CCLME.ORG - Uses and limitations of centennial clean water funds
Loading (50 kb)...'
(continued) in the loan or grant agreement;

(ff) User charge system development; wastewater or storm water utility rate studies;

(gg) Comprehensive basin, watershed, and area-wide water quality planning;

(hh) Implementation of eligible projects identified in watershed plans;

(ii) Wellhead protection.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-060, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-95A-070
How does the Growth Management Act impact the use of funds?
(1) A local government not in compliance with the Growth Management Act may not receive loans or grants from the department, except that, in limited circumstances, a local government that is not in compliance with the Growth Management Act may receive loans or grants from the department where necessary to address a public health need or substantial environmental degradation.

(2) For the purposes of this chapter, "compliance with the Growth Management Act" means that:

(a) A county, city, or town that is required to or chooses to plan under RCW 36.70A.040 has adopted a comprehensive plan and development regulations in conformance with the requirements of chapter 36.70A RCW, after it is required that the comprehensive plan and development regulations be adopted; and

(b) The county, city, or town has not been found out of compliance by a growth management hearings board; or

(c) A growth management hearings board has found a county, city, or town in compliance with the requirements of chapter 36.70A RCW, after previously finding the county, city, or town was not in compliance.

(3) For the purposes of this chapter, a public health need related to a loan or grant must be documented by a letter signed by the secretary of the Washington state department of health or his or her designee and addressed to the public official who signed the loan or grant application. "Public health need" means a situation where:

(a) There is a documented potential for:

(i) Contaminating a source of drinking water; or

(ii) Failure of existing wastewater system or systems resulting in contamination being present on the surface of the ground in such quantities and locations as to create a potential for public contact; or

(iii) Contamination of a commercial or recreational shellfish bed as to create a critical public health risk associated with consumption of the shellfish; or

(iv) Contamination of surface water so as to create a critical public health risk associated with recreational use; and

(b) The problem generally involves a serviceable area including, but not limited to, a subdivision, town, city, or county, or an area serviced by on-site sewage disposal systems; and

(c) The problem cannot be corrected through more efficient operation and maintenance of an existing wastewater disposal system or systems.

(4) For the purposes of this chapter, a substantial environmental degradation related to a loan or grant must be documented by a letter signed by the director of the department or his or her designee and addressed to the public official who signed the loan or grant application. "Substantial environmental degradation" means that:

(a) There is a situation causing real, documented, critical environmental contamination that:

(i) Contributes to violations of the state's water quality standards; or

(ii) Interferes with beneficial uses of the waters of the state; and

(b) The problem generally involves a serviceable area including, but not limited to, a subdivision, town, city, or county, or an area serviced by on-site sewage disposal systems; and

(c) The problem cannot be corrected through more efficient operation and maintenance of an existing wastewater disposal system or systems.

(5) A county, city, or town that has been offered a loan or grant for a water pollution control facilities project may not receive loan or grant funds while the county, city, or town is not in compliance with the Growth Management Act unless:

(a) Documentation showing that a public health need has been provided by the Washington state department of health; or documentation showing that a substantial environmental degradation exists has been provided by the department; and

(b) The county, city, or town has provided documentation to the department that actions or measures are being implemented to address the public health need or substantial environmental degradation; and

(c) The department has determined that the project is designed to address only the public health need or substantial environmental degradation described in the documentation, and does not address unrelated needs including, but not limited to, provisions for additional growth.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-070, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-95A-080
What is the "step process" for planning facilities and activities projects?
(1) The step process: The "step process" is a systematic method for proceeding with projects. The step process begins with site-specific planning, and continues through design to construction or implementation. It is required for facilities construction projects and, in a modified form, is required for some kinds of activities projects and recommended for all kinds of activities projects.

(2) The step process for facilities: To be eligible for a centennial loan or grant, facilities projects must follow the step process.

(a) Before a public body with a facilities project is eligible to apply for funds, all previous steps must be approved by the department in order to help ensure that funds are spent in a timely matter on projects proceeding towards a successful outcome. Funding for site-specific facilities planning (step one) or design (step two) does not guarantee the awarding of future loans or grants for construction (step three). The department will not sign a loan or grant agreement until all previous steps have been completed and approved by the department.

(b) Planning (step one): Step one involves the preparation of a site-specific facilities plan that identifies and prioritizes the cost-effective alternatives for addressing a water pollution control problem with or without state and federal funding. There is no prerequisite for planning. If there is an existing engineering report, prepared with or without department funding, it must be upgraded for centennial loan or grant eligibility if it does not meet the definition of a facilities plan.

(c) Design (step two): Step two includes the preparation of plans and specifications for use in construction. These must be based on the preferred cost-effective alternative identified in the facilities plan. Facilities plans must be approved by the department before an application for design can be considered for funding, regardless of whether or not the facilities planning documents were funded by a department grant or loan.

(i) Due to specific loan and grant review criteria, facilities plans approved by the department for purposes other than securing a loan or grant will not be accepted for design purposes.

(ii) Facilities plans approved by the department more than two years prior to the close of the loan and grant application period must contain evidence of recent review by the department to ensure the document reflects current conditions.

(d) Construction (step three): Step three includes the actual building of facilities based on the approved design. Design must be approved by the department before an application for construction can be considered for funding.

(e) Design and construction (step four): In some cases, design and construction may be combined into one loan award, which is called step four. Different ceiling amounts apply to step four projects, as provided for in WAC 173-95A-030. Applications for step four loans will be accepted and considered for funding if it can be demonstrated that step two (design) can be completed and approved by the department within one year of the date the final offer list is made public.

(3) Prerequisite documents for facilities projects: Draft documents must be sent to the department's engineers at least sixty days prior to end of application cycle for approval by end of application cycle.

(4) Step deviations. A deviation from the step process may be allowed only in a situation where the Washington state department of health has declared a public health emergency and the proposed project would remedy this situation.

(a) In this situation, the department will accept applications for funding consideration that do not follow the step process. However, no loan or grant agreement will be signed until all previous steps have been completed and approved by the department. This deviation from the step process will only allow an application to be considered for funding - it does not guarantee that funding will be offered. It does not allow a loan to be awarded until all step requirements have been satisfied.

(b) If a deviation is approved, the applicant may deviate by only one step. For instance, the department could accept an application for design if planning was not completed and approved, or an application for construction if design was not completed and approved. However, the department may not accept an application for construction if planning was not completed and approved, which would be a two step deviation.

(5) The step process for activities.

(a) Two kinds of activities projects must follow the step process:

(i) Best management practices; and

(ii) Lake projects.

(b) In other cases, the step process for activities is not required, however the department encourages all applicants to plan activities.

(c) The steps involved in the step process for activities are:

(i) Planning (step one) involves the identification of problems and evaluation of cost-effective alternatives, based on environmental and economic considerations, for correcting and preventing water quality problems. Specific activities may include planning for watershed management, ground water management areas, lake restoration, and water quality assessment and other related activities. If the planning document is one that must be approved by a government agency or public body other than the applicant, it must be signed before the applicant is eligible to apply for step two funding.

(ii) Implementation (step two) includes the actual implementation of the project based on the planning document. Where the project includes any type of construction, a design element may be included in step two.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-080, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-95A-090
What other laws, regulations or requirements must recipients comply with?
(1) Recipients shall fully comply with all federal, state, and local laws and regulations related to procurement, discrimination, labor, job safety, and drug-free environments. The recipient shall also comply with the state and federal minority-and-women-owned businesses regulations. Applications must not be inconsistent with pertinent adopted water quality plans.

(2) If a loan or grant is provided for water pollution control facilities, recipients shall submit a declaration of construction of water pollution control facilities to the department within thirty days of project, phase, or segment completion.

(3) Recipients must maintain accounting records in accordance with "generally accepted government accounting standards." These standards are defined as, but not limited to, those contained in the United States General Accounting Office publication "Standards for Audit of Governmental Organizations, Programs, Activities, and Functions."

(4) Accounting irregularities may result in an immediate stoppage of payment until irregularities are resolved. The director of the department may require immediate repayment of misused loan or grant funds.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-090, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-95A-100
How are grants and loans managed?
(1) Timely use of funds: Projects funded with loans or grants from the centennial fund must be spent in a timely fashion so that funds are put to work for the water quality of the state as soon as possible. To accomplish this, certain time restrictions are placed on the use of funds as follows:

(a) Work on a project must be started within sixteen months of the publication date of the final offer list on which the project was proposed.

(i) Any expenditure of funds which is eligible for reimbursement under the terms of the loan or grant agreement constitutes starting the project.

(ii) No more than one time extension of no more than twelve months may be made when there are valid reasons for the extension and when the extension is included in the signed funding agreement with the department.

(iii) Valid reasons for a time extension allowing a start date more than sixteen months after the publication date of the final offer list are limited to:

(A) Schedules included in water quality permits, consent decrees, or enforcement orders; or

(B) The recipient and the department agree that there is a need to do work during an environmental window in a specific season of the year.

(iv) If the funding recipient has one of these valid reasons to wait longer than sixteen months to start the project, the reasons why it will take longer and the schedule the recipient will follow must both be stated clearly in a signed loan or grant agreement.

(b) Work on a project must be completed within five years of the publication date of the final offer list on which the project was proposed or within a shorter time period if the shorter period is identified in the funding agreement for the project. When all work identified in the funding agreement scope of work is finished, the project is deemed to be completed. After the five-year time limit is reached, no further expenditures may be reimbursed unless an extension is made.

(i) No more than one time extension of no more than twelve months may be made when there are valid reasons for the extension; and

(A) The extension is requested no less than three months before the funding agreement is due to expire; and

(B) The department's water quality program manager agrees that the extension is for a valid reason.

(ii) Valid reasons for a time extension are limited to:

(A) Schedules included in water quality permits, consent decrees, or enforcement orders; or

(B) The recipient and the department agree that there is a need to do work during an environmental window in a specific season of the year.

(iii) If the funding recipient has one of these valid reasons to be allowed a time extension, the reasons why it will take longer and the schedule the recipient will follow must both be stated clearly in a signed amendment to the existing loan or grant agreement.

(c) In-kind goods and services may be used as match for activities grants subject to ceiling amount restrictions covered in WAC 173-95A-030 and subject to the most recent edition of Administrative Requirements for Ecology Grants and Loans.

(d) In-kind goods and services may be used as match for facilities grants only in the case of projects undertaken under the small town environmental program, or "STEP."

(2) Prior authorization to incur costs. In cases where a project has been identified on a final offer list, the applicant may make a written request to the water quality program manager, asking to begin incurring costs related to a loan or grant for which there is not yet a signed loan or grant agreement. If the department concurs with this request, the water quality program manager will send the applicant a letter authorizing the costs. The applicant incurs the costs at their own risk. When an agreement is signed, previously incurred costs that are not eligible under the terms of the agreement are the sole responsibility of the applicant.

(3) Appeals of loan and grant agreement decisions: The only decisions which may be appealed are written decisions by the department made during the effective loan or grant agreement period. Appeals must be filed in writing to the department within forty-five days from the date of the disputed decision. Following the final decision of a dispute, the department and the recipient shall proceed with the project in accordance with the decision rendered. Administrative or legal costs and other expenses incurred as part of an appeal will not be eligible for reimbursement.

(4) The department, or at the department's discretion another authorized auditor, may audit the loan or grant agreement and records.

(5) The administration of all loans and grants will be subject to all terms and conditions in a funding agreement signed by the department and by the recipient.

(6) Ongoing management of most aspects of loan and grant projects is subject to the most recent edition of Administrative Requirements for Ecology Grants and Loans, copies of which will be provided to all recipients.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-100, filed 12/8/00, effective 1/8/01.]




--------------------------------------------------------------------------------

173-95A-110
General provisions.
(1) Other state and federal grant funding: Other grant funds provided by the state legislature, federal government, or from other sources will be managed in a manner consistent with the centennial rule.

(2) For all projects, the recipient must acknowledge department financial assistance in all reports, technical documents, publications, brochures, and other materials produced using funding from the loan or grant. All site-specific projects must have a sign of sufficient size to be seen from nearby roadways, acknowledging department financial assistance, and left in place throughout the life of the project. Department logos must be on all signs and documents. Logos will be provided as needed.



[Statutory Authority: Chapter 70.146 RCW. 01-01-042 (Order 00-10), § 173-95A-110, filed 12/8/00, effective 1/8/01.]