s 15152. Tiering.
(a) "Tiering" refers to using the analysis of general matters contained in a broader EIR (such as one prepared for a general plan or policy statement) with later EIRs and negative declarations on narrower projects; incorporating by reference the general discussions from the broader EIR; and concentrating the later EIR or negative declaration solely on the issues specific to the later project.
(b) Agencies are encouraged to tier the environmental analyses which they prepare for separate but related projects including general plans, zoning changes, and development projects. This approach can eliminate repetitive discussions of the same issues and focus the later EIR or negative declaration on the actual issues ripe for decision at each level of environmental review. Tiering is appropriate when the sequence of analysis is from an EIR prepared for a general plan, policy, or program to an EIR or negative declaration for another plan, policy, or program of lesser scope, or to a site-specific EIR or negative declaration. Tiering does not excuse the lead agency from adequately analyzing reasonably foreseeable significant environmental effects of the project and does not justify deferring such analysis to a later tier EIR or negative declaration. However, the level of detail contained in a first tier EIR need not be greater than that of the program, plan, policy, or ordinance being analyzed.
(c) Where a lead agency is using the tiering process in connection with an EIR for a large-scale planning approval, such as a general plan or component thereof (e.g., an area plan or community plan), the development of detailed, site-specific information may not be feasible but can be deferred, in many instances, until such time as the lead agency prepares a future environmental document in connection with a project of a more limited geographical scale, as long as deferral does not prevent adequate identification of significant effects of the planning approval at hand.
(d) Where an EIR has been prepared and certified for a program, plan, policy, or ordinance consistent with the requirements of this section, any lead agency for a later project pursuant to or consistent with the program, plan, policy, or ordinance should limit the EIR or negative declaration on the later project to effects which:
(1) Were not examined as significant effects on the environment in the prior EIR; or
(2) Are susceptible to substantial reduction or avoidance by the choice of specific revisions in the project, by the imposition of conditions, or other means.
(e) Tiering under this section shall be limited to situations where the project is consistent with the general plan and zoning of the city or county in which the project is located, except that a project requiring a rezone to achieve or maintain conformity with a general plan may be subject to tiering.
(f) A later EIR shall be required when the initial study or other analysis finds that the later project may cause significant effects on the environment that were not adequately addressed in the prior EIR. A negative declaration shall be required when the provisions of Section 15070 are met.
(1) Where a lead agency determines that a cumulative effect has been adequately addressed in the prior EIR, that effect is not treated as significant for purposes of the later EIR or negative declaration, and need not be discussed in detail.
(2) When assessing whether there is a new significant cumulative effect, the lead agency shall consider whether the incremental effects of the project would be considerable when viewed in the context of past, present, and probable future projects. At this point, the question is not whether there is a significant cumulative impact, but whether the effects of the project are cumulatively considerable. For a discussion on how to assess whether project impacts are cumulatively considerable, see Section 15064(i).
(3) Significant environmental effects have been "adequately addressed" if the lead agency determines that:
(A) they have been mitigated or avoided as a result of the prior environmental impact report and findings adopted in connection with that prior environmental report; or
(B) they have been examined at a sufficient level of detail in the prior environmental impact report to enable those effects to be mitigated or avoided by site specific revisions, the imposition of conditions, or by other means in connection with the approval of the later project.
(g) When tiering is used, the later EIRs or negative declarations shall refer to the prior EIR and state where a copy of the prior EIR may be examined. The later EIR or negative declaration should state that the lead agency is using the tiering concept and that it is being tiered with the earlier EIR.
(h) There are various types of EIRs that may be used in a tiering situation. These include, but are not limited to, the following:
(1) General plan EIR (Section 15166).
(2) Staged EIR (Section 15167).
(3) Program EIR (Section 15168).
(4) Master EIR (Section 15175).
(5) Multiple-family residential development/residential and commercial or retail mixed-use development (Section 15179.5).
(6) Redevelopment project (Section 15180).
(7) Projects consistent with community plan, general plan, or zoning (Section 15183).

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21003, 21061, 21093, 21094, 21100 and 21151, Public Resources Code; Stanislaus Natural Heritage Project, Sierra Club v. County of Stanislaus (1996) 48 Cal.App.4th 182; Al Larson Boat Shop, Inc. v. Board of Harbor Commissioners (1993) 18 Cal.App. 4th 729; and Sierra Club v. County of Sonoma (1992) 6 Cal.App. 4th 1307.





s 15153. Use of an EIR from an Earlier Project.
(a) The lead agency may employ a single EIR to describe more than one project, if such projects are essentially the same in terms of environmental impact. Further, the lead agency may use an earlier EIR prepared in connection with an earlier project to apply to a later project, if the circumstances of the projects are essentially the same.
(b) When a lead agency proposes to use an EIR from an earlier project as the EIR for a separate, later project, the lead agency shall use the following procedures:
(1) The lead agency shall review the proposed project with an initial study, using incorporation by reference if necessary, to determine whether the EIR would adequately describe:
(A) The general environmental setting of the project,
(B) The significant environmental impacts of the project, and
(C) Alternatives and mitigation measures related to each significant effect.
(2) If the lead agency believes that the EIR would meet the requirements of subdivision (1), it shall provide public review as provided in Section 15087 stating that it plans to use the previously prepared EIR as the draft EIR for this project. The notice shall include as a minimum:
(A) An identification of the project with a brief description;
(B) A statement that the agency plans to use a certain EIR prepared for a previous project as the EIR for this project;
(C) A listing of places where copies of the EIR may be examined; and
(D) A statement that the key issues involving the EIR are whether the EIR should be used for this project and whether there are any additional, reasonable alternatives or mitigation measures that should be considered as ways of avoiding or reducing the significant effects of the project.
(3) The lead agency shall prepare responses to comments received during the review period.
(4) Before approving the project, the decisionmaker in the lead agency shall:
(A) Consider the information in the EIR including comments received during the review period and responses to those comments,
(B) Decide either on its own or on a staff recommendation whether the EIR is adequate for the project at hand, and
(C) Make or require certification to be made as described in Section 15090.
(D) Make findings as provided in Sections 15091 and 15093 as necessary.
(5) After making a decision on the project, the lead agency shall file a notice of determination.
(c) An EIR prepared for an earlier project may also be used as part of an initial study to document a finding that a later project will not have a significant effect. In this situation a negative declaration will be prepared.
(d) An EIR prepared for an earlier project shall not be used as the EIR for a later project if any of the conditions described in Section 15162 would require preparation of a subsequent or supplemental EIR.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21100, 21151 and 21166, Public Resources Code.





s 15154. Projects Near Airports.
(a) When a lead agency prepares an EIR for a project within the boundaries of a comprehensive airport land use plan or, if a comprehensive airport land use plan has not been adopted for a project within two nautical miles of a public airport or public use airport, the agency shall utilize the Airport Land Use Planning Handbook published by Caltrans' Division of Aeronautics to assist in the preparation of the EIR relative to potential airport-related safety hazards and noise problems.
(b) A lead agency shall not adopt a negative declaration or mitigated negative declaration for a project described in subdivision (a) unless the lead agency considers whether the project will result in a safety hazard or noise problem for persons using the airport or for persons residing or working in the project area.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21096, Public Resources Code.





s 15160. General.
This article describes a number of examples of variations in EIRs as the documents are tailored to different situations and intended uses. These variations are not exclusive. Lead agencies may use other variations consistent with the guidelines to meet the needs of other circumstances. All EIRs must meet the content requirements discussed in Article 9 beginning with Section 15120.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21061, 21100 and 21151, Public Resources Code.





s 15161. Project EIR.
The most common type of EIR examines the environmental impacts of a specific development project. This type of EIR should focus primarily on the changes in the environment that would result from the development project. The EIR shall examine all phases of the project including planning, construction, and operation.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21061, 21100 and 21151, Public Resources Code.





s 15162. Subsequent EIRs and Negative Declarations.
(a) When an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
(2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
(3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
(B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
(b) If changes to a project or its circumstances occur or new information becomes available after adoption of a negative declaration, the lead agency shall prepare a subsequent EIR if required under subdivision (a). Otherwise the lead agency shall determine whether to prepare a subsequent negative declaration, an addendum, or no further documentation.
(c) Once a project has been approved, the lead agency's role in project approval is completed, unless further discretionary approval on that project is required. Information appearing after an approval does not require reopening of that approval. If after the project is approved, any of the conditions described in subdivision (a) occurs, a subsequent EIR or negative declaration shall only be prepared by the public agency which grants the next discretionary approval for the project, if any. In this situation no other responsible agency shall grant an approval for the project until the subsequent EIR has been certified or subsequent negative declaration adopted.
(d) A subsequent EIR or subsequent negative declaration shall be given the same notice and public review as required under Section 15087 or Section 15072. A subsequent EIR or negative declaration shall state where the previous document is available and can be reviewed.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21166, Public Resources Code; Bowman v. City of Petaluma (1986) 185 Cal.App.3d 1065; Benton v. Board of Supervisors (1991) 226 Cal.App.3d 1467; and Fort Mojave Indian Tribe v. California Department of Health Services et al. (1995) 38 Cal.App.4th 1574.





s 15163. Supplement to an EIR.
(a) The lead or responsible agency may choose to prepare a supplement to an EIR rather than a subsequent EIR if:
(1) Any of the conditions described in Section 15162 would require the preparation of a subsequent EIR, and
(2) Only minor additions or changes would be necessary to make the previous EIR adequately apply to the project in the changed situation.
(b) The supplement to the EIR need contain only the information necessary to make the previous EIR adequate for the project as revised.
(c) A supplement to an EIR shall be given the same kind of notice and public review as is given to a draft EIR under Section 15087.
(d) A supplement to an EIR may be circulated by itself without recirculating the previous draft or final EIR.
(e) When the agency decides whether to approve the project, the decision-making body shall consider the previous EIR as revised by the supplemental EIR. A finding under Section 15091 shall be made for each significant effect shown in the previous EIR as revised.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21166, Public Resources Code.





s 15164. Addendum to an EIR or Negative Declaration.
(a) The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.
(b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred.
(c) An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration.
(d) The decision-making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project.
(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency's required findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21166, Public Resources Code; Bowman v. City of Petaluma (1986) 185 Cal.App.3d 1065; and Benton v. Board of Supervisors (1991) 226 Cal.App.3d 1467.





s 15165. Multiple and Phased Projects.
Where individual projects are, or a phased project is, to be undertaken and where the total undertaking comprises a project with significant environmental effect, the lead agency shall prepare a single program EIR for the ultimate project as described in Section 15168. Where an individual project is a necessary precedent for action on a larger project, or commits the lead agency to a larger project, with significant environmental effect, an EIR must address itself to the scope of the larger project. Where one project is one of several similar projects of a public agency, but is not deemed a part of a larger undertaking or a larger project, the agency may prepare one EIR for all projects, or one for each project, but shall in either case comment upon the cumulative effect.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21061, 21100 and 21151, Public Resources Code; Whitman v. Board of Supervisors, 88 Cal. App. 3d 397 (1979).






s 15166. EIR As Part of a General Plan.
(a) The requirements for preparing an EIR on a local general plan, element, or amendment thereof will be satisfied by using the general plan, or element document, as the EIR and no separate EIR will be required, if:
(1) the general plan addresses all the points required to be in an EIR by Article 9 of these guidelines and
(2) the document contains a special section or a cover sheet identifying where the general plan document addresses each of the points required.
(b) Where an EIR rather than a negative declaration has been prepared for a general plan, element, or amendment thereto, the EIR shall be forwarded to the State Clearinghouse for review. The requirement shall apply regardless of whether the EIR is prepared as a separate document or as a part of the general plan or element document.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21003, 21061, 21083, 21100, 21104, 21151 and 21152, Public Resources Code.





s 15167. Staged EIR.
(a)Where a large capital project will require a number of discretionary approvals from government agencies and one of the approvals will occur more than two years before construction will begin, a staged EIR may be prepared covering the entire project in a general form. The staged EIR shall evaluate the proposal in light of current and contemplated plans and produce an informed estimate of the environmental consequences of the entire project. The aspect of the project before the public agency for approval shall be discussed with a greater degree of specificity.
(b) When a staged EIR has been prepared, a supplement to the EIR shall be prepared when a later approval is required for the project, and the information available at the time of the later approval would permit consideration of additional environmental impacts, mitigation measures, or reasonable alternatives to the project.
(c) Where a statute such as the Warren-Alquist Energy Resources Conservation and Development Act provides that a specific agency shall be the lead agency for a project and requires the lead agency to prepare an EIR, a responsible agency which must grant an approval for the project before the lead agency has completed the EIR may prepare and consider a staged EIR.
(d) An agency requested to prepare a staged EIR may decline to act as the lead agency if it determines, among other factors, that:
(1) Another agency would be the appropriate lead agency; and
(2) There is no compelling need to prepare a staged EIR and grant an approval for the project before the appropriate lead agency will take its action on the project.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21003, Public Resources Code.





s 15168. Program EIR.
(a) General. A program EIR is an EIR which may be prepared on a series of actions that can be characterized as one large project and are related either:
(1) Geographically,
(2) As logical parts in the chain of contemplated actions,
(3) In connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program, or
(4) As individual activities carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways.
(b) Advantages. Use of a program EIR can provide the following advantages. The program EIR can:
(1) Provide an occasion for a more exhaustive consideration of effects and alternatives than would be practical in an EIR on an individual action,
(2) Ensure consideration of cumulative impacts that might be slighted in a case-by-case analysis,
(3) Avoid duplicative reconsideration of basic policy considerations,
(4) Allow the lead agency to consider broad policy alternatives and program wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems or cumulative impacts,
(5) Allow reduction in paperwork.
(c) Use With Later Activities. Subsequent activities in the program must be examined in the light of the program EIR to determine whether an additional environmental document must be prepared.
(1) If a later activity would have effects that were not examined in the program EIR, a new initial study would need to be prepared leading to either an EIR or a negative declaration.
(2) If the agency finds that pursuant to Section 15162, no new effects could occur or no new mitigation measures would be required, the agency can approve the activity as being within the scope of the project covered by the program EIR, and no new environmental document would be required.
(3) An agency shall incorporate feasible mitigation measures and alternatives developed in the program EIR into subsequent actions in the program.
(4) Where the subsequent activities involve site specific operations, the agency should use a written checklist or similar device to document the evaluation of the site and the activity to determine whether the environmental effects of the operation were covered in the program EIR.
(5) A program EIR will be most helpful in dealing with subsequent activities if it deals with the effects of the program as specifically and comprehensively as possible. With a good and detailed analysis of the program, many subsequent activities could be found to be within the scope of the project described in the program EIR, and no further environmental documents would be required.
(d) Use With Subsequent EIRS and Negative Declarations. A program EIR can be used to simplify the task of preparing environmental documents on later parts of the program. The program EIR can:
(1) Provide the basis in an initial study for determining whether the later activity may have any significant effects.
(2) Be incorporated by reference to deal with regional influences, secondary effects, cumulative impacts, broad alternatives, and other factors that apply to the program as a whole.
(3) Focus an EIR on a subsequent project to permit discussion solely of new effects which had not been considered before.
(e) Notice With Later Activities. When a law other than CEQA requires public notice when the agency later proposes to carry out or approve an activity within the program and to rely on the program EIR for CEQA compliance, the notice for the activity shall include a statement that:
(1) This activity is within the scope of the program approved earlier, and
(2) The program EIR adequately describes the activity for the purposes of CEQA.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21003, Public Resources Code; County of Inyo v. Yorty, 32 Cal. App. 3d 795 (1973).






s 15169. Master Environmental Assessment.
(a) General. A public agency may prepare a master environmental assessment, inventory, or data base for all, or a portion of, the territory subject to its control in order to provide information which may be used or referenced in EIRs or negative declarations. Neither the content, the format, nor the procedures to be used to develop a master environmental assessment are prescribed by these guidelines. The descriptions contained in this section are advisory. A master environmental assessment is suggested solely as an approach to identify and organize environmental information for a region or area of the state.
(b) Contents. A master environmental assessment may contain an inventory of the physical and biological characteristics of the area for which it is prepared and may contain such additional data and information as the public agency determines is useful or necessary to describe environmental characteristics of the area. It may include identification of existing levels of quality and supply of air and water, capacities and levels of use of existing services and facilities, and generalized incremental effects of different categories of development projects by type, scale, and location.
(c) Preparation.
(1) A master environmental assessment or inventory may be prepared in many possible ways. For example, a master environmental assessment may be prepared as a special, comprehensive study of the area involved, as part of the EIR on a general plan, or as a data base accumulated by indexing EIRs prepared for individual projects or programs in the area involved.
(2) The information contained in a master environmental assessment should be reviewed periodically and revised as needed so that it is accurate and current.
(3) When advantageous to do so, master environmental assessments may be prepared through a joint exercise of powers agreement with neighboring local agencies or with the assistance of the appropriate Council of Governments.
(d) Uses.
(1) A master environmental assessment can identify the environmental characteristics and constraints of an area. This information can be used to influence the design and location of individual projects.
(2) A master environmental assessment may provide information agencies can use in initial studies to decide whether certain environmental effects are likely to occur and whether certain effects will be significant.
(3) A master environmental assessment can provide a central source of current information for use in preparing individual EIRs and negative declarations.
(4) Relevant portions of a master environmental assessment can be referenced and summarized in EIRs and negative declarations.
(5) A master environmental assessment can assist in identifying long range, areawide, and cumulative impacts of individual projects proposed in the area covered by the assessment.
(6) A master environmental assessment can assist a city or county in formulating a general plan or any element of such a plan by identifying environmental characteristics and constraints that need to be addressed in the general plan.
(7) A master environmental assessment can serve as a reference document to assist public agencies which review other environmental documents dealing with activities in the area covered by the assessment. The public agency preparing the assessment should forward a completed copy to each agency which will review projects in the area.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21003, Public Resources Code.





s 15170. Joint EIR-EIS.
A lead agency under CEQA may work with a federal agency to prepare a joint document which will meet the requirements of both CEQA and NEPA. Use of such a joint document is described in Article 14, beginning with Section 15220.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21083.5 and 21083.7, Public Resources Code.






s 15175. Master EIR.
(a) The Master EIR procedure is an alternative to preparing a project EIR, staged EIR, or program EIR for certain projects which will form the basis for later decision making. It is intended to streamline the later environmental review of projects or approval included within the project, plan or program analyzed in the Master EIR. Accordingly, a Master EIR shall, to the greatest extent feasible, evaluate the cumulative impacts, growth inducing impacts, and irreversible significant effects on the environment of subsequent projects.
(b) A lead agency may prepare a Master EIR for any of the following classes of projects:
(1) A general plan, general plan update, general plan element, general plan amendment, or specific plan.
(2) Public or private projects that will be carried out or approved pursuant to, or in furtherance of, a redevelopment plan.
(3) A project that consists of smaller individual projects which will be carried out in phases.
(4) A rule or regulation which will be implemented by later projects.
(5) Projects that will be carried out or approved pursuant to a development agreement.
(6) A state highway project or mass transit project which will be subject to multiple stages of review or approval.
(7) A plan proposed by a local agency, including a joint powers authority, for the reuse of a federal military base or reservation that has been closed or is proposed for closure by the federal government.
(8) A regional transportation plan or congestion management plan.
(9) Regulations adopted by the California Department of Fish and Game for the regulation of hunting and fishing.
(c) A lead agency may develop and implement a fee program in accordance with applicable provisions of law to generate the revenue necessary to prepare a Master EIR.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21156, 21157 and 21089, Public Resources Code.





s 15176. Contents of a Master EIR.
A lead agency shall include in a Master EIR all of the following:
(a) A detailed discussion as required by Section 15126.
(b) A description of anticipated subsequent projects that are within the scope of the Master EIR, including information with regard to the kind, size, intensity, and location of the subsequent projects, including, but not limited to all of the following:
(1) The specific type of project anticipated to be undertaken such as a single family development, office-commercial development, sewer line installation or other activities.
(2) The maximum and minimum intensity of any anticipated subsequent project, such as the number of residences in a residential development, and with regard to a public works facility, its anticipated capacity and service area.
(3) The anticipated location for any subsequent development projects, and, consistent with the rule of reason set forth in Section 15126.6(f), alternative locations for any such projects.
(4) A capital outlay or capital improvement program, or other scheduling or implementing device that governs the submission and approval of subsequent projects, or an explanation as to why practical planning considerations render it impractical to identify any such program or scheduling or other device at the time of preparing the Master EIR.
(c) A description of potential impacts of anticipated projects for which there is not sufficient information reasonably available to support a full assessment of potential impacts in the Master EIR. This description shall not be construed as a limitation on the impacts which may be considered in a focused EIR.
(d) Where a Master EIR is prepared in connection with a project identified in subdivision (b)(1) of section 15175, the anticipated subsequent projects included within a Master EIR may consist of later planning approvals, including parcel-specific approvals, consistent with the overall planning decision (e.g., general plan, or specific plan, or redevelopment plan) for which the Master EIR has been prepared. Such subsequent projects shall be adequately described for purposes of subdivision (b) or of this section (15176) if the Master EIR and any other documents embodying or relating to the overall planning decision identify the land use designations and the permissible densities and intensities of use for the affected parcel(s). The proponents of such subsequent projects shall not be precluded from relying on the Master EIR solely because that document did not specifically identify or list, by name, the subsequent project as ultimately proposed for approval.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21157, Public Resources Code.






s 15177. Subsequent Projects Within the Scope of the MEIR.
(a) After a Master EIR has been prepared and certified, subsequent projects which the lead agency determines as being within the scope of the Master EIR will be subject to only limited environmental review.
(b) Except as provided in subdivision (2) of this subdivision, neither a new environmental document nor the preparation of findings pursuant to section 15091 shall be required of a subsequent project when all of the following requirements are met:
(1) The lead agency for the subsequent project is the lead agency or any responsible agency identified in the Master EIR.
(2) The lead agency for the subsequent project prepares an initial study on the proposal. The initial study shall analyze whether the subsequent project was described in the Master EIR and whether the subsequent project may cause any additional significant effect on the environment which was not previously examined in the Master EIR.
(3) The lead agency for the subsequent project determines, on the basis of written findings, that no additional significant environmental effect will result from the proposal, no new additional mitigation measures or alternatives may be required, and that the project is within the scope of the Master EIR. "Additional significant environmental effect" means any project-specific effect which was not addressed as a significant effect in the Master EIR.
(c) Whether a subsequent project is within the scope of the Master EIR is a question of fact to be determined by the lead agency based upon a review of the initial study to determine whether there are additional significant effects or new additional mitigation measures or alternatives required for the subsequent project that are not already discussed in the Master EIR.
(d) Prior to approval of the proposed subsequent project, the lead agency shall incorporate all feasible mitigation measures or feasible alternatives appropriate to the project as set forth in the Master EIR and provide notice in the manner required by Section 15087.
(e) When the lead agency approves a project pursuant to this section, the lead agency shall file a notice in the manner required by Section 15075.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21157, 21157.6 and 21158, Public Resources Code.





s 15178. Subsequent Projects Identified in the MEIR.
(a) When a proposed subsequent project is identified in the Master EIR, but the lead agency cannot make a determination pursuant to Section 15177 that the subsequent project is within the scope of the Master EIR, and the lead agency determines that the cumulative impacts, growth inducing impacts and irreversible significant effects analysis in the Master EIR is adequate for the subsequent project, the lead agency shall prepare a mitigated negative declaration or a focused EIR if, after preparing an initial study, the lead agency determines that the project may result in new or additional significant effects. Whether the cumulative impacts, growth inducing impacts and irreversible significant effects analyses are adequate is a question of fact to be determined by the lead agency based upon a review of the proposed subsequent project in light of the Master EIR.
(b) A lead agency shall prepare a mitigated negative declaration for any proposed subsequent project if both of the following occur:
(1) The initial study prepared pursuant to Section 15177 has identified potentially new or additional significant environmental effects that were not analyzed in the Master EIR; and
(2) Feasible mitigation measures or alternatives will be incorporated to revise the subsequent project before the negative declaration is released for public review pursuant to Section 15073 in order to avoid or mitigate the identified effects to a level of insignificance.
(c) A lead agency shall prepare a focused EIR if the subsequent project may have a significant effect on the environment and a mitigated negative declaration pursuant to subdivision (b) of this section cannot be prepared.
(1) The focused EIR shall incorporate by reference the Master EIR and analyze only the subsequent project's additional significant environmental effects and any new or additional mitigation measures or alternatives that were not identified and analyzed by the Master EIR. "Additional significant environmental effects" are those project-specific effects on the environment which were not addressed as significant in the Master EIR.
(2) A focused EIR need not examine those effects which the lead agency, prior to public release of the focused EIR, finds, on the basis of the initial study, related documents, and commitments from the proponent of a subsequent project, have been mitigated in one of the following manners:
(A) Mitigated or avoided as a result of mitigation measures identified in the Master EIR which the lead agency will require as part of the approval of the subsequent project;
(B) Examined at a sufficient level of detail in the Master EIR to enable those significant effects to be mitigated or avoided by specific revisions to the project, the imposition of conditions of approval, or by other means in connection with approval of the subsequent project; or
(C) The mitigation or avoidance of which is the responsibility of and within the jurisdiction of another public agency and is, or can and should be, undertaken by that agency.
(3) The lead agency's findings pursuant to subdivision (2) shall be included in the focused EIR prior to public release pursuant to Section 15087.
(4) A focused EIR prepared pursuant to this section shall analyze any significant environmental effects when:
(A) Substantial new or additional information shows that the adverse environmental effect may be more significant that was described in the Master EIR; or
(B) Substantial new or additional information shows that mitigation measures or alternatives which were previously determined to be infeasible are feasible and will avoid or reduce the significant effects of the subsequent project to a level of insignificance.
(d) A lead agency shall file a notice of determination shall be filed pursuant to Section 15075 if a project has been approved for which a mitigated negative declaration has been prepared pursuant to this section and a notice of determination shall be filed pursuant to Section 15094 if a project has been approved for which a focused EIR has been prepared pursuant to this section.
(e) When a lead agency determines that the cumulative impacts, growth inducing impacts and irreversible significant effects analysis in the Master EIR is inadequate for the subsequent project, the subsequent project is no longer eligible for the limited environmental review available under the Master EIR process and shall be reviewed according to Article 7 (commencing with Section 15080) of these guidelines. The lead agency shall tier the project specific EIR upon the Master EIR to the extent feasible under Section 15152.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Sections 21081(a)(2), 21157.5 and 21158, Public Resources Code.





s 15179. Limitations on the Use of the Master EIR.
The certified Master EIR shall not be used in accordance with this article if either (i) it was certified more than five years prior to the filing of an application for a later project, or (ii) a project not identified in the certified Master EIR as an anticipated subsequent project is approved and the approved project may affect the adequacy of the Master EIR, unless the lead agency does one of the following:
(a) Reviews the Master EIR and finds that no substantial changes have occurred with respect to the circumstances under which the Master EIR was certified, or that there is no new available information which was not known and could not have been known at the time the Master EIR was certified; or
(b) Prepares a subsequent or supplemental EIR that updates or revises the Master EIR and which either (i) is incorporated into the previously certified Master EIR, or (ii) references any deletions, additions or other modifications to the previously certified Master EIR.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21157.6, Public Resources Code.





s 15179.5. Focused EIRs and Small Projects.
(a) When a project is a multiple family residential development of 100 units or less or is a residential and commercial or retail mixed-use commercial development of not more then 100,000 square feet, whether or not the project is identified in the Master EIR, a focused EIR shall be prepared pursuant to this section when the following conditions are met:
(1) The project is consistent with a general plan, specific plan, community plan, or zoning ordinance for which an EIR was prepared within five years of certification of the focused EIR; and
(2) The parcel on which the project is to be developed is either:
(A) Surrounded by immediately contiguous urban development;
(B) Previously developed with urban uses; or
(C) Within one-half mile of an existing rail transit station.
(b) A focused environmental impact report prepared pursuant to this section shall be limited to a discussion of potentially significant effects on the environment specific to the project, or which substantial new information shows will be more significant than described in the prior environmental impact report. No discussion shall be required of alternatives to the project, cumulative impacts of the project, or the growth inducing impacts of the project.
(c) This section does not apply where the lead agency can make a finding pursuant to Section 15177 that the subsequent project is within the scope of the Master EIR, where the lead agency can prepare a mitigated negative declaration or focused EIR pursuant to Section 15178, or where, pursuant to Section 15162 or Section 15163, the environmental impact report referenced in subdivision (a)(1) of this section must be updated through the preparation of a subsequent environmental impact report or a supplemental environmental impact report.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21158.5, Public Resources Code.





s 15180. Redevelopment Projects.
(a) All public and private activities or undertakings pursuant to or in furtherance of a redevelopment plan constitute a single project, which shall be deemed approved at the time of adoption of the redevelopment plan by the legislative body. The EIR in connection with the redevelopment plan shall be submitted in accordance with Section 33352 of the Health and Safety Code.
(b) An EIR on a redevelopment plan shall be treated as a program EIR with no subsequent EIRs required for individual components of the redevelopment plan unless a subsequent EIR or a supplement to an EIR would be required by Section 15162 or 15163.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21090, Public Resources Code.





s 15181. Housing and Neighborhood Commercial Facilities in Urbanized Areas.

Note: Authority cited: Sections 21083 and 21087, Public Resources Code. Reference: Section 21080.7, Public Resources Code.





s 15182. Residential Projects Pursuant to a Specific Plan.
(a) Exemption. Where a public agency has prepared an EIR on a specific plan after January 1, 1980, no EIR or negative declaration need be prepared for a residential project undertaken pursuant to and in conformity to that specific plan if the project meets the requirements of this section.
(b) Scope. Residential projects covered by this section include but are not limited to land subdivisions, zoning changes, and residential planned unit developments.
(c) Limitation. This section is subject to the limitation that if after the adoption of the specific plan, an event described in Section 15162 should occur, this exemption shall not apply until the city or county which adopted the specific plan completes a subsequent EIR or a supplement to an EIR on the specific plan. The exemption provided by this section shall again be available to residential projects after the lead agency has filed a Notice of Determination on the specific plan as reconsidered by the subsequent EIR or supplement to the EIR.
(d) Fees. The lead agency has authority to charge fees to applicants for projects which benefit from this section. The fees shall be calculated in the aggregate to defray but not to exceed the cost of developing and adopting the specific plan including the cost of preparing the EIR.
(e) Statute of Limitations. A court action challenging the approval of a project under this section for failure to prepare a supplemental EIR shall be commenced within 30 days after the lead agency's decision to carry out or approve the project in accordance with the specific plan.

Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 65453, Government Code.





s 15183. Projects Consistent with a Community Plan, General Plan, or Zoning.
(a) CEQA mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. This streamlines the review of such projects and reduces the need to prepare repetitive environmental studies.
(b) In approving a project meeting the requirements of this section, a public agency shall limit its examination of environmental effects to those which the agency determines, in an initial study or other analysis:
(1) Are peculiar to the project or the parcel on which the project would be located,
(2) Were not analyzed as significant effects in a prior EIR on the zoning action, general plan or community plan with which the project is consistent,
(3) Are potentially significant off-site impacts and cumulative impacts which were not discussed in the prior EIR prepared for the general plan, community plan or zoning action, or
(4) Are previously identified significant effects which, as a result of substantial new information which was not known at the time the EIR was certified, are determined to have a more severe adverse impact than discussed in the prior EIR.
(c) If an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards, as contemplated by subdivision (e) below, then an additional EIR need not be prepared for the project solely on the basis of that impact.
(d) This section shall apply only to projects which meet the following conditions:
(1) The project is consistent with:
(A) A community plan adopted as part of a general plan,
(B) A zoning action which zoned or designated the parcel on which the project would be located to accommodate a particular density of development, or
(C) A general plan of a local agency, and
(2) An EIR was certified by the lead agency for the zoning action, the community plan, or the general plan.
(e) This section shall limit the analysis of only those significant environmental effects for which:
(1) Each public agency with authority to mitigate any of the significant effects on the environment identified in the EIR on the planning or zoning action undertakes or requires others to undertake mitigation measures specified in the EIR which the lead agency found to be feasible, and
(2) The lead agency makes a finding at a public hearing as to whether the feasible mitigation measures will be undertaken.
(f) An effect of a project on the environment shall not be considered peculiar to the project or the parcel for the purposes of this section if uniformly applied development policies or standards have been previously adopted by the city or county with a finding that the development policies or standards will substantially mitigate that environmental effect when applied to future projects, unless substantial new information shows that the policies or standards will not substantially mitigate the environmental effect. The finding shall be based on substantial evidence which need not include an EIR. Such development policies or standards need not apply throughout the entire city or county, but can apply only within the zoning district in which the project is located, or within the area subject to the community plan on which the lead agency is relying. Moreover, such policies or standards need not be part of the general plan or any community plan, but can be found within another pertinent planning document such as a zoning ordinance. Where a city or county, in previously adopting uniformly applied development policies or standards for imposition on future projects, failed to make a finding as to whether such policies or standards would substantially mitigate the effects of future projects, the decisionmaking body of the city or county, prior to approving such a future project pursuant to this section, may hold a public hearing for the purpose of considering whether, as applied to the project, such standards or policies would substantially mitigate the effects of the project. Such a public hearing need only be held if the city or county decides to apply the standards or policies as permitted in this section. (continued)