CCLME.ORG - DIVISION 80 LAND USE ORDINANCE
Loading (50 kb)...'
(continued)

(iii) At least one-quarter of any trees planted for screening purposes shall be coniferous for winter screening.

(iv) The exteriors of structures shall be dark and either natural or earth-tone colors unless specifically exempted by Commission Rule 350-080-0520(2)(k) or (l).

(C) Compatible recreation uses depend on the degree of natural resource sensitivity of a particular site. In the most critically sensitive River Bottomlands, very low-intensity uses which do not impair wetlands or special habitat requirements may be compatible. In other River Bottomland areas, nodes of moderate-intensity and/or high-intensity recreation uses may be compatible, provided that:

(i) Their designs emphasize retention and/or enhancement of native riparian communities,

(ii) Structures and parking areas are visually subordinate, and

(iii) They are separated from other areas of concentrated recreation usage by stretches of natural-appearing shoreline and adjacent uplands.

(j) Gorge Walls, Canyons and Wildlands:

(A) New development and expansion of existing development shall be screened so it is not seen from Key Viewing Areas, to the maximum extent practicable.

(B) All trees planted to screen permitted development and uses from Key Viewing Areas shall be native to the area.

(C) Existing tree cover shall be retained to the maximum extent practicable, except for the minimum removal necessary to accommodate facilities otherwise permitted in the underlying land use designation or for safety purposes.

(D) All structures shall be limited in height to a maximum of 1 and 1/2 stories.

(E) All structures' exteriors shall be non-reflective.

(F) Signage shall be limited to natural materials such as wood or stone, with natural or earth-tone colors, unless public safety concerns or federal or state highway guidelines require otherwise.

(G) Compatible recreation uses are limited to very low or low-intensity, resource-based activities which focus on enjoyment and appreciation of sensitive resources. Such compatible uses (such as trails) are generally associated with minimal facility development, if any.

(k) Developed Settings and Visual Subordinance Policies

(A) New development in areas listed in subsections (i) through (vi) shall be compatible with the setting, but not necessarily visually subordinate.

New uses and developments in these particular areas are subject to only the following guidelines for scenic resources: 350-080-0520(1)(a) through (e); 350-080-0520(2)(d), (e), (t), and (u); depending upon which setting the subject parcel is located in: 350-080-0520(3)(e)(A), (B) and (D), 350-080-0520(3)(g)(A) and (C), or 350-080-0520(3)(h)(A) through (L); and 350-080-0520(4)(a), (d), (e), and (f):

(i) Corbett Rural Center (Village);

(ii) Skamania Rural Center (Village);

(iii) West of Hood River Urban Area, east of Country Club Road (Rural Residential);

(iv) Murray's Addition Subdivision, The Dalles (Residential);

(v) Two small areas south of The Dalles in Sections 9 and 10, Township 1N, Range 13E (Rural Residential and Residential);

(vi) Portion of Underwood Heights along Cooper Avenue, south of Cook Underwood Road (Rural Residential/Residential).

(4) All Review Uses within Scenic Travel Corridors shall comply with the following applicable guidelines:

(a) For the purposes of implementing this section, the foreground of a Scenic Travel Corridor shall include those lands within one-quarter mile of the edge of pavement of the Scenic Travel Corridor roadway.

(b) All new buildings and alterations to existing buildings, except in a Rural Center designation (village landscape setting), shall be set back at least 100 feet from the edge of pavement of the Scenic Travel Corridor roadway. A variance to this setback requirement may be granted pursuant to Commission Rule 350-080-0150(7). All new parking lots and expansions of existing parking lots shall be set back at least 100 feet from the edge of pavement of the Scenic Travel Corridor roadway, to the maximum extent practicable.

(c) Additions to existing buildings or expansion of existing parking lots located within 100 feet of the edge of pavement of a Scenic Travel Corridor roadway except in a Rural Center designation (village landscape setting), shall comply with guideline (4)(b) above to the maximum extent practicable.

(d) All proposed vegetation management projects in public rights-of-way to provide or improve views shall include the following:

(A) An evaluation of potential visual impacts of the proposed project as seen from any Key Viewing Area;

(B) An inventory of any rare plants, sensitive wildlife habitat, wetlands or riparian areas on the project site. If such resources are determined to be present, the project shall comply with applicable guidelines to protect the resources.

(e) When evaluating possible locations for undergrounding of signal wires or powerlines, railroads and utility companies shall prioritize those areas specifically recommended as extreme or high priorities for undergrounding in the Columbia River Gorge National Scenic Area Corridor Visual Inventory prepared in April, 1990.

(f) New production and/or development of mineral resources proposed within one-quarter mile of the edge of pavement of a Scenic Travel Corridor may be allowed upon a demonstration that full visual screening of the site from the Scenic Travel Corridor can be achieved by use of existing topographic features or existing vegetation designed to be retained through the planned duration of the proposed project. An exception to this may be granted if planting of new vegetation in the vicinity of the access road to the mining area would achieve full screening. If existing vegetation is partly or fully employed to achieve visual screening, over 75 percent of the tree canopy area shall be coniferous species providing adequate winter screening. Mining and associated primary processing of mineral resources is prohibited within 100 feet of a Scenic Travel Corridor, as measured from the edge of pavement, except for access roads. Compliance with full screening requirements shall be achieved within time frames specified in Commission Rule 350-080-0520(2)(y).

(g) Expansion of existing quarries may be allowed pursuant to Commission Rule 350-080-0520(2)(v). Compliance with visual subordinance requirements shall be achieved within time frames specified in Commission Rule 350-080-0520(2)(x).

Stat. Auth.: ORS 196.150
Stats. Implemented: ORS 196.150; RCW 43.97.015; 16 U.S.C. § 544 et seq.
Hist.: CRGC 2-1993 (Temp), f. 5-6-93, cert. ef. 6-1-93; CRGC 4-1993, f. & cert. ef. 8-4-93; CRGC 5-1994, f. 12-27-94, cert. ef. 2-1-95; CRGC 1-1995(Temp), f. & cert. ef. 7-25-95

350-080-0530

Special Management Area Scenic Review Criteria

The following scenic review guidelines shall apply to all Review Uses in the Special Management Area of the Columbia River Gorge National Scenic Area with the exception of rehabilitation or modification of historic structures eligible or on the National Register of Historic Places when such modification is in compliance with the National Register of Historic Places guidelines:

(1) All Review Uses in the Special Management Area regardless of location or landscape setting shall comply with the following applicable guidelines:

(a) Proposed developments shall not protrude above the line of a bluff, cliff, or skyline as seen from Key Viewing Areas.

(b) Size, scale, shape, color, texture, siting, height, building materials, lighting, or other features of a proposed structure shall be visually subordinate in the landscape and have low contrast in the landscape.

(c) Colors shall be used in a manner so that developments are visually subordinate to the natural and cultural patterns in the landscape setting. Colors for structures and signs should be slightly darker than the surrounding background.

(d) Structure height shall remain below the average tree canopy height of the natural vegetation adjacent to the structure, except if it has been demonstrated that meeting this guideline is not feasible considering the function of the structure.

(e) Proposed developments or land use shall be aligned, designed and sited to fit the natural topography and to take advantage of vegetation and land form screening, and to minimize visible grading or other modifications of landforms, vegetation cover, and natural characteristics.

(f) Any exterior lighting shall be sited, limited in intensity, shielded or hooded in a manner that prevents lights from being highly visible from Key Viewing Areas and from noticeably contrasting with the surrounding landscape setting except for road lighting necessary for safety purposes.

(g) Seasonal lighting displays shall be permitted on a temporary basis, not to exceed three months duration.

(h) Reflectivity of structures and site improvements shall be minimized.

(i) Right-of-way vegetation shall be managed to minimize visual impact of clearing and other vegetation removal as seen from Key Viewing Areas. Roadside vegetation management (vista clearing, planting, etc.) should enhance views from the highway.

(j) Encourage existing and require new road maintenance warehouse and stockpile areas to be screened from view from Key Viewing Areas.

(2) New developments and land uses shall be evaluated to ensure that scenic resources are not adversely affected, including cumulative effects, based on visibility from Key Viewing Areas.

(3) All new developments and land uses immediately adjacent to scenic routes shall be in conformance with state or county scenic route guidelines.

(4) New land uses or developments shall comply with the following applicable design guidelines:

(a) Pastoral: Pastoral areas shall retain the overall appearance of an agricultural landscape.

(A) New developments and forest practices shall meet the Visual Quality Objective of partial retention.

(B) The use of plant species common to the landscape setting shall be encouraged. The use of plant species in rows as commonly found in the landscape setting is encouraged.

(C) Exterior colors of structures shall be earth-tone colors which will result in low contrast with the surrounding landscape.

(D) Exterior colors of structures may be white, except for the roof, only in the Mt. Pleasant and Dodson-Warrendale areas where other white structures are evident in the setting.

(b) Coniferous Woodlands and Oak-Pine Woodland: Woodland areas shall retain the overall appearance of a woodland landscape. New developments and land uses shall retain the overall visual character of the natural appearance of the Coniferous and Oak/Pine Woodland landscape.

(A) New developments and land uses in lands designated Federal Forest or Open Space shall meet the Visual Quality Objective of retention; all other land use designations shall meet the Visual Quality Objective of partial retention as seen from Key Viewing Areas.

(B) Forest practices on National Forest lands included in the Mt. Hood National Forest Plans shall meet the Visual Quality Objective identified for those lands in those plans.

(C) Buildings in the Coniferous Woodland landscape setting shall be encouraged to have a vertical overall appearance and a horizontal overall appearance in the Oak-Pine Woodland landscape setting.

(D) Use of plant species native to the landscape setting shall be encouraged. Where non-native plants are used, they shall have native-appearing characteristics.

(E) The exteriors of structures in the Coniferous Woodland landscape setting shall be dark earth-tone colors which will result in low contrast with the surrounding landscape as seen from the Key Viewing Areas.

(F) Exterior colors of structures in Oak-Pine Woodland landscape setting shall be earth-tone colors which will result in low contrast with the surrounding landscape as seen from the Key Viewing Areas.

(c) Residential: The Residential setting is characterized by concentrations of dwellings.

(A) New developments and land uses shall meet the Visual Quality Objective of partial retention.

(B) At Rowena Dell, new buildings shall have a rustic appearance and use natural materials and earth-tone colors.

(C) At Latourell Falls, new buildings shall have an appearance consistent with the predominant historical architectural style.

(D) Use of plant species native to the landscape setting shall be encouraged. Where non-native plants are used, they shall have native appearing characteristics.

(d) River Bottomlands: River bottomland shall retain the overall visual character of a floodplain and associated islands.

(A) New developments and land uses shall meet the Visual Quality Objective of partial retention, except in areas designated Open Space which shall meet the Visual Quality Objective of retention.

(B) Buildings shall have an overall horizontal appearance in areas with little tree cover.

(C) Use of plant species native to the landscape setting shall be encouraged. Where non-native plants are used, they shall have native-appearing characteristics.

(D) Exterior colors of structures shall be earth-tone or water-tone colors which will result in low contrast with surrounding landscape.

(e) Gorge Walls, and Canyonlands and Wildlands: New developments and land uses shall retain the overall visual character of the natural appearing landscape.

(A) New developments and land uses shall meet the Visual Quality Objective of retention as seen from Key Viewing Areas.

(B) Structures, including signs, shall have a rustic appearance, use non-reflective materials, and have low contrast with the surrounding landscape and be of a Cascadian architectural style.

(C) Temporary roads shall be promptly closed and revegetated.

(D) New utilities shall be below ground surface, where feasible.

(E) Use of plant species non-native to the Columbia River Gorge shall not be allowed.

(F) Exterior colors of structures shall be dark earth tones that will result in the structure having low contrast with the surrounding landscape.

(5) For forest practices the following guidelines shall apply:

(a) Forest practices must meet the design guidelines and Visual Quality Objective for the landscape setting designated for the management area.

(b) Not more than 16 percent of each total ownership within a viewshed shall be in created openings at any one time. The viewshed boundaries shall be delineated by the Forest Service.

(c) Size, shape, and dispersal of created openings shall maintain the natural patterns in the landscape.

(d) The maximum size of any created opening is 15 acres. In the foreground of Key Viewing Areas, the maximum size of created openings shall be five acres.

(e) Clearcutting shall not be used as a harvest practice on land designated Federal Forest Lands.

(f) Created openings shall not create a break or opening in the vegetation in the skyline as viewed from a Key Viewing Area.

(g) Created openings shall be dispersed to maintain at least 400 feet of closed canopy between openings. Closed canopy shall be at least 20 feet tall.

Stat. Auth.: ORS 196.150
Stats. Implemented: ORS 196.150; RCW 43.97.015; 16 U.S.C. § 544 et seq.
Hist.: CRGC 2-1993 (Temp), f. 5-6-93, cert. ef. 6-1-93; CRGC 4-1993, f. & cert. ef. 8-4-93; CRGC 5-1994, f. 12-27-94, cert. ef. 2-1-95; CRGC 1-1995(Temp), f. & cert. ef. 7-25-95

350-080-0540

General Management Area Cultural Resource Review Criteria

(1) General Provisions for Implementing the Cultural Resources Protection Process.

(a) All cultural resource surveys, evaluations, assessments, and mitigation plans shall be performed by professionals whose expertise reflects the type of cultural resources that are involved. Principal investigators shall meet the professional standards published in 36 Code of Federal Regulations (CFR) Part 61 and Guidelines for Evaluating and Documenting Traditional Cultural Properties (Parker and King, no date).

(b) Cultural resource surveys, evaluations, assessments, and mitigation plans shall generally be conducted in consultation with Indian tribal governments and any person who submits written comments on a proposed use (interested person). Indian tribal governments shall be consulted if the affected cultural resources are prehistoric or otherwise associated with Native Americans. If the cultural resources are associated with non-Native Americans, such as an historic house or pioneer campsite, the Indian tribal governments do not have to be consulted.

(c) Reconnaissance and Historic Surveys and Survey Reports.

(A) Reconnaissance survey requirements and exceptions.

(i) A reconnaissance survey shall be required for all proposed uses within 500 feet of a known cultural resource, including those uses listed as exceptions in Commission Rule 350-080-0504(1)(c)(A)(ii) below.

(ii) A reconnaissance survey shall be required for all proposed uses, except:

(I) The modification, expansion, replacement, or reconstruction of existing buildings and structures.

(II) Proposed uses that would not disturb the ground, including land divisions and lot-line adjustments; storage sheds that do not require a foundation; low-intensity recreation uses, such as fishing, hunting, and hiking; installation of surface chemical toilets; hand treatment of brush within established rights-of-way; and new uses of existing structures.

(III) Proposed uses that involve minor ground disturbance, as defined by depth and extent, including repair and maintenance of lawfully constructed and serviceable structures; home gardens; livestock grazing; cultivation that employs minimum tillage techniques, such as replanting pastures using a grassland drill; construction of fences; new utility poles that are installed using an auger, post-hole digger, or similar implement; and placement of mobile homes where septic systems and underground utilities are not involved The Gorge Commission shall review all land use applications and determine if proposed uses would have a minor ground disturbance.

(IV) Proposed uses that occur on sites that have been disturbed by human activities, provided the proposed uses do not exceed the depth and extent of existing ground disturbance. To qualify for this exception, a project applicant must demonstrate that land-disturbing activities occurred in the project area. Land-disturbing activities include grading and cultivation.

(V) Proposed uses that would occur on sites that have been adequately surveyed in the past. The project applicant must demonstrate that the project area has been adequately surveyed to qualify for this exception. Past surveys must have been conducted by a qualified professional and must include a surface survey and subsurface testing. The nature and extent of any cultural resources in the project area must be adequately documented.

(VI) Proposed uses occurring in areas that have a low probability of containing cultural resources, except: Residential development that involves two or more new dwellings for the same project applicant; Recreation facilities that contain parking areas for more than 10 cars, overnight camping facilities, boat ramps, and visitor information and environmental education facilities; Public transportation facilities that are outside improved rights-of-way; Electric facilities, lines, equipment, and appurtenances that are 33 kilovolts or greater; Communications, water and sewer, and natural gas transmission (as opposed to distribution) lines, pipes, equipment, and appurtenances.

(iii) Areas that have a low probability of containing cultural resources shall be identified using the results of reconnaissance surveys conducted by the Gorge Commission, the Forest Service, public agencies, and private archaeologists.

(iv) The Gorge Commission, after consulting Indian tribal governments and state historic preservation officers, shall prepare and adopt a map showing areas that have a low probability of containing cultural resources. This map shall be adopted within 200 days after the Secretary of Agriculture concurs with the Management Plan. It shall be refined and revised as additional reconnaissance surveys are conducted. Areas shall be added or deleted as warranted. All revisions of this map shall be reviewed and approved by the Gorge Commission.

(B) A historic survey shall be required for all proposed uses that would alter the exterior architectural appearance of buildings and structures that are 50 years old or older, or would compromise features of the surrounding area that are important in defining the historic or architectural character of buildings or structures that are 50 years old or older.

(C) The Gorge Commission shall conduct and pay for all reconnaissance and historic surveys for small-scale uses in the General Management Area. When archaeological resources or traditional cultural properties are discovered, the Gorge Commission also shall identify the approximate boundaries of the resource or property and delineate a reasonable buffer zone. Reconnaissance surveys and buffer zone delineations for large-scale uses shall be the responsibility of the project applicant. For Commission Rule 350-080-0540, large-scale uses include residential development involving two or more new dwellings; all recreation facilities; commercial and industrial development; public transportation facilities; electric facilities, lines, equipment, and appurtenances that are 33 kilovolts or greater; and communications, water and sewer, and natural gas transmission (as opposed to distribution) lines, pipes, equipment, and appurtenances.

(D) Reconnaissance Surveys for Small-Scale Uses. Reconnaissance surveys for small-scale uses shall generally include a surface survey and subsurface testing. They shall meet the following guidelines:

(i) A surface survey of the project area shall be conducted, except for inundated areas and impenetrable thickets.

(ii) Subsurface testing shall be conducted if the surface survey reveals that cultural resources may be present. Subsurface probes shall be placed at intervals sufficient to determine the absence or presence of cultural resources.

(E) Reconnaissance Survey Reports for Small-Scale Uses. The results of a reconnaissance survey for small-scale uses shall be documented in a confidential report that includes:

(i) A description of the fieldwork methodology used to identity cultural resources, including a description of the type and extent of the reconnaissance survey.

(ii) A description of any cultural resources that were discovered in the project area, including a written description and photographs.

(iii) A map that shows the project area, the areas surveyed, the location of subsurface probes, and, if applicable, the approximate boundaries of the affected cultural resources and a reasonable buffer zone.

(F) Reconnaissance Surveys for Large-Scale Uses:

(i) Reconnaissance surveys for large-scale uses shall be designed by a qualified professional. A written description of the survey shall be submitted to and approved by the Gorge Commission's designated archaeologist.

(ii) Reconnaissance surveys shall reflect the physical characteristics of the project area and the design and potential effects of the proposed use. They shall meet the following guidelines:

(I) Archival research shall be performed before any field work. It should entail a thorough examination of tax records; historic maps, photographs, and drawings; previous archaeological, historic, and ethnographic research; cultural resource inventories and records maintained by federal, state, and local agencies; and primary historic accounts, such as diaries, journals, letters, and newspapers.

(II) Surface surveys shall include the entire project area, except for inundated areas and impenetrable thickets.

(III) Subsurface probes shall be placed at intervals sufficient to document the presence or absence of cultural resources.

(IV) Archaeological site inventory forms shall be submitted to the State Historic Preservation Officer whenever cultural resources are discovered.

(G) Reconnaissance Survey Reports for Large-Scale Uses. The results of a reconnaissance survey for large-scale uses shall be documented in a confidential report that includes:

(i) A description of the proposed use, including drawings and maps.

(ii) A description of the project area, including soils, vegetation, topography, drainage, past alterations, and existing land use.

(iii) A list of the documents and records examined during the archival research and a description of any prehistoric or historic events associated with the project area.

(iv) A description of the fieldwork methodology used to identify cultural resources, including a map that shows the project area, the areas surveyed, and the location of subsurface probes. The map shall be prepared at a scale of 1 inch equals 100 feet (1:1,200), or a scale providing greater detail.

(v) An inventory of the cultural resources that exist in the project area, including a written description, photographs, drawings, and a map. The map shall be prepared at a scale of 1 inch equals 100 feet (1:1,200), or a scale providing greater detail.

(vi) A summary of all written comments submitted by Indian tribal governments and other interested persons.

(vii) A preliminary assessment of whether the proposed use would or would not have an effect on cultural resources. The assessment shall incorporate concerns and recommendations voiced during consultation meetings and information obtained through archival and ethnographic research and field surveys.

(H) Historic Surveys and Reports:

(i) Historic surveys shall document the location, form, style, integrity, and physical condition of historic buildings and structures. They shall include original photographs and maps. Archival research, blueprints, and drawings should be used as necessary.

(ii) Historic surveys shall describe any uses that will alter or destroy the exterior architectural appearance of the historic buildings or structures, or compromise features of the site that are important in defining the overall historic character of the historic buildings or structures.

(iii) The project applicant shall provide detailed architectural drawings and building plans that clearly illustrate all proposed alterations.

(d) The responsibility and cost of preparing an evaluation of significance, assessment of effect, or mitigation plan shall be borne by the project applicant, except for resources discovered during construction. The Gorge Commission shall conduct and pay for evaluations of significance and mitigation plans for resources that are discovered during construction of small-scale and large-scale uses.

(e) Cultural resources are significant if one of the following criteria is satisfied:

(A) The cultural resources are included in, or eligible for inclusion in, the National Register of Historic Places. The criteria for evaluating the eligibility of cultural resources for the National Register of Historic Places appear in the "National Register Criteria for Evaluation" (36 CFR 60.4).

(B) The cultural resources are determined to be culturally significant by an Indian tribal government, based on criteria developed by that Indian tribal government and filed with the Gorge Commission.

(f) The Gorge Commission shall establish a Cultural Advisory Committee (CAC). The CAC shall comprise cultural resource professionals, interested individuals, and at least one representative from each of the four Indian tribes. If a project applicant's and Indian tribal government's evaluations of significance contradict, the Cultural Advisory Committee (CAC) shall review the applicant's evaluation and Indian tribal government's substantiated concerns. The CAC will submit a recommendation to the Development Review Officer as to whether affected cultural resources are significant.

(2) Cultural Resource Reconnaissance and Historic Surveys:

(a) Consultation and Ethnographic Research:

(A) When written comments are submitted to the Development Review Officer within the comment period provided in Commission Rule 350-080-0120, the project applicant shall offer to meet with the interested persons within 10 calendar days. The 10-day consultation period may be extended upon agreement between the project applicant and the interested persons.

(i) Consultation meetings should provide an opportunity for interested persons to explain how the proposed use may affect cultural resources. Recommendations to avoid potential conflicts should be discussed.

(ii) All written comments and consultation meeting minutes shall be incorporated into the reconnaissance or historic survey report. In instances where a survey is not required, all such information shall be recorded and addressed in a report that typifies a survey report; inapplicable elements may be omitted.

(B) A project applicant who is proposing a large-scale use shall conduct interviews and other forms of ethnographic research if interested persons submit a written request for such research. All requests must include a description of the cultural resources that may be affected by the proposed use and the identity of knowledgeable informants. Ethnographic research shall be conducted by qualified specialists. Tape recordings, maps, photographs, and minutes shall be used when appropriate. All written comments, consultation meeting minutes, and ethnographic research shall be incorporated into the reconnaissance or historic survey report. In instances where a survey is not required, all such information shall be recorded and addressed in a report that typifies a survey report.

(b) Notice of Survey Results:

(A) The Development Review Officer shall submit a copy of all cultural resource survey reports to the State Historic Preservation Officer and the Indian tribal governments. Survey reports may include measures to avoid affected cultural resources, such as a map that shows a reasonable buffer zone.

(B) The State Historic Preservation Officer and the tribes shall have 30 calendar days from the date a survey report is mailed to submit written comments to the Development Review Officer. The Development Review Officer shall record and address all written comments in the development review order.

(c) Conclusion of the Cultural Resource Protection Process:

(A) The Development Review Officer shall make a final decision on whether the proposed use would be consistent with Commission Rule 350-080-0540. If the final decision contradicts the comments submitted by the State Historic Preservation Officer, the Development Review Officer shall justify how it reached an opposing conclusion.

(B) The cultural resource protection process may conclude when one of the following conditions exists:

(i) The proposed use does not require a reconnaissance or historic survey, no cultural resources are known to exist in the project area, and no substantiated concerns were voiced by interested persons within 21 calendar days of the date that a notice was mailed.

(ii) A reconnaissance survey demonstrates that cultural resources do not exist in the project area, no substantiated concerns were voiced by interested persons within 21 calendar days of the date that a notice was mailed, and no substantiated concerns regarding the reconnaissance survey were voiced by the State Historic Preservation Officer or Indian tribal governments during the 30-day comment period required in subsection 2(b)(B) above.

(iii) The proposed use would avoid archaeological resources and traditional cultural resources that exist in the project area. To meet this guideline, a reasonable buffer zone must be established around the affected resources or properties; all ground-disturbing activities shall be prohibited within the buffer zone.

(I) Buffer zones must preserve the integrity and context of cultural resources. They will vary in width depending on the eventual use of the project area, the type of cultural resources that are present, and the characteristics for which the cultural resources may be significant. A deed covenant, easement, or other appropriate mechanism shall be developed to ensure that the buffer zone and the cultural resources are protected.

(II) An evaluation of significance shall be conducted if a project applicant decides not to avoid the affected cultural resource. In these instances, the reconnaissance survey and survey report shall be incorporated into the evaluation of significance.

(C) A historic survey demonstrates that the proposed use would not have an effect on historic buildings or structures because:

(i) The State Historic Preservation Officer concludes that the historic buildings or structures are clearly not significant, as determined by using the criteria in the "National Register Criteria for Evaluation" (36 CFR 60.4), or

(ii) The proposed use would not compromise the historic or architectural character of the affected buildings or structures, or compromise features of the site that are important in defining the overall historic character of the affected buildings or structures, as determined by the guidelines and standards in The Secretary of the Interior's Standards for Rehabilitation (U.S. Department of the Interior 1990) and The Secretary of the Interior's Standards for Historic Preservation Projects (U.S. Department of the Interior 1983).

(I) The historic survey conducted by the Gorge Commission may provide sufficient information to satisfy these guidelines. If it does not, architectural and building plans, photographs, and archival research may be required. The project applicant shall be responsible for providing information beyond that included in the survey conducted by the Gorge Commission.

(II) The historic survey and report must demonstrate that these guidelines have been clearly and absolutely satisfied. If the State Historic Preservation Officer or the Development Review Officer question whether these guidelines have been satisfied, the project applicant shall conduct an evaluation of significance.

(3) Evaluation of Significance:

(a) Evaluation Criteria and Information Needs. If cultural resources would be affected by a new use, an evaluation of their significance shall be conducted. Evaluations of significance shall meet the following guidelines:

(A) Evaluations of significance shall follow the procedures in How to Apply the National Register Criteria for Evaluation (U.S. Department of the Interior, no date) and Guidelines for Evaluating and Documenting Traditional Cultural Properties (Parker and King, no date). They shall be presented within local and regional contexts and shall be guided by previous research and current research designs that are relevant to specific research questions for the Columbia River Gorge.

(B) To evaluate the significance of cultural resources, the information gathered during the reconnaissance or historic survey may have to be supplemented. Detailed field mapping, subsurface testing, photographic documentation, laboratory analyses, and archival research may be required.

(C) The project applicant shall contact Indian tribal governments and interested persons, as appropriate. Ethnographic research shall be undertaken as necessary to fully evaluate the significance of the cultural resources.

(D) The evaluation of significance shall follow the principles, guidelines, and report format recommended by the Oregon State Historic Preservation Office (Oregon SHPO 1990) or Washington Office of Archaeology and Historic Preservation (Washington SHPO, no date). It shall incorporate the results of the reconnaissance or historic survey and shall illustrate why each cultural resource is or is not significant. Findings shall be presented within the context of relevant local and regional research.

(E) All documentation used to support the evaluation of significance shall be cited. Evidence of consultation with Indian tribal governments and other interested persons shall be presented. All comments, recommendations, and correspondence from Indian tribal governments and interested persons shall be appended to the evaluation of significance.

(b) Notice of Evaluation Results:

(A) If the evaluation of significance demonstrates that the cultural resources are not significant, the Development Review Officer shall submit a copy of the evaluation of significance to the State Historic Preservation Officer and the Indian tribal governments.

(B) The State Historic Preservation Officer, Indian tribal governments, and interested persons shall have 30 calendar days from the date the evaluation of significance is mailed to submit written comments to the Development Review Officer. The Development Review Officer shall record and address all written comments in the development review order.

(c) Cultural Resources are Culturally Significant:

(A) If an Indian tribal government believes that the affected cultural resources are culturally significant, contrary to the evaluation submitted by the project applicant, the Cultural Advisory Committee (CAC) shall make an independent review of the applicant's evaluation and the Indian tribal government's substantiated concerns. The CAC shall formulate a recommendation regarding the significance of the cultural resources.

(B) The Indian tribal government shall substantiate its concerns in a written report. The report shall be submitted to the Development Review Officer, CAC, and the project applicant within 15 calendar days from the date the evaluation of significance is mailed. The CAC must submit its recommendation to the Development Review Officer within 30 calendar days from the date the evaluation of significance is mailed.

(d) Conclusion of the Cultural Resource Protection Process:

(A) The Development Review Officer shall make a final decision on whether the affected resources are significant. If the final decision contradicts the comments or recommendations submitted by the State Historic Preservation Officer or CAC, the Development Review Officer shall justify how an opposing conclusion was reached.

(B) The cultural resource protection process may conclude if the affected cultural resources are not significant.

(C) If the project applicant or the Development Review Officer determines that the cultural resources are significant, the effects of the proposed use shall be assessed.

(4) Assessment of Effect:

(a) Assessment Criteria and Information Needs. If a use could potentially affect significant cultural resources, an assessment shall be made to determine if it would have no effect, no adverse effect, or an adverse effect. The assessment shall meet the following guidelines:

(A) The assessment of effect shall be based on the criteria published in "Protection of Historic Properties" (36 CFR 800.9) and shall incorporate the results of the reconnaissance or historic survey and the evaluation of significance. All documentation shall follow the requirements listed in 36 CFR 800.8.

(i) Proposed uses are considered to have an effect on cultural resources when they alter or destroy characteristics of the resources that make them significant (36 CFR 800.9(a)).

(ii) Proposed uses are considered to have an adverse effect when they may diminish the integrity of the cultural resource's location, design, setting, materials, workmanship, feeling, or association (36 CFR 800.9(b)). Adverse effects on cultural resources include, but are not limited to:

(I) Physical destruction, damage, or alteration of all or part of the cultural resource.

(II) Isolation of the cultural resource from its setting or alteration of the character of the resource's setting when that character contributes to the resource's qualification as being significant.

(III) Introduction of visual, audible, or atmospheric elements that are out of character with the cultural resource or its setting.

(IV) Neglect of a significant cultural resource resulting in its deterioration or destruction.

(B) The assessment of effect shall be prepared in consultation with Indian tribal governments and interested persons, as appropriate. The concerns and recommendations voiced by Indian tribal governments and interested persons shall be recorded and addressed in the assessment.

(C) The effects of a proposed use that would otherwise be determined to be adverse may be considered to be not adverse if any of the following instances apply:

(i) The cultural resources are of value only for their potential contribution to archeological, historical, or architectural research, and when such value can be substantially preserved through the conduct of appropriate research before development begins, and such research is conducted in accordance with applicable professional standards and guidelines.

(ii) The undertaking is limited to the rehabilitation of buildings and structures, and is conducted in a manner that preserves the historical and architectural character of affected cultural resources through conformance with The Secretary of the Interior's Standards for Rehabilitation (U.S. Department of the Interior 1990) and The Secretary of the Interior's Standards for Historic Preservation Projects (U.S. Department of the Interior 1983).

(b) Notice of Assessment Results:

(A) If the assessment of effect concludes that the proposed use would have no effect or no adverse effect on significant cultural resources, the Development Review Officer shall submit a copy of the assessment to the State Historic Preservation Officer and the Indian tribal governments.

(B) The State Historic Preservation Officer, Indian tribal governments, and interested persons shall have 30 calendar days from the date the assessment of effect is mailed to submit written comments to the Development Review Officer. The Development Review Officer shall record and address all written comments in the development review order.

(c) Conclusion of the Cultural Resource Protection Process:

(A) The Development Review Officer shall make a final decision on whether the proposed use would have no effect, no adverse effect, or an adverse effect. If the final decision contradicts the comments submitted by the State Historic Preservation Officer, the Development Review Officer shall justify how an opposing conclusion was reached.

(B) The cultural resource protection process may conclude if the proposed use would have no effect or no adverse effect on significant cultural resources.

(C) A mitigation plan shall be prepared if a project applicant or the Development Review Officer determines that the proposed use would have an adverse effect on significant cultural resources.

(5) Mitigation Plans:

(a) Mitigation Plan Criteria and Information Needs. Mitigation plans shall be prepared when proposed uses would have an adverse effect on significant cultural resources. The plans shall reduce an adverse effect to no effect or no adverse effect. Mitigation plans shall meet the following guidelines:

(A) Mitigation plans shall be prepared in consultation with persons who have concerns about or knowledge of the affected cultural resources, including Indian tribal governments, Native Americans, local governments whose jurisdiction encompasses the project area, and the State Historic Preservation Officer.

(B) Avoidance of cultural resources through project design and modification is preferred. Avoidance may be effected by reducing the size, scope, configuration, and density of the proposed use. Alternative mitigation measures shall be used only if avoidance is not practicable. Alternative measures include, but are not limited to, burial under fill, stabilization, removal of the cultural resource to a safer place, and partial to full excavation and recordation. If the mitigation plan includes buffer zones to protect cultural resources, a deed covenant, easement, or other appropriate mechanism shall be developed and recorded in county deeds and records.

(C) Mitigation plans shall incorporate the results of the reconnaissance or historic survey, the evaluation of significance, and the assessment of effect, and shall provide the documentation required in 36 CFR 800.8(d), including, but not limited to:

(i) A description and evaluation of any alternatives or mitigation measures that the project applicant proposes for reducing the effects of the proposed use.

(ii) A description of any alternatives or mitigation measures that were considered but not chosen and the reasons for their rejection.

(iii) Documentation of consultation with the State Historic Preservation Officer regarding any alternatives or mitigation measures.

(iv) A description of the project applicant's efforts to obtain and consider the views of Indian tribal governments, interested persons, and Development Review Officer.

(v) Copies of any written recommendations submitted to the Development Review Officer or project applicant regarding the effects of the proposed use on cultural resources and alternatives to avoid or reduce those effects.

(b) Notice of Mitigation Plan Results:

(A) If a mitigation plan reduces the effect of a use from an adverse effect to no effect or no adverse effect, the Development Review Officer shall submit a copy of the mitigation plan to the State Historic Preservation Officer and the Indian tribal governments.

(B) The State Historic Preservation Officer, Indian tribal governments, and interested persons shall have 30 calendar days from the date the mitigation plan is mailed to submit written comments to the Development Review Officer. The Development Review Officer shall record and address all written comments in the development review order.

(c) Conclusion of the Cultural Resource Protection Process:

(A) The Development Review Officer shall make a final decision on whether the mitigation plan would reduce an adverse effect to no effect or no adverse effect. If the final decision contradicts the comments submitted by the State Historic Preservation Officer, the Development Review Officer shall justify how an opposing conclusion was reached.

(B) The cultural resource protection process may conclude if a mitigation plan would reduce an adverse effect to no effect or no adverse effect.

(C) The proposed use shall be prohibited when acceptable mitigation measures fail to reduce an adverse effect to no effect or no adverse effect.

(6) Cultural Resources Discovered After Construction Begins. The following procedures shall be effected when cultural resources are discovered during construction activities. All survey and evaluation reports and mitigation plans shall be submitted to the Development Review Officer and the State Historic Preservation Officer. Indian tribal governments also shall receive a copy of all reports and plans if the cultural resources are prehistoric or otherwise associated with Native Americans.

(a) Halt of Construction. All construction activities within 100 feet of the discovered cultural resource shall cease. The cultural resources shall remain as found; further disturbance is prohibited.

(b) Notification. The project applicant shall notify the Development Review Officer within 24 hours of the discovery. If the cultural resources are prehistoric or otherwise associated with Native Americans, the project applicant shall also notify the Indian tribal governments within 24 hours.

(c) Survey and Evaluation. The Gorge Commission shall survey the cultural resources after obtaining written permission from the landowner and appropriate permits from the State Historic Preservation Officer. (See Oregon Revised Statute (ORS) 273.705, ORS 358.905 to ORS 358.955, and Revised Code of Washington (RCW) 27.53). It shall gather enough information to evaluate the significance of the cultural resources. The survey and evaluation shall be documented in a report that generally follows the guidelines in "Reconnaissance Survey Reports for Large-Scale Uses" (Commission Rule 350-080-0540(1)(c)(G)) and "Evaluation of Significance: Evaluation Criteria and Information Needs" (Commission Rule 350-080-0540(3)(a)).

(A) Based on the survey and evaluation report and any written comments, the Development Review Officer shall make a final decision on whether the resources are significant. Construction activities may recommence if the cultural resources are not significant.

(B) A mitigation plan shall be prepared if the affected cultural resources are significant.

(d) Mitigation Plan. Mitigation plans shall be prepared according to the information, consultation, and report guidelines contained in the "Mitigation Plans: Mitigation Plan Criteria and Information Needs" section of this chapter. Construction activities may recommence when the conditions in the mitigation plan have been executed.

(7) Discovery of Human Remains. The following procedures shall be effected when human remains are discovered during a cultural resource survey or during construction. Human remains means articulated or disarticulated human skeletal remains, bones, or teeth, with or without attendant burial artifacts.

(a) Halt of Activities. All survey, excavation, and construction activities shall cease. The human remains shall not be disturbed any further.

(b) Notification. Local law enforcement officials, the Development Review Officer, the Gorge Commission, and the Indian tribal governments shall be contacted immediately.

(c) Inspection. The county coroner, or appropriate official, shall inspect the remains at the project site and determine if they are prehistoric/historic or modern. Representatives from the Indian tribal governments shall have an opportunity to monitor the inspection.

(d) Jurisdiction. If the remains are modern, the appropriate law enforcement officials shall assume jurisdiction and the cultural resource protection process may conclude.

(e) Treatment. In Oregon, prehistoric/historic remains of Native Americans shall generally be treated in accordance with the procedures set forth in ORS 97.740 to 97.760. In Washington, the procedures set forth in RCW 27.44 and 68.05 shall generally be implemented if the remains are prehistoric/historic. (continued)