(C) Ventilating units used for human comfort that do not exhaust air pollutants into the ambient air from any manufacturing or other industrial process;

(D) Heating units used for human comfort that do not provide heat for any manufacturing or other industrial process;

(E) Noncommercial food preparation;

(F) Consumer use of office equipment and products;

(G) Janitorial services and consumer use of janitorial products; and

(H) Internal combustion engines used for landscaping purposes.

(ii) Insignificant emissions levels. Emissions meeting the criteria in paragraph (c)(11)(ii)(A) or (c)(11)(ii)(B) of this section need not be included in the application, but must be listed with sufficient detail to identify the emission unit and indicate that the exemption applies. Similar emission units, including similar capacities or sizes, may be listed under a single description, provided the number of emission units is included in the description. No additional information is required at time of application, but the permitting authority may request additional information during application processing.

(A) Emission criteria for regulated air pollutants, excluding hazardous air pollutants (HAP). Potential to emit of regulated air pollutants, excluding HAP, for any single emissions unit shall not exceed 2 tpy.

(B) Emission criteria for HAP. Potential to emit of any HAP from any single emissions unit shall not exceed 1,000 lb per year or the de minimis level established under section 112(g) of the Act, whichever is less.

(d) Any application form, report, or compliance certification submitted pursuant to these regulations shall contain certification by a responsible official of truth, accuracy, and completeness. This certification and any other certification required under this part shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete.

§ 71.6 Permit content.
top
(a) Standard permit requirements. Each permit issued under this part shall include the following elements:

(1) Emission limitations and standards, including those operational requirements and limitations that assure compliance with all applicable requirements at the time of permit issuance.

(i) The permit shall specify and reference the origin of and authority for each term or condition, and identify any difference in form as compared to the applicable requirement upon which the term or condition is based.

(ii) The permit shall state that, where an applicable requirement of the Act is more stringent than an applicable requirement of 40 CFR parts 72 through 78, both provisions shall be incorporated into the permit and shall be enforceable by the Administrator.

(iii) If an applicable implementation plan allows a determination of an alternative emission limit at a part 71 source, equivalent to that contained in the plan, to be made in the permit issuance, renewal, or significant modification process, and the permitting authority elects to use such process, any permit containing such equivalency determination shall contain provisions to ensure that any resulting emissions limit has been demonstrated to be quantifiable, accountable, enforceable, and based on replicable procedures.

(2) Permit duration. The permitting authority shall issue permits for a fixed term of 5 years in the case of affected sources, and for a term not to exceed 5 years in the case of all other sources. Notwithstanding this requirement, the permitting authority shall issue permits for solid waste incineration units combusting municipal waste subject to standards under section 129(e) of the Act for a period not to exceed 12 years and shall review such permits at least every 5 years.

(3) Monitoring and related recordkeeping and reporting requirements. (i) Each permit shall contain the following requirements with respect to monitoring:

(A) All monitoring and analysis procedures or test methods required under applicable monitoring and testing requirements, including part 64 of this chapter and any other procedures and methods that may be promulgated pursuant to sections 114(a)(3) or 504(b) of the Act. If more than one monitoring or testing requirement applies, the permit may specify a streamlined set of monitoring or testing provisions provided the specified monitoring or testing is adequate to assure compliance at least to the same extent as the monitoring or testing applicable requirements that are not included in the permit as a result of such streamlining;

(B) Where the applicable requirement does not require periodic testing or instrumental or noninstrumental monitoring (which may consist of recordkeeping designed to serve as monitoring), periodic monitoring sufficient to yield reliable data from the relevant time period that are representative of the source's compliance with the permit, as reported pursuant to paragraph (a)(3)(iii) of this section. Such monitoring requirements shall assure use of terms, test methods, units, averaging periods, and other statistical conventions consistent with the applicable requirement. Recordkeeping provisions may be sufficient to meet the requirements of this paragraph (a)(3)(i)(B); and

(C) As necessary, requirements concerning the use, maintenance, and, where appropriate, installation of monitoring equipment or methods.

(ii) With respect to recordkeeping, the permit shall incorporate all applicable recordkeeping requirements and require, where applicable, the following:

(A) Records of required monitoring information that include the following:

(1) The date, place as defined in the permit, and time of sampling or measurements;

(2) The date(s) analyses were performed;

(3) The company or entity that performed the analyses;

(4) The analytical techniques or methods used;

(5) The results of such analyses; and

(6) The operating conditions as existing at the time of sampling or measurement;

(B) Retention of records of all required monitoring data and support information for a period of at least 5 years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records and all original strip-chart recordings for continuous monitoring instrumentation, and copies of all reports required by the permit.

(iii) With respect to reporting, the permit shall incorporate all applicable reporting requirements and require the following:

(A) Submittal of reports of any required monitoring at least every 6 months. All instances of deviations from permit requirements must be clearly identified in such reports. All required reports must be certified by a responsible official consistent with §71.5(d).

(B) Prompt reporting of deviations from permit requirements, including those attributable to upset conditions as defined in the permit, the probable cause of such deviations, and any corrective actions or preventive measures taken. Where the underlying applicable requirement contains a definition of prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall govern. Where the underlying applicable requirement fails to address the time frame for reporting deviations, reports of deviations shall be submitted to the permitting authority based on the following schedule:

(1) For emissions of a hazardous air pollutant or a toxic air pollutant (as identified in an applicable regulation) that continue for more than an hour in excess of permit requirements, the report must be made with 24 hours of the occurrence.

(2) For emissions of any regulated air pollutant, excluding those listed in paragraph (a)(3)(iii)(B)(1) of this section, that continue for more than two hours in excess of permit requirements, the report must be made within 48 hours.

(3) For all other deviations from permit requirements, the report shall be contained in the report submitted in accordance with the timeframe given in paragraph (a)(3)(iii)(A).

(4) A permit may contain a more stringent reporting requirement than required by paragraphs (a)(3)(iii)(B)(1), (2), or (3).

If any of the above conditions are met, the source must notify the permitting authority by telephone or facsimile based on the timetable listed in paragraphs (a)(3)(iii)(B) (1) through (4) of this section. A written notice, certified consistent with §71.5(d), must be submitted within 10 working days of the occurrence. All deviations reported under paragraph (a)(3)(iii)(A) of this section must also be identified in the 6 month report required under paragraph (a)(3)(iii)(A) of this section.

(C) For purposes of paragraph (a)(3)(iii)(B) of this section, deviation means any situation in which an emissions unit fails to meet a permit term or condition. A deviation is not always a violation. A deviation can be determined by observation or through review of data obtained from any testing, monitoring, or recordkeeping established in accordance with paragraphs (a)(3)(i) and (a)(3)(ii) of this section. For a situation lasting more than 24 hours which constitutes a deviation, each 24 hour period is considered a separate deviation. Included in the meaning of deviation are any of the following:

(1) A situation where emissions exceed an emission limitation or standard;

(2) A situation where process or emissions control device parameter values indicate that an emission limitation or standard has not been met;

(3) A situation in which observations or data collected demonstrates noncompliance with an emission limitation or standard or any work practice or operating condition required by the permit;

(4) A situation in which an exceedance or an excursion, as defined in part 64 of this chapter, occurs.

(4) A permit condition prohibiting emissions exceeding any allowances that the source lawfully holds under 40 CFR parts 72 through 78.

(i) No permit revision shall be required for increases in emissions that are authorized by allowances acquired pursuant to the acid rain program, provided that such increases do not require a permit revision under any other applicable requirement.

(ii) No limit shall be placed on the number of allowances held by the source. The source may not, however, use allowances as a defense to noncompliance with any other applicable requirement.

(iii) Any such allowance shall be accounted for according to the procedures established in regulations 40 CFR parts 72 through 78.

(5) A severability clause to ensure the continued validity of the various permit requirements in the event of a challenge to any portions of the permit.

(6) Provisions stating the following:

(i) The permittee must comply with all conditions of the part 71 permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.

(ii) Need to halt or reduce activity not a defense. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.

(iii) The permit may be modified, revoked, reopened, and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition.

(iv) The permit does not convey any property rights of any sort, or any exclusive privilege.

(v) The permittee shall furnish to the permitting authority, within a reasonable time, any information that the permitting authority may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit or to determine compliance with the permit. Upon request, the permittee shall also furnish to the permitting authority copies of records required to be kept by the permit or, in the case of a program delegated pursuant to §71.10, for information claimed to be confidential, the permittee may furnish such records directly to the Administrator along with a claim of confidentiality.

(7) A provision to ensure that a part 71 source pays fees to the Administrator consistent with the fee schedule approved pursuant to §71.9.

(8) Emissions trading. A provision stating that no permit revision shall be required, under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in the permit.

(9) Terms and conditions for reasonably anticipated operating scenarios identified by the source in its application as approved by the permitting authority. Such terms and conditions:

(i) Shall require the source, contemporaneously with making a change from one operating scenario to another, to record in a log at the permitted facility a record of the scenario under which it is operating;

(ii) May extend the permit shield described in paragraph (f) of this section to all terms and conditions under each such operating scenario; and

(iii) Must ensure that the terms and conditions of each such alternative scenario meet all applicable requirements and the requirements of this part.

(10) Terms and conditions, if the permit applicant requests them, for the trading of emissions increases and decreases in the permitted facility, to the extent that the applicable requirements provide for trading such increases and decreases without a case-by-case approval of each emissions trade. Such terms and conditions:

(i) Shall include all terms required under paragraphs (a) and (c) of this section to determine compliance;

(ii) May extend the permit shield described in paragraph (f) of this section to all terms and conditions that allow such increases and decreases in emissions; and

(iii) Must meet all applicable requirements and requirements of this part.

(11) Permit expiration. A provision to ensure that a part 71 permit expires upon the earlier occurrence of the following events:

(i) twelve years elapses from the date of issuance to a solid waste incineration unit combusting municipal waste subject to standards under section 112(e) of the Act; or

(ii) five years elapses from the date of issuance; or

(iii) the source is issued a part 70 permit.

(12) Off Permit Changes. A provision allowing changes that are not addressed or prohibited by the permit, other than those subject to the requirements of 40 CFR parts 72 through 78 or those that are modifications under any provision of title I of the Act to be made without a permit revision, provided that the following requirements are met:

(i) Each such change shall meet all applicable requirements and shall not violate any existing permit term or condition;

(ii) Sources must provide contemporaneous written notice to the permitting authority (and EPA, in the case of a program delegated pursuant to §71.10) of each such change, except for changes that qualify as insignificant under §71.5(c)(11). Such written notice shall describe each such change, including the date, any change in emissions, pollutants emitted, and any applicable requirement that would apply as a result of the change;

(iii) The change shall not qualify for the shield under §71.6(f);

(iv) The permittee shall keep a record describing changes made at the source that result in emissions of a regulated air pollutant subject to an applicable requirement, but not otherwise regulated under the permit, and the emissions resulting from those changes.

(13) Operational flexibility. Provisions consistent with paragraphs (a)(3)(i) through (iii) of this section to allow changes within a permitted facility without requiring a permit revision, if the changes are not modifications under any provision of title I of the Act and the changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or in terms of total emissions): Provided, that the facility provides the Administrator (in the case of a program delegated pursuant to §71.10) and the permitting authority with written notification as required below in advance of the proposed changes, which shall be a minimum of 7 days.

(i) The permit shall allow the permitted source to make section 502(b)(10) changes without requiring a permit revision, if the changes are not modifications under any provision of title I of the Act and the changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or in terms of total emissions).

(A) For each such change, the written notification required above shall include a brief description of the change within the permitted facility, the date on which the change will occur, any change in emissions, and any permit term or condition that is no longer applicable as a result of the change.

(B) The permit shield described in §71.6(f) shall not apply to any change made pursuant to this paragraph (a)(13)(i).

(ii) The permit may provide for the permitted source to trade increases and decreases in emissions in the permitted facility, where the applicable implementation plan provides for such emissions trades without requiring a permit revision and based on the 7-day notice prescribed in this paragraph (a)(13)(ii) of this section. This provision is available in those cases where the permit does not already provide for such emissions trading.

(A) Under this paragraph (a)(13)(ii), the written notification required above shall include such information as may be required by the provision in the applicable implementation plan authorizing the emissions trade, including at a minimum, when the proposed change will occur, a description of each such change, any change in emissions, the permit requirements with which the source will comply using the emissions trading provisions of the applicable implementation plan, and the pollutants emitted subject to the emissions trade. The notice shall also refer to the provisions with which the source will comply in the applicable implementation plan and that provide for the emissions trade.

(B) The permit shield described in §71.6(f) shall not extend to any change made under this paragraph (a)(13)(ii). Compliance with the permit requirements that the source will meet using the emissions trade shall be determined according to requirements of the applicable implementation plan authorizing the emissions trade.

(iii) The permit shall require the permitting authority, if a permit applicant requests it, to issue permits that contain terms and conditions, including all terms required under §71.6 (a) and (c) to determine compliance, allowing for the trading of emissions increases and decreases in the permitted facility solely for the purpose of complying with a federally-enforceable emissions cap that is established in the permit independent of otherwise applicable requirements. The permit applicant shall include in its application proposed replicable procedures and permit terms that ensure the emissions trades are quantifiable and enforceable. The permitting authority shall not be required to include in the emissions trading provisions any emissions units for which emissions are not quantifiable or for which there are no replicable procedures to enforce the emissions trades. The permit shall also require compliance with all applicable requirements.

(A) Under this paragraph (a)(13)(iii), the written notification required above shall state when the change will occur and shall describe the changes in emissions that will result and how these increases and decreases in emissions will comply with the terms and conditions of the permit.

(B) The permit shield described in §71.6(f) may extend to terms and conditions that allow such increases and decreases in emissions.

(b) Federally-enforceable requirements. All terms and conditions in a part 71 permit, including any provisions designed to limit a source's potential to emit, are enforceable by the Administrator and citizens under the Act.

(c) Compliance requirements. All part 71 permits shall contain the following elements with respect to compliance:

(1) Consistent with paragraph (a)(3) of this section, compliance certification, testing, monitoring, reporting, and recordkeeping requirements sufficient to assure compliance with the terms and conditions of the permit. Any document (including reports) required by a part 71 permit shall contain a certification by a responsible official that meets the requirements of §71.5(d).

(2) Inspection and entry requirements that require that, upon presentation of credentials and other documents as may be required by law, the permittee shall allow the permitting authority or an authorized representative to perform the following:

(i) Enter upon the permittee's premises where a part 71 source is located or emissions-related activity is conducted, or where records must be kept under the conditions of the permit;

(ii) Have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit;

(iii) Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit; and

(iv) As authorized by the Act, sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with the permit or applicable requirements.

(3) A schedule of compliance consistent with §71.5(c)(8).

(4) Progress reports consistent with an applicable schedule of compliance and §71.5(c)(8) to be submitted at least semiannually, or at a more frequent period if specified in the applicable requirement or by the permitting authority. Such progress reports shall contain the following:

(i) Dates for achieving the activities, milestones, or compliance required in the schedule of compliance, and dates when such activities, milestones or compliance were achieved; and

(ii) An explanation of why any dates in the schedule of compliance were not or will not be met, and any preventive or corrective measures adopted.

(5) Requirements for compliance certification with terms and conditions contained in the permit, including emission limitations, standards, or work practices. Permits shall include each of the following:

(i) The frequency (not less than annually or such more frequent periods as specified in the applicable requirement or by the permitting authority) of submissions of compliance certifications;

(ii) In accordance with §71.6(a)(3), a means for monitoring the compliance of the source with its emissions limitations, standards, and work practices;

(iii) A requirement that the compliance certification include all of the following (provided that the identification of applicable information may cross-reference the permit or previous reports, as applicable):

(A) The identification of each term or condition of the permit that is the basis of the certification;

(B) The identification of the method(s) or other means used by the owner or operator for determining the compliance status with each term and condition during the certification period. Such methods and other means shall include, at a minimum, the methods and means required under paragraph (a)(3) of this section;

(C) The status of compliance with the terms and conditions of the permit for the period covered by the certification, including whether compliance during the period was continuous or intermittent. The certification shall be based on the method or means designated in paragraph (c)(5)(iii)(B) of this section. The certification shall identify each deviation and take it into account in the compliance certification; and

(D) Such other facts as the permitting authority may require to determine the compliance status of the source.

(iv) A requirement that all compliance certifications be submitted to the Administrator as well as to the permitting authority.

(6) Such other provisions as the permitting authority may require.

(d) General permits. (1) The permitting authority may, after notice and opportunity for public participation provided under §71.11, issue a general permit covering numerous similar sources. Any general permit shall comply with all requirements applicable to other part 71 permits and shall identify criteria by which sources may qualify for the general permit. To sources that qualify, the permitting authority shall grant the conditions and terms of the general permit. Notwithstanding the shield provisions of paragraph (f) of this section, the source shall be subject to enforcement action for operation without a part 71 permit if the source is later determined not to qualify for the conditions and terms of the general permit. General permits shall not be authorized for affected sources under the acid rain program unless otherwise provided in 40 CFR parts 72 through 78.

(2) Part 71 sources that would qualify for a general permit must apply to the permitting authority for coverage under the terms of the general permit or must apply for a part 71 permit consistent with §71.5. The permitting authority may, in the general permit, provide for applications which deviate from the requirements of §71.5, provided that such applications meet the requirements of title V of the Act, and include all information necessary to determine qualification for, and to assure compliance with, the general permit. Without repeating the public participation procedures required under §71.11, the permitting authority may grant a source's request for authorization to operate under a general permit, but such a grant shall not be a final permit action for purposes of judicial review.

(e) Temporary sources. The permitting authority may issue a single permit authorizing emissions from similar operations by the same source owner or operator at multiple temporary locations. The operation must be temporary and involve at least one change of location during the term of the permit. No affected source shall be permitted as a temporary source. Permits for temporary sources shall include the following:

(1) Conditions that will assure compliance with all applicable requirements at all authorized locations;

(2) Requirements that the owner or operator notify the permitting authority at least 10 days in advance of each change in location; and

(3) Conditions that assure compliance with all other provisions of this section.

(f) Permit shield. (1) Except as provided in this part, the permitting authority may expressly include in a part 71 permit a provision stating that compliance with the conditions of the permit shall be deemed compliance with any applicable requirements as of the date of permit issuance, provided that:

(i) Such applicable requirements are included and are specifically identified in the permit; or

(ii) The permitting authority, in acting on the permit application or revision, determines in writing that other requirements specifically identified are not applicable to the source, and the permit includes the determination or a concise summary thereof.

(2) A part 71 permit that does not expressly state that a permit shield exists shall be presumed not to provide such a shield.

(3) Nothing in this paragraph or in any part 71 permit shall alter or affect the following:

(i) The provisions of section 303 of the Act (emergency orders), including the authority of the Administrator under that section;

(ii) The liability of an owner or operator of a source for any violation of applicable requirements prior to or at the time of permit issuance;

(iii) The applicable requirements of the acid rain program, consistent with section 408(a) of the Act; or

(iv) The ability of EPA to obtain information from a source pursuant to section 114 of the Act.

(g) Emergency provision—(1) Definition. An “emergency” means any situation arising from sudden and reasonably unforeseeable events beyond the control of the source, including acts of God, which situation requires immediate corrective action to restore normal operation, and that causes the source to exceed a technology-based emission limitation under the permit, due to unavoidable increases in emissions attributable to the emergency. An emergency shall not include noncompliance to the extent caused by improperly designed equipment, lack of preventative maintenance, careless or improper operation, or operator error.

(2) Effect of an emergency. An emergency constitutes an affirmative defense to an action brought for noncompliance with such technology-based emission limitations if the conditions of paragraph (g)(3) of this section are met.

(3) The affirmative defense of emergency shall be demonstrated through properly signed, contemporaneous operating logs, or other relevant evidence that:

(i) An emergency occurred and that the permittee can identify the cause(s) of the emergency;

(ii) The permitted facility was at the time being properly operated;

(iii) During the period of the emergency the permittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards, or other requirements in the permit; and

(iv) The permittee submitted notice of the emergency to the permitting authority within 2 working days of the time when emission limitations were exceeded due to the emergency. This notice fulfills the requirement of paragraph (a)(3)(iii)(B) of this section. This notice must contain a description of the emergency, any steps taken to mitigate emissions, and corrective actions taken.

(4) In any enforcement proceeding, the permittee seeking to establish the occurrence of an emergency has the burden of proof.

(5) This provision is in addition to any emergency or upset provision contained in any applicable requirement.

[61 FR 34228, July 1, 1996, as amended at 62 FR 54947, Oct. 22, 1997; 66 FR 12876, Mar. 1, 2001; 66 FR 55885, Nov. 5, 2001; 68 FR 38523, June 27, 2003]

§ 71.7 Permit issuance, renewal, reopenings, and revisions.
top
(a) Action on application. (1) A permit, permit modification, or renewal may be issued only if all of the following conditions have been met:

(i) The permitting authority has received a complete application for a permit, permit modification, or permit renewal, except that a complete application need not be received before issuance of a general permit under §71.6(d);

(ii) Except for modifications qualifying for minor permit modification procedures under paragraphs (e) (1) and (2) of this section, the permitting authority has complied with the requirements for public participation under this section or §71.11, as applicable;

(iii) The permitting authority has complied with the requirements for notifying and responding to affected States under §71.8(a);

(iv) The conditions of the permit provide for compliance with all applicable requirements and the requirements of this part; and

(v) In the case of a program delegated pursuant to §71.10, the Administrator has received a copy of the proposed permit and any notices required under §71.10(d) and has not objected to issuance of the permit under §71.10(g) within the time period specified therein.

(2) Except as provided under the initial transition plan provided for under §71.4(i) or under 40 CFR part 72 or title V of the Act for the permitting of affected sources under the acid rain program, the permitting authority shall take final action on each permit application (including a request for permit modification or renewal) within 18 months after receiving a complete application.

(3) The permitting authority shall ensure that priority is given to taking action on applications for construction or modification under title I, parts C and D of the Act.

(4) The permitting authority shall promptly provide notice to the applicant of whether the application is complete. Unless the permitting authority requests additional information or otherwise notifies the applicant of incompleteness within 60 days of receipt of an application, the application shall be deemed complete. For modifications processed through minor permit modification procedures, such as those in paragraphs (e) (1) and (2) of this section, the permitting authority need not make a completeness determination.

(5) The permitting authority shall provide a statement that sets forth the legal and factual basis for the draft permit conditions (including references to the applicable statutory or regulatory provisions). The permitting authority shall send this statement to any person who requests it, and to EPA, in the case of a program delegated pursuant to §71.10.

(6) The submittal of a complete application shall not affect the requirement that any source have a preconstruction permit under title I of the Act.

(b) Requirement for a permit. Except as provided in the following sentence, §71.6(a)(13), and paragraphs (e)(1)(v) and e(2)(v) of this section, no part 71 source may operate after the time that it is required to submit a timely and complete application under this part, except in compliance with a permit issued under this part. If a part 71 source submits a timely and complete application for permit issuance (including for renewal), the source's failure to have a part 71 permit is not a violation of this part until the permitting authority takes final action on the permit application, except as noted in this section. This protection shall cease to apply if, subsequent to the completeness determination made pursuant to paragraph (a)(4) of this section, and as required by §71.5(c), the applicant fails to submit by the deadline specified in writing by the permitting authority any additional information identified as being needed to process the application.

(c) Permit renewal and expiration. (1) (i) Permits being renewed are subject to the same procedural requirements, including those for public participation, affected State review, and EPA review (in the case of a program delegated pursuant to §71.10) that apply to initial permit issuance.

(ii) Permit expiration terminates the source's right to operate unless a timely and complete renewal application has been submitted consistent with paragraph (b) of this section and §71.5(a)(1)(iii).

(2) In the case of a program delegated pursuant to §71.10, if the permitting authority fails to act in a timely way on permit renewal, EPA may invoke its authority under section 505(e) of the Act to terminate or revoke and reissue the permit.

(3) If a timely and complete application for a permit renewal is submitted, consistent with §71.5(a)(2), but the permitting authority has failed to issue or deny the renewal permit before the end of the term of the previous part 70 or 71 permit, then the permit shall not expire until the renewal permit has been issued or denied and any permit shield that may be granted pursuant to §71.6(f) may extend beyond the original permit term until renewal; or all the terms and conditions of the permit including any permit shield that may be granted pursuant to §71.6(f) shall remain in effect until the renewal permit has been issued or denied.

(d) Administrative permit amendments. (1) An “administrative permit amendment” is a permit revision that:

(i) Corrects typographical errors;

(ii) Identifies a change in the name, address, or phone number of any person identified in the permit, or provides a similar minor administrative change at the source;

(iii) Requires more frequent monitoring or reporting by the permittee;

(iv) Allows for a change in ownership or operational control of a source where the permitting authority determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the permitting authority;

(v) Incorporates into the part 71 permit the requirements from preconstruction review permits authorized under an EPA-approved program, provided that such a program meets procedural requirements substantially equivalent to the requirements of §§71.7 and 71.8 (and §71.10 in the case of a delegated program) that would be applicable to the change if it were subject to review as a permit modification, and compliance requirements substantially equivalent to those contained in §71.6; or

(vi) Incorporates any other type of change which the Administrator has determined to be similar to those in paragraphs (d)(1)(i) through (iv) of this section.

(2) Administrative permit amendments for purposes of the acid rain portion of the permit shall be governed by 40 CFR part 72.

(3) Administrative permit amendment procedures. An administrative permit amendment may be made by the permitting authority consistent with the following:

(i) The permitting authority shall take no more than 60 days from receipt of a request for an administrative permit amendment to take final action on such request, and may incorporate such changes without providing notice to the public or affected States provided that it designates any such permit revisions as having been made pursuant to this paragraph.

(ii) The permitting authority shall submit a copy of the revised permit to the Administrator in the case of a program delegated pursuant to §71.10.

(iii) The source may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.

(4) The permitting authority may, upon taking final action granting a request for an administrative permit amendment, allow coverage by the permit shield in §71.6(f) for administrative permit amendments made pursuant to paragraph (d)(1)(v) of this section which meet the relevant requirements of §§71.6, 71.7, and 71.8 for significant permit modifications.

(e) Permit modifications. A permit modification is any revision to a part 71 permit that cannot be accomplished under the provisions for administrative permit amendments under paragraph (d) of this section. A permit modification for purposes of the acid rain portion of the permit shall be governed by 40 CFR part 72.

(1) Minor permit modification procedures. (i) Criteria. (A) Minor permit modification procedures may be used only for those permit modifications that:

(1) Do not violate any applicable requirement;

(2) Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements in the permit;

(3) Do not require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts, or a visibility or increment analysis;

(4) Do not seek to establish or change a permit term or condition for which there is no corresponding underlying applicable requirement and that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject. Such terms and conditions include:

(i) A federally enforceable emissions cap assumed to avoid classification as a modification under any provision of title I; and

(ii) An alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of the Act;

(5) Are not modifications under any provision of title I of the Act; and

(6) Are not required to be processed as a significant modification.

(B) Notwithstanding paragraphs (e)(1)(i)(A) and (e)(2)(i) of this section, minor permit modification procedures may be used for permit modifications involving the use of economic incentives, marketable permits, emissions trading, and other similar approaches, to the extent that such minor permit modification procedures are explicitly provided for in an applicable implementation plan or in applicable requirements promulgated by EPA.

(ii) Application. An application requesting the use of minor permit modification procedures shall meet the requirements of §71.5(c) and shall include the following:

(A) A description of the change, the emissions resulting from the change, and any new applicable requirements that will apply if the change occurs;

(B) The source's suggested draft permit;

(C) Certification by a responsible official, consistent with §71.5(d), that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used; and

(D) Completed forms for the permitting authority to use to notify affected States (and the Administrator in the case of a program delegated pursuant to §71.10) as required under §§71.8 and 71.10(d).

(iii) EPA and affected State notification. Within 5 working days of receipt of a complete permit modification application, the permitting authority shall meet its obligation under §71.8(a) to notify affected States (and its obligation under §71.10(d) to notify the Administrator in the case of a program delegated pursuant to §71.10) of the requested permit modification. In the case of a program delegated pursuant to §71.10, the permitting authority promptly shall send any notice required under §71.8(b) to the Administrator.

(iv) Timetable for issuance. In the case of a program delegated pursuant to §71.10, the permitting authority may not issue a final permit modification until after EPA's 45-day review period or until EPA has notified the permitting authority that EPA will not object to issuance of the permit modification, whichever is first, although the permitting authority can approve the permit modification prior to that time. Within 90 days of the permitting authority's receipt of an application under minor permit modification procedures (or 15 days after the end of the Administrator's 45-day review period under §71.10(g) in the case of a program delegated pursuant to §71.10, whichever is later), the permitting authority shall:

(A) Issue the permit modification as proposed;

(B) Deny the permit modification application;

(C) Determine that the requested modification does not meet the minor permit modification criteria and should be reviewed under the significant modification procedures; or

(D) Revise the draft permit modification (and, in the case of a program delegated pursuant to §71.10, transmit to the Administrator the new proposed permit modification as required by §71.10(d)).

(v) Source's ability to make change. The source may make the change proposed in its minor permit modification application immediately after it files such application. After the source makes the change allowed by the preceding sentence, and until the permitting authority takes any of the actions specified in paragraphs (e)(1)(iv) (A) through (C) of this section, the source must comply with both the applicable requirements governing the change and the proposed permit terms and conditions. During this time period, the source need not comply with the existing permit terms and conditions it seeks to modify. However, if the source fails to comply with its proposed permit terms and conditions during this time period, the existing permit terms and conditions it seeks to modify may be enforced against it.

(vi) Permit shield. The permit shield under §71.6(f) may not extend to minor permit modifications.

(2) Group processing of minor permit modifications. Consistent with this paragraph, the permitting authority may modify the procedure outlined in paragraph (e)(1) of this section to process groups of a source's applications for certain modifications eligible for minor permit modification processing.

(i) Criteria. Group processing of modifications may be used only for those permit modifications:

(A) That meet the criteria for minor permit modification procedures under paragraph (e)(1)(i)(A) of this section; and

(B) That collectively are below the threshold level of 10 percent of the emissions allowed by the permit for the emissions unit for which the change is requested, 20 percent of the applicable definition of major source in §71.2, or 5 tpy, whichever is least.

(ii) Application. An application requesting the use of group processing procedures shall meet the requirements of §71.5(c) and shall include the following:

(A) A description of the change, the emissions resulting from the change, and any new applicable requirements that will apply if the change occurs.

(B) The source's suggested draft permit.

(C) Certification by a responsible official, consistent with §71.5(d), that the proposed modification meets the criteria for use of group processing procedures and a request that such procedures be used.

(D) A list of the source's other pending applications awaiting group processing, and a determination of whether the requested modification, aggregated with these other applications, equals or exceeds the threshold set under paragraph (e)(2)(i)(B) of this section.

(E) Certification, consistent with §71.5(d), that, in the case of a program delegated pursuant to §71.10, the source has notified EPA of the proposed modification. Such notification need only contain a brief description of the requested modification.

(F) Completed forms for the permitting authority to use to notify affected States as required under §71.8 (and the Administrator as required under §71.10(d) in the case of a program delegated pursuant to §71.10).

(iii) EPA and affected State notification. On a quarterly basis or within 5 business days of receipt of an application demonstrating that the aggregate of a source's pending applications equals or exceeds the threshold level set under paragraph (e)(2)(i)(B) of this section, whichever is earlier, the permitting authority promptly shall meet its obligation under §71.8(a) to notify affected States (and its obligation under §71.10(d) to notify EPA in the case of a program delegated pursuant to §71.10) of the requested permit modification. The permitting authority shall send any notice required under §71.8(b) to the Administrator in the case of a program delegated pursuant to §71.10.

(iv) Timetable for issuance. The provisions of paragraph (e)(1)(iv) of this section shall apply to modifications eligible for group processing, except that the permitting authority shall take one of the actions specified in paragraphs (e)(1)(iv) (A) through (D) of this section within 180 days of receipt of the application (or, in the case of a program delegated pursuant to §71.10, 15 days after the end of the Administrator's 45-day review period under §71.10(g), whichever is later).

(v) Source's ability to make change. The provisions of paragraph (e)(1)(v) of this section shall apply to modifications eligible for group processing.

(vi) Permit shield. The provisions of paragraph (e)(1)(vi) of this section shall also apply to modifications eligible for group processing.

(3) Significant modification procedures—(i) Criteria. Significant modification procedures shall be used for applications requesting permit modifications that do not qualify as minor permit modifications or as administrative amendments. Every significant change in existing monitoring permit terms or conditions and every relaxation of reporting or recordkeeping permit terms or conditions shall be considered significant. Nothing herein shall be construed to preclude the permittee from making changes consistent with this part that would render existing permit compliance terms and conditions irrelevant.

(ii) Significant permit modifications shall meet all requirements of this part, including those for applications, public participation, review by affected States, and review by EPA (in the case of a program delegated pursuant to §71.10), as they apply to permit issuance and permit renewal. The permitting authority shall design and implement this review process to complete review on the majority of significant permit modifications within 9 months after receipt of a complete application.

(f) Reopening for cause. (1) Each issued permit shall include provisions specifying the conditions under which the permit will be reopened prior to the expiration of the permit. A permit shall be reopened and revised under any of the following circumstances:

(i) Additional applicable requirements under the Act become applicable to a major part 71 source with a remaining permit term of 3 or more years. Such a reopening shall be completed not later than 18 months after promulgation of the applicable requirement. No such reopening is required if the effective date of the requirement is later than the date on which the permit is due to expire, unless the original permit or any of its terms and conditions have been extended pursuant to paragraph (c)(3) of this section.

(ii) Additional requirements (including excess emissions requirements) become applicable to an affected source under the acid rain program. Upon approval by the Administrator, excess emissions offset plans shall be deemed to be incorporated into the permit.

(iii) The permitting authority (or EPA, in the case of a program delegated pursuant to §71.10) determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.

(iv) The permitting authority (or EPA, in the case of a program delegated pursuant to §71.10) determines that the permit must be revised or revoked to assure compliance with the applicable requirements.

(2) Proceedings to reopen and issue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists, and shall be made as expeditiously as practicable.

(3) Reopenings under paragraph (f)(1) of this section shall not be initiated before a notice of such intent is provided to the part 71 source by the permitting authority at least 30 days in advance of the date that the permit is to be reopened, except that the permitting authority may provide a shorter time period in the case of an emergency. (continued)