(C) Provide for an audit procedure for quality control of purchased equipment to ensure conformance with purchase specifications. The audit program may be conducted by the owner or operator of the plant site or process unit or by a designated representative; and
(D) Detail off-line pump maintenance and repair procedures. These procedures shall include provisions to ensure that rebuilt or refurbished pumps and pump seals will meet the design specifications for the pump category and will operate so that emissions are minimized.
(ii) The quality assurance program shall be established no later than the start of the third year of the quality improvement program for plant sites with 400 or more valves or 100 or more employees, and no later than the start of the fourth year of the quality improvement program for plant sites with less than 400 valves and less than 100 employees.
(8) Pump or pump seal replacement. Beginning at the start of the third year of the quality improvement program for plant sites with 400 or more valves or 100 or more employees and at the start of the fourth year of the quality improvement program for plant sites with less than 400 valves and less than 100 employees, the owner or operator shall replace as described in paragraphs (d)(8)(i) and (ii) of this section the pumps or pump seals that are not superior emission performance technology with pumps or pump seals that have been identified as superior emission performance technology and that comply with the quality assurance standards for the pump category. Superior emission performance technology is that category or design of pumps or pump seals with emission performance that, when combined with appropriate process, operating, and maintenance practices, will result in less than 10 percent leaking pumps for specific applications in the process unit or plant site. Superior emission performance technology includes material or design changes to the existing pump, pump seal, seal support system, installation of multiple mechanical seals or equivalent, or pump replacement.
(i) Pumps or pump seals shall be replaced at the rate of 20 percent per year based on the total number of pumps in light liquid service. The calculated value shall be rounded to the nearest nonzero integer value. The minimum number of pumps or pump seals shall be one. Pump replacement shall continue until all pumps subject to the requirements of §65.107 are pumps determined to be superior performance technology.
(ii) The owner or operator may delay replacement of pump seals or pumps with superior technology until the next planned process unit shutdown provided the number of pump seals and pumps replaced is equivalent to the 20 percent or greater annual replacement rate.
(iii) The pumps shall be maintained as specified in the quality assurance program.
(e) QIP recordkeeping. In addition to the records required by paragraph (d)(2) of this section, the owner or operator shall maintain records for the period of the quality improvement program for the process unit as specified in paragraphs (e)(1) through (6) of this section.
(1) When using a pump quality improvement program as specified in this section, record the following information:
(i) The rolling average percent leaking pumps.
(ii) Documentation of all inspections conducted under the requirements of paragraph (d)(4) of this section and any recommendations for design or specification changes to reduce leak frequency.
(iii) The beginning and ending dates while meeting the requirements of paragraph (d) of this section.
(2) If a leak is not repaired within 15 calendar days after discovery of the leak, the reason for the delay and the expected date of successful repair.
(3) Records of all analyses required in paragraph (d) of this section. The records will include the following information:
(i) A list identifying areas associated with poorer than average performance and the associated service characteristics of the stream, the operating conditions, and the maintenance practices.
(ii) The reasons for rejecting specific candidate superior emission performing pump technology from performance trials.
(iii) The list of candidate superior emission performing valve or pump technologies and documentation of the performance trial program items required under paragraph (d)(6)(iii) of this section.
(iv) The beginning date and duration of performance trials of each candidate superior emission performing technology.
(4) All records documenting the quality assurance program for pumps as specified in paragraph (d)(7) of this section, including records indicating that all pumps replaced or modified during the period of the quality improvement program are in compliance with the quality assurance.
(5) Records documenting compliance with the 20 percent or greater annual replacement rate for pumps as specified in paragraph (d)(8) of this section.
(6) Information and data to show the corporation has fewer than 100 employees, including employees providing professional and technical contracted services.
§ 65.117 Alternative means of emission limitation: Batch processes.
top
(a) General requirement. As an alternative to complying with the requirements of §§65.106 through 65.114 and §65.116, an owner or operator of a batch process that operates in regulated material service during the calendar year may comply with one of the standards specified in paragraphs (b) and (c) of this section, or the owner or operator may petition for approval of an alternative standard under the provisions of §65.102(b). The alternative standards of this section provide the options of pressure testing or monitoring the equipment for leaks. The owner or operator may switch among the alternatives provided the change is documented as specified in paragraph (b)(7) of this section.
(b) Pressure testing of the batch equipment. The following requirements shall be met if an owner or operator elects to use pressure testing of batch product-process equipment to demonstrate compliance with this subpart:
(1) Reconfiguration. Each time equipment is reconfigured for production of a different product or intermediate, the batch product-process equipment train shall be pressure-tested for leaks before regulated material is first fed to the equipment and the equipment is placed in regulated material service.
(i) When the batch product-process equipment train is reconfigured to produce a different product, pressure testing is required only for the new or disturbed equipment.
(ii) Each batch product-process that operates in regulated material service during a calendar year shall be pressure-tested at least once during that calendar year.
(iii) Pressure testing is not required for routine seal breaks, such as changing hoses or filters, that are not part of the reconfiguration to produce a different product or intermediate.
(2) Testing procedures. The batch product-process equipment shall be tested either using the procedures specified in paragraph (b)(5) of this section for pressure vacuum loss or with a liquid using the procedures specified in paragraph (b)(6) of this section.
(3) Leak detection. (i) For pressure or vacuum tests using a gas, a leak is detected if the rate of change in pressure is greater than 6.9 kilopascals (1 pound per square inch gauge) in 1 hour or if there is visible, audible, or olfactory evidence of fluid loss.
(ii) For pressure tests using a liquid, a leak is detected if there are indications of liquids dripping or if there is other evidence of fluid loss.
(4) Leak repair. (i) If a leak is detected, it shall be repaired and the batch product-process equipment shall be retested before startup of the process.
(ii) If a batch product-process fails the retest (the second of two consecutive pressure tests), it shall be repaired as soon as practical but not later than 30 calendar days after the second pressure test, except as specified in paragraph (e) of this section.
(5) Gas pressure test procedure for pressure or vacuum loss. The following procedures shall be used to pressure test batch product-process equipment for pressure or vacuum loss to demonstrate compliance with the requirements of paragraph (b)(3)(i) of this section:
(i) The batch product-process equipment train shall be pressurized with a gas to a pressure less than the set pressure of any safety relief devices or valves or to a pressure slightly above the operating pressure of the equipment, or alternatively the equipment shall be placed under a vacuum.
(ii) Once the test pressure is obtained, the gas source or vacuum source shall be shut off.
(iii) The test shall continue for not less than 15 minutes unless it can be determined in a shorter period of time that the allowable rate of pressure drop or of pressure rise was exceeded. The pressure in the batch product-process equipment shall be measured after the gas or vacuum source is shut off and at the end of the test period. The rate of change in pressure in the batch product-process equipment shall be calculated using Equation 117–1 of this section:
Where:
?(P/t) = Change in pressure, pounds per square inch gauge/hr.
Pf = Final pressure, pounds per square inch gauge.
Pi = Initial pressure, pounds per square inch gauge.
tf - ti = Elapsed time, hours.
(iv) The pressure shall be measured using a pressure measurement device (gauge, manometer, or equivalent) that has a precision of ±2.5 millimeters mercury (0.10 inch of mercury) in the range of test pressure and is capable of measuring pressures up to the relief set pressure of the pressure relief device. If such a pressure measurement device is not reasonably available, the owner or operator shall use a pressure measurement device with a precision of at least ±10 percent of the test pressure of the equipment and shall extend the duration of the test for the time necessary to detect a pressure loss or rise that equals a rate of 1 pound per square inch gauge per hour (7 kilopascals per hour).
(v) An alternative procedure may be used for leak testing the equipment if the owner or operator demonstrates the alternative procedure is capable of detecting a pressure loss or rise.
(6) Pressure test procedure using test liquid. The following procedures shall be used to pressure test batch product-process equipment using a liquid to demonstrate compliance with the requirements of paragraph (b)(3)(ii) of this section:
(i) The batch product-process equipment train or section of the equipment train shall be filled with the test liquid (for example, water, alcohol) until normal operating pressure is obtained. Once the equipment is filled, the liquid source shall be shut off.
(ii) The test shall be conducted for a period of at least 60 minutes unless it can be determined in a shorter period of time that the test is a failure.
(iii) Each seal in the equipment being tested shall be inspected for indications of liquid dripping or other indications of fluid loss. If there are any indications of liquids dripping or of fluid loss, a leak is detected.
(iv) An alternative procedure may be used for leak testing the equipment if the owner or operator demonstrates the alternative procedure is capable of detecting losses of fluid.
(7) Pressure testing recordkeeping. The owner or operator of a batch product-process who elects to pressure test the batch product-process equipment train to demonstrate compliance with this subpart shall maintain records of the information specified in paragraphs (b)(7)(i) through (v) of this section.
(i) The identification of each product or product code produced during the calendar year. It is not necessary to identify individual items of equipment in a batch product-process equipment train.
(ii) Physical tagging of the equipment to identify that it is in regulated material service and subject to the provisions of this subpart is not required. Equipment in a batch product-process subject to the provisions of this subpart may be identified on a plant site plan, in log entries, or by other appropriate methods.
(iii) The dates of each pressure test required in paragraph (b) of this section, the test pressure, and the pressure drop observed during the test.
(iv) Records of any visible, audible, or olfactory evidence of fluid loss.
(v) When a batch product-process equipment train does not pass two consecutive pressure tests, as specified in paragraph (b)(4)(ii) of this section, the following information shall be recorded in a log and kept for 2 years:
(A) The date of each pressure test and the date of each leak repair attempt;
(B) Repair methods applied in each attempt to repair the leak;
(C) The reason for the delay of repair;
(D) The expected date for delivery of the replacement equipment and the actual date of delivery of the replacement equipment; and
(E) The date of successful repair.
(c) Equipment monitoring. The following requirements shall be met if an owner or operator elects to monitor the equipment in a batch process to detect leaks by the method specified in §65.104(b) and (c) to demonstrate compliance with this subpart:
(1) The owner or operator shall comply with the requirements of §§65.106 through 65.116 as modified by paragraphs (c)(2) through (4) of this section.
(2) The equipment shall be monitored for leaks by the method specified in §65.104(b) and (c) when the equipment is in regulated material service or is in use with any other detectable material.
(3) The equipment shall be monitored for leaks as specified in the following:
(i) Each time the equipment is reconfigured for the production of a new product, the reconfigured equipment shall be monitored for leaks within 30 days of startup of the process. This initial monitoring of reconfigured equipment shall not be included in determining percent leaking equipment in the process unit.
(ii) Connectors shall be monitored in accordance with the requirements in §65.108.
(iii) Equipment other than connectors shall be monitored at the frequencies specified in table 1 to this subpart. The operating time shall be determined as the proportion of the year the batch product-process that is subject to the provisions of this subpart is operating.
(iv) The monitoring frequencies specified in paragraph (c)(3)(iii) of this section are not requirements for monitoring at specific intervals and can be adjusted to accommodate process operations. An owner or operator may monitor anytime during the specified monitoring period (for example, month, quarter, year), provided the monitoring is conducted at a reasonable interval after completion of the last monitoring campaign. For example, if the equipment is not operating during the scheduled monitoring period, the monitoring can be done during the next period when the process is operating.
(4) If a leak is detected, it shall be repaired as soon as practical but not later than 15 calendar days after it is detected except as provided in paragraph (e) of this section.
(d) Added equipment recordkeeping. (1) For batch product-process units that the owner or operator elects to monitor as provided under paragraph (c) of this section, the owner or operator shall prepare a list of equipment added to batch product-process units since the last monitoring period required in paragraphs (c)(3)(ii) and (iii) of this section.
(2) Maintain records demonstrating the proportion of the time during the calendar year the equipment is in use in a batch process that is subject to the provisions of this subpart. Examples of suitable documentation are records of time in use for individual pieces of equipment or average time in use for the process unit. These records are not required if the owner or operator does not adjust monitoring frequency by the time in use, as provided in paragraph (c)(3)(iii) of this section.
(3) Record and keep pursuant to §65.4 the date and results of the monitoring required in paragraph (c)(3)(i) of this section for equipment added to a batch product-process unit since the last monitoring period required in paragraphs (c)(3)(ii) and (iii) of this section. If no leaking equipment is found during this monitoring, the owner or operator shall record that the inspection was performed. Records of the actual monitoring results are not required.
(e) Delay of repair. Delay of repair of equipment for which leaks have been detected is allowed if the replacement equipment is not available provided the following conditions are met:
(1) Equipment supplies have been depleted and supplies had been sufficiently stocked before the supplies were depleted.
(2) The repair is made no later than 10 calendar days after delivery of the replacement equipment.
(f) Periodic report contents. For owners or operators electing to meet the requirements of paragraph (b) of this section, the following periodic report to be filed pursuant to §65.120(b) shall include the following information for each process unit:
(1) Batch product-process equipment train identification;
(2) The number of pressure tests conducted;
(3) The number of pressure tests where the equipment train failed the pressure test; and
(4) The facts that explain any delay of repairs.
§ 65.118 Alternative means of emission limitation: Enclosed-vented process units.
top
(a) Use of closed vent system and control device. Process units that are enclosed in such a manner that all emissions from equipment leaks are routed to a process or fuel gas system or collected and vented through a closed vent system to a control device meeting the requirements of §65.115 are exempt from the requirements of §§65.106 through 65.114 and §65.116. The enclosure shall be maintained under a negative pressure at all times while the process unit is in operation to ensure that all emissions are routed to a control device.
(b) Recordkeeping. Owners and operators choosing to comply with the requirements of this section shall maintain the following records:
(1) Identification of the process unit(s) and the regulated materials they handle.
(2) A schematic of the process unit, enclosure, and closed vent system.
(3) A description of the system used to create a negative pressure in the enclosure to ensure that all emissions are routed to the control device.
§ 65.119 Recordkeeping provisions.
top
(a) Recordkeeping system. An owner or operator of more than one regulated source subject to the provisions of this subpart may comply with the recordkeeping requirements for these regulated sources in one recordkeeping system. The recordkeeping system shall identify each record by regulated source and the type of program being implemented (for example, quarterly monitoring, quality improvement) for each type of equipment. The records required by this subpart are summarized in paragraphs (b) and (c) of this section.
(b) General equipment leak records. (1) As specified in §65.103(a) through (c), the owner or operator shall keep general and specific equipment identification if the equipment is not physically tagged and the owner or operator is electing to identify the equipment subject to subpart F of this part through written documentation such as a log or other designation.
(2) The owner or operator shall keep a written plan as specified in §65.103(c)(4) for any equipment that is designated as unsafe- or difficult-to-monitor.
(3) The owner or operator shall maintain a record of the identity and an explanation as specified in §65.103(d)(2) for any equipment that is designated as unsafe to repair.
(4) As specified in §65.103(e), the owner or operator shall maintain a record of the identity of compressors operating with an instrument reading of less than 500 parts per million.
(5) The owner or operator shall keep records associated with the determination that equipment is in heavy liquid service as specified in §65.103(f).
(6) The owner or operator shall keep records for leaking equipment as specified in §65.104(e)(2).
(7) The owner or operator shall keep records for leak repair as specified in §65.105(f) and records for delay of repair as specified in §65.105(d).
(8) For instrument response factor criteria determinations performed pursuant to §65.104(b)(2)(i), the owner or operator shall maintain a record of an engineering assessment that identifies the representative composition of the process fluid. The assessment shall be based on knowledge of the compounds present in the process, similarity of response factors for the materials present, the range of compositions encountered during monitoring, or other information available to the owner or operator.
(9) The owner or operator shall keep records of the detection limit calibration as specified in §65.104(b)(3).
(c) Specific equipment leak records. (1) For valves, the owner or operator shall maintain the following records:
(i) The monitoring schedule for each process unit as specified in §65.106(b)(3)(v).
(ii) The valve subgrouping records specified in §65.106(b)(4)(iv), if applicable.
(2) For pumps, the owner or operator shall maintain the following records:
(i) Documentation of pump visual inspections as specified in §65.107(b)(4).
(ii) Documentation of dual mechanical seal pump visual inspections as specified in §65.107(e)(1)(v).
(iii) For the criteria as to the presence and frequency of drips for dual mechanical seal pumps, records of the design criteria and explanations and any changes and the reason for the changes, as specified in §65.107(e)(1)(i).
(3) For connectors, the owner or operator shall maintain the records specified in §65.108(b)(3)(v) which identify a monitoring schedule for each process unit.
(4) For agitators, the owner or operator shall maintain the following records:
(i) Documentation of agitator seal visual inspections as specified in §65.109(b)(3).
(ii) For agitators equipped with a dual mechanical seal system that includes barrier fluid system, the owner or operator shall keep records as specified in §65.109(e)(1)(vi)(B).
(iii) Documentation of the dual mechanical seal agitator seal visual inspections as specified in §65.109(e)(1)(iv).
(5) For pressure relief devices in gas/vapor or light liquid service, the owner or operator shall keep records of the dates and results of monitoring following a pressure release, as specified in §65.111(c)(3), or the date the rupture disk is replaced as specified in §65.111(e).
(6) For compressors, the owner or operator shall maintain the following records:
(i) For criteria as to failure of the seal system and/or the barrier fluid system, record the design criteria and explanations and any changes and the reason for the changes, as specified in §65.112(d)(2).
(ii) For compressors operating under the alternative compressor standard, record the dates and results of each compliance test as specified in §65.112(f)(2).
(7) For a pump QIP program, the owner or operator shall maintain the following records:
(i) Individual pump records as specified in §65.116(d)(2).
(ii) Trial evaluation program documentation as specified in §65.116(d)(6)(iii).
(iii) Engineering evaluation documenting the basis for judgement that superior emission performance technology is not applicable as specified in §65.116(d)(6)(vi).
(iv) Quality assurance program documentation as specified in §65.116(d)(7).
(v) QIP records as specified in §65.116(e).
(8) For process units complying with the batch process unit alternative, the owner or operator shall maintain the following records:
(i) Pressure test records as specified in §65.117(b)(7).
(ii) Records for equipment added to the process unit as specified in §65.117(d).
(9) For process units complying with the enclosed-vented process unit alternative, the owner or operator shall maintain the records for enclosed-vented process units as specified in §65.118(b).
§ 65.120 Reporting provisions.
top
(a) Initial Compliance Status Report. Unless the information specified in paragraphs (a)(1) through (3) of this section has previously been submitted under the referencing subpart, each owner or operator shall submit an Initial Compliance Status Report according to the procedures in §65.5(d). The notification shall include the information listed in paragraphs (a)(1) through (3) of this section, as applicable.
(1) The notification shall provide the following information for each process unit subject to the requirements of this subpart:
(i) Process unit identification;
(ii) Number of each equipment type (for example, valves, pumps) excluding equipment in vacuum service; and
(iii) Method of compliance with the standard (for example, “monthly leak detection and repair” or “equipped with dual mechanical seals”).
(2) The notification shall provide the following information for each process unit subject to the requirements of §65.117(b):
(i) Batch products or product codes subject to the provisions of this subpart; and
(ii) Planned schedule for pressure testing when equipment is configured for production of products subject to the provisions of this subpart.
(3) The notification shall provide the following information for each process unit subject to the requirements in §65.118:
(i) Process unit identification;
(ii) A description of the system used to create a negative pressure in the enclosure, and the control device used to comply with the requirements of subpart G of this part.
(b) Periodic reports. The owner or operator shall report the information specified in paragraphs (b)(1) through (9) of this section, as applicable, in the periodic report specified in §65.5(e).
(1) For the equipment specified in paragraphs (b)(1)(i) through (v) of this section, report in a summary format by equipment type the number of components for which leaks were detected, and for valves, pumps, and connectors show the percent leakers and the total number of components monitored. Also include the number of leaking components that were not repaired as required by §65.105(a), and for valves identify the number of components that are determined by §65.106(c)(3) to be nonrepairable.
(i) Valves in gas/vapor service and in light liquid service pursuant to §65.106(b) and (c).
(ii) Pumps in light liquid service pursuant to §65.107(b) and (c).
(iii) Connectors in gas/vapor service and in light liquid service pursuant to §65.108(b) and (c).
(iv) Agitators in gas/vapor service and in light liquid service pursuant to §65.109(b).
(v) Compressors pursuant to §65.112(d).
(2) Where any delay of repair is utilized pursuant to §65.105(d), report that delay of repair has occurred and report the number of instances of delay of repair.
(3) If applicable, report the valve subgrouping information specified in §65.106(b)(4)(iv).
(4) For pressure relief devices in gas/vapor service pursuant to §65.111(b) and for compressors pursuant to §65.112(f) that are to be operated at a leak detection instrument reading of less than 500 parts per million, report the results of all monitoring to show compliance conducted within the semiannual reporting period.
(5) Report, if applicable, the initiation of a monthly monitoring program for valves pursuant to §65.106(b)(3)(i).
(6) Report, if applicable, the initiation of a quality improvement program for pumps pursuant to §65.116.
(7) [Reserved]
(8) Where the alternative means of emissions limitation for batch processes is utilized, report the information listed in §65.117(f).
(9) Report the information listed in paragraph (a) of this section for the Initial Compliance Status Report for process units with later compliance dates. Report any revisions to items reported in an earlier Initial Compliance Status Report if the method of compliance has changed since the last report.
§§ 65.121-65.139 [Reserved]
top
Table 1 to Subpart F of Part 65—Batch Processes Monitoring Frequency for Equipment Other Than Connectors
top
----------------------------------------------------------------------------------------------------------------
Equivalent continuous process monitoring frequency time in use
Operating time (percent of year) --------------------------------------------------------------------------
Monthly Quarterly Semiannually
----------------------------------------------------------------------------------------------------------------
0 to <25.......................... Quarterly.............. Annually............... Annually.
25 to <50......................... Quarterly.............. Semiannually........... Annually.
50 to <75......................... Bimonthly.............. Three times............ Semiannually.
75 to 100............................ Monthly................ Quarterly.............. Semiannually.
----------------------------------------------------------------------------------------------------------------
Subpart G—Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process
top
§ 65.140 Applicability.
top
The provisions of this subpart and of subpart A of this part (including the startup, shutdown, and malfunction provisions in §65.6) apply to routing emissions to processes, fuel gas systems, closed vent systems, control devices, and recovery devices where another subpart expressly references the use of this subpart.
§ 65.141 Definitions.
top
All terms used in this subpart shall have the meaning given them in the Act and in subpart A of this part. If a term is defined in both subpart A of this part and in other subparts that reference the use of this subpart, the term shall have the meaning given in subpart A of this part for purposes of this subpart.
§ 65.142 Standards.
top
(a) Storage vessel requirements. The owner or operator expressly referenced to this subpart from subpart C of this part shall comply with the following requirements, as applicable:
(1) Closed vent system and flare. Owners or operators subject to §65.42(b)(4) who route storage vessel emissions through a closed vent system to a flare shall meet the requirements in §65.143 for closed vent systems; §65.147 for flares; and §65.157(a), (b), and (c) for provisions regarding flare compliance determinations; and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to storage vessel emissions routed through a closed vent system to a flare.
(2) Closed vent system and nonflare control device. Owners or operators subject to §65.42(b)(5) who route storage vessel emissions through a closed vent system to a nonflare control device shall meet the requirements in §65.143 for closed vent systems and §65.145 for nonflare control devices and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to storage vessel emissions routed through a closed vent system to a nonflare control device unless specifically required in the monitoring plan submitted under §65.145(c).
(3) Route to a fuel gas system or process. Owners or operators subject to §65.42(b)(6) who route storage vessel emissions to a fuel gas system or to a process shall meet the requirements in §65.144 and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to storage vessel emissions being routed to a fuel gas system or to a process.
(b) Process vent requirements. The owner or operator expressly referenced to this subpart from subpart D of this part or 40 CFR part 60, subpart DDD, shall comply with the following requirements, as applicable:
(1) Flare. Owners or operators subject to §65.63(a)(1) or 40 CFR 60.562–1(a)(1)(i)(C) who route process vent emissions to a flare shall meet the applicable requirements in §65.143 for closed vent systems; §65.147 for flares; and §65.157(a), (b), and (c) for provisions regarding flare compliance determinations; and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to process vent emissions routed through a closed vent system to a flare.
(2) Nonflare control device. Owners or operators subject to §65.63(a)(2) or 40 CFR 60.562–1(a)(1)(i)(A) or (B) who route process vent emissions to a nonflare control device shall meet the applicable requirements in §65.143 for closed vent systems; the requirements applicable to the control devices being used in §§65.148 through 65.152 or §65.155; the applicable general monitoring requirements of §65.156; the applicable performance test requirements and procedures of §§65.157 and 65.158; and the monitoring, recordkeeping, and reporting requirements referenced therein. Owners or operators subject to the halogen reduction device requirements of §65.63(b)(1) must also comply with §65.154 and the monitoring, recordkeeping, and reporting requirements referenced therein. The requirements of §§65.144 through 65.146 do not apply to process vents. No other provisions of this subpart apply to process vent emissions routed through a closed vent system to a nonflare control device.
(3) Final recovery devices. Owners or operators subject to §65.63(a)(3) who use a final recovery device to maintain the TRE index value of a Group 2A process vent above 1.0 shall meet the requirements in §65.153, and the monitoring, recordkeeping, and reporting requirements referenced therein applicable to the recovery device being used and the applicable monitoring requirements in §65.156, and the recordkeeping and reporting requirements referenced therein, except for §65.156(c)(2)(ii). No other provisions of this subpart apply to Group 2A process vents.
(c) Transfer rack requirements. The owner or operator expressly referenced to this subpart from subpart E of this part shall comply with the following requirements, as applicable:
(1) Closed vent system and flare. Owners or operators subject to §65.83(a)(2) who route transfer rack emissions through a closed vent system to a flare shall meet the applicable requirements in §65.143 for closed vent systems; §65.147 for flares; and §65.157(a), (b), and (c) for provisions regarding flare compliance determinations; and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to transfer rack emissions routed through a closed vent system to a flare.
(2) Closed vent system and nonflare control device for low-throughput transfer racks. Owners or operators of low-throughput transfer racks subject to §65.83(a)(1) who route low-throughput transfer rack emissions through a closed vent system to a nonflare control device shall meet the applicable requirements in §65.143 for closed vent systems and §65.145 for nonflare control devices and the monitoring, recordkeeping, and reporting requirements referenced therein. Owners or operators subject to the halogen reduction requirements of §65.83(b)(1) must also comply with the recordkeeping requirement of §65.160(d) and the reporting requirement of §65.165(d). No other provisions of this subpart apply to low-throughput transfer rack emissions routed through a closed vent system to a nonflare control device unless specifically required in the monitoring plan submitted under §65.145(c).
(3) Closed vent system and nonflare control devices for high-throughput transfer racks. Owners or operators of high-throughput transfer racks subject to §65.83(a)(1) who route high-throughput transfer rack emissions through a closed vent system to a nonflare control device shall meet the applicable requirements in §65.143 for closed vent systems; the requirements applicable to the control device being used in §§65.148 through 65.152 or §65.155; the applicable general monitoring of §65.156; the applicable performance test requirements and procedures of §§65.157 and 65.158; and the monitoring, recordkeeping, and reporting requirements referenced therein. Owners or operators subject to the halogen reduction device requirements of §65.83(b)(1) must also comply with §65.154 and the monitoring, recordkeeping, and reporting requirements referenced therein. The requirements of §§65.144 through 65.146 do not apply to high-throughput transfer rack emissions routed through a closed vent system to a nonflare control device. No other provisions of this subpart apply to high-throughput transfer rack emissions routed through a closed vent system to a nonflare control device.
(4) Route to a fuel gas system or to a process. Owners or operators subject to §65.83(a)(4) of this part who route transfer rack emissions to a fuel gas system or to a process shall meet the applicable requirements in §65.144 and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to transfer rack emissions being routed to a fuel gas system or to a process.
(d) Equipment leak requirements. The owner or operator expressly referenced to this subpart from subpart F of this part shall comply with the following requirements, as applicable:
(1) Closed vent system and flare. Owners or operators subject to §65.115(b) who route equipment leak emissions through a closed vent system to a flare shall meet the requirements in §65.143 for closed vent systems; §65.147 for flares; and §65.157(a), (b), and (c) for provisions regarding flare compliance determinations; and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to equipment leak emissions routed through a closed vent system to a flare.
(2) Closed vent system and nonflare control device. Owners or operators subject to §65.115(b) who route equipment leak emissions through a closed vent system to a nonflare control device shall meet the requirements in §65.143 for closed vent systems, §65.146 for nonflare control devices used for equipment leak emissions, and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to equipment leak emissions routed through a closed vent system to a nonflare control device.
(3) Route to a fuel gas system or to a process. Owners or operators subject to §65.115(b) who route equipment leak emissions to a fuel gas system or to a process shall meet the requirements in §65.144 and the monitoring, recordkeeping, and reporting requirements referenced therein. No other provisions of this subpart apply to equipment leak emissions being routed to a fuel gas system or to a process.
(e) Combined emissions. When emissions of different kinds (for example, emissions from process vents, transfer racks, and/or storage vessels) are combined, the owner or operator shall comply with the requirements of either paragraph (e)(1) or (2) of this section:
(1) Comply with the applicable requirements of this subpart for each kind of emissions in the stream (for example, the requirements of §65.142(b) for process vents, and the requirements of §65.142(c) for transfer racks); or
(2) Comply with the first set of requirements identified in paragraphs (e)(2)(i) through (iii) of this section which applies to any individual emission stream that is included in the combined stream. Compliance with the first applicable set of requirements identified in paragraphs (e)(2)(i) through (iii) of this section constitutes compliance with all other requirements in paragraphs (e)(2)(i) through (iii) of this section applicable to other types of emissions in the combined stream. The hierarchy is as follows:
(i) The requirements of §65.142(b) for Group 1 process vents, including applicable monitoring, recordkeeping, and reporting;
(ii) The requirements of §65.142(c) for high-throughput transfer racks, including applicable monitoring, recordkeeping, and reporting;
(iii) The requirements of §65.142(a) for control of emissions from storage vessels or low-throughput transfer racks, including monitoring, recordkeeping, and reporting.
§ 65.143 Closed vent systems.
top
(a) Closed vent system equipment and operating requirements. The provisions of paragraph (a) of this section apply to closed vent systems collecting regulated material from a storage vessel, process vent, transfer rack, or equipment leaks.
(1) Collection of emissions. Each closed vent system shall be designed and operated to collect the regulated material vapors from the emission point and to route the collected vapors to a control device.
(2) Period of operation. Closed vent systems used to comply with the provisions of this subpart shall be operated at all times when emissions are vented to them.
(3) Bypass monitoring. Except for pressure relief devices needed for safety purposes, low leg drains, high point bleeds, analyzer vents, and open-ended valves or lines, the owner or operator shall comply with either of the following provisions for each closed vent system that contains bypass lines that could divert a vent stream to the atmosphere:
(i) Properly install, maintain, and operate a flow indicator that takes a reading at least once every 15 minutes. Records shall be generated as specified in §65.163(a)(1)(i). The flow indicator shall be installed at the entrance to any bypass line.
(ii) Secure the bypass line valve in the non-diverting position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure the valve is maintained in the non-diverting position and the vent stream is not diverted through the bypass line. Records shall be generated as specified in §65.163(a)(1)(ii).
(4) Loading arms at transfer racks. Each closed vent system collecting regulated material from a transfer rack shall be designed and operated so that regulated material vapors collected at one loading arm will not pass through another loading arm in the rack to the atmosphere.
(5) Pressure relief devices in a transfer rack's closed vent system. The owner or operator of a transfer rack subject to the provisions of this subpart shall ensure that no pressure relief device in the transfer rack's closed vent system shall open to the atmosphere during loading. Pressure relief devices needed for safety purposes are not subject to paragraph (a)(5) of this section.
(b) Closed vent system inspection requirements. The provisions of paragraph (b) of this section apply to closed vent systems collecting regulated material from a storage vessel, transfer rack or equipment leaks. Inspection records shall be generated as specified in §65.163(a)(3) and (4).
(1) Except for closed vent systems operated and maintained under negative pressure and as provided in paragraphs (b)(2) and (3) of this section, each closed vent system shall be inspected as specified in paragraph (b)(1)(i) or (ii) of this section.
(i) If the closed vent system is constructed of hard-piping, the owner or operator shall comply with the following requirements:
(A) Conduct an initial inspection according to the procedures in paragraph (c) of this section; and
(B) Conduct annual visual inspections for visible, audible, or olfactory indications of leaks.
(ii) If the closed vent system is constructed of ductwork, the owner or operator shall conduct an initial and annual inspection according to the procedures in paragraph (c) of this section.
(2) Any parts of the closed vent system that are designated as described in §65.163(a)(2) as unsafe to inspect are exempt from the inspection requirements of paragraph (b)(1) of this section if the following conditions are met:
(i) The owner or operator determines that the equipment is unsafe to inspect because inspecting personnel would be exposed to an imminent or potential danger as a consequence of complying with paragraph (b)(1) of this section; and
(ii) The owner or operator has a written plan that requires inspection of the equipment as frequently as practical during safe-to-inspect times. Inspection is not required more than once annually.
(3) Any parts of the closed vent system that are designated, as described in §65.163(a)(2), as difficult-to-inspect are exempt from the inspection requirements of paragraph (b)(1) of this section if the following provisions apply:
(i) The owner or operator determines that the equipment cannot be inspected without elevating the inspecting personnel more than 2 meters (7 feet) above a support surface; and
(ii) The owner or operator has a written plan that requires inspection of the equipment at least once every 5 years.
(c) Closed vent system inspection procedures. The provisions of paragraph (c) of this section apply to closed vent systems collecting regulated material from a storage vessel, transfer rack, or equipment leaks.
(1) Each closed vent system subject to paragraph (c) of this section shall be inspected according to the procedures specified in paragraphs (c)(1)(i) through (vii) of this section.
(i) Inspections shall be conducted in accordance with Method 21 of appendix A of 40 CFR part 60 except as specified in this section.
(ii) Except as provided in paragraph (c)(1)(iii) of this section, the detection instrument shall meet the performance criteria of Method 21 of appendix A of 40 CFR part 60, except the instrument response factor criteria in section 3.1.2(a) of Method 21 shall be for the representative composition of the process fluid not each individual organic compound in the stream. For process streams that contain nitrogen, air, water, or other inerts that are not organic hazardous air pollutants or volatile organic compounds, the response factor shall be determined on an inert-free basis. The response factor may be determined at any concentration for which the monitoring for leaks will be conducted. Maintain the record specified by §65.163(a)(5).
(iii) If no instrument is available at the plant site that will meet the performance criteria specified in paragraph (c)(1)(ii) of this section, the instrument readings may be adjusted by multiplying by the representative response factor of the process fluid calculated on an inert-free basis as described in paragraph (c)(1)(ii) of this section.
(iv) The detection instrument shall be calibrated before use on each day of its use by the procedures specified in Method 21 of appendix A of 40 CFR part 60.
(v) Calibration gases shall be as specified in the following:
(A) Zero air (less than 10 parts per million hydrocarbon in air).
(B) Mixtures of methane in air at a concentration less than 10,000 parts per million. A calibration gas other than methane in air may be used if the instrument does not respond to methane or if the instrument does not meet the performance criteria specified in paragraph (c)(1)(ii) of this section. In such cases, the calibration gas may be a mixture of one or more of the compounds to be measured in air.
(C) If the detection instrument's design allows for multiple calibration scales, then the lower scale shall be calibrated with a calibration gas that is no higher than 2,500 parts per million.
(vi) An owner or operator may elect to adjust or not adjust instrument readings for background. If an owner or operator elects not to adjust readings for background, all such instrument readings shall be compared directly to 500 parts per million to determine whether there is a leak. If an owner or operator elects to adjust instrument readings for background, the owner or operator shall measure background concentration using the procedures in this section. The owner or operator shall subtract the background reading from the maximum concentration indicated by the instrument.
(vii) If the owner or operator elects to adjust for background, the arithmetic difference between the maximum concentration indicated by the instrument and the background level shall be compared with 500 parts per million for determining whether there is a leak.
(2) The instrument probe shall be traversed around all potential leak interfaces as close to the interface as possible as described in Method 21 of appendix A of 40 CFR part 60.
(3) Except as provided in paragraph (c)(4) of this section, inspections shall be performed when the equipment is in regulated material service or in use with any other detectable gas or vapor.
(4) Inspections of the closed vent system collecting regulated material from a transfer rack shall be performed only while a tank truck or railcar is being loaded or is otherwise pressurized to normal operating conditions with regulated material or any other detectable gas or vapor.
(d) Closed vent system leak repair provisions. The provisions of paragraph (d) of this section apply to closed vent systems collecting regulated material from a storage vessel, transfer rack, or equipment leak.
(1) If there are visible, audible, or olfactory indications of leaks at the time of the annual visual inspections required by paragraph (b)(1)(i)(B) of this section, the owner or operator shall follow either of the following procedures:
(i) The owner or operator shall eliminate the indications of the leak.
(ii) The owner or operator shall monitor the equipment according to the procedures in paragraph (c) of this section.
(2) Leaks as indicated by an instrument reading greater than 500 parts per million by volume above background shall be repaired as soon as practical except as provided in paragraph (d)(3) of this section. Records shall be generated as specified in §65.163(a)(3) when a leak is detected.
(i) A first attempt at repair shall be made no later than 5 calendar days after the leak is detected.
(ii) Except as provided in paragraph (d)(3) of this section, repairs shall be completed no later than 15 calendar days after the leak is detected or at the beginning of the next introduction of vapors to the system, whichever is later. (continued)