CCLME.ORG - 40 CFR PART 35—STATE AND LOCAL ASSISTANCE
Loading (50 kb)...'
(continued)

(1) Will the proposed project displace any people?

(2) Will the proposed project deface existing residences or residential areas? What mitigative actions such as landscaping, screening, or buffer zones have been considered? Are they included?

(3) Will the proposed project be likely to lead to a change in established land use patterns, such as increased development pressure near the lake? To what extent and how will this change be controlled through land use planning, zoning, or through other methods?

(4) Will the proposed project adversly affect a significant amount of prime agricultural land or agricultural operations on such land?

(5) Will the proposed project result in a significant adverse effect on parkland, other public land, or lands of recognized scenic value?

(6) Has the State Historical Society or State Historical Preservation Officer been contacted? Has he responded, and if so, what was the nature of that response? Will the proposed project result in a significant adversely effect on lands or structures of historic, architectural, archaeological or cultural value?

(7) Will the proposed project lead to a significant long-range increase in energy demands?

(8) Will the proposed project result in significant and long range adverse changes in ambient air quality or noise levels? Short term?

(9) If the proposed project involves the use of in-lake chemical treatment, what long and short term adverse effects can be expected from that treatment? How will the project recipient mitigate these effects?

(10) Does the proposal contain all the information that EPA requires in order to determine whether the project complies with Executive Order 11988 on floodplains? Is the proposed project located in a floodplain? If so, will the project involve construction of structures in the floodplain? What steps will be taken to reduce the possible effects of flood damage to the project?

(11) If the project involves physically modifying the lake shore or its bed or its watershed, by dredging, for example, what steps will be taken to minimize any immediate and long term adverse effects of such activities? When dredging is employed, where will the dredged material be deposited, what can be expected and what measures will the recipient employ to minimize any significant adverse impacts from its deposition?

(12) Does the project proposal contain all information that EPA requires in order to determine whether the project complies with Executive Order 11990 on wetlands? Will the proposed project have a significant adverse effect on fish and wildlife, or on wetlands or any other wildife habitat, especially those of endangered species? How significant is this impact in relation to the local or regional critical habitat needs? Have actions to mitigate habitat destruction been incorporated into the project? Has the recipient properly consulted with appropriate State and Federal fish, game and wildlife agencies and with the U.S. Fish and Wildlife Service? What were their replies?

(13) Describe any feasible alternatives to the proposed project in terms of environmental impacts, commitment of resources, public interest and costs and why they were not proposed.

(14) Describe other measures not discussed previously that are necessary to mitigate adverse environmental impacts resulting from the implementation of the proposed project.

Subpart I—Grants for Construction of Treatment Works
top
Authority: Secs. 101(e), 109(b), 201 through 205, 207, 208(d), 210 through 212, 215 through 219, 304(d)(3), 313, 501, 502, 511 and 516(b) of the Clean Water Act, as amended, 33 U.S.C. 1251 et seq.

Source: 49 FR 6234, Feb. 17, 1984, unless otherwise noted.

§ 35.2000 Purpose and policy.
top
(a) The primary purpose of Federal grant assistance available under this subpart is to assist municipalities in meeting enforceable requirements of the Clean Water Act, particularly, applicable National Pollutant Discharge Elimination System (NPDES) permit requirements.

(b) This subpart supplements EPA's Uniform Relocation and Real Property Acquisition Policies Act regulation (part 4 of this chapter), its National Environmental Policy Act (NEPA) regulation (part 6 of this chapter), its public participation regulation (part 25 of this chapter), its intergovernmental review regulation (part 29 of this chapter), its general grant regulation (part 30 of this chapter), its debarment regulation (part 32 of this chapter), and its procurement under assistance regulation (part 33 of this chapter), and establishes requirements for Federal grant assistance for the building of wastewater treatment works. EPA may also find it necessary to publish other requirements applicable to the construction grants program in response to Congressional action and executive orders.

(c) EPA's policy is to delegate administration of the construction grants program on individual projects to State agencies to the maximum extent possible (see subpart F). Throughout this subpart we have used the term Regional Administrator. To the extent that the Regional Administrator delegates review of projects for compliance with the requirements of this subpart to a State agency under a delegation agreement (§35.1030), the term Regional Administrator may be read State agency. This paragraph does not affect the rights of citizens, applicants or grantees provided in subpart F.

(d) In accordance with the Federal Grant and Cooperative Agreement Act (Pub. L. 95–224) EPA will, when substantial Federal involvement is anticipated, award assistance under cooperative agreements. Throughout this subpart we have used the terms grant and grantee but those terms may be read cooperative agreement and recipient if appropriate.

(e) From time to time EPA publishes technical and guidance materials on various topics relevant to the construction grants program. Grantees may find this information useful in meeting requirements in this subpart. These publications, including the MCD and FRD series, may be ordered from: EPA, 1200 Pennsylvania Ave., NW., room 1115 ET, WH 547, Washington, DC 20460. In order to expedite processing of requests, persons wishing to obtain these publications should request a copy of EPA form 7500–21 (the order form listing all available publications), from EPA Headquarters, Municipal Construction Division (WH–547) or from any EPA Regional Office.

§ 35.2005 Definitions.
top
(a) Words and terms not defined below shall have the meaning given to them in 40 CFR parts 30 and 33.

(b) As used in this subpart, the following words and terms mean:

(1) Act. The Clean Water Act (33 U.S.C. 1251 et seq., as amended).

(2) Ad valorem tax. A tax based upon the value of real property.

(3) Allowance. An amount based on a percentage of the project's allowable building cost, computed in accordance with appendix B.

(4) Alternative technology. Proven wastewater treatment processes and techniques which provide for the reclaiming and reuse of water, productively recycle wastewater constitutuents or otherwise eliminate the discharge of pollutants, or recover energy. Specifically, alternative technolgy includes land application of effluent and sludge; aquifer recharge; aquaculture; direct reuse (non-potable); horticulture; revegetation of disturbed land; containment ponds; sludge composting and drying prior to land application; self-sustaining incineration; and methane recovery.

(5) Alternative to conventional treatment works for a small community. For purposes of §§35.2020 and 35.2032, alternative technology used by treatment works in small communities include alternative technologies defined in paragraph (b)(4), as well as, individual and onsite systems; small diameter gravity, pressure or vacuum sewers conveying treated or partially treated wastewater. These systems can also include small diameter gravity sewers carrying raw wastewater to cluster systems.

(6) Architectural or engineering services. Consultation, investigations, reports, or services for design-type projects within the scope of the practice of architecture or professional engineering as defined by the laws of the State or territory in which the grantee is located.

(7) Best Practicable Waste Treatment Technology (BPWTT). The cost-effective technology that can treat wastewater, combined sewer overflows and nonexcessive infiltration and inflow in publicly owned or individual wastewater treatment works, to meet the applicable provisions of:

(i) 40 CFR part 133—secondary treatment of wastewater;

(ii) 40 CFR part 125, subpart G—marine discharge waivers;

(iii) 40 CFR 122.44(d)—more stringent water quality standards and State standards; or

(iv) 41 FR 6190 (February 11, 1976)—Alternative Waste Management Techniques for Best Practicable Waste Treatment (treatment and discharge, land application techniques and utilization practices, and reuse).

(8) Building. The erection, acquisition, alteration, remodeling, improvement or extension of treatment works.

(9) Building completion. The date when all but minor components of a project have been built, all equipment is operational and the project is capable of functioning as designed.

(10) Collector sewer. The common lateral sewers, within a publicly owned treatment system, which are primarily installed to receive wastewaters directly from facilities which convey wastewater from individual systems, or from private property, and which include service “Y” connections designed for connection with those facilities including:

(i) Crossover sewers connecting more than one property on one side of a major street, road, or highway to a lateral sewer on the other side when more cost effective than parallel sewers; and

(ii) Except as provided in paragraph (b)(10)(iii) of this section, pumping units and pressurized lines serving individual structures or groups of structures when such units are cost effective and are owned and maintained by the grantee.

(iii) This definition excludes other facilities which convey wastewater from individual structures, from private property to the public lateral sewer, or its equivalent and also excludes facilities associated with alternatives to conventional treatment works in small communities.

(11) Combined sewer. A sewer that is designed as a sanitary sewer and a storm sewer.

(12) Complete waste treatment system. A complete waste treatment system consists of all the treatment works necessary to meet the requirements of title III of the Act, involving: (i) The transport of wastewater from individual homes or buildings to a plant or facility where treatment of the wastewater is accomplished; (ii) the treatment of the wastewater to remove pollutants; and (iii) the ultimate disposal, including recycling or reuse, of the treated wastewater and residues which result from the treatment process.

(13) Construction. Any one or more of the following: Preliminary planning to determine the feasibility of treatment works, engineering, architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures, field testing of innovative or alternative wastewater treatment processes and techniques (excluding operation and maintenance) meeting guidelines promulgated under section 304(d)(3) of the Act, or other necessary actions, erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works, or the inspection or supervision of any of the foregoing items.

(14) Conventional technology. Wastewater treatment processes and techniques involving the treatment of wastewater at a centralized treatment plant by means of biological or physical/chemical unit processes followed by direct point source discharge to surface waters.

(15) Enforceable requirements of the Act. Those conditions or limitations of section 402 or 404 permits which, if violated, could result in the issuance of a compliance order or initiation of a civil or criminal action under section 309 of the Act or applicable State laws. If a permit has not been issued, the term shall include any requirement which, in the Regional Administrator's judgment, would be included in the permit when issued. Where no permit applies, the term shall include any requirement which the Regional Administrator determines is necessary for the best practicable waste treatment technology to meet applicable criteria.

(16) Excessive infiltration/inflow. The quantities of infiltration/inflow which can be economically eliminated from a sewer system as determined in a cost-effectiveness analysis that compares the costs for correcting the infiltration/inflow conditions to the total costs for transportation and treatment of the infiltration/inflow. (See §§35.2005(b) (28) and (29) and 35.2120.)

(17) Field testing. Practical and generally small-scale testing of innovative or alternative technologies directed to verifying performance and/or refining design parameters not sufficiently tested to resolve technical uncertainties which prevent the funding of a promising improvement in innovative or alternative treatment technology.

(18) Individual systems. Privately owned alternative wastewater treatment works (including dual waterless/gray water systems) serving one or more principal residences, or small commercial establishments. Normally these are onsite systems with localized treatment and disposal of wastewater, but may be systems utilizing small diameter gravity, pressure or vacuum sewers conveying treated or partially treated wastewater. These systems can also include small diameter gravity sewers carrying raw wastewater to cluster systems.

(19) Industrial user. Any nongovernmental, nonresidential user of a publicly owned treatment works which is identified in the Standard Industrial Classification Manual, 1972, Office of Management and Budget, as amended and supplemented, under one of the following divisions:


Division A. Agriculture, Forestry, and Fishing

Division B. Mining

Division D. Manufacturing

Division E. Transportation, Communications, Electric, Gas, and Sanitary Services

Division I. Services


(20) Infiltration. Water other than wastewater that enters a sewer system (including sewer service connections and foundation drains) from the ground through such means as defective pipes, pipe joints, connections, or manholes. Infiltration does not include, and is distinguished from, inflow.

(21) Inflow. Water other than wastewater that enters a sewer system (including sewer service connections) from sources such as, but not limited to, roof leaders, cellar drains, yard drains, area drains, drains from springs and swampy areas, manhole covers, cross connections between storm sewers and sanitary sewers, catch basins, cooling towers, storm waters, surface runoff, street wash waters, or drainage. Inflow does not include, and is distinguished from, infiltration.

(22) Initiation of operation. The date specified by the grantee on which use of the project begins for the purpose for which it was planned, designed, and built.

(23) Innovative technology. Developed wastewater treatment processes and techniques which have not been fully proven under the circumstances of their contemplated use and which represent a significant advancement over the state of the art in terms of significant reduction in life cycle cost or significant environmental benefits through the reclaiming and reuse of water, otherwise eliminating the discharge of pollutants, utilizing recycling techniques such as land treatment, more efficient use of energy and resources, improved or new methods of waste treatment management for combined municipal and industrial systems, or the confined disposal of pollutants so that they will not migrate to cause water or other environmental pollution.

(24) Interceptor sewer. A sewer which is designed for one or more of the following purposes:

(i) To intercept wastewater from a final point in a collector sewer and convey such wastes directly to a treatment facility or another interceptor.

(ii) To replace an existing wastewater treatment facility and transport the wastes to an adjoining collector sewer or interceptor sewer for conveyance to a treatment plant.

(iii) To transport wastewater from one or more municipal collector sewers to another municipality or to a regional plant for treatment.

(iv) To intercept an existing major discharge of raw or inadequately treated wastewater for transport directly to another interceptor or to a treatment plant.

(25) Interstate agency. An agency of two or more States established under an agreement or compact approved by the Congress, or any other agency of two or more States, having substantial powers or duties pertaining to the control of water pollution.

(26) Marine bays and estuaries. Semi-enclosed coastal waters which have a free connection to the territorial sea.

(27) Municipality. A city, town, borough, county, parish, district, association, or other public body (including an intermunicipal agency of two or more of the foregoing entities) created under State law, or an Indian tribe or an authorized Indian tribal organization, having jurisdiction over disposal of sewage, industrial wastes, or other waste, or a designated and approved management agency under section 208 of the Act.

(i) This definition includes a special district created under State law such as a water district, sewer district, sanitary district, utility district, drainage district or similar entity or an integrated waste management facility, as defined in section 201(e) of the Act, which has as one of its principal responsibilities the treatment, transport, or disposal of domestic wastewater in a particular geographic area.

(ii) This definition excludes the following:

(A) Any revenue producing entity which has as its principal responsibility an activity other than providing wastewater treatment services to the general public, such as an airport, turnpike, port facility or other municipal utility.

(B) Any special district (such as school district or a park district) which has the responsibility to provide wastewater treatment services in support of its principal activity at specific facilities, unless the special district has the responsibility under State law to provide wastewater treatment services to the community surrounding the special district's facility and no other municipality, with concurrent jurisdiction to serve the community, serves or intends to serve the special district's facility or the surrounding community.

(28) Nonexcessive infiltration. The quantity of flow which is less than 120 gallons per capita per day (domestic base flow and infiltration) or the quantity of infiltration which cannot be economically and effectively eliminated from a sewer system as determined in a cost-effectiveness analysis. (See §§35.2005(b)(16) and 35.2120.)

(29) Nonexcessive inflow. The maximum total flow rate during storm events which does not result in chronic operational problems related to hydraulic overloading of the treatment works or which does not result in a total flow of more than 275 gallons per capita per day (domestic base flow plus infiltration plus inflow). Chronic operational problems may include surcharging, backups, bypasses, and overflows. (See §§35.2005(b)(16) and 35.2120).

(30) Operation and Maintenance. Activities required to assure the dependable and economical function of treatment works.

(i) Maintenance: Preservation of functional integrity and efficiency of equipment and structures. This includes preventive maintenance, corrective maintenance and replacement of equipment (See §35.2005(b)(36)) as needed.)

(ii) Operation: Control of the unit processes and equipment which make up the treatment works. This includes financial and personnel management; records, laboratory control, process control, safety and emergency operation planning.

(31) Principal residence. For the purposes of §35.2034, the habitation of a family or household for at least 51 percent of the year. Second homes, vacation or recreation residences are not included in this definition.

(32) Project. The activities or tasks the Regional Administrator identifies in the grant agreement for which the grantee may expend, obligate or commit funds.

(33) Project performance standards. The performance and operations requirements applicable to a project including the enforceable requirements of the Act and the specifications, including the quantity of excessive infiltration and inflow proposed to be eliminated, which the project is planned and designed to meet.

(34) Priority water quality areas. For the purposes of §35.2015, specific stream segments or bodies of water, as determined by the State, where municipal discharges have resulted in the impairment of a designated use or significant public health risks, and where the reduction of pollution from such discharges will substantially restore surface or groundwater uses.

(35) Project schedule. A timetable specifying the dates of key project events including public notices of proposed procurement actions, subagreement awards, issuance of notice to proceed with building, key milestones in the building schedule, completion of building, initiation of operation and certification of the project.

(36) Replacement. Obtaining and installing equipment, accessories, or appurtenances which are necessary during the design or useful life, whichever is longer, of the treatment works to maintain the capacity and performance for which such works were designed and constructed.

(37) Sanitary sewer. A conduit intended to carry liquid and water-carried wastes from residences, commercial buildings, industrial plants and institutions together with minor quantities of ground, storm and surface waters that are not admitted intentionally.

(38) Services. A contractor's labor, time or efforts which do not involve the delivery of a specific end item, other than documents (e.g., reports, design drawings, specifications). This term does not include employment agreements or collective bargaining agreements.

(39) Small commercial establishments. For purposes of §35.2034 private establishments such as restaurants, hotels, stores, filling stations, or recreational facilities and private, nonprofit entities such as churches, schools, hospitals, or charitable organizations with dry weather wastewater flows less than 25,000 gallons per day.

(40) Small Community. For purposes of §§35.2020(b) and 35.2032, any municipality with a population of 3,500 or less or highly dispersed sections of larger municipalities, as determined by the Regional Administrator.

(41) State. A State, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Trust Territory of the Pacific Islands, and the Commonwealth of the Northern Marianas. For the purposes of applying for a grant under section 201(g)(1) of the act, a State (including its agencies) is subject to the limitations on revenue producing entities and special districts contained in §35.2005(b)(27)(ii).

(42) State agency. The State agency designated by the Governor having responsibility for administration of the construction grants program under section 205(g) of the Act.

(43) Step 1. Facilities planning.

(44) Step 2. Preparation of design drawings and specifications.

(45) Step 3. Building of a treatment works and related services and supplies.

(46) Step 2+3. Design and building of a treatment works and building related services and supplies.

(47) Step 7. Design/building of treatment works wherein a grantee awards a single contract for designing and building certain treatment works.

(48) Storm sewer. A sewer designed to carry only storm waters, surface run-off, street wash waters, and drainage.

(49) Treatment works. Any devices and systems for the storage, treatment, recycling, and reclamation of municipal sewage, domestic sewage, or liquid industrial wastes used to implement section 201 of the Act, or necessary to recycle or reuse water at the most economical cost over the design life of the works. These include intercepting sewers, outfall sewers, sewage collection systems, individual systems, pumping, power, and other equipment and their appurtenances; extensions, improvement, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and any works, including acquisition of the land that will be an integral part of the treatment process or is used for ultimate disposal of residues resulting from such treatment (including land for composting sludge, temporary storage of such compost and land used for the storage of treated wastewater in land treatment systems before land application); or any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste or industrial waste, including waste in combined storm water and sanitary sewer systems.

(50) Treatment works phase or segment. A treatment works phase or segment may be any substantial portion of a facility and its interceptors described in a facilities plan under §35.2030, which can be identified as a subagreement or discrete subitem. Multiple subagreements under a project shall not be considered to be segments or phases. Completion of building of a treatment works phase or segment may, but need not in and of itself, result in an operable treatment works.

(51) Useful life. The period during which a treatment works operates. (Not “design life” which is the period during which a treatment works is planned and designed to be operated.)

(52) User charge. A charge levied on users of a treatment works, or that portion of the ad valorem taxes paid by a user, for the user's proportionate share of the cost of operation and maintenance (including replacement) of such works under sections 204(b)(1)(A) and 201(h)(2) of the Act and this subpart.

(53) Value engineering. A specialized cost control technique which uses a systematic and creative approach to identify and to focus on unnecessarily high cost in a project in order to arrive at a cost saving without sacrificing the reliability or efficiency of the project.

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45894, Nov. 4, 1985; 55 FR 27095, June 29, 1990]

§ 35.2010 Allotment; reallotment.
top
(a) Allotments are made on a formula or other basis which Congress specifies for each fiscal year (FY). The allotment for each State and the availability period shall be announced each fiscal year in the Federal Register. This section applies only to funds allotted under section 205 of the Act.

(b) Unless otherwise provided by Congress, all sums allotted to a State under section 205 of the Act shall remain available for obligation until the end of the one year after the close of the fiscal year for which the sums were appropriated. Except as provided in §35.2020(a), sums not obligated at the end of that period shall be subject to reallotment on the basis of the same ratio as applicable to the then-current fiscal year, adjusted for the States which failed to obligate any of the fiscal year funds being reallotted, but none of the funds reallotted shall be made available to any State which failed to obligate any of the fiscal year funds being reallotted. Any sum made available to a State by reallotment under this section shall be in addition to any funds otherwise allotted to such State for grants under this subpart during any fiscal year and the reallotted funds shall remain available for obligation until the last day of the fiscal year following the fiscal year in which the reallotted funds are issued by the Comptroller to the Regional Administrator.

(c) Except for funds appropriated for FY 72 and fiscal years prior to 1972, sums which are deobligated and reissued by the Comptroller to the Regional Administrator before their reallotment date shall be available for obligation in the same State and treated in the same manner as the allotment from which such funds were derived.

(d) Except for funds appropriated for FY 72 and fiscal years prior to 1972, deobligated sums which are reissued by the Comptroller to the Regional Administrator after their reallotment date shall be available for obligation in the same State until the last day of the fiscal year following the fiscal year in which the reissuance occurs.

(e) Deobligated FY 72 and prior to 1972 fiscal year funds, except 1964, 1965 and 1966 funds, will be credited to the allowances of the same Region from which such funds are recovered, and the Regional Administrator may determine how these recoveries are credited to the States within the Region.

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985]

§ 35.2012 Capitalization grants.
top
Amounts allotted to a State under title II may be deposited in that State's water pollution control revolving fund as a capitalization grant in accordance with 40 CFR 35.5020 (f) and (g).

[55 FR 27095, June 29, 1990]

§ 35.2015 State priority system and project priority list.
top
(a) General. The Regional Administrator will award grant assistance from annual allotments to projects on a State project priority list developed in accordance with an approved State priority system. The State priority system and list must be designed to achieve optimum water quality management consistent with the goals and requirements of the Act. All projects for building treatment works to be funded by EPA must be included on a State project list, except training facilities funded under section 109(b) of the Act and marine CSO projects funded under section 201(n)(2) of the Act.

(b) State priority system. The State priority system describes the methodology used to rank projects that are considered eligible for assistance. The priority system should give high priority to projects in priority water quality areas. The priority system may also include the administrative, management, and public participation procedures required to develop and revise the State project priority list. The priority system includes at least the following elements:

(1) Criteria. (i) The priority system shall include at least the following criteria for ranking projects:

(A) The impairment of classified water uses resulting from existing municipal pollutant discharges; and

(B) The extent of surface or ground water use restoration or public health improvement resulting from the reduction in pollution.

(ii) The State may also include other criteria in its priority system for ranking projects, such as the use of innovative or alternative technology, the need to complete a waste treatment system for which a grant for a phase or segment was previously awarded; and the category of need and the existing population affected.

(iii) In ranking phased and segmented projects States must comply with §35.2108.

(2) Categories of need. All projects must fit into at least one of the categories of need described in this paragraph to be eligible for funding, except as provided in paragraphs (b)(2) (iii) and (iv) of this section. States will have sole authority to determine the priority for each category of need.

(i) Before October 1, 1984, these categories of need shall include at least the following:

(A) Secondary treatment (category I);

(B) Treatment more stringent than secondary (category II);

(C) Infiltration/inflow correction (category IIIA);

(D) Major sewer system rehabilitation (category IIIB);

(E) New collector sewers and appurtenances (category IVA);

(F) New interceptors and appurtenances (category IVB);

(G) Correction of combined sewer overflows (category V).

(ii) After September 30, 1984, except as provided in paragraphs (b)(2) (iii) and (iv) of this section, these categories of need shall include only the following:

(A) Secondary treatment or any cost-effective alternative;

(B) Treatment more stringent than secondary or any cost-effective alternative;

(C) New interceptors and appurtenances; and

(D) Infiltration/inflow correction.

(iii) After September 30, 1984, up to 20 percent (as determined by the Governor) of a State's annual allotment may be used for categories of need other than those listed in paragraph (b)(2)(ii) of this section and for any purpose for which grants may be made under sections 319 (h) and (i) of the Act (including any innovative and alternative approaches for the control of nonpoint sources of pollution).

(iv) After September 30, 1984, the Governor may include in the priority system a category for projects needed to correct combined sewer overflows which result in impaired uses in priority water quality areas. Only projects which comply with the requirements of §35.2024(a) may be included in this category.

(c) Project priority list. The State's annual project priority list is an ordered listing of projects for which the State expects Federal financial assistance. The priority list contains two portions: the fundable portion, consisting of those projects anticipated to be funded from funds available for obligation; and the planning portion, consisting of projects anticipated to be funded from future authorized allotments.

(1) The State shall develop the project priority list consistent with the criteria established in the approved priority system. In ranking projects, the State must also consider total funds available, needs and priorities set forth in areawide water quality management plans, and any other factors contained in the State priority system.

(2) The list shall include an estimate of the eligible cost of each project.

(d) Public participation. (1) In addition to any requirements in 40 CFR part 25, the State shall hold public hearings as follows:

(i) Before submitting its priority system to the Regional Administrator for approval and before adopting any significant change to an approved priority system; and

(ii) Before submitting its annual project priority list to the Regional Administrator for acceptance and before revising its priority list unless the State agency and the Regional Administrator determine that the revision is not significant.

(iii) If the approved State priority system contains procedures for bypassing projects on the fundable portion of the priority list, such bypasses will not be significant revisions for purposes of this section.

(2) Public hearings may be conducted as directed in the State's continuing planning process document or may be held in conjunction with any regular public meeting of the State agency.

(e) Regional Administrator review. The State must submit its priority system, project priority list and revisions of the priority system or priority list to the Regional Administrator for review. The State must also submit each year, by August 31, a new priority list for use in the next fiscal year.

(1) After submission and approval of the initial priority system and submission and acceptance of the project priority lists under paragraph (c) of this section, the State may revise its priority system and list as necessary.

(2) The Regional Administrator shall review the State priority system and any revisions to insure that they are designed to obtain compliance with the criteria established in accordance with paragraphs (b) and (d) of this section and the enforceable requirements of the Act as defined in §35.2005(b)(15). The Regional Administrator shall complete review of the priority system within 30 days of receipt of the system from the State and will notify the State in writing of approval or disapproval of the priority system, stating any reasons for disapproval.

(3) The Regional Administrator will review the project priority list and any revisions to insure compliance with the State's approved priority system and the requirements of paragraph (c) of this section. The Regional Administrator will complete review of the project priority list within 30 days of receipt from the State and will notify the State in writing of acceptance or rejection, stating the reasons for the rejection. Any project which is not contained on an accepted current priority list will not receive funding.

(f) Compliance with the enforceable requirements of the Act. (1) Except as limited under paragraph (f)(2) of this section, the Regional Administrator, after a public hearing, shall require the removal of a specific project or portion thereof from the State project priority list if the Regional Administrator determines it will not contribute to compliance with the enforceable requirements of the Act.

(2) The Regional Administrator shall not require removal of projects in categories under paragraphs (b)(2)(i) (D) through (G) of this section which do not meet the enforceable requirements of the Act unless the total Federal share of such projects would exceed 25 percent of the State's annual allotment.

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27095, June 29, 1990]

§ 35.2020 Reserves.
top
In developing its priority list the State shall establish the reserves required or authorized under this section. The amount of each mandatory reserve shall be based on the allotment to each State from the annual appropriation under §35.2010. The State may also establish other reserves which it determines appropriate.

(a) Reserve for State management assistance grants. Each State may request that the Regional Administrator reserve, from the State's annual allotment, up to 4 percent of the State's allotment based on the amount authorized to be appropriated, or $400,000, whichever is greater, for State management assistance grants under subpart A of this part. Grants may be made from these funds to cover the costs of administering activities delegated or scheduled to be delegated to a State. Funds reserved for this purpose that are not obligated by the end of the allotment period will be added to the amounts last allotted to a State. These funds shall be immediately available for obligation to projects in the same manner and to the same extent as the last allotment.

(b) Reserve for alternative systems for small communities. Each State with 25 percent or more rural population (as determined by the population estimates of the Bureau of Census) shall reserve not less than 4 percent nor more than 7 1/2 percent of the State's annual allotment for alternatives to conventional treatment works for small communities. The Governor of any non-rural State may reserve up to 7 1/2 percent of the State's allotment for the same purpose.

(c) Reserve for innovative and alternative technologies. Each State shall reserve not less than 4 percent nor more than 7 1/2 percent from its annual allotment to increase the Federal share of grant awards under §35.2032 for projects which use innovative or alternative wastewater treatment processes and techniques. Of this amount not less than one-half of one percent of the State's allotment shall be set aside to increase the Federal share for projects using innovative processes and techniques.

(d) Reserve for water quality management. Each State shall reserve not less than $100,000 nor more than 1 percent from its annual allotments, to carry out water quality management planning under §35.2023, except that in the case of Guam, the Virgin Islands, American Samoa, the Trust Territory of the Pacific Islands and the Commonwealth of the Northern Marianas, a reasonable amount shall be reserved for this purpose.

(e) Reserve for Advances of Allowance. Each State shall reserve a reasonable portion of its annual allotment not to exceed 10 percent for advances of allowance under §35.2025. The Regional Administrator may waive this reserve requirement where a State can demonstrate that such a reserve is not necessary because no new facilities planning or design work requiring an advance and resulting in Step 3 grant awards is expected to begin during the period of availability of the annual allotment.

(f) Nonpoint source reserve. Each State shall reserve 1 percent of its annual allotment or $100,000, whichever is greater, for development and implementation of a nonpoint source management program under section 319 of the Act. Sums reserved by the State under this paragraph that are in excess of $100,000 and that are not used for these purposes, may be used by the State for any other purpose under title II of the Act.

(g) Marine estuary reserve. The Administrator shall reserve, before allotment of funds to the States, 1 percent of the funds appropriated under section 207 in fiscal years 1987 and 1988, and 1 1/2 percent of the funds appropriated under section 207 in fiscal years 1989 and 1990, to carry out section 205(l) of the Act.

(h) Indian program reserve. The Administrator shall reserve, before allotment of funds to the States, one-half of 1 percent of the funds appropriated under section 207 in fiscal years 1987, 1988, 1989 and 1990, for grants for the development of waste treatment management plans and for the construction of sewage treatment works to serve Indian tribes.

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985; 55 FR 27095, June 29, 1990]

§ 35.2021 Reallotment of reserves.
top
(a) Mandatory portions of reserves under §35.2020(b) through (g) shall be reallotted if not obligated during the allotment period (§35.2010(b) and (d)). Such reallotted sums are not subject to reserves. The State management assistance reserve under §35.2020(a) is not subject to reallotment.

(b) States may request the Regional Administrator to release funds in optional reserves or optional portions of required reserves under §35.2020(b) through (e) for funding projects at any time before the reallotment date. If these optional reserves are not obligated or released and obligated for other purposes before the reallotment date, they shall be subject to reallotment under §35.2010(b).

(c) Sums deobligated from the mandatory portion of reserves under paragraphs (b) through (e) of §35.2020 which are reissued by the Comptroller to the Regional Administrator before the initial reallotment date for those funds shall be returned to the same reserve. (See §35.2010(c)).

[49 FR 6234, Feb. 17, 1984, as amended at 50 FR 45895, Nov. 4, 1985; 55 FR 27095, June 29, 1990]

§ 35.2023 Water quality management planning.
top
(a) From funds reserved under §35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to:

(1) Identifying the most cost-effective and locally acceptable facility and non-point measures to meet and maintain water quality standards;

(2) Developing an implementation plan to obtain State and local financial and regulatory commitments to implement measures developed under paragraph (a)(1) of this section;

(3) Determining the nature, extent and causes of water quality problems in various areas of the State and interstate region, and reporting on these annually; and

(4) Determining which publicly owned treatment works should be constructed, in which areas and in what sequence, taking into account the relative degree of effluent reduction attained, the relative contributions to water quality of other point or nonpoint sources, and the consideration of alternatives to such construction, and implementing section 303(e) of the Act.

(b) In carrying out planning with grants made under paragraph (a) of this section, a State shall develop jointly with local, regional and interstate entities, a plan for carrying out the program and give funding priority to such entities and designated or undesignated public comprehensive planning organizations to carry out the purposes of this section.

§ 35.2024 Combined sewer overflows.
top
(a) Grant assistance from State allotment. As provided in §35.2015(b)(2)(iv), after September 30, 1984, upon request from a State, the Administrator may award a grant under section 201(n)(1) of the Act from the State allotment for correction of combined sewer overflows provided that the project is on the project priority list, it addresses impaired uses in priority water quality areas which are due to the impacts of the combined sewer overflows and otherwise meets the requirements of this subpart. The State must demonstrate to the Administrator that the water quality goals of the Act will not be achieved without correcting the combined sewer overflows. The demonstration shall as a minimum prove that significant usage of the water for fishing and swimming will not be possible without the proposed project, and that the project will result in substantial restoration of an existing impaired use.

(b) Separate fund for combined sewer overflows in marine waters. (1) After September 30, 1982, the Administrator may award grants under section 201(n)(2) of the Act for addressing impaired uses or public health risks in priority water quality areas in marine bays and estuaries due to the impacts of combined sewer overflows. The Administrator may award such grants provided that the water quality benefits of the proposed project have been demonstrated by the State. The demonstration shall as a minimum prove that significant usage of the water for shellfishing and swimming will not be possible without the proposed project for correction of combined sewer overflows, and the proposed project will result in substantial restoration of an existing impaired use.

(2) The Administrator shall establish priorities for projects with demonstrated water quality benefits based upon the following criteria:

(i) Extent of water use benefits that would result, including swimming and shellfishing;

(ii) Relationship of water quality improvements to project costs; and

(iii) National and regional significance.

(3) If the project is a phase or segment of the proposed treatment works described in the facilities plan, the criteria in paragraph (b)(2) of this section must be applied to the treatment works described in the facilities plan and each segment proposed for funding.

(4) All requirements of this subpart apply to grants awarded under section 201(n)(2) of the Act except §§35.2010, 35.2015, 35.2020, 35.2021, 35.2025(b), 35.2042, 35.2103, 35.2109, and 35.2202.

§ 35.2025 Allowance and advance of allowance.
top
(a) Allowance. Step 2+3 and Step 3 grant agreements will include an allowance for facilities planning and design of the project and Step 7 agreements will include an allowance for facility planning in accordance with appendix B of this subpart.

(b) Advance of allowance to potential grant applicants. (1) After application by the State (see §35.2040(d)), the Regional Administrator will award a grant to the State in the amount of the reserve under §35.2020(e) to advance allowances to potential grant applicants for facilities planning and project design.

(2) The State may request that the right to receive payments under the grant be assigned to specified potential grant applicants.

(3) The State may provide advances of allowance only to small communities, as defined by the State, which would otherwise be unable to complete an application for a grant under §35.2040 in the judgment of the State.

(4) The advance shall not exceed the Federal share of the estimate of the allowance for such costs which a grantee would receive under paragraph (a) of this section.

(5) In the event a Step 2+3, Step 3 or Step 7 grant is not awarded to a recipient of an advance, the State may seek repayment of the advance on such terms and conditions as it may determine. When the State recovers such advances they shall be added to its most recent grant for advances of allowance.

[49 FR 6234, Feb. 17, 1984, as amended at 55 FR 27095, June 29, 1990]

§ 35.2030 Facilities planning.
top
(a) General. (1) Facilities planning consists of those necessary plans and studies which directly relate to treatment works needed to comply with enforceable requirements of the Act. Facilities planning will investigate the need for proposed facilities. Through a systematic evaluation of alternatives that are feasible in light of the unique demographic, topographic, hydrologic and institutional characteristics of the area, it will demonstrate that, except for innovative and alternative technology under §35.2032, the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while recognizing environmental and other non-monetary considerations). For sewered communities with a population of 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions of communities of 10,000 or less, consideration must be given to onsite systems. The facilities plan will also demonstrate that the selected alternative is implementable from legal, institutional, financial and management standpoints.

(2) Grant assistance may be awarded before certification of the completed facilities plan if:

(i) The Regional Administrator determines that applicable statutory and regulatory requirements (including part 6) have been met; that the facilities planning related to the project has been substantially completed; and that the project for which grant assistance is awarded will not be significantly affected by the completion of the facilities plan and will be a component part of the complete waste treatment system; and

(ii) The applicant agrees to complete the facilities plan on a schedule the State accepts and such schedule is inserted as a special condition of the grant agreement.

(b) Facilities plan contents. A completed facilities plan must include: (continued)