loan, the recipient shall not be entitled to, and shall not effect, its economic defeasance or advance refunding.



[Statutory Authority: Chapter 90.50A RCW. 01-01-043 (Order 00-11), § 173-98-110, filed 12/8/00, effective 1/8/01. Statutory Authority: RCW 43.21.080 and chapters 34.05 and 90.50A RCW. 98-24-036 (Order 98-10), § 173-98-110, filed 11/24/98, effective 12/25/98. Statutory Authority: Chapter 90.50A RCW. 89-18-019 (Order 89-34), § 173-98-110, filed 8/29/89, effective 9/29/89.]




--------------------------------------------------------------------------------

173-98-120
General provisions.
(1) Sale of facilities to private enterprises. Recipients may sell facilities for which the SRF loan was provided to private enterprises; however, the SRF loan agreement must be terminated in accordance with the terms of the agreement and the assistance repaid to the SRF immediately upon sale.

(2) Refinancing. The refinancing of existing debt obligations shall be limited to water pollution control facilities where project construction began after March 7, 1985. Applicants requesting refinancing must meet all the requirements contained in the act. They must be on the intended use plan before assistance will be offered and must be eligible to receive such assistance. There are two kinds of refinance with different regulations:

(a) Interim refinance: Interim refinance refers to a project which is still in progress and for which the applicant went forward on their own accord and using funding from a source other than the department. For projects in this category, applicants for funding should apply in the same manner as any other project, making certain to clearly state that the project is underway and that they have secured all prerequisite documents.

(b) Standard refinance: Standard refinance refers to a project which has been completed using funding from a source other than the department.

(i) Standard refinance projects will only be funded if there is limited demand for funds for new projects.

(ii) The department will not refinance debt from funding programs administered by the department.

(iii) All project prerequisites must have been met at the time the project was undertaken.

(iv) All standard refinance projects applying for funding in a fiscal year will be ranked by financial capability using the same criteria used for evaluating hardship, and giving the highest ranking to the applicants with the greatest financial need.

(v) For standard refinance projects, applicants for funding may use a shorter, simpler application form. This form will ask basic questions about the project and about the applicant's financial capability to pay for the project with and without the refinance.

(vi) Successful applicants for standard refinance projects must make their first repayment six months after they sign a funding agreement.

(3) Self certification. The department may authorize a recipient to certify compliance with selected program requirements. The recipient must request such certification authority and document that it has the capability and resources, that it is in the best interest of the state, and that the request is consistent with state and federal laws and regulations. Concurrences required in the environmental review process cannot be delegated to recipients.

(4) For all projects, the recipient must acknowledge state and federal financial assistance in all reports, technical documents, publications, brochures, and other materials produced using funding from the loan or grant. All site-specific projects must have a sign of sufficient size to be seen from nearby roadways, acknowledging state and federal financial assistance, and left in place throughout the life of the project. Department and environmental protection agency logos must be on all signs and documents and will be provided as needed.



[Statutory Authority: Chapter 90.50A RCW. 01-01-043 (Order 00-11), § 173-98-120, filed 12/8/00, effective 1/8/01. Statutory Authority: RCW 43.21.080 and chapters 34.05 and 90.50A RCW. 98-24-036 (Order 98-10), § 173-98-120, filed 11/24/98, effective 12/25/98. Statutory Authority: Chapter 90.50A RCW. 89-18-019 (Order 89-34), § 173-98-120, filed 8/29/89, effective 9/29/89.]