340-141-0001

Purpose and Applicability

(1) The purpose of these rules is to establish:

(a) Fees for covered vessels and facilities;

(b) Contingency preparedness and planning standards for covered vessels and facilities needing approved plans before operating in Oregon; and

(c) Standards for preparation, management and maintenance of contingency plans.

(2) Applicability:

(a) The owner or operator of an onshore facility, offshore facility and covered vessel must prepare, submit and use oil spill prevention and emergency response plans in accordance with the requirements of this Division. Federal plans required under 33 CFR 154, 40 CFR 109, 40 CFR 110, or the Federal Oil Pollution Act of 1990 or plans required by other states may be submitted to satisfy plan requirements under this Division, if the Department deems that such federal or state requirements equal or exceed those of the Department.

[Publications: Publications referenced are available from the agency.]

Stat. Auth.: ORS 468.020, ORS 468B.345 - ORS 468B.405
Stats. Implemented: ORS 468B.300 - ORS 468B.500
Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03

340-141-0005

Definitions as used in this Division

(1) "Average Most Probable" spill, release or discharge means the probable volume of oil that may spill as defined in a plan considering the history of spills from similar facilities or vessels of the same class operating on the west coast of the United States. It may also be defined as the lesser of one percent of the worst case spill, release or discharge, or 50 barrels, when used as a planning volume.

(2) "Best Achievable Protection" means the highest level of protection that can be achieved through the use of the best achievable technology and those staffing levels, training procedures and operational methods that provide the greatest degree of protection available considering:

(a) The additional protection provided by the measures;

(b) The technological feasibility of the measures; and

(c) The cost of the measures.

(3) "Best Achievable Technology" means the technology that provides the greatest degree of protection, taking into consideration processes that are currently in use, processes that have been developed or processes that could feasibly be developed with reasonable expenditures on research and development. In determining what is best achievable technology, the Director will consider the effectiveness, engineering feasibility and commercial availability of the technology.

(4) "Bulk" means material that is stored or transported in a loose, unpackaged liquid, powder or granular form capable of being conveyed by a pipe, bucket, chute or belt system.

(5) "Cargo vessel" means a self-propelled ship in commerce, other than a tank vessel of 300 or more gross tons. "Cargo vessel" does not include a vessel used solely for commercial fish harvesting.

(6) "Columbia River" means the length of the Columbia River from where it enters the State of Oregon from the State of Washington to the point where it leaves the state at river mile zero at the Pacific Ocean.

(7) "Commercial Fish Harvesting" means taking food fish with any gear unlawful for angling under ORS 506.006, taking food fish in excess of the limits permitted for personal use, or taking food fish with the intent of disposing of such food fish or parts thereof for profit, or by sale, barter or trade, in commercial channels.

(8) "Commission" means the Environmental Quality Commission.

(9) "Contingency Plan" or "Plan" means an oil spill prevention and emergency response plan required under ORS 468B.345.

(10) "Contract or other approved means" in a response or a plan means:

(a) A written contract between a covered vessel or facility owner or operator and an oil spill removal organization that identifies and ensures the availability of specified personnel and equipment within stipulated response times in specified oil spill response Zones;

(b) Certification by the vessel or facility owner or operator that specified personnel and equipment are owned, operated or under the direct control of the vessel or facility owner or operator and are available within stipulated response times in specified oil spill response Zones;

(c) Active membership in a local or regional oil spill removal organization that has identified specified personnel and equipment that are available to respond to an oil spill within stipulated response times in specified oil spill response Zones; or

(d) A written document that:

(A) Identifies personnel, equipment and services capable of being provided by the oil spill removal organization within stipulated response times in specified oil spill response Zones;

(B) Acknowledges that the oil spill removal organization intends to commit the identified resources in the event of an oil spill;

(C) Permits the commission to verify the availability of the identified oil spill removal resources through tests, inspections and exercises; and

(D) Is referenced in an oil spill contingency plan for the vessel or facility.

(11) "Covered vessel" means a tank vessel, self-propelled tank vessel, cargo vessel or passenger vessel.

(12) "Dedicated response vessel" means a vessel that limits service exclusively to recovering and transporting spilled oil, tanker escorting, deploying oil spill response equipment, supplies and personnel, spill response-related training, testing, exercises and research or other oil spill removal and related activities.

(13) "Department" means the Department of Environmental Quality.

(14) "Director" means the Director of the Department of Environmental Quality.

(15) "Discharge" means any emission other than natural seepage of oil, whether intentional or unintentional. "Discharge" includes but is not limited to spilling, leaking, pumping, pouring, emitting, emptying or dumping oil.

(16) "Drill" means the simulated performance of a spill response or task predicted in a plan.

(17) "Effective Daily Recovery Capacity" or "EDRC" means the factor used to estimate limitations on equipment efficiency from variables such as sea state, current velocity or visibility.

(18) "Field Document" means a simplified response plan for onsite use in the event of a spill, summarizing key notification and action elements.

(19) "Facility" means a pipeline or any structure, group of structures, equipment or device, other than a vessel located on or near navigable waters of a state, that is used for producing, storing, handling, transferring, processing or transporting oil in bulk and that is capable of storing or transporting 10,000 or more gallons of oil per day. "Facility" does not include:

(a) A railroad car, motor vehicle or other rolling stock while transporting oil over the highways or rail lines of this state;

(b) An underground storage tank regulated by the Department of Environmental Quality or a local government under ORS 466.706 - 466.882 and 466.994; or

(c) Any structure, group of structures, equipment or device, other than a vessel located on or near navigable waters of a state, that is used for producing, storing, handling, transferring, processing or transporting 10,000 gallons or more of oil per day but does not receive oil from tank vessels, barges or pipelines.

(20) "Initial assessment" is a task assigned to first responders who are participating with the Department in a Unified Command or Incident Command System, and includes the following tasks:

(a) Verifying the spill location;

(b) Establishing the type of incident based on products and conditions;

(c) Confirming or correcting the reported quantity released or area extent of the contamination;

(d) Reporting the efficacy of the initial containment;

(e) Projecting immediate resource needs to control the release; and

(f) Reporting local knowledge about the probable impacts of the release.

(21) "Interim Storage Site" means a site used to temporarily store recovered oil or oily waste until the recovered oil or oily waste is disposed of at a permanent disposal site. Interim storage sites include trucks, barges and other vehicles used to store recovered oil or oily waste until transport begins.

(22) "Maritime Association" means an association or cooperative of marine terminals, facilities, vessel owners, vessel operators, vessel agents or other maritime industry groups that provides oil spill response planning and spill related communications services within the state.

(23) "Maximum Extent Practicable" means the highest level of effectiveness that can be achieved through staffing levels, training procedures and best achievable technology considering the effectiveness, engineering feasibility, commercial availability, safety and cost of the measures.

(24) "National Incident Management System" or "NIMS", as established by the Homeland Security Presidential Directive 5 of February 28, 2003 is a consistent nationwide template to enable Federal, State, local and tribal governments and private-sector and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to and recover from domestic incidents, regardless of cause, size or complexity, including acts of catastrophic terrorism.

(25) "Navigable Waters" means the Columbia River, the Willamette River up to Willamette Falls, the Pacific Ocean and estuaries to the head of tide water.

(26) "Non-Persistent Oil" means those petroleum products with physical characteristics less dense than persistent oils, also referred to as Group I petroleum products.

(27) "Northwest Area Contingency Plan" means the regional emergency response plan developed in accordance with federal requirements and adopted as an annex to the State of Oregon all hazard plan as required by ORS 466.620.

(28) "Offshore Facility" means any facility located in, on or under any of the navigable waters of the state.

(29) "Oil" or "Oils" means oil including gasoline, crude oil, fuel oil, diesel oil, lubricating oil, oil sludge, oil refuse, and any other petroleum-related product.

(30) "Oil Spill Contingency Response Planning Standards" means the Department's standards for reviewing oil spill contingency plans. The planning standards represent the Department's best general estimate of types and quantities of personnel and equipment required to ensure adequate response to any location.

(31) "Oil Spill Response Planning Zones" are geographic areas of the State for which the Department has established minimum planning standards. The Oil Spill Planning Zones are as follows:

(a) "Columbia River Zone" includes the Columbia River from where it enters the State of Oregon from the State of Washington to the point where it leaves the state at river mile zero at the Pacific Ocean, and extending 25 miles inland adjacent to the waterway. It is divided into four sub-Zones:

(A) "Columbia River, Upper River sub-Zone" means the Columbia River from the point where it enters Oregon from the State of Washington to the Bonneville Dam;

(B) "Columbia River, Portland sub-Zone" means the Willamette River below Willamette Falls, and the Columbia River between the Bonneville Dam and river mile 85 at St. Helens;

(C) "Columbia River, Rainier sub-Zone" means the Columbia River between river mile 85 at St. Helens and river mile 40 at Bugby Hole; and

(D) "Columbia River, Astoria sub-Zone" means the Columbia River between river mile 40 at Bugby Hole and river mile zero at the Pacific Ocean.

(b) "Coastal Bays Zone" means all ports on the Oregon coast where covered vessels make calls and extending inland 25 miles;

(c) "Open Ocean Zone" is the Pacific Ocean from the mark of average high tide out to the three mile limit of Oregon's authority; and

(d) "Inland Zone" means areas of Oregon where oil spill risks can be reduced through planning and contingency strategies, and not included in another listed Planning Zone.

(32) "Oily Waste" means oil contaminated waste resulting from an oil spill or oil spill response operations.

(33) "Onshore Facility" means any facility, located in, on or under any land of the state, other than submerged land, that, because of its location, could reasonably be expected to cause substantial harm to the environment by discharging oil into or on the navigable waters of the state or adjoining shorelines.

(34) "Owner or Operator" means:

(a) In the case of an onshore or offshore facility, any person owning or operating the facility.

(b) In the case of a vessel, any person owning, operating or chartering by demise, the vessel.

(c) In the case of an abandoned onshore or offshore facility, or vessel, the person who owned or operated the facility or vessel immediately before its abandonment.

(35) "Passenger vessel" means a ship of 300 or more gross tons carrying passengers for compensation.

(36) "Persistent Oil" means those petroleum products with environmental degradation resistance or viscosity characteristics equal to and greater than fuel oil having a specific gravity of more than 0.8, also referred to as Group II and higher petroleum products.

(37) "Person" includes individuals, corporations, associations, firms, partnerships, joint stock companies, public and municipal corporations, political subdivisions, the state and any agencies thereof, and the federal government and any agencies thereof.

(38) "Person Having Control Over Oil" includes, but is not limited to, any person using, storing or transporting oil immediately prior to entry of such oil into the navigable waters of the state, and specifically includes carriers and bailees of such oil.

(39) "Pipeline" means a facility, including piping, compressors, pump stations and storage tanks used to transport oil between facilities or between facilities and tank vessels.

(40) "Primary Response Contractor" means a response contractor that is identified in a required plan and is committed to the plan holder by contract or other approved means.

(41) "Region of Operation" with respect to the holder of a contingency plan means the area where the operations that require a contingency plan are located.

(42) "Resident" means that the resource is kept ready for use at an address within the planning Zone (or sub-Zone if planning standards specify) in which the facility or vessel is located.

(43) "Response Contractor" means an individual, organization, association, or cooperative that provides or intends to provide equipment, personnel for oil spill containment, cleanup or removal activities.

(44) "Self-propelled tank vessel" means a tank vessel that is capable of moving under its own power.

(45) "Ship" means any boat, ship, vessel, barge or other floating craft of any kind.

(46) "Spill or release" means the discharge, deposit, injection, dumping, spilling, emitting, releasing, leaking or placing of any oil or hazardous material into the air or into or on any land or waters of the state, as defined in ORS 468B.005, except as authorized by a permit issued under ORS chapter 454, 459, 459A, 468, 468A, 468B or 469, 466.005 to 466.385, 466.990(1) and (2) or 466.992 or federal law or while being stored or used for its intended purpose.

(47) "Tank vessel" means a ship that is constructed or adapted to carry, or that carries, oil in bulk as cargo or cargo residue. "Tank vessel" does not include:

(a) A vessel carrying oil in drums, barrels or other packages;

(b) A vessel carrying oil as fuel or stores for that vessel; or

(c) An oil spill response barge or vessel.

(48) "Trip" means travel to the appointed destination and return travel to the point of origin within the navigable waters of the State of Oregon.

(49) "Waters of the State" includes lakes, bays, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Pacific Ocean within the territorial limits of the State of Oregon and all other bodies of surface or underground waters, natural or artificial, inland or coastal, fresh or salt, public or private (except those private waters which do not combine or effect a junction with natural surface or underground waters), which are wholly or partially within or bordering the state or within its jurisdiction.

(50) "Worst case spill" means:

(a) In the case of a vessel, a spill of the entire cargo and fuel of the tank vessel complicated by adverse weather conditions.

(b) In the case of an onshore or offshore facility, the largest foreseeable spill in adverse weather conditions.

Stat. Auth.: ORS 468.020 & 468B.345 - 468B.405
Stats. Implemented: ORS 468B.300 - 468B.500
Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03; DEQ 8-2005, f. & cert. ef. 7-14-05

340-141-0010

Program Administration and Compliance Fees

(1) All offshore and onshore facilities required to develop oil spill prevention and emergency response plans under ORS 468B.345 will be assessed an annual fee of $4,500. The fee is due in July, and covers the 12 month period commencing July 1.

(2) Covered vessels and facilities are subject to the following fees:

(a) Self-propelled tank vessels of more than 300 gross tons: $836 per trip;

(b) Self-propelled tank vessels of 300 gross tons or less: $42 per trip;

(c) Tank vessels and barges that are not self-propelled: $42 per trip; and

(d) Cargo vessels: $48 per trip.

(3) Fees assessed under section (2) must be remitted to the Department within 30 days of the conclusion of each trip.

(4) Moneys collected under this rule will be deposited in the State Treasury to the credit of the Oil Spill Prevention Fund established by ORS 468B.410.

Stat. Auth.: ORS 468.020 & 468B.345 - 468B.500
Stats. Implemented: ORS 468B.405
Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03; DEQ 8-2005, f. & cert. ef. 7-14-05

340-141-0100

Plan Preparation

(1) The owner or operator of each onshore and offshore facility handling or storing 10,000 gallons of oil or more per day and of each covered vessel must prepare a contingency plan for the prevention, containment and cleanup of oil spills from the facility or vessel into the navigable waters of the state, and for the protection of fisheries and wildlife, other natural resources and public or private property from such spills.

(2) Plans must be in a form usable for oil spill prevention, control, containment, cleanup and disposal operations and must be capable of being located as required by OAR 340-141-0210(1) and (2).

(3) Plans must be thorough and contain enough information, analyses, supporting data and documentation to demonstrate the plan holder's ability to meet the requirements of this Division.

(4) Plans must be designed to promptly and properly remove oil and minimize environmental damage to the maximum extent practicable. They must cover a variety of spill sizes, including average most probable spills and worst case spills. At a minimum, plans must meet the plan content criteria specified in OAR 340-141-0140 and meet the planning standards in 340-141-0150.

Stat. Auth.: ORS 468.020, ORS 468B.395
Stats. Implemented: ORS 468B.355
Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03

340-141-0130

Plan Format Requirements

(1) Plans must be prepared using a combination of narrative and graphic formats that provide both detailed spill response information and quick access to general information needed during an emergency response.

(2) Plans must be divided into a system of chapters and appendices. Chapters and appendices must be numbered. Chapters should be reserved primarily for information on emergency response and cleanup operations, such as notification procedures or description of the spill response organization structure. Appendices should be used primarily for supplemental background information and documentation such as response strategies or descriptions of drills and exercises. The spill prevention strategies may be part of the appendices.

(3) A system of index tabs must be used to provide easy reference to particular chapters and appendices.

(4) Plans must be formatted to allow replacement of revised pages and components without requiring replacement of the entire plan.

(5) Plans must include a simplified field document that summarizes key notification and action elements of the plan and is suitable for onsite use in the event of a spill.

(6) Plans may be submitted and updated electronically if all required plan components are in a form the Department can easily access. The Department will determine which types of electronic media are acceptable for the plan submittal.

(7) Composite plans that rely on standard documents the Department already has on file may incorporate those documents by reference.

Stat. Auth.: ORS 468.020, ORS 468B.395
Stats. Implemented: ORS 468B.345 - ORS 468B.390
Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03

340-141-0140

Plan Content Requirements

(1) Submittal Agreement. Each plan must contain a submittal agreement that:

(a) Includes the name, address and phone number of the submitting party;

(b) Verifies acceptance of the plan, including any incorporated contingency plans, by the owner or operator of the facility or covered vessel by either signature of the owner or operator or a person with authority to bind the corporation that owns or operates the facility or covered vessel;

(c) Commits to execution of the plan, including any incorporated contingency plans, by the owner or operator of the facility or covered vessel, and verifies authority for the plan holder to make appropriate expenditures in order to execute plan provisions; and

(d) Includes:

(A) In the case of a facility, the name, location including latitude, longitude and river mile, and address of the facility, type of facility, starting date of operations, types of oils (see definition of oil) handled, volume of oil stored and maximum volume of oil capable of being stored.

(B) In the case of a covered vessel, the vessel's name, the name, location and address of the owner or operator, official identification code or call sign, country of registry, common ports of call in Oregon, type of oils (see definition of oil) handled, volume of oil transported as fuel and expected period of operation in state waters.

(C) In the case of a covered vessel enrolled in a cooperative or maritime association plan, the vessel may provide evidence of coverage in lieu of paragraph (B) of this subsection.

(2) Amendments. Each plan must include a log sheet to record amendments to the plan. The log sheet must be placed at the front of the plan. The log sheet must provide for a record of the section amended, the date that the old section was replaced with the amended section, verification that the Department was notified of the amendment pursuant to OAR 340-141-0220(3) and the initials of the individual making the change. A description of the amendment and its purpose must also be included in the log sheet, or filed in the form of an amendment letter immediately after the log sheet.

(3) Table of Contents. Each plan must include a detailed table of contents based on chapter, section, appendix numbers and titles and tables and figures. If the plan is an integrated plan used to also satisfy USCG and USEPA requirements, a cross reference must be included.

(4) Purpose and Scope. Each plan must describe the purpose and scope of that plan, including:

(a) The region of operation covered by the plan;

(b) The onshore facility, offshore facility or covered vessel operations covered by the plan; and

(c) The size and type of the average most probable spill and the worst case spill from the facility or covered vessel.

(5) Updates. Each plan must describe the events or time periods that will trigger updates of the plan.

(6) Implementation Strategy. Each plan must present a strategy for ensuring use of the plan for spill response and cleanup operations as required by OAR 340-141-0210.

(7) Spill Response System. Each plan must describe the organization of the spill response system, including all task assignments anticipated by the end of the first full operational period, or necessary to manage the resources required by the 12 hour planning standard, given a response to an Average Most Probable Discharge. Plans must use a National Incident Management System (NIMS) incident management system, as described in the Northwest Area Contingency Plan (NWACP).

(8) Contractor Identification. Each plan must identify the primary response contractor and subcontractors (except equipment rentals or supply vendors) whose services are bound to the plan by a contract or other approved means:

(a) If a plan holder is a member of an oil spill response cooperative and relies on that cooperative to perform or supplement its response operations within the regions of operations covered by the plan, the plan must state the cooperative's name, address, phone number and response capability. The plan must also include proof of cooperative membership; or

(b) If a plan holder is not a member of an oil spill response cooperative, for each contractor, the plan must state that contractor's name, address, phone number or other means of contact at any time of the day, and response capability (e.g., land spills only). For each contractor, the plan must include a letter of intent signed by the contractor which indicates the contractor's commitment to respond within the specified time period, with personnel and equipment listed in (12) and (13) of this section. Copies of written contracts or agreements with contractors must be available for inspection, if requested by the Department.

(9) Relationship to Other Plans. Each plan must briefly describe its relation to all applicable local, state, regional and federal government spill response plans. The plan must describe how the plan holder's response organization will be integrated into the Northwest Area Contingency Plan.

(10) Spill Detection. Each plan must list procedures that will be used to detect and document the presence and size of a spill, including methods which are effective during low visibility conditions. The plan must also describe the use of mechanical or electronic monitoring or alarm systems (including threshold sensitivities) used to detect oil discharges into adjacent land or water from tanks, pipes, manifolds and other transfer or storage equipment.

(11) Notifications. Each plan must describe procedures that will be taken to immediately notify appropriate parties that a spill has occurred.

(a) The plan holder must maintain a notification call out list that must be available for inspection upon the request of the Department, and that:

(A) Provides a contact at any time of the day for all spill response personnel identified under section (7) of this rule, including the contact's name, position title, phone number or other means of contact for any time of the day, and an alternate contact in the event the individual is unavailable;

(B) Lists the name and phone number of all government agencies that must be notified in the event of an oil spill pursuant to requirements under ORS 466.635; and

(C) Establishes a clear order of priority for immediate notifications.

(b) The plan must identify a central reporting office or individual who is responsible for implementing the call out process.

(12) Response Personnel. Each plan must describe the personnel, including contract personnel available, to respond to an oil spill, including:

(a) A job description for each type of spill response position needed as indicated in the spill response organization scheme addressed in section (7) of this rule, or a reference to a recognized NIMS position;

(b) The number of personnel available to perform the duties of each type of spill response position;

(A) This number must be equal to or greater than the number of persons necessary to sustain a response to the worst case spill defined in the plan.

(B) If 24 hour operations are expected, the number of persons available to staff the ICS must be multiplied by the proposed number of operational periods (shifts).

(c) Arrangements for pre-positioning personnel at strategic locations that will meet criteria pursuant to OAR 340-141-0190(3)(d); and

(d) The type and frequency of spill response operations and safety training that each individual in a spill response position receives to attain the level of qualification demanded by their job description.

(13) Equipment and spill response resources. Each plan must describe equipment and spill resources as follows:

(a) Each plan must list all resident equipment and resident dedicated response vessels used for oil containment, recovery, removal, shoreline and adjacent lands cleanup and wildlife rescue and rehabilitation. Each plan must also list all relied upon communication tools. The Department will accept information about equipment by reference if the equipment is being provided through a primary response contractor as part of the plan. The Department may request information about the condition and date of manufacture of any listed and referenced equipment to further evaluate its applicability to the planning standards or a response.

(b) For resident equipment and vessels listed under subsection (a) of this section that are not owned by or available exclusively to the plan holder, the plan must also estimate the extent that other contingency plans rely on the same equipment.

(c) For all resident oil containment and recovery equipment, the plan also must include equipment make and model, the manufacturer's nameplate capacity of the response equipment, the EDRC (in barrels per day) and applicable design limits (e.g., maximum wave height capability, suitability for inland waters or open ocean).

(d) Based on information described in subsection (c) of this section, the plan must state the maximum amount of oil that could be recovered per 24-hour period with the equipment used as it is designed.

(e) For purposes of determining plan adequacy under OAR 340-141-0190, and to assess realistic capabilities based on potential limitations by weather, sea state, and other variables, the Department will use the data presented in subsections (c) and (d) of this section to apply a higher efficiency factor for equipment listed in a plan if that plan holder provides adequate evidence that the higher efficiency factor is warranted for particular equipment or if the United States Coast Guard has approved a higher efficiency rating.

(f) The plan must provide arrangements for pre-positioning of oil spill response equipment at strategic locations that will meet response time criteria pursuant to OAR 340-141-0190(3)(d).

(g) When calculating the delivery time of equipment to a spill staging area, the plan must use travel speeds consistent with federal speed predictions for the equipment being moved.

(14) Communications. Each plan must describe the communication systems used for spill notification and response operations, including:

(a) Communication procedures that identify who will be responsible for the function, to whom and from whom communication will be established and any special instructions;

(b) The communication function (e.g., ground-to-air) assigned to each channel or frequency used;

(c) The maximum geographic range for each type of communications equipment used; and

(d) The communication system compatibility with key spill response agencies.

(15) Response Operation Sites. Each plan must describe the process used by the plan holder to establish sites needed for spill response operations, including location or location selection criteria for an incident command post, a communications center if located away from the command post and equipment and personnel staging areas.

(16) Response Flow Chart or Timeline. Each plan must describe the response process by:

(a) Presenting a flowchart or decision tree describing the procession of each major stage of spill response operations from spill discovery to completion of cleanup. The flowchart or decision tree must describe the general order and priority in which key spill response activities are performed; and

(b) Describing all key spill response operations in checklist forms, to be used by spill response managers in the event of an oil spill.

(17) Authorities. Each plan must describe responsible authorities by:

(a) Listing the local, state and other government authorities responsible for the emergency procedures peripheral to spill containment and cleanup; and

(b) Describing the plan holder's role in these emergency operation procedures before the proper authorities arrive, including but not limited to, control of fires and explosions, rescue activities, access restriction to the spill impact area and site security.

(18) Damage Control. Each plan must describe equipment and procedures to be used by the facility or covered vessel personnel to minimize the magnitude of the spill and minimize structural damage that could increase the quantity of oil spilled.

(a) For facilities, damage control procedures must include methods to slow or stop pipeline, storage tank, and other leaks, and methods to achieve immediate emergency shutdown.

(b) For tank vessels, damage control procedures must include methods and onboard equipment to achieve vessel stability and prevent further vessel damage, slow or stop pipe, tank, and other leaks and achieve emergency shutdown during oil transfer.

(c) For other covered vessels, damage control procedures must address methods to achieve vessel stability and slow or stop leaks from fuel tanks and lines.

(19) Containment. Each plan must describe, in detail, any nonstandard methods specific to the plan to contain spilled oil and recover it from the environment. When a plan calls for the use of methods that have not been expressly approved by the Department, the description of the proposed options must include:

(a) The surveillance methods expected to be used to detect and track the extent and movement of the spill; and

(b) A description of methods to be used to contain and remove oil that will be effective for environmentally sensitive locations included in the Zone, or Zones, for which the plan is written.

(20) Response Time. Each plan must briefly describe initial equipment and personnel deployment activities that will accomplish the response standard listed in OAR 340-141-0190(e)(d) and provide:

(a) An estimate of the actual execution time;

(b) The specific location in the Zone where the resident required response equipment is stored; and

(c) The source and management of personnel to deploy the initial response equipment.

(21) Chemical Agents. If the plan holder proposes to use dispersants, coagulants, bioremediants or other chemical agents for response operations under certain conditions, the plan must describe:

(a) Type and toxicity of chemicals, supplemented with material safety data sheets (MSDS) for each product;

(b) The conditions under which the chemicals will be applied, in conformance with all applicable local, state and federal requirements, including the Northwest Area Contingency plan and OAR 340-141-0020;

(c) Methods of deployment; and

(d) Location and accessibility of supplies and deployment equipment.

(22) In Situ-Burning. If the plan holder proposes to use in-situ burning for response operations, the plan must describe:

(a) Type of burning operations;

(b) Conditions under which burning will be applied in conformance with all applicable local, state and federal requirements, including the Northwest Area Contingency plan and OAR 340-264-0030 to 0040;

(c) Methods of application; and

(d) Location and accessibility of supplies and deployment equipment.

(23) Environmental Protection. Each plan must describe how environmental protection will be achieved, including:

(a) Protection of sensitive shoreline and island habitat by diverting or blocking oil movement;

(b) Priorities for sensitive area protection in the region of operation covered by the plan as provided in a Geographic Response Strategy of the Northwest Area Contingency Plan, or designated by the Department;

(c) Rescue and rehabilitation of birds, marine mammals and other wildlife contaminated or otherwise affected by the oil spill; and

(d) Measures taken to reduce damages to the environment caused by shoreline and adjacent land cleanup operations.

(24) Interim Storage. Each plan that has identified that oil will be recovered must plan for the storage of the oil and combined oily waste material potentially created.

(a) Each plan must describe site criteria and methods used for interim storage of oil recovered and oily wastes generated during response and cleanup operations, including sites available within the facility. Interim storage methods and sites must be designed to prevent contamination of the storage area by recovered oil and oily wastes.

(b) If use of interim storage sites will require approval by local, state or federal officials, the plan must include information that could expedite the approval process, including a list of appropriate contacts and a brief description of procedures to follow for each applicable approval process.

(c) Interim storage and permanent disposal methods and sites must be sufficient to sustain support for oil recovery operations and manage the entire volume of oil recovered and oily wastes generated.

(d) Interim storage and permanent disposal methods and sites must comply with all applicable local, state and federal requirements.

(25) Health and Safety. Each plan must describe procedures to protect the health and safety of oil spill response workers, and other individuals on-site. Provisions for training, decontamination facilities, safety gear and a safety officer position must be addressed.

(26) Post Spill Review. Each plan must explain post-spill review procedures, including methods to review both the effectiveness of the plan and the need for plan amendments. Post-spill procedures must provide for a debriefing with the Department that will include any newly recognized need to amend the plan and list of any other lessons learned.

(27) Drills and Exercises. All approved plans must be verified by drills and exercises. Each plan must describe the schedule and type of drills and other exercises that will be practiced to ensure readiness of the plan elements, including drills that satisfy OAR 340-141-0200 (3).

(a) The plan holder must test and document internal call out procedures at least once every 90 calendar days. The plan holder must retain records of these drills for at least three years and make them available for Department review upon request.

(b) The plan holder must notify the Department of drills and exercises, at least 60 days before full deployment and tabletop drills, and 10 days prior to equipment exercises. Prior notice to the Department is not required before notification drills and internal phone number verification exercises.

(c) The plan holder must send post drill reports for all tabletop exercises or deployment drills to the Department no later than 60 days after the completion of the drill or exercise. The executive summary from a National Preparedness for Response Exercise Program (N-PREP) report may be submitted to meet this requirement when the exercise has been designed by the N-PREP staff.

(28) Risk Variables. Each plan must list the spill risk variables within the region of operation covered by the plan, including:

(a) Each plan for a facility must list the following:

(A) Types, physical properties and amounts of oil handled;

(B) A written description and map indicating site topography, stormwater and other drainage systems, mooring areas, pipelines, tanks, and other oil processing, storage and transfer sites and operations;

(C) A written description of sites or operations with a history of or high potential for oil spills, including key areas that pose significant navigation risk within the region of operation covered by the plan; and

(D) Methods to reduce spills during transfer operations, including overfill prevention.

(b) Each plan for a covered vessel must list the following:

(A) Types, physical properties and amounts of oil handled;

(B) A written description and diagram showing cargo, fuel and ballast tanks; and piping, power plants and other oil storage and transfer sites and operations; and

(C) A written description of operations with a history of or high potential for oil spills, including key areas that pose significant navigation risks within the region of operation covered by the plan.

(29) Environmental Variables. Each plan must list the environmental variables within the region of operation covered by the plan. Facility plans required to include river or coastal areas must identify the environmental variables from the probable point of release to the point the oil could travel in 24 hours in a current of four knots. Vessel contingency plans must encompass the entire length of the Oregon waterway in the Zone or sub-Zone entered. All plans must describe:

(a) Natural resources, including coastal and aquatic habitat types and sensitivity by season, breeding sites, presence of state or federally listed endangered or threatened species and presence of commercial and recreational species;

(b) Public resources, including public beaches, water intakes, drinking water supplies and marinas;

(c) Seasonal hydrographic and climatic conditions; and

(d) Physical geographic features, including relative isolation of coastal regions, beach types, and other geological characteristics. Plans may reference numbered Geographic Response Plan strategies (GRPs) in the Northwest Area Contingency Plan when identifying individual environmental features.

(30) Logistical Resources. Each plan must list the logistical resources within the region of operation covered by the plan, including facilities for fire services, medical services and accommodations; and shoreline access areas, including boat launches.

(31) Response Strategy Outline. Each plan must include a statement of the intended response activities. This statement must describe how the plan resources must be applied to adequately respond during the initial phase of the response to an average most probable and worst case spill, release or discharge. The Response Strategy Outline must begin with a description of the situation to be managed, and must describe:

(a) Deployment of resources and estimates of response times;

(b) The intended result of the activity for each person listed in section (7) and (12) of this section;

(c) Command and control arrangements;

(d) Required coordination; and

(e) Probable obstacles and an estimate of oil movement during the first 72 hours.

(32) Financial Responsibility. Each plan must provide evidence that the facility or vessel is in compliance with federal financial responsibility requirements pursuant to ORS 468B.390.

(33) Technical Terms Glossary. Each plan must include a glossary of technical terms and abbreviations used in the plan.

Stat. Auth.: ORS 468.020 & 468B.395

Stats. Implemented: ORS 468B.345 - 468B.390

Hist.: DEQ 2-2003, f. & cert. ef. 1-31-03; DEQ 8-2005, f. & cert. ef. 7-14-05

340-141-0150

Oil Spill Contingency Planning Standards

(1) The purpose of this rule is to establish oil spill prevention and emergency response contingency planning standards for onshore and offshore facilities, pipelines and vessels that will, when followed:

(a) Promote the prevention of oil spills;

(b) Promote a consistent west coast approach to oil spill prevention and response;

(c) Maximize the effectiveness and timeliness of oil spill response by responsible parties and response contractors;

(d) Ensure readiness of equipment and personnel;

(e) Support coordination with state, federal and other contingency plans in particular the state plan required under ORS 468B.495 - 468B.500; and

(f) Protect Oregon waters and other natural resources from the impacts of oil spills.

(2) A plan that conforms to the Department's planning standards, or alternative planning standard approved or required by the Department as provided in subsection (2)(a) and (2)(b), may be approved if all other planning requirements in this Division are met:

(a) Plans submitted that are based on standards that differ from the Department's planning standards must be supported by a detailed analysis that fully supports the methodology proposed. Alternative planning standards proposed by a plan submitter must be consistent with regional goals, be defended by the plan writer during public review of the plan and be approved by the Department.

(b) The Department will apply the applicable planning standard when evaluating the adequacy of a plan submitted to the Department for approval, unless the planning standards do not fully reflect the unique circumstances of a particular facility or vessel. If the Department determines that the plan does not fully protect the environment despite compliance with the general planning standards, the Department will provide a detailed written explanation of its decision outlining the basis for its decision and the specific changes needed in the submitted plan.

(3) Plan writers must identify in their plans adequate resources to protect the areas potentially affected by a spill from their facility or vessel. The plan must state how the Planning Standards, including any performance standards, will be achieved. Required resources are further described in section (4)(a), (4)(b) and (4)(c) of this rule. The lands and waters of the state are divided into Zones and sub-Zones for planning purposes. Planning standards are established for each Zone and sub-Zone covered by this Division:

(a) Facilities located in a sub-Zone of the Columbia River must meet the following planning standards, except as provided in subsections (g) and (h) of this section:

(A) By 1 hour after the discovery of a spill, the facility must have deployed containment boom around the spill source. The length of boom on hand for this purpose must be at least four times the length of the largest vessel, or combined vessel lengths, potentially at that facility. The boom must be placed in the water in a location and fashion so as to contain and facilitate recovery of the greatest amount of oil from the water.

(B) By 2 hours after the discovery of a spill, responders listed in the plan must be prepared to participate in an initial assessment of the release. The amount of boom deployed and available in reserve to be deployed, if needed, must be eight times the length of the largest vessel, or combined vessel lengths, potentially at that facility.

(C) By 6 hours after the discovery of a spill, the facility must arrange for recovery of spilled oil. There must be equipment and personnel on site with the ability to recover the lesser of 12,000 barrels of oil or an amount of oil equal to 10 percent of the facility's worst case spill from the water in the next 24 hours.

(D) By 12 hours after the discovery of a spill, the facility must have 35,000 feet of boom deployed or available at the designated staging area for equipment deployment. Facilities handling only nonpersistent oils need to have 15,000 feet of boom at this time. All facilities must have the ability at or before this time to recover the lesser of 36,000 barrels of oil or 15 percent of the worst case spill volume from the water in the next 24 hours. Facilities must have the ability to assess the impact of a spill on wildlife. Responders listed in the plan must have the ability to identify shoreline impacts.

(E) By 24 hours after the discovery of a spill, the facility must have in place equipment and personnel with the ability to recover oil from the water to the lesser of 48,000 barrels of oil or 20 percent of the worst case spill volume in the next 24 hours.

(F) By 48 hours after the discovery of a spill, the facility must have in place equipment and personnel with the ability to recover oil from the water to the lesser of 60,000 barrels of oil or 25 percent of the worst case spill volume in the next 24 hours.

(b) Facilities located in the Coastal Bays Zone must meet the following planning standards:

(A) By 1 hour after the discovery of a spill, the facility must have deployed containment boom around the spill source. The length of boom on hand for this purpose must be at least four times the length of the largest vessel, or combined vessel lengths, potentially at that facility. The boom must be placed in the water in a location and fashion so as to contain and facilitate recovery of the greatest amount of oil from the water.

(B) By 2 hours after the discovery of a spill, responders listed in the plan must be prepared to participate in an initial assessment of the release. The amount of boom deployed and available in reserve to be deployed if needed must be eight times the length of the largest vessel, or combined vessel lengths, potentially at that facility.

(C) By 6 hours after the discovery of a spill, the facility must arrange for recovery of spilled oil. There must be equipment and personnel on site with the ability to recover the lesser of 12,000 barrels of oil or an amount of oil equal to 10 percent of the facility's worst case spill from the water in the next 24 hours.

(D) By 12 hours after the discovery of a spill, the facility must have 35,000 feet of boom deployed or available at the designated staging area for equipment deployment. Facilities handling only nonpersistent oils need to have 10,000 feet of boom at this time. All facilities must have the ability to recover oil at or before this time and have in place equipment and personnel with the ability to recover the lesser of 36,000 barrels of oil or 15 percent of the worst case spill volume from the water in the next 24 hours. Facilities must have the ability to assess the impact of a spill on wildlife. Responders listed in the plan must have the ability to identify shoreline impacts. (continued)