(continued)

(b) Information needs. Information necessary for a proper environmental review shall be provided by the permit applicant in an environmental information document. The responsible official shall consult with the applicant to determine the scope of an environmental information document. In doing this the responsible official shall consider the size of the new source and the extent to which the applicant is capable of providing the required information. The responsible official shall not require the applicant to gather data or perform analyses which unnecessarily duplicate either existing data or the results of existing analyses available to EPA. The responsible official shall keep requests for data to the minimum consistent with his responsibilities under NEPA.

(c) Environmental assessment. The responsible official shall prepare a written environmental assessment based on an environmental review of either the environmental information document and/or any other available environmental information.

(d) EIS determination. (1) When the environmental review indicates that a significant environmental impact may occur and that the significant adverse impacts cannot be eliminated by making changes in the proposed new source project, a notice of intent shall be issued, and a draft EIS prepared and distributed. When the environmental review indicates no significant impacts are anticipated or when the proposed project is changed to eliminate the significant adverse impacts, a FNSI shall be issued which lists any mitigation measures necessary to make the recommended alternative environmentally acceptable.

(2) The FNSI together with the environmental assessment that supports the finding shall be distributed in accordance with §6.400(d) of this regulation.

(e) Lead agency. (1) If the environmental review reveals that the preparation of an EIS is required, the responsible official shall determine if other Federal agencies are involved with the project. The responsible official shall contact all other involved agencies and together the agencies shall decide the lead agency based on the criteria set forth in 40 CFR 1501.5.

(2) If, after the meeting of involved agencies, EPA has been determined to be the lead agency, the responsible official may request that other involved agencies be cooperating agencies. Cooperating agencies shall be chosen and shall be involved in the EIS preparation process in the manner prescribed in the 40 CFR 1501.6(a). If EPA has been determined to be a cooperating agency, the responsible official shall be involved in assisting in the preparation of the EIS in the manner prescribed in 40 CFR 1501.6(b).

(f) Notice of intent. (1) If EPA is the lead agency for the preparation of an EIS, the responsible official shall arrange through OER for the publication of the notice of intent in the Federal Register, distribute the notice of intent and arrange and conduct a scoping meeting as outlined in 40 CFR 1501.7.

(2) If the responsible official and the permit applicant agree to a third party method of EIS preparation, pursuant to §6.604(g)(3) of this part, the responsible official shall insure that a notice of intent is published and that a scoping meeting is held before the third party contractor begins work which may influence the scope of the EIS.

(g) EIS method. EPA shall prepare EISs by one of the following means:

(1) Directly by its own staff;

(2) By contracting directly with a qualified consulting firm; or

(3) By utilizing a third party method, whereby the responsible official enters into a third party agreement for the applicant to engage and pay for the services of a third party contractor to prepare the EIS. Such an agreement shall not be initiated unless both the applicant and the responsible official agree to its creation. A third party agreement will be established prior to the applicant's environmental information document and eliminate the need for that document. In proceeding under the third party agreement, the responsible official shall carry out the following practices:

(i) In consultation with the applicant, choose the third party contractor and manage that contract.

(ii) Select the consultant based on his ability and an absence of conflict of interest. Third party contractors will be required to execute a disclosure statement prepared by the responsible official signifying they have no financial or other conflicting interest in the outcome of the project.

(iii) Specify the information to be developed and supervise the gathering, analysis and presentation of the information. The responsible official shall have sole authority for approval and modification of the statements, analyses, and conclusions included in the third party EIS.

(h) Documents for the administrative record. Pursuant to 40 CFR 124.9(b)(6) and 124.18(b)(5) any environmental assessment, FNSI EIS, or supplement to an EIS shall be made a part of the administrative record related to permit issuance.

[44 FR 64177, Nov. 6, 1979, as amended at 47 FR 9831, Mar. 8, 1982]

§ 6.605 Criteria for preparing EISs.
top
(a) General guidelines. (1) When determining the significance of a proposed new source's impact, the responsible official shall consider both its short term and long term effects as well as its direct and indirect effects and beneficial and adverse environmental impacts as defined in 40 CFR 1508.8.

(2) If EPA is proposing to issue a number of new source NPDES permits during a limited time span and in the same general geographic area, the responsible official shall examine the possibility of tiering EISs. If the permits are minor and environmentally insignificant when considered separately, the responsible official may determine that the cumulative impact of the issuance of all these permits may have a significant environmental effect and require an EIS for the area. Each separate decision to issue an NPDES permit shall then be based on the information in this areawide EIS. Site specific EISs may be required in certain circumstances in addition to the areawide EIS.

(b) Specific criteria. An EIS will be prepared when:

(1) The new source will induce or accelerate significant changes in industrial, commercial, agricultural, or residential land use concentrations or distributions which have the potential for significant environmental effects. Factors that should be considered in determining if these changes are environmentally significant include but are not limited to: The nature and extent of the vacant land subject to increased development pressure as a result of the new source; the increases in population or population density which may be induced and the ramifications of such changes; the nature of land use regulations in the affected area and their potential effects on development and the environment; and the changes in the availability or demand for energy and the resulting environmental consequences.

(2) The new source will directly, or through induced development, have significant adverse effect upon local ambient air quality, local ambient noise levels, floodplains, surface or groundwater quality or quantity, fish, wildlife, and their natural habitats.

(3) Any major part of the new source will have significant adverse effect on the habitat of threatened or endangered species on the Department of the Interior's or a State's lists of threatened and endangered species.

(4) The environmental impact of the issuance of a new source NPDES permit will have significant direct and adverse effect on a property listed in or eligible for listing in the National Register of Historic Places.

(5) Any major part of the source will have significant adverse effects on parklands, wetlands, wild and scenic rivers, reservoirs or other important bodies of water, navigation projects, or agricultural lands.

§ 6.606 Record of decision.
top
(a) General. At the time of permit award, the responsible official shall prepare a record of decision in those cases where a final EIS was issued in accordance with 40 CFR 1505.2 and pursuant to the provisions of the permit regulations under 40 CFR 124.15 and 124.18(b)(5). The record of decision shall list any mitigation measures necessary to make the recommended alternative environmentally acceptable.

(b) Mitigation measures. The mitigation measures derived from the EIS process shall be incorporated as conditions of the permit; ancillary agreements shall not be used to require mitigation.

[44 FR 64177, Nov. 6, 1979, as amended at 47 FR 9831, Mar. 8, 1982]

§ 6.607 Monitoring.
top
In accordance with 40 CFR 1505.3 and pursuant to 40 CFR 122.66(c) and 122.10 the responsible official shall ensure that there is adequate monitoring of compliance with all NEPA related requirements contained in the permit.

[47 FR 9831, Mar. 8, 1982]

Subpart G—Environmental Review Procedures for Office of Research and Development Projects
top
Source: 56 FR 20543, May 6, 1991, unless otherwise noted.

§ 6.700 Purpose.
top
(a) This subpart amplifies the requirements described in subparts A through D by providing specific environmental review procedures for activities undertaken or funded by the Office of Research and Development (ORD).

(b) The ORD Program provides scientific support for setting environmental standards as well as the technology needed to prevent, monitor and control pollution. Intramural research is conducted at EPA laboratories and field stations throughout the United States. Extramural research is implemented through grants, cooperative agreements, and contracts. The majority of ORD's research is conducted within the confines of laboratories. Outdoor research includes monitoring, sampling, and environmental stress and ecological effects studies.

§ 6.701 Definition.
top
The term appropriate program official means the official at each decision level within ORD to whom the Assistant Administrator has delegated responsibility for carrying out the environmental review process.

§ 6.702 Applicability.
top
The requirements of this subpart apply to administrative actions undertaken to approve intramural and extramural projects under the purview of ORD.

§ 6.703 General.
top
(a) Environmental information. (1) For intramural research projects, information necessary to perform the environmental review shall be obtained by the appropriate program official.

(2) For extramural research projects, environmental information documents shall be submitted to EPA by applicants to facilitate the Agency's environmental review process. Guidance on environmental information documents shall be included in all assistance application kits and in contract proposal instructions. If there is a question concerning the preparation of an environmental information document, the applicant should consult with the project officer or contract officer for guidance.

(b) Environmental review. The diagram in figure 1 represents the various stages of the environmental review process to be undertaken for ORD projects.

(1) For intramural research projects, an environmental review will be performed for each laboratory's projects at the start of the planning year. The review will be conducted before projects are incorporated into the ORD program planning system. Projects added at a later date and, therefore, not identified at the start of the planning year, or any redirection of a project that could have significant environmental effects, also will be subjected to an environmental review. This review will be performed in accordance with the process set forth in this subpart and depicted in figure 1.

(2) For extramural research projects, the environmental review shall be conducted before an initial or continuing award is made. The appropriate program official will perform the environmental review in accordance with the process set forth in this subpart and depicted in figure 1. EPA form 5300–23 will be used to document categorical exclusion determinations or, with appropriate supporting analysis, as the environmental assessment (EA). The completed form 5300–23 and any finding of no significant impact (FNSI) or environmental impact statement (EIS) will be submitted with the proposal package to the appropriate EPA assistance or contract office.

(c) Agency coordination. In order to avoid duplication of effort and ensure consistency throughout the Agency, environmental reviews of ORD projects will be coordinated, as appropriate and feasible, with reviews performed by other program offices. Technical support documents prepared for reviews in other EPA programs may be adopted for use in ORD's environmental reviews and supplemented, as appropriate.

§ 6.704 Categorical exclusions.
top
(a) At the beginning of the environmental review process (see Figure 1), the appropriate program official shall determine whether an ORD project can be categorically excluded from the substantive requirements of a NEPA review. This determination shall be based on general criteria in §6.107(d) and specialized categories of ORD actions eligible for exclusion in §6.704(b). If the appropriate program official determines that an ORD project is consistent with the general criteria and any of the specialized categories of eligible activities, and does not satisfy the criteria in §6.107(e) for not granting a categorical exclusion, then this finding shall be documented and no further action shall be required. A categorical exclusion shall be revoked by the appropriate program official if it is determined that the project meets the criteria for revocation in §6.107(c). Projects that fail to qualify for categorical exclusion or for which categorical exclusion has been revoked must undergo full environmental review in accordance with §6.705 and §6.706.

(b) The following specialized categories of ORD actions are eligible for categorical exclusion from a detailed NEPA review:

(1) Library or literature searches and studies;

(2) Computer studies and activities;

(3) Monitoring and sample collection wherein no significant alteration of existing ambient conditions occurs;

(4) Projects conducted completely within a contained facility, such as a laboratory or other enclosed building, where methods are employed for appropriate disposal of laboratory wastes and safeguards exist against hazardous, toxic, and radioactive materials entering the environment. Laboratory directors or other appropriate officials must certify and provide documentation that the laboratory follows good laboratory practices and adheres to applicable Federal statutes, regulations and guidelines.

§ 6.705 Environmental assessment and finding of no significant impact.
top
(a) When a project does not meet any of the criteria for categorical exclusion, the appropriate program official shall undertake an environmental assessment in accordance with 40 CFR 1508.9 in order to determine whether an EIS is required or if a FNSI can be made. ORD projects which normally result in the preparation of an EA include the following:

(1) Initial field demonstration of a new technology;

(2) Field trials of a new product or new uses of an existing technology;

(3) Alteration of a local habitat by physical or chemical means.

(b) If the environmental assessment reveals that the research is not anticipated to have a significant impact on the environment, the appropriate program official shall prepare a FNSI in accordance with §6.105(f). Pursuant to §6.400(d), no administrative action will be taken on a project until the prescribed 30-day comment period for a FNSI has elapsed and the Agency has fully considered all comments.

(c) On actions involving potentially significant impacts on the environment, a FNSI may be prepared if changes have been made in the proposed action to eliminate any significant impacts. These changes must be documented in the proposal and in the FNSI.

(d) If the environmental assessment reveals that the research may have a significant impact on the environment, an EIS must be prepared. The appropriate program official may make a determination that an EIS is necessary without preparing a formal environmental assessment. This determination may be made by applying the criteria for preparation of an EIS in §6.706.

§ 6.706 Environmental impact statement.
top
(a) Criteria for preparation. In performing the environmental review, the appropriate program official shall assure that an EIS is prepared when any of the conditions under §6.108 (a) through (g) exist or when:

(1) The proposed action may significantly affect the environment through the release of radioactive, hazardous or toxic substances;

(2) The proposed action, through the release of an organism or organisms, may involve environmental effects which are significant;

(3) The proposed action involves effects upon the environment which are likely to be highly controversial;

(4) The proposed action involves environmental effects which may accumulate over time or combine with effects of other actions to create impacts which are significant;

(5) The proposed action involves uncertain environmental effects or highly unique environmental risks which may be significant.

(b) ORD actions which may require preparation of an EIS. There are no ORD actions which normally require the preparation of an EIS. However, each ORD project will be evaluated using the EIS criteria as stated in §6.706(a) to determine whether an EIS must be prepared.

(c) Notice of intent. (1) If the environmental review reveals that a proposed action may have a significant effect on the environment and this effect cannot be eliminated by redirection of the research or other means, the appropriate program official shall issue a notice of intent to prepare an EIS pursuant to §6.400(b).

(2) As soon as possible after release of the notice of intent, the appropriate program official shall ensure that a draft EIS is prepared in accordance with subpart B and that the public is involved in accordance with subpart D.

(3) Draft and final EISs shall be sent to the Assistant Administrator for ORD for approval.

(4) Pursuant to §6.401(b), a decision on whether to undertake or fund a project must be made in conformance with the time frames indicated.

(d) Record of decision. Before the project is undertaken or funded, the appropriate program official shall prepare, in accordance with §6.105 (g) and (h), a record of decision in any case where a final EIS has been issued.



View or download PDF


Subpart H—Environmental Review Procedures for Solid Waste Demonstration Projects
top
§ 6.800 Purpose.
top
This subpart amplifies the procedures described in subparts A through D by providing more specific environmental review procedures for demonstration projects undertaken by the Office of Solid Waste and Emergency Response.

[44 FR 64177, Nov. 6, 1979, as amended at 51 FR 32613, Sept. 12, 1986]

§ 6.801 Applicability.
top
The requirements of this subpart apply to solid waste demonstration projects for resource recovery systems and improved solid waste disposal facilities undertaken pursuant to section 8006 of the Resource Conservation and Recovery Act of 1976.

§ 6.802 Criteria for preparing EISs.
top
The responsible official shall assure that an EIS will be prepared when it is determined that any of the conditions in §6.108 exist.

[44 FR 64177, Nov. 6, 1979, as amended at 50 FR 26323, June 25, 1985]

§ 6.803 Environmental review process.
top
(a) Environmental information. (1) Environmental information documents shall be submitted to EPA by grant applicants or contractors. If there is a question concerning the need for a document, the potential contractor or grantee should consult with the appropriate project officer for the grant or contract.

(2) The environmental information document shall contain the same sections specified for EIS's in subpart B. Guidance alerting potential grantees and contractors of the environmental information documents shall be included in all grant application kits, attached to letters concerning the submission of unsolicited proposals, and included with all requests for proposal.

(b) Environmental review. An environmental review will be conducted before a grant or contract award is made. This review will include the preparation of an environmental assessment by the responsible official; the appropriate Regional Administrator's input will include his recommendations on the need for an EIS.

(c) Notice of intent and EIS. Based on the environmental review if the criteria in §6.802 of this part apply, the responsible official will assure that a notice of intent and a draft EIS are prepared. The responsible official may request the appropriate Regional Administrator to assist him in the preparation and distribution of the environmental documents.

(d) Finding of no significant impact. If the environmental review indicated no significant environmental impacts, the responsible official will assure that a FNSI is prepared which lists any mitigation measures necessary to make the recommended alternative environmentally acceptable.

(e) Timing of action. Pursuant to §6.401(b), in no case shall a contract or grant be awarded until the prescribed 30-day review period for a final EIS has elapsed. Similarly, no action shall be taken until the 30-day comment period for a FNSI is completed.

§ 6.804 Record of decision.
top
The responsible official shall prepare a record of decision in any case where final EIS has been issued in accordance with 40 CFR 1505.2. It shall be prepared at the time of contract or grant award. The record of decision shall list any mitigation measures necessary to make the recommended alternative environmentally acceptable.

Subpart I—Environmental Review Procedures for EPA Facility Support Activities
top
§ 6.900 Purpose.
top
This subpart amplifies the general requirements described in subparts A through D by providing environmental procedures for the preparation of EISs on construction and renovation of special purpose facilities.

§ 6.901 Definitions.
top
(a) The term special purpose facility means a building or space, including land incidental to its use, which is wholly or predominantly utilized for the special purpose of an agency and not generally suitable for other uses, as determined by the General Services Administration.

(b) The term program of requirements means a comprehensive document (booklet) describing program activities to be accomplished in the new special purpose facility or improvement. It includes architectural, mechanical, structural, and space requirements.

(c) The term scope of work means a document similar in content to the program of requirements but substantially abbreviated. It is usually prepared for small-scale projects.

§ 6.902 Applicability.
top
(a) Actions covered. These procedures apply to all new special purpose facility construction, activities related to this construction (e.g., site acquisition and clearing), and any improvements or modifications to facilities having potential environmental effects external to the facility, including new construction and improvements undertaken and funded by the Facilities Engineering and Real Estate Branch, Facilities and Support Services Division, Office of the Assistant Administrator for Administration and Resource Management; or by a regional office .

(b) Actions excluded. This subpart does not apply to those activities of the Facilities Engineering and Real Estate Branch, Facilities and Support Services Division, for which the branch does not have full fiscal responsibility for the entire project. This includes pilot plant construction, land acquisition, site clearing and access road construction where the Facilities Engineering and Real Estate Branch's activity is only supporting a project financed by a program office. Responsibility for considering the environmental impacts of such projects rests with the office managing and funding the entire project. Other subparts of this regulation apply depending on the nature of the project.

[44 FR 64177, Nov. 6, 1979, as amended at 51 FR 32613, Sept. 12, 1986]

§ 6.903 Criteria for preparing EISs.
top
(a) Preliminary information. The responsible official shall request an environmental information document from a construction contractor or consulting architect/engineer employed by EPA if he is involved in the planning, construction or modification of special purpose facilities when his activities have potential environmental effects external to the facility. Such modifications include but are not limited to facility additions, changes in central heating systems or wastewater treatment systems, and land clearing for access roads and parking lots.

(b) EIS preparation criteria. The responsible official shall conduct an environmental review of all actions involving construction of special purpose facilities and improvements to these facilities. The responsible official shall assure that an EIS will be prepared when it is determined that any of the conditions in §6.108 of this part exist.

[44 FR 64177, Nov. 6, 1979, as amended at 50 FR 26323, June 25, 1985]

§ 6.904 Environmental review process.
top
(a) Environmental review. (1) An environmental review shall be conducted when the program of requirements or scope of work has been completed for the construction, improvements, or modification of special purpose facilities. For special purpose facility construction, the Chief, Facilities Engineering and Real Estate Branch, shall request the assistance of the appropriate program office and Regional Administrator in the review. For modifications and improvement, the appropriate responsible official shall request assistance in making the review from other cognizant EPA offices.

(2) Any environmental information documents requested shall contain the same sections listed for EISs in subpart B. Contractors and consultants shall be notified in contractual documents when an environmental information document must be prepared.

(b) Notice of intent, EIS, and FNSI. The responsible official shall decide at the completion of the Environmental review whether there may be any significant environmental impacts. If there could be significant environmental impacts, a notice of intent and an EIS shall be prepared according to the procedures under subparts A, B, C and D. If there are not any significant environmental impacts, a FNSI shall be prepared according to the procedures in subparts A and D. The FNSI shall list any mitigation measures necessary to make the recommended alternative environmentally acceptable.

(c) Timing of action. Pursuant to §6.401(b), in no case shall a contract be awarded or construction activities begun until the prescribed 30-day wait period for a final EIS has elapsed. Similarly, under §6.400(d), no action shall be taken until the 30-day comment period for FNSIs is completed.

§ 6.905 Record of decision.
top
At the time of contract award, the responsible official shall prepare a record of decision in those cases where a final EIS has been issued in accordance with 40 CFR 1505.2. The record of decision shall list any mitigation measures necessary to make the recommended alternative environmentally acceptable.

Subpart J—Assessing the Environmental Effects Abroad of EPA Actions
top
Authority: Executive Order 12114, 42 U.S.C. 4321, note.

Source: 46 FR 3364, Jan. 14, 1981, unless otherwise noted.

§ 6.1001 Purpose and policy.
top
(a) Purpose. On January 4, 1979, the President signed Executive Order 12114 entitled “Environmental Effects Abroad of Major Federal Actions.” The purpose of this Executive Order is to enable responsible Federal officials in carrying out or approving major Federal actions which affect foreign nations or the global commons to be informed of pertinent environmental considerations and to consider fully the environmental impacts of the actions undertaken. While based on independent authority, this Order furthers the purpose of the National Environmental Policy Act (NEPA) (42 U.S.C. 4321 et seq.) and the Marine Protection Research and Sanctuaries Act (MPRSA) (33 U.S.C. 1401 et seq.). It should be noted, however, that in fulfilling its responsibilities under Executive Order 12114, EPA shall be guided by CEQ regulations only to the extent that they are made expressly applicable by this subpart. The procedures set forth below reflect EPA's duties and responsibilities as required under the Executive Order and satisfy the requirement for issuance of procedures under section 2–1 of the Executive Order.

(b) Policy. It shall be the policy of this Agency to carry out the purpose and requirements of the Executive Order to the fullest extent possible. EPA, within the realm of its expertise, shall work with the Department of State and the Council on Environmental Quality to provide information to other Federal agencies and foreign nations to heighten awareness of and interest in the environment. EPA shall further cooperate to the extent possible with Federal agencies to lend special expertise and assistance in the preparation of required environmental documents under the Executive Order. EPA shall perform environmental reviews of activities significantly affecting the global commons and foreign nations as required under Executive Order 12114 and as set forth under these procedures.

§ 6.1002 Applicability.
top
(a) Administrative actions requiring environmental review. The environmental review requirements apply to the activities of EPA as set forth below:

(1) Major research or demonstration projects which affect the global commons or a foreign nation.

(2) Ocean dumping activities carried out under section 102 of the MPRSA which affect the related environment.

(3) Major permitting or licensing by EPA of facilities which affect the global commons or the environment of a foreign nation. This may include such actions as the issuance by EPA of hazardous waste treatment, storage, or disposal facility permits pursuant to section 3005 of the Resource Conservation and Recovery Act (42 U.S.C. 6925), NPDES permits pursuant to section 402 of the Clean Water Act (33 U.S.C. 1342), and prevention of significant deterioration approvals pursuant to Part C of the Clean Air Act (42 U.S.C. 7470 et seq.).

(4) Wastewater Treatment Construction Grants Program under section 201 of the Clean Water Act when activities addressed in the facility plan would have environmental effects abroad.

(5) Other EPA activities as determined by OER and OIA (see §6.1007(c)).

§ 6.1003 Definitions.
top
As used in this subpart, environment means the natural and physical environment and excludes social, economic and other environments; global commons is that area (land, air, water) outside the jurisdiction of any nation; and responsible official is either the EPA Assistant Administrator or Regional Administrator as appropriate for the particular EPA program. Also, an action significantly affects the environment if it does significant harm to the environment even though on balance the action may be beneficial to the environment. To the extent applicable, the responsible official shall address the considerations set forth in the CEQ Regulations under 40 CFR 1508.27 in determining significant effect.

§ 6.1004 Environmental review and assessment requirements.
top
(a) Research and demonstration projects. The appropriate Assistant Administrator is responsible for performing the necessary degree of environmental review on research and demonstration projects undertaken by EPA. If the research or demonstration project affects the environment of the global commons, the applicant shall prepare an environmental analysis. This will assist the responsible official in determining whether an EIS is necessary. If it is determined that the action significantly affects the environment of the global commons, then an EIS shall be prepared. If the undertaking significantly affects a foreign nation EPA shall prepare a unilateral, bilateral or multilateral environmental study. EPA shall afford the affected foreign nation or international body or organization an opportunity to participate in this study. This environmental study shall discuss the need for the action, analyze the environmental impact of the various alternatives considered and list the agencies and other parties consulted.

(b) Ocean dumping activities. (1) The Assistant Administrator for Water and Waste Management shall ensure the preparation of appropriate environmental documents relating to ocean dumping activities in the global commons under section 102 of the MPRSA. For ocean dumping site designations prescribed pursuant to section 102(c) of the MPRSA and 40 CFR part 228, EPA shall prepare an environmental impact statement consistent with the requirements of EPA's Procedures for the Voluntary Preparation of Environmental Impact Statements dated October 21, 1974 (see 39 FR 37419). Also EPA shall prepare an environmental impact statement for the establishment or revision of criteria under section 102(a) of MPRSA.

(2) For individual permits issued by EPA under section 102(b) an environmental assessment shall be made by EPA. Pursuant to 40 CFR part 221, the permit applicant shall submit with the application an environmental analysis which includes a discussion of the need for the action, an outline of alternatives, and an analysis of the environmental impact of the proposed action and alternatives consistent with the EPA criteria established under section 102(a) of MPRSA. The information submitted under 40 CFR part 221 shall be sufficient to satisfy the environmental assessment requirement.

(c) EPA permitting and licensing activities. The appropriate Regional Administrator is responsible for conducting concise environmental reviews with regard to permits issued under section 3005 of the Resource Conservation and Recovery Act (RCRA permits), section 402 of the Clean Water Act (NPDES permits), and section 165 of the Clean Air Act (PSD permits), for such actions undertaken by EPA which affect the global commons or foreign nations. The information submitted by applicants for such permits or approvals under the applicable consolidated permit regulations (40 CFR parts 122 and 124) and Prevention of Significant Deterioration (PSD) regulations (40 CFR part 52) shall satisfy the environmental document requirement under section 2–4(b) of Executive Order 12114. Compliance with applicable requirements in part 124 of the consolidated permit regulations (40 CFR part 124) shall be sufficient to satisfy the requirements to conduct a concise environmental review for permits subject to this paragraph.

(d) Wastewater treatment facility planning. 40 CFR 6.506 details the environmental review process for the facilities planning process under the wastewater treatment works construction grants program. For the purpose of these regulations, the facility plan shall also include a concise environmental review of those activities that would have environmental effects abroad. This shall apply only to the Step 1 grants awarded after January 14, 1981, but on or before December 29, 1981, and facilities plans developed after December 29, 1981. Where water quality impacts identified in a facility plan are the subject or water quality agreements with Canada or Mexico, nothing in these regulations shall impose on the facility planning process coordination and consultation requirements in addition to those required by such agreements.

(e) Review by other Federal agencies and other appropriate officials. The responsible officials shall consult with other Federal agencies with relevant expertise during the preparation of the environmental document. As soon as feasible after preparation of the environmental document, the responsible official shall make the document available to the Council on Environmental Quality, Department of State, and other appropriate officials. The responsible official with assistance from OIA shall work with the Department of State to establish procedures for communicating with and making documents available to foreign nations and international organizations.

[46 FR 3364, Jan. 14, 1981, as amended at 50 FR 26323, June 25, 1985]

§ 6.1005 Lead or cooperating agency.
top
(a) Lead Agency. Section 3–3 of Executive Order 12114 requires the creation of a lead agency whenever an action involves more than one Federal agency. In implementing section 3–3, EPA shall, to the fullest extent possible, follow the guidance for the selection of a lead agency contained in 40 CFR 1501.5 of the CEQ regulations.

(b) Cooperating Agency. Under section 2–4(d) of the Executive Order, Federal agencies with special expertise are encouraged to provide appropriate resources to the agency preparing environmental documents in order to avoid duplication of resources. In working with a lead agency, EPA shall to the fullest extent possible serve as a cooperating agency in accordance with 40 CFR 1501.6. When other program commitments preclude the degree of involvement requested by the lead agency, the responsible EPA official shall so inform the lead agency in writing.

§ 6.1006 Exemptions and considerations.
top
Under section 2–5 (b) and (c) of the Executive Order, Federal agencies may provide for modifications in the contents, timing and availability of documents or exemptions from certain requirements for the environmental review and assessment. The responsible official, in consultation with the Director, Office of Environmental Review (OER), and the Director, Office of International Activities (OIA), may approve modifications for situations described in section 2–5(b). The responsible official, in consultation with the Director, OER and Director OIA, shall obtain exemptions from the Administrator for situations described in section 2–5(c). The Department of State and the Council on Environmental Quality shall be consulted as soon as possible on the utilization of such exemptions.

§ 6.1007 Implementation.
top
(a) Oversight. OER is responsible for overseeing the implementation of these procedures and shall consult with OIA wherever appropriate. OIA shall be utilized for making formal contacts with the Department of State. OER shall assist the responsible officials in carrying out their responsibilities under these procedures.

(b) Information exchange. OER with the aid of OIA, shall assist the Department of State and the Council on Environmental Quality in developing the informational exchange on environmental review activities with foreign nations.

(c) Unidentified activities. The responsible official shall consult with OER and OIA to establish the type of environmental review or document appropriate for any new EPA activities or requirements imposed upon EPA by statute, international agreement or other agreements.

Appendix A to Part 6—Statement of Procedures on Floodplain Management and Wetlands Protection
top
Contents:

Section 1 General

Section 2 Purpose

Section 3 Policy

Section 4 Definitions

Section 5 Applicability

Section 6 Requirements

Section 7 Implementation

Section 1 General

a. Executive Order 11988 entitled “Floodplain Management” dated May 24, 1977, requires Federal agencies to evaluate the potential effects of actions it may take in a floodplain to avoid adversely impacting floodplains wherever possible, to ensure that its planning programs and budget requests reflect consideration of flood hazards and floodplain management, including the restoration and preservation of such land areas as natural undeveloped floodplains, and to prescribe procedures to implement the policies and procedures of this Executive Order. Guidance for implementation of the Executive Order has been provided by the U.S. Water Resources Council in its Floodplain Management Guidelines dated February 10, 1978 (see 40 FR 6030).

b. Executive Order 11990 entitled “Protection of Wetlands”, dated May 24, 1977, requires Federal agencies to take action to avoid adversely impacting wetlands wherever possible, to minimize wetlands destruction and to preserve the values of wetlands, and to prescribe procedures to implement the policies and procedures of this Executive Order.

c. It is the intent of these Executive Orders that, wherever possible, Federal agencies implement the floodplains/wetlands requirements through existing procedures, such as those internal procedures established to implement the National Environmental Policy Act (NEPA) and OMB A–95 review procedures. In those instances where the environmental impacts of a proposed action are not significant enough to require an environmental impact statement (EIS) pursuant to section 102(2)(C) of NEPA, or where programs are not subject to the requirements of NEPA, alternative but equivalent floodplain/wetlands evaluation and notice procedures must be established.

Section 2 Purpose

a. The purpose of this Statement of Procedures is to set forth Agency policy and guidance for carrying out the provisions of Executive Orders 11988 and 11990.

b. EPA program offices shall amend existing regulations and procedures to incorporate the policies and procedures set forth in this Statement of Procedures.

c. To the extent possible, EPA shall accommodate the requirements of Executive Orders 11988 and 11990 through the Agency NEPA procedures contained in 40 CFR part 6.

Section 3 Policy

a. The Agency shall avoid wherever possible the long and short term impacts associated with the destruction of wetlands and the occupancy and modification of floodplains and wetlands, and avoid direct and indirect support of floodplain and wetlands development wherever there is a practicable alternative.

b. The Agency shall incorporate floodplain management goals and wetlands protection considerations into its planning, regulatory, and decisionmaking processes. It shall also promote the preservation and restoration of floodplains so that their natural and beneficial values can be realized. To the extent possible EPA shall:

(1) Reduce the hazard and risk of flood loss and wherever it is possible to avoid direct or indirect adverse impact on floodplains;

(2) Where there is no practical alternative to locating in a floodplain, minimize the impact of floods on human safety, health, and welfare, as well as the natural environment;

(3) Restore and preserve natural and beneficial values served by floodplains;

(4) Require the construction of EPA structures and facilities to be in accordance with the standards and criteria, of the regulations promulgated pursuant to the National Flood Insurance Program;

(5) Identify floodplains which require restoration and preservation and recommend management programs necessary to protect these floodplains and to include such considerations as part of on-going planning programs; and

(6) Provide the public with early and continuing information concerning floodplain management and with opportunities for participating in decision making including the (evaluation of) tradeoffs among competing alternatives.

c. The Agency shall incorporate wetlands protection considerations into its planning, regulatory, and decisionmaking processes. It shall minimize the destruction, loss, or degradation of wetlands and preserve and enhance the natural and beneficial values of wetlands. Agency activities shall continue to be carried out consistent with the Administrator's Decision Statement No. 4 dated February 21, 1973 entitled “EPA Policy to Protect the Nation's Wetlands.”

Section 4 Definitions

a. Base Flood means that flood which has a one percent chance of occurrence in any given year (also known as a 100-year flood). This term is used in the National Flood Insurance Program (NFIP) to indicate the minimum level of flooding to be used by a community in its floodplain management regulations.

b. Base Floodplain means the land area covered by a 100-year flood (one percent chance floodplain). Also see definition of floodplain.

c. Flood or Flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland and/or tidal waters, and/or the unusual and rapid accumulation or runoff of surface waters from any source, or flooding from any other source.

d. Floodplain means the lowland and relatively flat areas adjoining inland and coastal waters and other floodprone areas such as offshore islands, including at a minimum, that area subject to a one percent or greater chance of flooding in any given year. The base floodplain shall be used to designate the 100-year floodplain (one percent chance floodplain). The critical action floodplain is defined as the 500-year floodplain (0.2 percent chance floodplain).

e. Floodproofing means modification of individual structures and facilities, their sites, and their contents to protect against structural failure, to keep water out or to reduce effects of water entry.

f. Minimize means to reduce to the smallest possible amount or degree.

g. Practicable means capable of being done within existing constraints. The test of what is practicable depends upon the situation and includes consideration of the pertinent factors such as environment, community welfare, cost, or technology.

h. Preserve means to prevent modification to the natural floodplain environment or to maintain it as closely as possible to its natural state.

i. Restore means to re-establish a setting or environment in which the natural functions of the floodplain can again operate.

j. Wetlands means those areas that are inundated by surface or ground water with a frequency sufficient to support and under normal circumstances does or would support a prevalence of vegetative or aquatic life that requires saturated or seasonally saturated soil conditions for growth and reproduction. Wetlands generally include swamps, marshes, bogs, and similar areas such as sloughs, potholes, wet meadows, river overflows, mud flats, and natural ponds.

Section 5 Applicability

a. The Executive Orders apply to activities of Federal agencies pertaining to (1) acquiring, managing, and disposing of Federal lands and facilities, (2) providing Federally undertaken, financed, or assisted construction and improvements, and (3) conducting Federal activities and programs affecting land use, including but not limited to water and related land resources planning, regulating, and licensing activities.

b. These procedures shall apply to EPA's programs as follows: (1) All Agency actions involving construction of facilities or management of lands or property. This will require amendment of the EPA Facilities Management Manual (October 1973 and revisions thereafter).

(2) All Agency actions where the NEPA process applies. This would include the programs under sections 306/402 of the Clean Water Act pertaining to new source permitting and section 201 of the Clean Water Act pertaining to wastewater treatment construction grants.

(3) All agency actions where there is sufficient independent statutory authority to carry out the floodplain/wetlands procedures.

(4) In program areas where there is no EIS requirement nor clear statutory authority for EPA to require procedural implementation, EPA shall continue to provide leadership and offer guidance so that the value of floodplain management and wetlands protection can be understood and carried out to the maximum extent practicable in these programs.

c. These procedures shall not apply to any permitting or source review programs of EPA once such authority has been transferred or delegated to a State. However, EPA shall, to the extent possible, require States to provide equivalent effort to assure support for the objectives of these procedures as part of the State assumption process.

Section 6 Requirements

a. Floodplain/Wetlands review of proposed Agency actions.

(1) Floodplain/Wetlands Determination— Before undertaking an Agency action, each program office must determine whether or not the action will be located in or affect a floodplain or wetlands. The Agency shall utilize maps prepared by the Federal Insurance Administration of the Federal Emergency Management Agency (Flood Insurance Rate Maps or Flood Hazard Boundary Maps), Fish and Wildlife Service (National Wetlands Inventory Maps), and other appropriate agencies to determine whether a proposed action is located in or will likely affect a floodplain or wetlands. If there is no floodplain/wetlands impact identified, the action may proceed without further consideration of the remaining procedures set forth below.

(2) Early Public Notice—When it is apparent that a proposed or potential agency action is likely to impact a floodplain or wetlands, the public should be informed through appropriate public notice procedures.

(3) Floodplain/Wetlands Assessment—If the Agency determines a proposed action is located in or affects a floodplain or wetlands, a floodplain/wetlands assessment shall be undertaken. For those actions where an environmental assessment (EA) or environmental impact statement (EIS) is prepared pursuant to 40 CFR part 6, the floodplain/wetlands assessment shall be prepared concurrently with these analyses and shall be included in the EA or EIS. In all other cases, a floodplain/wetlands assessment shall be prepared. Assessments shall consist of a description of the proposed action, a discussion of its effect on the floodplain/wetlands, and shall also describe the alternatives considered.

(4) Public Review of Assessments—For proposed actions impacting floodplain/wetlands where an EA or EIS is prepared, the opportunity for public review will be provided through the EIS provisions contained in 40 CFR parts 6, 25, or 35, where appropriate. In other cases, an equivalent public notice of the floodplain/wetlands assessment shall be made consistent with the public involvement requirementsof the applicable program. (continued)