s 3684. Administrative Record.
(a) Once the appellant has been notified that a determination has been made that an appeal is within the jurisdiction of the Board for purposes of hearing the appeal, the appellant shall submit three certified copies of the complete administrative record, which shall include, but shall not be limited to, all of the following information:
(1) A copy of the approved reclamation plan for the mining operation and any permit conditions or California Environmental Quality Act mitigations which pertain to reclamation for which the financial assurances for reclamation are proposed;
(2) A copy of the documents comprising the financial assurances or the proposed financial assurances for reclamation which were submitted to the lead agency for review and approval pursuant to Public Resources Code section 2770;
(3) Location and site description maps submitted to the lead agency as part of the reclamation plan;
(4) A detailed estimate of the cost of the reclamation, in accordance with the approved reclamation plan, of the lands remaining disturbed and/or to be disturbed by the surface mining operation in the applicable twelve (12) month period, together with a map clearly delineating the boundaries of those lands;
(5) All reports, findings, communications, correspondence and statements in the file of the lead agency relating to the financial assurances in question;
(6) Written transcripts of all public hearings related to the lead agency's review of the financial assurances.
(b) Failure of the appellant to request the administrative record from the lead agency within 21 days of receiving the notice stating the Board's acceptance of the appeal, may be deemed grounds for dismissal of the appeal.
(c) If the appellant is unable to obtain the administrative record from the lead agency within 10 working days after submission of the request for the record, the appellant shall so notify the Board in writing. The Board may then require the lead agency to immediately submit three certified copies of the administrative record to the Board for purposes of hearing the appeal without undue delay.
(d) Failure of the lead agency to produce the administrative record upon request of the Board within 30 days may be deemed grounds for Board action based on information provided solely by the appellant.
(e) Following production of the administrative record by the lead agency, failure of the appellant to produce the administrative record upon the request of the Board within 21 days may be deemed grounds for dismissal of the appeal.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Section 2770, Public Resources Code.
s 3685. Hearing Procedures - Scheduling.
The Board shall schedule and hold a public hearing on an appeal no later than 45 days from the filing of the complete administrative record, or at such time as may be mutually agreed upon by the Board and the appellant. The hearing may be scheduled as part of a regular business meeting of the Board or may be conducted by a committee of the Board.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Section 2770, Public Resources Code.
s 3686. Hearing Procedures - Authority for Delegation.
The Board may delegate conduct of the hearing to a committee of at least two Board members to be appointed for that hearing by the Chairman of the Board. The Chairman of the Board or the Chairman's designee (Board Member) shall conduct the hearing; the recommendations of the committee shall be presented to a quorum of the board at a regular business meeting for a decision of the full Board consistent with the procedures set forth in section 3690 of these regulations.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Section 2770, Public Resources Code.
s 3687. Hearing Procedures - Notice.
(a) At least 10 working days prior to the hearing, the Board shall give public notice as follows:
(1) Mailing the notice to the lead agency and to the appellant;
(2) Mailing the notice to any person who requests notice of the appeal or hearing;
(3) Mailing the notice to the Board's regular mailing list; and
(4) Posting of the notice in a place where notices are customarily placed within the jurisdiction of the lead agency.
(b) The notice of hearing shall include the following:
(1) The name of the appellant;
(2) Description of the financial assurances for reclamation, identification of the surface mining operation for which the financial assurances for reclamation were provided, a brief description of the location of the surface mining operation by reference to any commonly known landmarks in the area, and a simple location map indicating the general location of the operation;
(3) A statement of the grounds for the appeal;
(4) A statement that the Board may approve or deny approval of the financial assurances for reclamation;
(5) A statement that if the Board denies approval of the financial assurances, they shall be returned to the mine operator who shall be granted, once only, a period of 30 days, or a longer period mutually agreed upon by the operator and the Board, to correct the noted deficiencies and submit the revised financial assurances to the lead agency for review and approval;
(6) A statement inviting the appellant, the lead agency, and the public to provide testimony and evidence at the hearing regarding the action or inaction of the lead agency; and
(7) The time, date, and location of the public hearing.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Section 2770, Public Resources Code.
s 3688. Hearing Procedures - Record.
The record before the Board at the public hearing shall be the administrative record submitted pursuant to sections 3681 and 3684 of this article.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Sections 2770 and 2774, Public Resources Code.
s 3689. Hearing Procedures - Sequence.
(a) The public hearing shall normally proceed in the following manner:
(1) Identification of the record;
(2) Statements on behalf of the appellant;
(3) Statements on behalf of the lead agency;
(4) Statements on behalf of the public;
(5) Rebuttal on behalf of the appellant; and
(6) Motion to close the public hearing.
(b) Notwithstanding the above, the Chairman or the Chairman's designee (Board Member) for purposes of conducting the hearing may, in the exercise of discretion, determine the order of the proceedings.
(c) The Chairman or the Chairman's designee (Board Member) shall have the authority to impose time limits upon statements and presentations and to accept written statements in lieu of oral statements. Written statements shall be submitted to the Board at least ten days prior to the hearing.
(d) The public hearing shall be recorded.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Section 2770, Public Resources Code.
s 3690. Hearing Procedures - Determination.
Following the public hearing, the Board shall determine whether, based on the record before it, the proposed or existing financial assurances for reclamation substantially meet the applicable requirements of Public Resources Code sections 2770, 2773.1., and the lead agency surface mining ordinance adopted pursuant to subdivision (a) of section 2774. Financial assurances determined to meet these requirements shall be approved. Notification of the Board's determination shall be made by certified mail to the appellant and the lead agency within 15 days following the regular business meeting of the Board at which the decision was made. In cases where the financial assurances for reclamation are not approved, deficiencies shall be noted in the correspondence notifying the appellant and the lead agency of the Board's decision. The appellant shall be granted, once only, a period of 30 days, or a longer period mutually agreed upon by the operator and the Board, to correct the noted deficiencies and submit the revised financial assurances for reclamation to the lead agency for review and approval.
Note: Authority cited: Sections 2755 and 2770, Public Resources Code. Reference: Sections 2770 and 2774, Public Resources Code.
s 3695. Definitions.
The following definitions shall govern the interpretation of these regulations:
"Produced Minerals" means minerals extracted at the site of the mining operation, and either:
(a) sold, given or otherwise moved off the site of the operation, as defined in the approved reclamation plan, or;
(b) used on-site for production of completed products (e.g. cement, bricks, asphaltic concrete, etc.),Stockpiles of mineral products that remain on the site, as defined in the lead agency approved reclamation plan, are not produced minerals for purposes of these regulations. "Primary Mineral Commodity Produced" means the produced mineral that provides the highest dollar values sales for the operation.
"Board" means State Mining and Geology Board.
As used in Section 3697 and 3699 "Mining Company" means any entity, corporation, partnership, parent or holding company. Any subsidiaries of the above are deemed to be part of the mining company.
As used in section 3699, "Gross Income" means all income from whatever source derived as defined by, and determined in accordance with, Section 61 of the Internal Revenue Code, Title 26, U.S.C.S.
"Aggregate Products" means decomposed granite, sand and gravel, slag, or stone.
"Industrial Minerals" means borates, cinders, clay, diatomite, dolomite, gypsum, iron ore, lime, limestone, perlite, pumice, rare earth elements, saline compounds, salt, shale, silica, specialty sand, abrasives, asbestos, barite, bituminous rock, decorative rock, dimension stone, feldspar, fluorite, gemstones, graphite, kyanite, lignite, lithium, magnesite, mica, olivine, peat, phosphate, potash, pyrophyllite, quartz crystal, sea shells, sericite, sulfur, talc, vermiculite, wollastonite, zeolites, and zircon.
"Gold, Silver, and Precious Metals" means gold (lode), gold (placer), platinum group metals, and silver.
"Base Metals and Other Metals" means antimony, arsenic, chromite, copper, lead, manganese, mercury, molybdenum, nickel, pyrite, tin, titanium, tungsten, uranium, vanadium, and zinc.
Note: Authority cited: Sections 2207(d)(1)-(2), Public Resources Code. Reference: Sections 2207(d)(1)-(2) and 2207(f), Public Resources Code.
s 3696. Operations Subject to Fees.
(a) Each surface mining operation, as defined in Public Resources Code Sections 2719, 2727.1, 2735, and California Code of Regulations, Title 14, Section 3501, unless exempted by Public Resources Code Section 2714, shall be assessed an annual reporting fee according to the schedule established pursuant to in Section 3698 each May 1 following the reporting calendar year.
(b) In addition to the annual reporting fee, each surface mining operation that is newly permitted shall be assessed an initial reporting fee according to the schedule in Section 3698 of this article.
Note: Authority cited: Section 2207, Public Resources Code. Reference: Sections 2207 and 2719, Public Resources Code.
s 3696.5. Board Administration Fee.
Each surface mining operation, as defined in Public Resources Code sections 2719, 2727.1, and 2735, and, Title 14 California Code of Regulations, Section 3501, unless exempted by Public Resources Code Section 2714, shall be assessed each January 31 an annual administration fee of $7 (seven dollars) per day for each day of the previous calendar year that the surface mine operation was under the board's jurisdiction as lead agency pursuant to Chapter 9, commencing with Section 2710. The administration fee is due and payable to the State Mining and Geology Board not later than April 1 each year by the surface mine's owner or operator of record on the preceding December 31.
Note: Authority cited: Sections 2207 and 2755, Public Resources Code. Reference: Section 2207, Public Resources Code.
s 3697. Fees Due and Delinquent.
(a) The annual reporting fee and Mining Operation Annual Report (MRRC-2) are due and payable to the Department of Conservation not later than July 1 for the prior reporting year, by the owner or operator of record on the preceding December 31. The initial reporting fee for a new surface mining operation, together with an initial report, are due and payable to the Department of Conservation not later than thirty (30) days after permit approval. An owner or operator of a surface mining operation submitting an annual reporting fee or annual report after July 1, or more than thirty (30) days after permit approval, shall be assessed a penalty fee and interest as provided in Public Resources Code Section 2207(c) and (d)(5).
(b) Except as otherwise provided in (c), for the purposes of this article, surface mining operations are deemed to be discrete operations per each reclamation plan required.
(c) Multiple site surface mining operations are deemed to be those active surface mining operations which meet all of the following criteria:
(1) one or more surface mining operations are operated on one or more sites by a single operator or mining company;
(2) the total annual combined mineral production for all sites is less than 100 troy ounces for precious metals, if precious metals are the primary mineral commodity produced, or less than 100,000 short tons if the primary mineral commodity product is not precious metals;
(3) all of the sites included are active;
(4) all of the operator or company's entire active surface mining operations located in the State of California are tied to, or located on, the listed sites; and
(d) In addition to the criteria provided in (c), multiple site mining operator's submittal of the annual report form (Mining Operation Annual Report, Form MRRC-2) shall be accompanied by a multiple site form (Multiple Site Single Fee Request, Form MRRC-4M) supplied by the Department of Conservation.
Note: Authority cited: Section 2207, Public Resources Code. Reference: Section 2207, Public Resources Code.
s 3698. Fees Calculation.
Annual reporting fees cited in sections 3698 and 3699 shall be adjusted for the cost of living as measured by the California Consumer Price Index for all urban consumers, calendar year averages, using the percentage change in the previous year, beginning with the 2005-2006 fiscal year and annually thereafter.
(a) The annual reporting fee for a multiple site surface mining operation shall be four thousand dollars ($4,000).
(b) The annual reporting fee for surface mining operations which are no longer in operation with no intent to resume, which had no mineral production in the reporting calendar year, and
(1) which did not complete reclamation during the reporting calendar year shall be $100; or
(2) which completed reclamation during the reporting calendar year shall be $100. Proof of completion of reclamation, approved by the lead agency, shall be submitted with this fee.
(c) Except as otherwise provided, the annual reporting fee for surface mining operations shall be calculated on the total primary mineral commodity produced in the reporting calendar year. A factor to determine the amount of fee adjustments from one reporting calendar year to the next shall be calculated according to the following formula:
[((AT RY) - (AT PY))/(AT PY)] = Factor
Where: Adjusted Total (AT) equals the Amount Requested by the Director, less a projected amount from fees set in CCR s3698(a)(b)(d)(e) and CCR s3699, and less a projected amount from mine operations subject to the maximum fee amount of $4,000;
Where: ATRY is the Adjusted Total for the current "Reporting Year"
Where: ATPY is the Adjusted Total for the "Prior Year"
The new Fee Amount for each category is determined by the following formulae (calculated amounts cannot be less than $100 or more than $4,000, as adjusted for the cost of living as measured by the California Consumer Price Index for all urban consumers, calendar year averages, using the percentage change in the previous year, beginning with the 2005-2006 fiscal year and annually thereafter, and may be rounded to the nearest $1 (one dollar):
Formula 1: Current Year Reporting Fee = Prior Year Reporting Fee times (1 + Factor) if Factor is positive;
Formula 2: Current Year Reporting Fee = Prior Year Reporting Fee times (1 - Factor) if Factor is negative.
(1) Operations where the primary mineral commodity produced is either aggregate products or industrial minerals shall be assessed a fee as follows:
Tons Fee in Dollars
0 - 100 Formula 1 or 2 (not less than $100)
>100 - 1,000 Formula 1 or 2
>1,000 - 10,000 Formula 1 or 2
>10,000 - 50,000 Formula 1 or 2
>50,000 - 100,000 Formula 1 or 2
>100,000 4,000
(2) Operations where the primary mineral commodity produced is gold, silver, or precious metals shall be assessed a fee as follows:
Ounces Fee in Dollars
0 - 1 Formula 1 or 2 (not less than $100)
>1 - 10 Formula 1 or 2
>10 - 50 Formula 1 or 2
>50 - 150 Formula 1 or 2
>150 - 300 Formula 1 or 2
>300 4,000
(3) Operations where the primary mineral commodity produced is base metals or other metals shall be assessed a fee as follows:
Pounds Fee in Dollars
0 - 10 Formula 1 or 2 (not less than $100)
>10 - 100 Formula 1 or 2
>100 - 1,000 Formula 1 or 2
>1,000 - 10,000 Formula 1 or 2
>10,000 - 20,000 Formula 1 or 2
>20,000 4,000
(d) The initial reporting fee for surface mining operations shall be five hundred dollars ($500).
(e) The annual reporting fee for newly permitted surface mining operations which have not yet begun operations shall be one hundred dollars ($100).
(f) In addition to the annual reporting fees, the board shall collect five dollars ($5) per ounce of gold and ten cents ($0.10) per ounce of silver based on the amount of product mined within the state during the reporting year.
Note: Authority cited: Section 2207, Public Resources Code. Reference: Section 2207, Public Resources Code.
s 3699. Low Gross Exemptions.
(a) For the calendar reporting year, a single operator or mining company may file with the Office of Mine Reclamation of the Department of Conservation, a written request for an exemption from the method of fee assessment set forth in Section 3698. Neither the State, nor any county, city, district or other political subdivision shall be eligible for an exemption under this Section. A request for an exemption must be filed on a form (Low Gross Exemption Fee Request, Form MRRC-4L) supplied by the Department of Conservation and received by the Department of Conservation by July 1 following the calendar reporting year. The Department of Conservation shall grant the exemption if information submitted and confirmed by the annual report form and approved reclamation plan, clearly demonstrates that the operation meets the following criteria:
(1) material is extracted from one surface mining operation, and lead agency approval of a reclamation plan and financial assurance has been obtained; and
(2) all of the single operator or mining company's surface mining operation located in the State of California is tied to, or located on, one site; and
(3) the amount of the operator's gross income from the surface mining operation for the reporting calendar year was less than $100,000, and proof of gross income is supplied in the form of a signed federal tax return or returns accompanied by a complete and signed Federal Internal Revenue Service Form 4506, or a report prepared and signed by a certified public accountant; and
(4) the owner or operator has submitted an annual reporting fee of four hundred dollars ($400) as adjusted for the cost of living as measured by the California Consumer Price Index for all urban consumers, calendar year averages, using the percentage change in the previous year, beginning with the 2005-2006 fiscal year and annually thereafter.
(b) For any request received on or before July 1 following the reporting calendar year the Department may afford the applicant one 30-day period in which to correct minor deficiencies in the application.
(c) If the Department of Conservation determines that an exemption is not warranted, the operator may appeal that determination to the Board. The appeal must be submitted in writing within fifteen (15) days of the denial of exemption notification by the Department of Conservation. The Chairman of the Board or his designee (Board Member), shall determine whether the Board has jurisdiction for the purposes of an appeal. In order for the Board to have jurisdiction the appeal must:
(1) Demonstrate the exemption request was complete and filed in a timely fashion;
(2) Specifically relate to the exemption criteria outlined in this Section; and
(3) Specify the appellant's arguments for granting the exemption.
(d) If the appeal is within the Board's jurisdiction, the Board, based on all the evidence in the record, may affirm the Department's decision or grant the exemption. If the operator does not appeal, the appeal is not within the Board's jurisdiction, or the Board affirms the Department's decision, the operator or owner shall submit an annual reporting fee calculated upon the total mineral commodity produced pursuant to Section 3698. Such fee shall be submitted within thirty (30) days of notification by the Department of Conservation or the Board. An operator or owner submitting an annual reporting fee later than thirty (30) days after notification shall be assessed a penalty and interest as provided in Public Resources Code Section 2207(d)(5).
Note: Authority cited: Section 2207, Public Resources Code. Reference: Section 2207, Public Resources Code.
s 3700. Applicability.
Reclamation of mined lands shall be implemented in conformance with the standards in this Article.
(a) The standards shall apply to each surface mining operation to the extent that:
(1) they are consistent with required mitigation identified in conformance with the California Environmental Quality Act, provided that such mitigation is at least as stringent as the standards; and
(2) they are consistent with the planned or actual subsequent use or uses of the mining site.
(b) Where an applicant demonstrates to the satisfaction of the lead agency that an exception to the standards specified in this article is necessary based upon the approved end use, the lead agency may approve a different standard for inclusion in the approved reclamation plan. Where the lead agency allows such an exception, the approved reclamation plan shall specify verifiable, site-specific standards for reclamation. The lead agency may set standards which are more stringent than the standards set forth in this Article; however, in no case may the lead agency approve a reclamation plan which sets any standard which is less stringent than the comparable standard specified in this Article.
(c) When substantial amendments are proposed to reclamation plans which were approved prior to January 15, 1993, the standards set forth in this Article shall be applied by the lead agency in approving or denying approval of the amended reclamation plan.
(d) The standards in this Article shall not apply to mining operations:
(1) which completed reclamation prior to January 15, 1993, in conformance with an approved reclamation plan; or
(2) for which a reclamation plan has been approved prior to January 15, 1993.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3701. Definitions.
The following definitions shall govern the interpretation of these regulations:
"Arid" means landscapes with an average annual precipitation of five inches or less.
"Contamination" means an impairment of the quality of the waters of the state to a degree which creates a hazard to the public health through poisoning or through the spread of disease.
"Highwall" means the unexcavated face of exposed overburden and ore in a surface mine.
"Indigenous Plants" means plants occurring naturally in an area, not introduced.
"Native Species" means plant species indigenous to California, using pre-European as the historic time reference.
"Noxious Weeds" means any species of plant that is or is likely to become destructive or difficult to control or eradicate, and is termed to be so by the Director of the Department of Food and Agriculture in section 4500, Title 3 of the California Code of Regulations, pursuant to the Food and Agriculture Code section 5004 et seq.
"Vegetative Cover" means the vertical projection of the crown or shoot area of a species to the ground surface expressed as a percentage of the reference area (percentage can be greater than 100 percent).
"Vegetative Density" means the number of individuals or stems of each species rooted within the given reference area.
"Vegetative Species-richness" means the number of different plant species within the given reference area.
"Wetlands" for the purposes of these regulations, the definition of wetlands shall be the same as defined in the California Fish and Game Code, section 2785, subdivision (g).
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3702. Financial Assurances.
Lead agencies shall require financial assurances for reclamation in accordance with Public Resources Code section 2773.1 to ensure that reclamation is performed in accordance with the approved reclamation plan and with this article.
Note: Authority cited: Sections 2755, 2773 and 2773.1, Public Resources Code. Reference: Sections 2773 and 2773.1, Public Resources Code.
s 3703. Performance Standards for Wildlife Habitat.
Wildlife and wildlife habitat shall be protected in accordance with the following standards:
(a) Rare, threatened or endangered species as listed by the California Department of Fish and Game, (California Code of Regulations, Title 14, sections 670.2 - 670.5) or the U.S. Fish and Wildlife Service, (50 CFR 17.11 and 17.12) or species of special concern as listed by the California Department of Fish and Game in the Special Animals List, Natural Diversity Data Base, and their respective habitat, shall be conserved as prescribed by the federal Endangered Species Act of 1973, 16 U.S.C. section 1531 et seq., and the California Endangered Species Act, Fish and Game Code section 2050 et seq. If avoidance cannot be achieved through the available alternatives, mitigation shall be proposed in accordance with the provisions of the California Endangered Species Act, Fish and Game Code section 2050 et seq., and the federal Endangered Species Act of 1973, 16 U.S.C. section 1531 et seq.
(b) Wildlife habitat shall be established on disturbed land in a condition at least as good as that which existed before the lands were disturbed by surface mining operations, unless the proposed end use precludes its use as wildlife habitat or the approved reclamation plan establishes a different habitat type than that which existed prior to mining.
(c) Wetland habitat shall be avoided. Any wetland habitat impacted as a consequence of surface mining operations shall be mitigated at a minimum of one to one ratio for wetland habitat acreage and wetland habitat value.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3704. Performance Standards for Backfilling, Regrading, Slope Stability, and Recontouring.
Backfilling, regrading, slope stabilization, and recontouring shall conform with the following standards:
(a) Where backfilling is proposed for urban uses (e.g., roads, building sites, or other improvements sensitive to settlement), the fill material shall be compacted in accordance with the Uniform Building Code, published by the International Conference of Building Officials and as adopted by the lead agency, the local grading ordinance, or other methods approved by the lead agency as appropriate for the approved end use.
(b) Where backfilling is required for resource conservation purposes (e.g., agriculture, fish and wildlife habitat, and wildland conservation), fill material shall be backfilled to the standards required for the resource conservation use involved.
(c) Piles or dumps of mining waste shall be stockpiled in such a manner as to facilitate phased reclamation. They shall be segregated from topsoil and topsoil substitutes or growth media salvaged for use in reclamation.
(d) Final reclaimed fill slopes, including permanent piles or dumps of mine waste rock and overburden, shall not exceed 2:1 (horizontal:vertical), except when site-specific geologic and engineering analysis demonstrate that the proposed final slope will have a minimum slope stability factor of safety that is suitable for the proposed end use, and when the proposed final slope can be successfully revegetated.
(e) At closure, all fill slopes, including permanent piles or dumps of mine waste and overburden, shall conform with the surrounding topography and/or approved end use.
(f) Cut slopes, including final highwalls and quarry faces, shall have a minimum slope stability factor of safety that is suitable for the proposed end use and conform with the surrounding topography and/or approved end use.
(g) Permanent placement of piles or dumps of mining waste and overburden shall not occur within wetlands unless mitigation acceptable to the regulatory agencies with jurisdiction over wetlands, which may include the lead agency, has been proposed to offset wetland impacts and/or losses.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3704.1. Performance Standards for Backfilling Excavations and Recontouring Lands Disturbed by Open Pit Surface Mining Operations for Metallic Minerals.
Notwithstanding the provisions of Section 3700(b) of this Article, no reclamation plan, including any reclamation plan in which the end use is for wildlife habitat, wildland conservation, or open space, or financial assurance for a surface mining operation subject to the provisions of this section, shall be approved by a lead agency unless the reclamation plan meets the provisions of this section. Financial assurances must be maintained in an amount sufficient to provide for the backfilling and contour grading of the mined lands as required in this section.
(a) An open pit excavation created by surface mining activities for the production of metallic minerals shall be backfilled to achieve not less than the original surface elevation, unless the circumstances under subsection (h) are determined by the lead agency to exist.
(b) Backfilling shall be engineered, and backfilled materials shall be treated, if necessary, to meet all of the provisions of Title 27, California Code of Regulations, Division 2, Chapter 7, Subchapter 1, Mining Waste Management, commencing with Section 22470, and the applicable Regional Water Quality Control Board's Water Quality Control Plan.
(c) Excavated materials remaining in overburden piles, waste rock piles, and processed or leached ore piles not used in the backfilling process and remaining on the mine site shall be graded and contoured to create a final surface that is consistent with the original topography of the area. Care shall be taken to avoid the creation of un-natural topographic features, impediments to natural drainage, or conditions hazardous to human life and wildlife.
(d) Backfilling, recontouring, and revegetation activities shall be performed in clearly defined phases to the engineering and geologic standards required for the end use of the site as stipulated in the approved reclamation plan. All fills and fill slopes shall be designed to protect groundwater quality, to prevent surface water ponding, to facilitate revegetation, to convey runoff in a non-erosive manner, and to account for long term settlement.
(e) The requirements of subsections (a), (b), (c), and (d) notwithstanding, no final reclaimed fill slopes shall exceed 2:1 (horizontal:vertical), nor shall the resultant topography exceed inheight the pre-mining surface contour elevations by more than 25 feet. Final fill slopes shall have static and dynamic factors of safety, as determined by an engineer licensed in California, that are suitable for the proposed end use of the site and meet or exceed the requirements of applicable building or grading codes, ordinances, statutes, and regulations. Final slopes must be capable of being revegetated, and shall blend visually with the local topography. Surface soil shall be salvaged, stored, and reapplied to facilitate revegetation of recontoured material in accordance with the requirements of Section 3711 of this Article.
(f) For the purposes of this section, a metallic mine is defined as one where more than ten percent of the mining operation's gross annual revenues as averaged over the last five years are derived from the production of, or any combination of, the following metallic minerals by the open pit extraction method: Precious metals (gold, silver, platinum);
Iron;
Nickel;
Copper;
Lead;
Tin;
Ferro-alloy metals (tungsten, chromium, manganese);
Mercury;
Uranium and thorium;
Minor metals including rubidium, strontium, and cesium;
Niobium and tantalum;
(g) For the purposes of this regulation, an open pit mine is the same as an open pit quarry, opencast mine, or opencut mine, and is defined as a mine working or excavation that is open to the surface and in which the opening is approximately the full size of the excavation.
(h) The requirement to backfill an open pit excavation to the surface pursuant to this section using materials mined on site shall not apply if there remains on the mined lands at the conclusion of mining activities, in the form of overburden piles, waste rock piles, and processed or leached ore piles, an insufficient volume of materials to completely backfill the open pit excavation to the surface, and where, in addition, none of the mined materials has been removed from the mined lands in violation of the approved reclamation plan. In such case, the open pit excavation shall be backfilled in accordance with subsections (b) and (d) to an elevation that utilizes all of the available material remaining as overburden, waste rock, and processed or leached ore.
(i) This regulation does not apply to any surface mining operation as defined in Public Resources Code Section 2735(a) and (b) for which the lead agency has issued final approval of a reclamation plan and a financial assurance prior to December 18, 2002.
Note: Authority cited: Sections 2755 and 2756, Public Resources Code; Reference: Sections 2733, 2772 and 2773, Public Resources Code.
s 3705. Performance Standards for Revegetation.
Revegetation shall be part of the approved plan, unless it is not consistent with the approved end use.
(a) A vegetative cover suitable for the proposed end use and capable of self-regeneration without continued dependence on irrigation, soil amendments or fertilizer shall be established on disturbed land unless an artificially maintained landscape is consistent with the approved reclamation plan. Vegetative cover or density, and species-richness shall be, where appropriate, sufficient to stabilize the surface against effects of long-term erosion and shall be similar to naturally occurring habitats in the surrounding area. The vegetative density, cover and species richness of naturally occurring habitats shall be documented in baseline studies carried out prior to the initiation of mining activities. However, for areas that will not be reclaimed to prior conditions, the use of data from reference areas in lieu of baseline site data is permissible.
(b) Test plots conducted simultaneously with mining shall be required to determine the most appropriate planting procedures to be followed to ensure successful implementation of the proposed revegetation plan. The lead agency may waive the requirement to conduct test plots when the success of the proposed revegetation plan can be documented from experience with similar species and conditions or by relying on competent professional advice based on experience with the species to be planted.
(c) Where surface mining activities result in compaction of the soil, ripping, disking, or other means shall be used in areas to be revegetated to eliminate compaction and to establish a suitable root zone in preparation for planting.
(d) Prior to closure, all access roads, haul roads, and other traffic routes to be reclaimed shall be stripped of any remaining roadbase materials, prepared in accordance with subsection 3705(g), covered with suitable growth media or topsoil, and revegetated. When it is not necessary to remove roadbase materials for revegetative purposes, lead agencies may set a different standard as specified in section 3700(b) of this Article.
(e) Soil analysis shall be required to determine the presence or absence of elements essential for plant growth and to determine those soluble elements that may be toxic to plants, if the soil has been chemically altered or if the growth media consists of other than the native topsoil. If soil analysis suggests that fertility levels or soil constituents are inadequate to successfully implement the revegetative program, fertilizer or other soil amendments may be incorporated into the soil. When native plant materials are used, preference shall be given to slow-release fertilizers, including mineral and organic materials that mimic natural sources, and shall be added in amounts similar to those found in reference soils under natural vegetation of the type being reclaimed.
(f) Temporary access for exploration or other short-term uses on arid lands shall not disrupt the soil surface except where necessary to gain safe access. Barriers shall be installed when necessary to gain safe access. Barriers shall be installed when necessary to prevent unauthorized vehicular traffic from interfering with the reclamation of temporary access routes.
(g) Native plant species shall be used for revegetation, except when introduced species are necessary to meet the end uses specified in the approved reclamation plan. Areas to be developed for industrial, commercial, or residential use shall be revegetated for the interim period, as necessary, to control erosion. In this circumstance, non-native plant species may be used if they are not noxious weeds and if they are species known not to displace native species in the area.
(h) Planting shall be conducted during the most favorable period of the year for plant establishment.
(i) Soil stabilizing practices shall be used where necessary to control erosion and for successful plant establishment. Irrigation may be used when necessary to establish vegetation.
(j) If irrigation is used, the operator must demonstrate that the vegetation has been self-sustaining without irrigation for a minimum of two years prior to release of the financial assurances by the lead agency, unless an artificially maintained landscape is consistent with the approved end use.
(k) Noxious weeds shall be managed: (1) when they threaten the success of the proposed revegetation; (2) to prevent spreading to nearby areas; and (3) to eliminate fire hazard.
(l) Protection measures, such as fencing of revegetated areas and/or the placement of cages over individual plants, shall be used in areas where grazing, trampling, herbivory, or other causes threaten the success of the proposed revegetation. Fencing shall be maintained until revegetation efforts are successfully completed and the lead agency authorizes removal.
(m) Success of revegetation shall be judged based upon the effectiveness of the vegetation for the approved end use, and by comparing the quantified measures of vegetative cover, density, and species-richness of the reclaimed mined-lands to similar parameters of naturally occurring vegetation in the area. Either baseline data or data from nearby reference areas may be used as the standard for comparison. Quantitative standards for success and the location(s) of the reference area(s) shall be set forth in the approved reclamation plan. Comparisons shall be made until performance standards are met provided that, during the last two years, there has been no human intervention, including, for example, irrigation, fertilization, or weeding. Standards for success shall be based on expected local recovery rates. Valid sampling techniques for measuring success shall be specified in the approved reclamation plan. Sample sizes must be sufficient to produce at least an 80 percent confidence level. There are standard statistical methods in commonly available literature for determining an 80 percent confidence level on a site-by-site basis. Examples of such literature include, but are not limited to, D. Mueller-Dombois and H. Ellenberg, 1974, "Aims and Methods of Vegetation Ecology", John Wiley and Sons, Inc., or C. D. Bonham, 1988, "Measurements for Terrestrial Vegetation", John Wiley and Sons, Inc., and are available at many university libraries. The texts are also available at some local libraries through the Inter-Library Loan Program.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3706. Performance Standards for Drainage, Diversion Structures, Waterways, and Erosion Control.
(a) Surface mining and reclamation activities shall be conducted to protect on-site and downstream beneficial uses of water in accordance with the Porter-Cologne Water Quality Control Act, Water Code section 13000, et seq., and the Federal Clean Water Act, 33 U.S.C. section 1251, et seq.
(b) The quality of water, recharge potential, and storage capacity of ground water aquifers which are the source of water for domestic, agricultural, or other uses dependent on the water, shall not be diminished, except as allowed in the approved reclamation plan.
(c) Erosion and sedimentation shall be controlled during all phases of construction, operation, reclamation, and closure of a surface mining operation to minimize siltation of lakes and watercourses, as required by the Regional Water Quality Control Board or the State Water Resources Control Board.
(d) Surface runoff and drainage from surface mining activities shall be controlled by berms, silt fences, sediment ponds, revegetation, hay bales, or other erosion control measures, to ensure that surrounding land and water resources are protected from erosion, gullying, sedimentation and contamination. Erosion control methods shall be designed to handle runoff from not less than the 20 year/1 hour intensity storm event.
(e) Where natural drainages are covered, restricted, rerouted, or otherwise impacted by surface mining activities, mitigating alternatives shall be proposed and specifically approved in the reclamation plan to assure that runoff shall not cause increased erosion or sedimentation.
(f) When stream diversions are required, they shall be constructed in accordance with:
(1) the stream and lake alteration agreement between the operator and the Department of Fish and Game; and
(2) the requirements of the Federal Clean Water Act, Sections 301 (33 U.S.C. 1311) and Section 404 (33 U.S.C. 1344) and/or Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(g) When no longer needed to achieve the purpose for which they were authorized, all temporary stream channel diversions shall be removed and the affected land reclaimed.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3707. Performance Standards for Prime Agricultural Land Reclamation.
In addition to the standards for topsoil salvage, maintenance, and redistribution, the following standards shall apply to mining operations on prime agricultural lands where the approved end use is agriculture:
(a) Mining operations which will operate on prime agricultural lands, as defined by the U.S. Soil Conservation Service, shall return all disturbed areas to a fertility level as specified in the approved reclamation plan.
(b) When distinct soil horizons are present, topsoil shall be salvaged and segregated by defined A, B, and C soil horizons. Upon reconstruction of the soil, the sequence of horizons shall have the A atop the B, the B atop the C, and the C atop graded overburden.
(c) Reclamation shall be deemed complete when productive capability of the affected land is equivalent to or exceeds, for two consecutive crop years, that of the premining condition or similar crop production in the area. Productivity rates, based on reference areas described in the approved reclamation plan, shall be specified in the approved reclamation plan.
(d) Use of fertilizers or other soil amendments shall not cause contamination of surface or ground water.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3708. Performance Standards for Other Agricultural Land.
The following standards shall apply to agricultural lands, other than prime agricultural lands, when the approved end use is agriculture.
In addition to the standards for topsoil salvage, maintenance, and redistribution, non-prime agricultural lands shall be reclaimed so as to be capable of sustaining economically viable production of crops commonly grown in the surrounding areas.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3709. Performance Standards for Building, Structure, and Equipment Removal.
(a) All equipment, supplies and other materials shall be stored in designated areas (as shown in the approved reclamation plan). All waste shall be disposed of in accordance with state and local health and safety ordinances.
(b) All buildings, structures, and equipment shall be dismantled and removed prior to final mine closure except those buildings, structures, and equipment approved in the reclamation plan as necessary for the end use.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3710. Performance Standards for Stream Protection, Including Surface and Groundwater.
(a) Surface and groundwater shall be protected from siltation and pollutants which may diminish water quality as required by the Federal Clean Water Act, sections 301 et seq. (33 U.S.C. section 1311), 404 et seq. (33 U.S.C. section 1344), the Porter-Cologne Act, section 13000 et seq., County anti-siltation ordinances, the Regional Water Quality Control Board or the State Water Resources Control Board.
(b) In-stream surface mining operations shall be conducted in compliance with Section 16000 et seq. of the California Fish and Game Code, section 404 of the Clean Water Act, and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(c) Extraction of sand and gravel from river channels shall be regulated to control channel degredation in order to prevent undermining of bridge supports, exposure of pipelines or other structures buried within the channel, loss of spawning habitat, lowering of ground water levels, destruction of riparian vegetation, and increased stream bank erosion (exceptions may be specified in the approved reclamation plan). Changes in channel elevations and bank erosion shall be evaluated annually using records of annual extraction quantities and benchmarked annual cross sections and/or sequential aerial photographs to determine appropriate extraction locations and rates.
(d) In accordance with requirements of the California Fish and Game Code section 1600 et seq., in-stream mining activities shall not cause fish to become entrapped in pools or in off-channel pits, nor shall they restrict spawning or migratory activities.
Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.
s 3711. Performance Standards for Topsoil Salvage, Maintenance, and Redistribution.
When the approved reclamation plan calls for revegetation or cultivation of disturbed lands, the following performance standards shall apply to topsoil salvage, maintenance, and redistribution activities:
(a) All salvageable topsoil suitable for revegetation shall be removed as a separate layer from areas to be disturbed by mining operations. Topsoil and vegetation removal shall not precede surface mining activities by more than one year, unless a longer time period is approved by the lead agency.
(b) Topsoil resources shall be mapped prior to stripping and the location of topsoil stockpiles shall be shown on a map in the reclamation plan. If the amount of topsoil needed to cover all surfaces to be revegetated is not available on site, other suitable material capable of sustaining vegetation (such as subsoil) shall be removed as a separate layer for use as a suitable growth media. Topsoil and suitable growth media shall be maintained in separate stockpiles. Test plots may be required to determine the suitability of growth media for revegatation purposes.
(c) Soil salvageoperations and phases of reclamation shall be carried out in accordance with a schedule that: (1) is set forth in the approved reclamation plan; (2) minimizes the area disturbed; and (3) is designed to achieve maximum revegetation success allowable under the mining plan. (continued)