(7) The corporate guarantee as specified in §264.143(f)(10) of this chapter.
(8) The use of multiple financial mechanisms, as specified in §264.143(g) of this chapter is permitted.
(9) A modification to a facility storing PCB waste that increases the maximum storage capacity indicated in the permit requires that a new financial assurance mechanism be established or an existing one be amended. When such a modification occurs, the Director of the Federal or State issuing authority must be notified in writing no later than 30 days from the completion of the modification. The new or revised financial assurance mechanism must be established and activated no later than 30 days after the Director of the Federal or State issuing authority is notified of the completion of the modification, but prior to the use of the modified portion of the facility.
(h) Release of owner or operator. Within 60 days after receiving certifications from the owner or operator and an independent registered professional engineer that final closure has been completed in accordance with the approved closure plan, the Regional Administrator or the Director, National Programs Chemical Division, if he approved the closure plan, will notify the owner or operator in writing that the owner or operator is no longer required by this section to maintain financial assurance for final closure of the facility, unless the Regional Administrator or the Director, National Programs Chemical Division, if he approved the closure plan, has reason to believe that final closure has not been completed in accordance with the approved closure plan. The Regional Administrator or the Director, National Programs Chemical Division, if he approved the closure plan, shall provide the owner or operator with a detailed written statement stating the reasons why he believed closure was not conducted in accordance with the approved closure plan.
(i) Laboratories and samples. (1) A laboratory is conditionally exempt from the notification and approval requirements for a commercial storer under §761.65 (d) through (h) when it stores samples held for disposal in a facility that complies with the standards in §761.65 (b)(1)(i) through (b)(1)(iv).
(2) A laboratory sample is exempt from the manifesting requirements in §761.208 when:
(i) The sample is being transported to a laboratory for the purpose of testing.
(ii) The sample is being transported back to the sample collector after testing.
(iii) The sample is being stored by the sample collector before transport to a laboratory for testing.
(iv) The sample is being stored in a laboratory before testing.
(v) The sample is being stored in a laboratory after testing but before it is returned to the sample collector.
(vi) The sample is being stored temporarily in the laboratory after testing for a specific purpose (for example, until conclusion of a court case or enforcement action where further testing of the sample may be necessary).
(3) In order to qualify for the exemption in paragraph (i)(2)(i) and (i)(2)(ii) of this section, a sample collector shipping samples to a laboratory and a laboratory returning samples to a sample collector must:
(i) Comply with applicable U.S. Department of Transportation (DOT) or U.S. Postal Service (USPS) shipping requirements, found respectively in 49 CFR 173.345 and U.S. Postal Regulations 652.2 and 652.3.
(ii) Assure that the following information accompanies the sample:
(A) The sample collector's name, mailing address, and telephone number.
(B) The laboratory's name, mailing address, and telephone number.
(C) The quantity of the sample.
(D) The date of shipment.
(E) A description of the sample.
(iii) Package the sample so that it does not leak, spill, or vaporize from its packaging.
(4) When the concentration of the PCB sample has been determined, and its use is terminated, the sample must be properly disposed. A laboratory must either manifest the PCB waste to a disposer or commercial storer, as required under §761.208, retain a copy of each manifest, as required under §761.209, and follow up on exception reporting, as required under §761.215 (a) and (b), or return the sample to the sample collector who must then properly dispose of the sample. If the laboratory returns the sample to the sample collector, the laboratory must comply with the shipping requirements set forth in paragraph (i)(3)(i) through (i)(3)(iii) of this section.
(j) Changes in ownership or operational control of a commercial storage facility. The date of transfer of interim status or final approval shall be the date the EPA Regional Administrator (or Director, National Program Chemicals Division) provides written approval of the transfer. EPA will provide a final written decision within 90 days of receipt of the complete new or amended application. The Agency will approve the transfer if the following conditions are met:
(1) The transferee has established financial assurance for closure pursuant to paragraph (g) of this section using a mechanism effective as of the date of final approval so that there will be no lapse in financial assurance for the transferred facility.
(2) The transferor or transferee has resolved any deficiencies (e.g., technical operations, closure plans, cost estimates, etc.) the Agency has identified in the transferor's application.
(k) States and the Federal Government. States and the Federal Government are exempt from the requirements of paragraphs (f) and (g) of this section.
(Sec. 6, Pub. L. 94–469, 90 Stat. 2020 (15 U.S.C. 2605)
[44 FR 31542, May 31, 1979. Redesignated at 47 FR 19527, May 6, 1982, and amended at 47 FR 37359, Aug. 8, 1982; 49 FR 28191, July 10, 1984; 53 FR 12524, Apr. 15, 1988; 54 FR 52746, Dec. 21, 1989; 55 FR 695, Jan. 8, 1990; 55 FR 26205, June 27, 1990; 58 FR 15809, Mar. 24, 1993; 58 FR 34205, June 23, 1993; 58 FR 59374, Nov. 9, 1993; 63 FR 35439, 35452, June 29, 1998]
§ 761.70 Incineration.
top
This section applies to facilities used to incinerate PCBs required to be incinerated by this part.
(a) Liquid PCBs. An incinerator used for incinerating PCBs shall be approved by an EPA Regional Administrator or the Director, National Programs Chemical Division pursuant to paragraph (d) of this section. Requests for approval of incinerators to be used in more than one region must be submitted to the Director, National Programs Chemical Division, except for research and development involving less than 500 pounds of PCB material (see §761.60(i)(2)). Requests for approval of incinerators to be used in only one region must be submitted to the appropriate Regional Administrator. The incinerator shall meet all of the requirements specified in paragraphs (a) (1) through (9) of this section, unless a waiver from these requirements is obtained pursuant to paragraph (d)(5) of this section. In addition, the incinerator shall meet any other requirements which may be prescribed pursuant to paragraph (d)(4) of this section.
(1) Combustion criteria shall be either of the following:
(i) Maintenance of the introduced liquids for a 2-second dwell time at 1200 °C (±100 °C) and 3 percent excess oxygen in the stack gas; or
(ii) Maintenance of the introduced liquids for a 1 1/2 second dwell time at 1600 °C(±100 °C) and 2 percent excess oxygen in the stack gas.
(2) Combustion efficiency shall be at least 99.9 percent computed as follows:
Combustion efficiency = [Cco2/(Cco2 + Cco)]100
where
Cco2=Concentration of carbon dioxide.
Cco=Concentration of carbon monoxide.
(3) The rate and quantity of PCBs which are fed to the combustion system shall be measured and recorded at regular intervals of no longer than 15 minutes.
(4) The temperatures of the incineration process shall be continuously measured and recorded. The combustion temperature of the incineration process shall be based on either direct (pyrometer) or indirect (wall thermocouple-pyrometer correlation) temperature readings.
(5) The flow of PCBs to the incinerator shall stop automatically whenever the combustion temperature drops below the temperatures specified in paragraph (a)(1) of this section.
(6) Monitoring of stack emission products shall be conducted:
(i) When an incinerator is first used for the disposal of PCBs under the provisions of this regulation;
(ii) When an incinerator is first used for the disposal of PCBs after the incinerator has been modified in a manner which may affect the characteristics of the stack emission products; and
(iii) At a minimum such monitoring shall be conducted for the following parameters:
(a) O2; (b) CO; (c) CO2; (d) Oxides of Nitrogen (NOX); (e) Hydrochloric Acid (HCl); (f) Total Chlorinated Organic Content (RCl); (g) PCBs; and (h) Total Particulate Matter.
(7) At a minimum monitoring and recording of combustion products and incineration operations shall be conducted for the following parameters whenever the incinerator is incinerating PCBs:
(i) O2; (ii) CO; and (iii) CO2. The monitoring for O2 and CO shall be continuous. The monitoring for CO2 shall be periodic, at a frequency specified by the Regional Administrator or Director, National Programs Chemical Division.
(8) The flow of PCBs to the incinerator shall stop automatically when any one or more of the following conditions occur, unless a contingency plan is submitted by the incinerator owner or operator and approved by the Regional Administrator or Director, National Programs Chemical Division. The contingency plan indicates what alternative measures the incinerator owner or operator would take if any of the following conditions occur:
(i) Failure of monitoring operations specified in paragraph (a)(7) of this section;
(ii) Failure of the PCB rate and quantity measuring and recording equipment specified in paragraph (a)(3) of this section; or
(iii) Excess oxygen falls below the percentage specified in paragraph (a)(1) of this section.
(9) Water scrubbers shall be used for HCl control during PCB incineration and shall meet any performance requirements specified by the appropriate EPA Regional Administrator or the Director, National Programs Chemical Division. Scrubber effluent shall be monitored and shall comply with applicable effluent or pretreatment standards, and any other State and Federal laws and regulations. An alternate method of HCl control may be used if the alternate method has been approved by the Regional Administrator or the Director, National Programs Chemical Division. (The HCl neutralizing capability of cement kilns is considered to be an alternate method.)
(b) Nonliquid PCBs. An incinerator used for incinerating nonliquid PCBs, PCB Articles, PCB Equipment, or PCB Containers shall be approved by the appropriate EPA Regional Administrator or the Director, National Programs Chemical Division pursuant to paragraph (d) of this section. Requests for approval of incinerators to be used in more than one region must be submitted to the Director, National Programs Chemical Division except for research and development involving less than 500 pounds of PCB material (see §761.60(i)(2)). Requests for approval of incinerators to be used in only one region must be submitted to the appropriate Regional Administrator. The incinerator shall meet all of the requirements specified in paragraphs (b)(1) and (2) of this section unless a waiver from these requirements is obtained pursuant to paragraph (d)(5) of this section. In addition, the incinerator shall meet any other requirements that may be prescribed pursuant to paragraph (d)(4) of this section.
(1) The mass air emissions from the incinerator shall be no greater than 0.001g PCB/kg of the PCB introduced into the incinerator.
(2) The incinerator shall comply with the provisions of paragraphs (a)(2), (3), (4), (6), (7), (8)(i) and (ii), and (9) of this section.
(c) Maintenance of data and records. All data and records required by this section shall be maintained in accordance with §761.180, Records and monitoring.
(d) Approval of incinerators. Prior to the incineration of PCBs and PCB Items the owner or operator of an incinerator shall receive the written approval of the Agency Regional Administrator for the region in which the incinerator is located, or the Director, National Programs Chemical Division. Approval from the Director, National Programs Chemical Division may be effective in all ten EPA regions. Such approval shall be obtained in the following manner:
(1) Application. The owner or operator shall submit to the Regional Administrator or the Director, National Programs Chemical Division an application which contains:
(i) The location of the incinerator;
(ii) A detailed description of the incinerator including general site plans and design drawings of the incinerator;
(iii) Engineering reports or other information on the anticipated performance of the incinerator;
(iv) Sampling and monitoring equipment and facilities available;
(v) Waste volumes expected to be incinerated;
(vi) Any local, State, or Federal permits or approvals; and
(vii) Schedules and plans for complying with the approval requirements of this regulation.
(2) Trial burn. (i) Following receipt of the application described in paragraph (d)(1) of this section, the Regional Administrator or the Director, National Programs Chemical Division shall determine if a trial burn is required and notify the person who submitted the report whether a trial burn of PCBs and PCB Items must be conducted. The Regional Administrator or the Director, National Programs Chemical Division may require the submission of any other information that the Regional Administrator or the Director, National Programs Chemical Division finds to be reasonably necessary to determine the need for a trial burn. Such other information shall be restricted to the types of information required in paragraphs (d)(1)(i) through (vii) of this section.
(ii) If the Regional Administrator or the Director, National Programs Chemical Division determines that a trial burn must be held, the person who submitted the report described in paragraph (d)(1) of this section shall submit to the Regional Administrator or the Director, National Programs Chemical Division a detailed plan for conducting and monitoring the trial burn. At a minimum, the plan must include:
(A) Date trial burn is to be conducted;
(B) Quantity and type of PCBs and PCB Items to be incinerated;
(C) Parameters to be monitored and location of sampling points;
(D) Sampling frequency and methods and schedules for sample analyses; and
(E) Name, address, and qualifications of persons who will review analytical results and other pertinent data, and who will perform a technical evaluation of the effectiveness of the trial burn.
(iii) Following receipt of the plan described in paragraph (d)(2)(ii) of this section, the Regional Administrator or the Director, National Programs Chemical Division will approve the plan, require additions or modifications to the plan, or disapprove the plan. If the plan is disapproved, the Regional Administrator or the Director, National Programs Chemical Division will notify the person who submitted the plan of such disapproval, together with the reasons why it is disapproved. That person may thereafter submit a new plan in accordance with paragraph (d)(2)(ii) of this section. If the plan is approved (with any additions or modifications which the Regional Administrator or the Director, National Programs Chemical Division may prescribe), the Regional Administrator or the Director, National Programs Chemical Division will notify the person who submitted the plan of the approval. Thereafter, the trial burn shall take place at a date and time to be agreed upon between the Regional Administrator or the Director, National Programs Chemical Division and the person who submitted the plan.
(3) Other information. In addition to the information contained in the report and plan described in paragraphs (d)(1) and (2) of this section, the Regional Administrator or the Assistant Administrator for Prevention, Pesticides and Toxic Substances may require the owner or operator to submit any other information that the Regional Administrator or the Assistant Administrator for Prevention, Pesticides and Toxic Substances finds to be reasonably necessary to determine whether an incinerator shall be approved.
Note: The Regional Administrator will have available for review and inspection an Agency manual containing information on sampling methods and analytical procedures for the parameters required in §761.70(a) (3), (4), (6), and (7) plus any other parameters he/she may determine to be appropriate. Owners or operators are encouraged to review this manual prior to submitting any report required in §761.70.
(4) Contents of approval. (i) Except as provided in paragraph (d)(5) of this section, the Regional Administrator or the Director, National Programs Chemical Division may not approve an incinerator for the disposal of PCBs and PCB Items unless he finds that the incinerator meets all of the requirements of paragraphs (a) and/or (b) of this section.
(ii) In addition to the requirements of paragraphs (a) and/or (b) of this section, the Regional Administrator or the Director, National Programs Chemical Division may include in an approval any other requirements that the Regional Administrator or the Director, National Programs Chemical Division finds are necessary to ensure that operation of the incinerator does not present an unreasonable risk of injury to health or the environment from PCBs. Such requirements may include a fixed period of time for which the approval is valid.
(5) Waivers. An owner or operator of the incinerator may submit evidence to the Regional Administrator or the Director, National Programs Chemical Division that operation of the incinerator will not present an unreasonable risk of injury to health or the enviroment from PCBs, when one or more of the requirements of paragraphs (a) and/or (b) of this section are not met. On the basis of such evidence and any other available information, the Regional Administrator or the Director, National Programs Chemical Division may in his/her discretion find that any requirement of paragraphs (a) and (b) of this section is not necessary to protect against such a risk, and may waive the requirements in any approval for that incinerator. Any finding and waiver under this paragraph must be stated in writing and included as part of the approval.
(6) Persons approved. An approval will designate the persons who own and who are authorized to operate the incinerator, and will apply only to such persons, except as provided in paragraph (d)(8) of this section.
(7) Final approval. Approval of an incinerator will be in writing and signed by the Regional Administrator or the Director, National Programs Chemical Division. The approval will state all requirements applicable to the approved incinerator.
(8) Transfer of property. Any person who owns or operates an approved incinerator must notify EPA at least 30 days before transferring ownership in the incinerator or the property it stands upon, or transferring the right to operate the incinerator. The transferor must also submit to EPA, at least 30 days before such transfer, a notarized affidavit signed by the transferee which states that the transferee will abide by the transferor's EPA incinerator approval. Within 30 days of receiving such notification and affidavit, EPA will issue an amended approval substituting the transferee's name for the transferor's name, or EPA may require the transferee to apply for a new incinerator approval. In the latter case, the transferee must abide by the transferor's EPA approval until EPA issues the new approval to the transferee.
(Sec. 6, Pub. L. 94–469, 90 Stat. 2020 (15 U.S.C. 2605)
[44 FR 31542, May 31, 1979. Redesignated at 47 FR 19527, May 6, 1982, and amended at 48 FR 13185, Mar. 30, 1983; 49 FR 28191, July 10, 1984; 53 FR 12524, Apr. 15, 1988; 58 FR 15809, Mar. 24, 1993; 63 FR 35439, June 29, 1998]
§ 761.71 High efficiency boilers.
top
(a) To burn mineral oil dielectric fluid containing a PCB concentration of =50 ppm, but <500 ppm:
(1) The boiler shall comply with the following criteria:
(i) The boiler is rated at a minimum of 50 million BTU hours.
(ii) If the boiler uses natural gas or oil as the primary fuel, the carbon monoxide concentration in the stack is =50 ppm and the excess oxygen is at least 3 percent when PCBs are being burned.
(iii) If the boiler uses coal as the primary fuel, the carbon monoxide concentration in the stack is =100 ppm and the excess oxygen is at least 3 percent when PCBs are being burned.
(iv) The mineral oil dielectric fluid does not comprise more than 10 percent (on a volume basis) of the total fuel feed rate.
(v) The mineral oil dielectric fluid is not fed into the boiler unless the boiler is operating at its normal operating temperature (this prohibits feeding these fluids during either start up or shut down operations).
(vi) The owner or operator of the boiler:
(A) Continuously monitors and records the carbon monoxide concentration and excess oxygen percentage in the stack gas while burning mineral oil dielectric fluid; or
(B) If the boiler will burn <30,000 gallons of mineral oil dielectric fluid per year, measures and records the carbon monoxide concentration and excess oxygen percentage in the stack gas at regular intervals of no longer than 60 minutes while burning mineral oil dielectric fluid.
(vii) The primary fuel feed rates, mineral oil dielectric fluid feed rates, and total quantities of both primary fuel and mineral oil dielectric fluid fed to the boiler are measured and recorded at regular intervals of no longer than 15 minutes while burning mineral oil dielectric fluid.
(viii) The carbon monoxide concentration and the excess oxygen percentage are checked at least once every hour that mineral oil dielectric fluid is burned. If either measurement falls below the levels specified in this section, the flow of mineral oil dielectric fluid to the boiler shall be stopped immediately.
(2) Thirty days before any person burns mineral oil dielectric fluid in the boiler, the person gives written notice to the EPA Regional Administrator for the EPA Region in which the boiler is located and that the notice contains the following information:
(i) The name and address of the owner or operator of the boiler and the address of the boiler.
(ii) The boiler rating in units of BTU/hour.
(iii) The carbon monoxide concentration and the excess oxygen percentage in the stack of the boiler when it is operated in a manner similar to the manner in which it will be operated when mineral oil dielectric fluid is burned.
(iv) The type of equipment, apparatus, and procedures to be used to control the feed of mineral oil dielectric fluid to the boiler and to monitor and record the carbon monoxide concentration and excess oxygen percentage in the stack.
(3) When burning mineral oil dielectric fluid, the boiler must operate at a level of output no less than the output at which the measurements required under paragraph (a)(2)(iii) of this section were taken.
(4) Any person burning mineral oil dielectric fluid in a boiler obtains the following information and retains the information for 5 years at the boiler location:
(i) The data required to be collected under paragraphs (a)(1)(vi) and (vii) of this section.
(ii) The quantity of mineral oil dielectric fluid burned in the boiler each month.
(b) To burn liquids, other than mineral oil dielectric fluid, containing a PCB concentration of =50 ppm, but <500 ppm:
(1) The boiler shall comply with the following criteria:
(i) The boiler is rated at a minimum of 50 million BTU/hour.
(ii) If the boiler uses natural gas or oil as the primary fuel, the carbon monoxide concentration in the stack is =50 ppm and the excess oxygen is at least 3 percent when PCBs are being burned.
(iii) If the boiler uses coal as the primary fuel, the carbon monoxide concentration in the stack is =100 ppm and the excess oxygen is at least 3 percent when PCBs are being burned.
(iv) The waste does not comprise more than 10 percent (on a volume basis) of the total fuel feed rate.
(v) The waste is not fed into the boiler unless the boiler is operating at its normal operating temperature (this prohibits feeding these fluids during either start up or shut down operations).
(vi) The owner or operator of the boiler must:
(A) Continuously monitor and record the carbon monoxide concentration and excess oxygen percentage in the stack gas while burning waste fluid; or
(B) If the boiler will burn <30,000 gallons of waste fluid per year, measure and record the carbon monoxide concentration and excess oxygen percentage in the stack gas at regular intervals of no longer than 60 minutes while burning waste fluid.
(vii) The primary fuel feed rate, waste fluid feed rate, and total quantities of both primary fuel and waste fluid fed to the boiler must be measured and recorded at regular intervals of no longer than 15 minutes while burning waste fluid.
(viii) The carbon monoxide concentration and the excess oxygen percentage must be checked at least once every hour that the waste is burned. If either measurement falls below the levels specified in either (a)(1)(ii) or (a)(1)(iii) of this section, the flow of waste to the boiler shall be stopped immediately.
(2) Prior to any person burning these liquids in the boiler, approval must be obtained from the EPA Regional Administrator for the EPA Region in which the boiler is located and any persons seeking such approval must submit to the EPA Regional Administrator a request containing at least the following information:
(i) The name and address of the owner or operator of the boiler and the address of the boiler.
(ii) The boiler rating in units of BTU/hour.
(iii) The carbon monoxide concentration and the excess oxygen percentage in the stack of the boiler when it is operated in a manner similar to the manner in which it will be operated when low concentration PCB liquid is burned.
(iv) The type of equipment, apparatus, and procedures to be used to control the feed of mineral oil dielectric fluid to the boiler and to monitor and record the carbon monoxide concentration and excess oxygen percentage in the stack.
(v) The type of waste to be burned (e.g., hydraulic fluid, contaminated fuel oil, heat transfer fluid, etc.).
(vi) The concentration of PCBs and of any other chlorinated hydrocarbon in the waste and the results of analyses using the American Society of Testing and Materials (ASTM) methods as follows: Carbon and hydrogen content using ASTM D-3178-84, nitrogen content using ASTM E-258-67 (Reapproved 1987), sulfur content using ASTM D-2784-89, ASTM D-1266-87, or ASTM D-129-64, chlorine content using ASTM D-808-87, water and sediment content using either ASTM D-2709-88 or ASTM D-1796-83 (Reapproved 1990), ash content using ASTM D-482-87, calorific value using ASTM D-240-87, carbon residue using either ASTM D-2158-89 or ASTM D-524-88, and flash point using ASTM D-93-90.
(vii) The quantity of wastes estimated to be burned in a 30–day period.
(viii) An explanation of the procedures to be followed to ensure that burning the waste will not adversely affect the operation of the boiler such that combustion efficiency will decrease.
(3) On the basis of the information in paragraph (b)(2) of this section and any other available information, the Regional Administrator may, at his/her discretion, find that the alternate disposal method will not present an unreasonable risk of injury to health or the environment and approve the use of the boiler.
(4) When burning PCB wastes, the boiler must operate at a level of output no less than the output at which the measurements required under paragraph (b)(2)(iii) of this section were taken.
(5) Any person burning liquids in boilers approved as provided in paragraph (b)(3) of this section, must obtain the following information and retain the information for 5 years at the boiler location:
(i) The data required to be collected in paragraphs (b)(1)(vi) and (b)(1)(vii) of this section.
(ii) The quantity of low concentration PCB liquid burned in the boiler each month.
(iii) The analysis of the waste required by paragraph (b)(2)(vi) of this section taken once a month for each month during which low concentration PCB liquid is burned in the boiler.
[63 FR 35454, June 29, 1998]
§ 761.72 Scrap metal recovery ovens and smelters.
top
Any person may dispose of residual PCBs associated with PCB-Contaminated articles regulated for disposal under §761.60(b), metal surfaces in PCB remediation waste regulated under §761.61, or metal surfaces in PCB bulk product waste regulated under §§761.62(a)(6) and 761.79(c)(6), from which all free-flowing liquids have been removed:
(a) In a scrap metal recovery oven:
(1) The oven shall have at least two enclosed (i.e., negative draft, no fugitive emissions) interconnected chambers.
(2) The equipment with all free-flowing liquid removed shall first be placed in the primary chamber at room temperature.
(3) The primary chamber shall operate at a temperature between 537 °C and 650 °C for a minimum of 2 1/2 hours and reach a minimum temperature of 650 °C (1,202 °F) once during each heating cycle or batch treatment of unheated, liquid-free equipment.
(4) Heated gases from the primary chamber must feed directly into the secondary chamber (i.e., afterburner) which must operate at a minimum temperature of 1,200 °C (2,192 °F) with at least a 3 percent excess oxygen and a retention time of 2.0 seconds with a minimum combustion efficiency of 99.9 percent according to the definition in §761.70(a)(2).
(5) Heating of the primary chamber shall not commence until the secondary chamber has reached a temperature of 1,200 ±100 °C (2,192 ° ±180 °F).
(6) Continuous emissions monitors and recorders for carbon dioxide, carbon monoxide, and excess oxygen in the secondary chamber and continuous temperature recorders in the primary and secondary chambers shall be installed and operated while the primary and secondary chambers are in operation to assure that the two chambers are within the operating parameters in paragraphs (a)(3) through (a)(5) of this section.
(7) Emissions from the secondary chamber must be vented through an exhaust gas stack in accordance with either:
(i) State or local air regulations or permits, or
(ii) The standards in paragraph (a)(8) of this section.
(8) Exhaust gas stack emissions shall be for: particulates <0.015 grains/dry standard cubic foot, sulfur dioxide <35 parts per million by volume (ppmv), nitrogen oxide <150 ppmv, carbon monoxide <35 ppmv, and hydrogen chloride <35 ppmv.
(9) A measurement of the temperature in the secondary chamber at the time the primary chamber starts heating must be taken, recorded and retained at the facility for 3 years from the date each charge is introduced into the primary chamber.
(b) By smelting:
(1) The operating temperature of the hearth must be at least 1,000 °C at the time it is charged with any PCB-Contaminated non-porous surface.
(2) Each charge containing a PCB-Contaminated item must be added into molten metal or a hearth at =1,000 °C.
(3) Successive charges may not be introduced into the hearth in less than 15–minute intervals.
(4) The smelter must operate in compliance with any applicable emissions standards in part 60 of this chapter.
(5) The smelter must have an operational device which accurately measures directly or indirectly, the temperature in the hearth.
(6) Take, record and retain at the disposal facility for 3 years from the date each charge is introduced, a reading of the temperature in the hearth at the time it is charged with a non-porous surface item.
(c)(1) Scrap metal recovery ovens and smelters must either have a final permit under RCRA (part 266, subpart H of this chapter and §270.66 of this chapter) or be operating under a valid State air emissions permit which includes a standard for PCBs.
(2) Scrap metal recovery ovens and smelters disposing of PCBs must provide notification as disposers of PCBs, are not required to submit annual reports, and shall otherwise comply with all applicable provisions of subparts J and K of this part, as well as other applicable Federal, State, and local laws and regulations.
(3) In lieu of the requirements in paragraph (c)(1) of this section, upon written request by the owner or operator of a scrap metal recovery oven or smelter, the EPA Regional Administrator, for the Region where the oven or smelter is located, may make a finding in writing, based on a site-specific risk assessment, that the oven or smelter does not pose an unreasonable risk of injury to health or the environment because it is operating in compliance with the parameters and conditions listed in paragraph (a) or (b) of this section even though the oven or smelter does not have a RCRA or State air permit as required by paragraph (c)(1) of this section. The written request shall include a site-specific risk assessment.
(d) PCB liquids, other liquid waste qualifying as waste oils which may be used as provided for at §761.20(e), or PCB remediation waste, other than PCB-Contaminated articles, may not be disposed of in a scrap metal recovery oven or smelter unless approved or otherwise allowed under subpart D of this part.
[63 FR 35455, June 29, 1998, as amended at 64 FR 33761, June 24, 1999]
§ 761.75 Chemical waste landfills.
top
This section applies to facilities used to dispose of PCBs in accordance with the part.
(a) General. A chemical waste landfill used for the disposal of PCBs and PCB Items shall be approved by the Agency Regional Administrator pursuant to paragraph (c) of this section. The landfill shall meet all of the requirements specified in paragraph (b) of this section, unless a waiver from these requirements is obtained pursuant to paragraph (c)(4) of this section. In addition, the landfill shall meet any other requirements that may be prescribed pursuant to paragraph (c)(3) of this section.
(b) Technical requirements. Requirements for chemical waste landfills used for the disposal of PCBs and PCB Items are as follows:
(1) Soils. The landfill site shall be located in thick, relatively impermeable formations such as large-area clay pans. Where this is not possible, the soil shall have a high clay and silt content with the following parameters:
(i) In-place soil thickness, 4 feet or compacted soil liner thickness, 3 feet;
(ii) Permeability (cm/sec), equal to or less than 1×10-7;
(iii) Percent soil passing No. 200 Sieve, >30;
(iv) Liquid Limit, >30; and
(v) Plasticity Index >15.
(2) Synthetic membrane liners. Synthetic membrane liners shall be used when, in the judgment of the Regional Administrator, the hydrologic or geologic conditions at the landfill require such a liner in order to provide at least a permeability equivalent to the soils in paragraph (b)(1) of this section. Whenever a synthetic liner is used at a landfill site, special precautions shall be taken to insure that its integrity is maintained and that it is chemically compatible with PCBs. Adequate soil underlining and soil cover shall be provided to prevent excessive stress on the liner and to prevent rupture of the liner. The liner must have a minimum thickness of 30 mils.
(3) Hydrologic conditions. The bottom of the landfill shall be above the historical high groundwater table as provided below. Floodplains, shorelands, and groundwater recharge areas shall be avoided. There shall be no hydraulic connection between the site and standing or flowing surface water. The site shall have monitoring wells and leachate collection. The bottom of the landfill liner system or natural in-place soil barrier shall be at least fifty feet from the historical high water table.
(4) Flood protection. (i) If the landfill site is below the 100-year floodwater elevation, the operator shall provide surface water diversion dikes around the perimeter of the landfill site with a minimum height equal to two feet above the 100-year floodwater elevation.
(ii) If the landfill site is above the 100-year floodwater elevation, the operators shall provide diversion structures capable of diverting all of the surface water runoff from a 24-hour, 25-year storm.
(5) Topography. The landfill site shall be located in an area of low to moderate relief to minimize erosion and to help prevent landslides or slumping.
(6) Monitoring systems—(i) Water sampling. (A) For all sites receiving PCBs, the ground and surface water from the disposal site area shall be sampled prior to commencing operations under an approval provided in paragraph (c) of this section for use as baseline data.
(B) Any surface watercourse designated by the Regional Administrator using the authority provided in paragraph (c)(3)(ii) of this section shall be sampled at least monthly when the landfill is being used for disposal operations.
(C) Any surface watercourse designated by the Regional Administrator using the authority provided in paragraph (c)(3)(ii) of this section shall be sampled for a time period specified by the Regional Administrator on a frequency of no less than once every six months after final closure of the disposal area.
(ii) Groundwater monitor wells. (A) If underlying earth materials are homogenous, impermeable, and uniformly sloping in one direction, only three sampling points shall be necessary. These three points shall be equally spaced on a line through the center of the disposal area and extending from the area of highest water table elevation to the area of the lowest water table elevation on the property.
(B) All monitor wells shall be cased and the annular space between the monitor zone (zone of saturation) and the surface shall be completely backfilled with Portland cement or an equivalent material and plugged with Portland cement to effectively prevent percolation of surface water into the well bore. The well opening at the surface shall have a removable cap to provide access and to prevent entrance of rainfall or stormwater runoff. The well shall be pumped to remove the volume of liquid initially contained in the well before obtaining a sample for analysis. The discharge shall be treated to meet applicable State or Federal discharge standards or recycled to the chemical waste landfill.
(iii) Water analysis. As a minimum, all samples shall be analyzed for the following parameters, and all data and records of the sampling and analysis shall be maintained as required in §761.180(d)(1). Sampling methods and analytical procedures for these parameters shall comply with those specified in 40 CFR part 136 as amended in 41 FR 52779 on December 1, 1976.
(A) PCBs.
(B) pH.
(C) Specific conductance.
(D) Chlorinated organics.
(7) Leachate collection. A leachate collection monitoring system shall be installed above the chemical waste landfill. Leachate collection systems shall be monitored monthly for quantity and physicochemical characteristics of leachate produced. The leachate should be either treated to acceptable limits for discharge in accordance with a State or Federal permit or disposed of by another State or Federally approved method. Water analysis shall be conducted as provided in paragraph (b)(6)(iii) of this section. Acceptable leachate monitoring/collection systems shall be any of the following designs, unless a waiver is obtained pursuant to paragraph (c)(4) of this section.
(i) Simple leachate collection. This system consists of a gravity flow drainfield installed above the waste disposal unit liner. This design is recommended for use when semi-solid or leachable solid wastes are placed in a lined pit excavated into a relatively thick, unsaturated, homogenous layer of low permeability soil.
(ii) Compound leachate collection. This system consists of a gravity flow drainfield installed above the waste disposal unit liner and above a secondary installed liner. This design is recommended for use when semi-liquid or leachable solid wastes are placed in a lined pit excavated into relatively permeable soil.
(iii) Suction lysimeters. This system consists of a network of porous ceramic cups connected by hoses/tubing to a vacuum pump. The porous ceramic cups or suction lysimeters are installed along the sides and under the bottom of the waste disposal unit liner. This type of system works best when installed in a relatively permeable unsaturated soil immediately adjacent to the bottom and/or sides of the disposal facility.
(8) Chemical waste landfill operations. (i) PCBs and PCB Items shall be placed in a landfill in a manner that will prevent damage to containers or articles. Other wastes placed in the landfill that are not chemically compatible with PCBs and PCB Items including organic solvents shall be segregated from the PCBs throughout the waste handling and disposal process.
(ii) An operation plan shall be developed and submitted to the Regional Administrator for approval as required in paragraph (c) of this section. This plan shall include detailed explanations of the procedures to be used for recordkeeping, surface water handling procedures, excavation and backfilling, waste segregation burial coordinates, vehicle and equipment movement, use of roadways, leachate collection systems, sampling and monitoring procedures, monitoring wells, environmental emergency contingency plans, and security measures to protect against vandalism and unauthorized waste placements. EPA guidelines entitled “Thermal Processing and Land Disposal of Solid Waste” (39 FR 29337, Aug. 14, 1974) are a useful reference in preparation of this plan. If the facility is to be used to dispose of liquid wastes containing between 50 ppm and 500 ppm PCB, the operations plan must include procedures to determine that liquid PCBs to be disposed of at the landfill do not exceed 500 ppm PCB and measures to prevent the migration of PCBs from the landfill. Bulk liquids not exceeding 500 ppm PCBs may be disposed of provided such waste is pretreated and/or stabilized (e.g., chemically fixed, evaporated, mixed with dry inert absorbant) to reduce its liquid content or increase its solid content so that a non-flowing consistency is achieved to eliminate the presence of free liquids prior to final disposal in a landfill. PCB Container of liquid PCBs with a concentration between 50 and 500 ppm PCB may be disposed of if each container is surrounded by an amount of inert sorbant material capable of absorbing all of the liquid contents of the container.
(iii) Ignitable wastes shall not be disposed of in chemical waste landfills. Liquid ignitable wastes are wastes that have a flash point less than 60 degrees C (140 degrees F) as determined by the following method or an equivalent method: Flash point of liquids shall be determined by a Pensky-Martens Closed Cup Tester, using the protocol specified in ASTM D 93–90, or the Setaflash Closed Tester using the protocol specified in ASTM Standard D–3278–89.
(iv) Records shall be maintained for all PCB disposal operations and shall include information on the PCB concentration in liquid wastes and the three dimensional burial coordinates for PCBs and PCB Items. Additional records shall be developed and maintained as required in §761.180.
(9) Supporting facilities. (i) A six foot woven mesh fence, wall, or similar device shall be placed around the site to prevent unauthorized persons and animals from entering.
(ii) Roads shall be maintained to and within the site which are adequate to support the operation and maintenance of the site without causing safety or nuisance problems or hazardous conditions.
(iii) The site shall be operated and maintained in a manner to prevent safety problems or hazardous conditions resulting from spilled liquids and windblown materials.
(c) Approval of chemical waste landfills. Prior to the disposal of any PCBs and PCB Items in a chemical waste landfill, the owner or operator of the landfill shall receive written approval of the Agency Regional Administrator for the Region in which the landfill is located. The approval shall be obtained in the following manner:
(1) Initial report. The owner or operator shall submit to the Regional Administrator an initial report which contains:
(i) The location of the landfill;
(ii) A detailed description of the landfill including general site plans and design drawings;
(iii) An engineering report describing the manner is which the landfill complies with the requirements for chemical waste landfills specified in paragraph (b) of this section;
(iv) Sampling and monitoring equipment and facilities available;
(v) Expected waste volumes of PCBs;
(vi) General description of waste materials other than PCBs that are expected to be disposed of in the landfill;
(vii) Landfill operations plan as required in paragraph (b) of this section;
(viii) Any local, State, or Federal permits or approvals; and
(ix) Any schedules or plans for complying with the approval requirements of these regulations.
(2) Other information. In addition to the information contained in the report described in paragraph (c)(1) of this section, the Regional Administrator may require the owner or operator to submit any other information that the Regional Administrator finds to be reasonably necessary to determine whether a chemical waste landfill should be approved. Such other information shall be restricted to the types of information required in paragraphs (c)(1) (i) through (ix) of this section.
(3) Contents of approval. (i) Except as provided in paragraph (c)(4) of this section the Regional Administrator may not approve a chemical waste landfill for the disposal of PCBs and PCB Items, unless he finds that the landfill meets all of the requirements of paragraph (b) of this section.
(ii) In addition to the requirements of paragraph (b) of this section, the Regional Administrator may include in an approval any other requirements or provisions that the Regional Administrator finds are necessary to ensure that operation of the chemical waste landfill does not present an unreasonable risk of injury to health or the environment from PCBs. Such provisions may include a fixed period of time for which the approval is valid.
The approval may also include a stipulation that the operator of the chemical waste landfill report to the Regional Administrator any instance when PCBs are detectable during monitoring activities conducted pursuant to paragraph (b)(6) of this section.
(4) Waivers. An owner or operator of a chemical waste landfill may submit evidence to the Regional Administrator that operation of the landfill will not present an unreasonable risk of injury to health or the environment from PCBs when one or more of the requirements of paragraph (b) of this section are not met. On the basis of such evidence and any other available information, the Regional Administrator may in his discretion find that one or more of the requirements of paragraph (b) of this section is not necessary to protect against such a risk and may waive the requirements in any approval for that landfill. Any finding and waiver under this paragraph will be stated in writing and included as part of the approval.
(5) Persons approved. Any approval will designate the persons who own and who are authorized to operate the chemical waste landfill, and will apply only to such persons, except as provided by paragraph (c)(7) of this section.
(6) Final approval. Approval of a chemical waste landfill will be in writing and will be signed by the Regional Administrator. The approval will state all requirements applicable to the approved landfill.
(7) Transfer of property. Any person who owns or operates an approved chemical waste landfill must notify EPA at least 30 days before transferring ownership in the property or transferring the right to conduct the chemical waste landfill operation. The transferor must also submit to EPA, at least 30 days before such transfer, a notarized affidavit signed by the transferee which states that the transferee will abide by the transferor's EPA chemical waste landfill approval. Within 30 days of receiving such notification and affidavit, EPA will issue an amended approval substituting the transferee's name for the transferor's name, or EPA may require the transferee to apply for a new chemical waste landfill approval. In the latter case, the transferee must abide by the transferor's EPA approval until EPA issues the new approval to the transferee.
(Sec. 6, Pub. L. 94–469, 90 Stat. 2020 (15 U.S.C. 2605)
[44 FR 31542, May 31, 1979. Redesignated at 47 FR 19527, May 6, 1982, and amended at 48 FR 5730, Feb. 8, 1983; 49 FR 28191, July 10, 1984; 53 FR 12524, Apr. 15, 1988; 53 FR 21641, June 9, 1988; 57 FR 13323, Apr. 16, 1992; 63 FR 35456, June 29, 1998]
§ 761.77 Coordinated approval.
top
(a) General requirements. Notwithstanding any other provision of this part, the EPA Regional Administrator for the Region in which a PCB disposal or PCB commercial storage facility described in paragraphs(b) and (c) of this section is located may issue a TSCA PCB Coordinated Approval to the persons described in those paragraphs if the conditions listed in this section are met. A TSCA PCB Coordinated Approval will designate the persons who own and who are authorized to operate the facilities described in paragraphs (b) and (c) of this section and will apply only to such persons. All requirements, conditions, and limitations of any other permit or waste management document cited or described in paragraphs (b) and (c) of this section, as the technical or legal basis on which the TSCA PCB Coordinated Approval is issued, are conditions of the TSCA PCB Coordinated Approval. (continued)