CCLME.ORG - 30 CFR PART 282—OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL GAS AND SULPHUR
Loading (50 kb)...'
(continued) de proposed exploration or testing activities where those activities are needed to obtain additional data and information on which to base plans for future mining activities. A Testing Plan may include exploration activities when those activities are needed to obtain additional data or information on which to base plans for future testing or mining activities.

(d) Preliminary activities are bathymetric, geological, geophysical, mapping, and other surveys necessary to develop a comprehensive Delineation, Testing, or Mining Plan. Such activities are those which have no significant adverse impact on the natural resources of the OCS. The lessee shall give notice to the Director at least 30 days prior to initiating the proposed preliminary activities on the lease. The notice shall describe in detail those activities that are to be conducted and the time schedule for conducting those activities.

(e) Leasehold activities shall be carried out with due regard to conservation of resources, paying particular attention to the wise management of OCS mineral resources, minimizing waste of the leased resource(s) in mining and processing, and preventing damage to unmined parts of the mineral deposit and other resources of the OCS.

§ 282.22 Delineation Plan.
top
All exploration activities shall be conducted in accordance with a Delineation Plan submitted by the lessee and approved by the Director. The Delineation Plan shall describe the proposed activities necessary to locate leased OCS minerals, characterize the quantity and quality of the minerals, and generate other information needed for the development of a comprehensive Testing or Mining Plan. A Delineation Plan at a minimum shall include the following:

(a) The OCS mineral(s) or primary interest.

(b) A brief narrative description of the activities to be conducted and how the activities will lead to the discovery and evaluation of a commercially minable deposit on the lease.

(c) The name, registration, and type of equipment to be used, including vessel types as well as their navigation and mobile communication systems, and transportation corridors to be used between the lease and shore.

(d) Information showing that the equipment to be used (including the vessel) is capable of performing the intended operation in the environment which will be encountered.

(e) Maps showing the proposed locations of test drill holes, the anticipated depth of penetration of test drill holes, the locations where surficial sample were taken, and the location of proposed geophysical survey lines for each surveying method being employed.

(f) A description of measures to be taken to avoid, minimize, or otherwise mitigate air, land, and water pollution and damage to aquatic and wildlife species and their habitats; any unique or special features in the lease area; aquifers; other natural resources of the OCS; and hazards to public health, safety, and navigation.

(g) A schedule indicating the starting and completion dates for each proposed exploration activity.

(h) A list of any known archaeological resources on the lease and measures to assure that the proposed exploration activities do not damage those resources.

(i) A description of any potential conflicts with other uses and users of the area.

(j) A description of measures to be taken to monitor the effects of the proposed exploration activities on the environment in accordance with §282.28(c) of this part.

(k) A detailed description of practices and procedures to effect the abandonment of exploration activities, e.g., plugging of test drill holes. The proposed procedures shall indicate the steps to be taken to assure that test drill holes and other testing procedures which penetrate the seafloor to a significant depth are properly sealed and that the seafloor is left free of obstructions or structures that may present a hazard to other uses or users of the OCS such as navigation or commercial fishing.

(l) A detailed description of the cycle of all materials, the method for discharge and disposal of waste and refuse, and the chemical and physical characteristics of waste and refuse.

(m) A description of the potential environmental impacts of the proposed exploration activities including the following:

(1) The location of associated port, transport, processing, and waste disposal facilities and affected environment (e.g., maps, land use, and layout);

(2) A description of the nature and degree of environmental impacts and the domestic socioeconomic effects of construction and operation of the associated facilities, including waste characteristics and toxicity;

(3) Any proposed mitigation measures to avoid or minimize adverse impacts on the environment;

(4) A certificate of consistency with the federally approved State coastal zone management program, where applicable; and

(5) Alternative sites and technologies considered by the lessee and the reasons why they were not chosen.

(n) Any other information needed for technical evaluation of the planned activity, such as sample analyses to be conducted at sea, and the evaluation of potential environmental impacts.

§ 282.23 Testing Plan.
top
All testing activities shall be conducted in accordance with a Testing Plan submitted by the lessee and approved by the Director. Where a lessee needs more information to develop a detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or to determine environmental effects by a pilot test mining operation, the lessee shall submit a comprehensive Testing Plan for the Director's approval. Any OCS minerals acquired during activities conducted under an approved Testing Plan will be subject to the payment of royalty pursuant to the governing lease terms. A Testing Plan at a minimum shall include the following:

(a) The nature and purpose of the proposed testing program.

(b) A comprehensive description of the activities to be performed including descriptions of the proposed methods for analysis of samples taken.

(c) A narrative description and maps showing water depths and the locations of the proposed pilot mining or other testing activities.

(d) A comprehensive description of the method and manner in which testing activities will be conducted and the results the lessee expects to obtain as a result of those activities.

(e) The name, registration, and type of equipment to be used, including vessel types together with their navigation and mobile communication systems, and transportation corridors to be used between the lease and shore.

(f) Information showing that the equipment to be used (including the vessel) is capable of performing the intended operation in the environment which will be encountered.

(g) A schedule specifying the starting and completion dates for each of the testing activities.

(h) A list of known archaeological resources on the lease and measures to be used to assure that the proposed testing activities do not damage those resources.

(i) A description of any potential conflicts with other uses and users of the area.

(j) A description of measures to be taken to avoid, minimize, or otherwise mitigate air, land, and water pollution and damage to aquatic and wildlife species and their habitat; any unique or special features in the lease area, other natural resources of the OCS; and hazards to public health, safety, and navigation.

(k) A description of the measures to be taken to monitor the impacts of the proposed testing activities in accordance with §282.28(c) of this part.

(l) A detailed description of the cycle of all materials including samples and wastes, the method for discharge and disposal of waste and refuse, and the chemical and physical characteristics of such waste and refuse.

(m) A detailed description of practices and procedures to effect the abandonment of testing activities, e.g., abandonment of a pilot mining facility. The proposed procedures shall indicate the steps to be taken to assure that mined areas do not pose a threat to the environment and that the seafloor is left free of obstructions and structures that may present a hazard to other uses or users of the OCS such as navigation or commercial fishing.

(n) A description of potential environmental impacts of testing activities including the following:

(1) The location of associated port, transport, processing, and waste disposal facilities and affected environment (e.g., maps, land use, and layout);

(2) A description of the nature and degree of potential environmental impacts of the proposed testing activities and the domestic socioeconomic effects of construction and operation of the proposed testing facilities, including waste characteristics and toxicity;

(3) Any proposed mitigation measures to avoid or minimize adverse impacts on the environment;

(4) A certificate of consistency with the federally approved State coastal zone management program, where applicable; and

(5) Alternate sites and technologies considered by the lessee and the reasons why they were not selected.

(o) Any other information needed for technical evaluation of the planned activities and for evaluation of the impact of those activities on the human, marine, and coastal environments.

§ 282.24 Mining Plan.
top
All OCS mineral development and production activities shall be conducted in accordance with a Mining Plan submitted by the lessee and approved by the Director. A Mining Plan shall include comprehensive detailed descriptions, illustrations, and explanations of the proposed OCS mineral development, production, and processing activities and accurately present the lessee's proposed plan of operation. A Mining Plan at a minimum shall include the following:

(a) A narrative description of the mining activities including:

(1) The OCS mineral(s) or material(s) to be recovered;

(2) Estimates of the number of tons and grade(s) of ore to be recovered;

(3) Anticipated annual production;

(4) Volume of ocean bottom expected to be disturbed (area and depth of disruption) each year; and

(5) All activities of the mining cycle from extraction through processing and waste disposal.

(b) Maps of the lease showing water depths, the outline of the mineral deposit(s) to be mined with cross sections showing thickness, and the area(s) anticipated to be mined each year.

(c) The name, registration, and type of equipment to be used, including vessel types as well as their navigation and mobile communication systems, and transportation corridors to be used between the lease and shore.

(d) Information showing that the equipment to be used (including the vessel) is capable of performing the intended operation in the environment which will be encountered.

(e) A description of equipment to be used in mining, processing, and transporting of the ore.

(f) A schedule indicating the anticipated starting and completion dates for each activity described in the plan.

(g) For onshore processing, a description of how OCS minerals are to be processed and how the produced OCS minerals will be weighed, assayed, and royalty determinations made.

(h) For at-sea processing, additional information including type and size of installation or structures and the method of tailings disposal.

(i) A list of known archaeological resources on the lease and the measures to be taken to assure that the proposed mining activities do not damage those resources.

(j) Description of any potential conflicts with other uses and users of the area.

(k) A detailed description of the nature and occurrence of the OCS mineral deposit(s) in the leased area with adequate maps and sections.

(l) A detailed description of development and mining methods to be used, the proposed sequence of mining or development, the expected production rate, the method and location of the proposed processing operation, and the method of measuring production.

(m) A detailed description of the method of transporting the produced OCS minerals from the lease to shore and adequate maps showing the locations of pipelines, conveyors, and other transportation facilities and corridors.

(n) A detailed description of the cycle of all materials including samples and wastes, the method of discharge and disposal of waste and refuse, and the chemical and physical characteristics of the waste and refuse.

(o) A description of measures to be taken to avoid, minimize, or otherwise mitigate air, land, and water pollution and damage to aquatic and wildlife species and their habitats; any unique or special features in the lease area, aquifers, or other natural resources of the OCS; and hazards to public health, safety, and navigation.

(p) A detailed description of measures to be taken to monitor the impacts of the proposed mining and processing activities on the environment in accordance with §282.28(c) of this part.

(q) A detailed description of practices and procedures to effect the abandonment of mining and processing activities. The proposed procedures shall indicate the steps to be taken to assure that mined areas on tailing deposits do not pose a threat to the environment and that the seafloor is left free of obstructions and structures that present a hazard to other users or uses of the OCS such as navigation or commercial fishing.

(r) A description of potential environmental impacts of mining activities including the following:

(1) The location of associated port, transport, processing, and waste disposal facilities and the affected environment (e.g., maps, land use, and layout);

(2) A description of the nature and degree of potential environmental impacts of the proposed mining activities and the domestic socioeconomic effects of construction and operation of the associated facilities, including waste characteristics and toxicity;

(3) Any proposed mitigation measures to avoid or minimize adverse impacts on the environment;

(4) A certificate of consistency with the federally approved State coastal zone management program, where applicable; and

(5) Alternative sites and technologies considered by the lessee and the reasons why they were not chosen.

(s) Any other information needed for technical evaluation of the proposed activities and for the evaluation of potential impacts on the environment.

§ 282.25 Plan modification.
top
Approved Delineation, Testing, and Mining Plans may be modified upon the Director's approval of the changes proposed. When circumstances warrant, the Director may direct the lessee to modify an approved plan to adjust to changed conditions. If the lessee requests the change, the lessee shall submit a detailed, written statement of the proposed modifications, potential, impacts, and the justification for the proposed changes. Revision of an approved plan whether initiated by the lessee or ordered by the Director shall be submitted to the Director for approval. When the Director determines that a proposed revision could result in significant change in the impacts previously identified and evaluated or requires additional permits, the proposed plan revision shall be subject to the applicable review and approval procedures of §§282.21, 282.22, 282.23, and 282.24 of this part.

§ 282.26 Contingency Plan.
top
(a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan shall comply with the requirements of §282.28(e) of this part.

(b) The Director may order or the lessee may request the Director's approval of a modification of the Contingency Plan when such a change is necessary to reflect any new information concerning the nature, magnitude, and significance of potential equipment or procedural failures or the effectiveness of the corrective actions described in the Contingency Plan.

§ 282.27 Conduct of operations.
top
(a) The lessee shall conduct all exploration, testing, development, and production activities and other operations in a safe and workmanlike manner and shall maintain equipment in a manner which assures the protection of the lease and its improvements, the health and safety of all persons, and the conservation of property, and the environment.

(b) Nothing in this part shall preclude the use of new or alternative technologies, techniques, procedures, equipment, or activities, other than those prescribed in the regulations of this part, if such other technologies, techniques, procedures, equipment, or activities afford a degree of protection, safety, and performance equal to or better than that intended to be achieved by the regulations of this part, provided the lessee obtains the written approval of the Director prior to the use of such new or alternative technologies, techniques, procedures, equipment, or activities.

(c) The lessee shall immediately notify the Director when there is a death or serious injury; fire, explosion, or other hazardous event which threatens damage to life, a mineral deposit, or equipment; spills of oil, chemical reagents, or other liquid pollutants which could cause pollution; or damage to aquatic life or the environment associated with operations on the lease. As soon as practical, the lessee shall file a detailed report on the event and action(s) taken to control the situation and to mitigate any further damage.

(d)(1) Lessees shall provide means, at all reasonable hours either day or night, for the Director to inspect or investigate the conditions of the operation and to determine whether applicable regulations; terms and conditions of the lease; and the requirements of the approved Delineation, Testing, or Mining Plan are being met.

(2) A lessee shall, on request by the Director, furnish food, quarters, and transportation for MMS representatives to inspect its facilities. Upon request, the lessee will be reimbursed by the United States for the actual costs which it incurs as a result of its providing food, quarters, and transportation for an MMS representative's stay of more than 10 hours. Request for reimbursement must be submitted within 60 days following the cost being incurred.

(e) Mining and processing vessels, platforms, structures, artificial islands, and mobile drilling units which have helicopter landing facilities shall be identified with at least one sign using letters and figures not less than 12 inches in height. Signs for structures without helicopter landing facilities shall be identified with at least one sign using letters and figures not less than 3 inches in height. Signs shall be affixed at a location that is visible to approaching traffic and shall contain the following information which may be abbreviated:

(1) Name of the lease operator;

(2) The area designation based on Official OCS Protraction Diagrams;

(3) The block number in which the facility is located; and

(4) Vessel, platform, structure, or rig name.

(f)(1) Drilling.(i) When drilling on lands valuable or potentially valuable for oil and gas or geopressured or geothermal resources, drilling equipment shall be equipped with blowout prevention and control devices acceptable to the Director before penetrating more than 500 feet unless a different depth is specified in advance by the Director.

(ii) In cases where the Director determines that there is sufficient liklihood of encountering pressurized hydrocarbons, the Director may require that the lessee comply with all or portions of the requirements in part 250, subpart D, of this title.

(iii) Before drilling any hole which may penetrate an aquifer, the lessee shall follow the procedures included in the approved plan for the penetration and isolation of the aquifer during the drilling operation, during use of the hole, and for subsequent abandonment of the hole.

(iv) Cuttings from holes drilled on the lease shall be disposed of and monitored in accordance with the approved plan.

(v) The use of muds in drilling holes on the lease and their subsequent disposition shall be according to the approved plan.

(2) All drill holes which are susceptible to logging shall be logged, and the lessee shall prepare a detailed lithologic log of each drill hole. Drill holes which are drilled deeper than 500 feet shall be drilled in a manner which permits logging. Copies of logs of cores and cuttings and all in-hole surveys such as electronic logs, gamma ray logs, neutron density logs, and sonic logs shall be provided to the Director.

(3) Drill holes for exploration, testing, development, or production shall be properly plugged and abandoned to the satisfaction of the Director in accordance with the approved plan and in such a manner as to protect the surface and not endanger any operation; any freshwater aquifer; or deposit of oil, gas, or other mineral substance.

(g) The use of explosives on the lease shall be in accordance with the approved plan.

(h)(1) Any equipment placed on the seabed shall be designed to allow its recovery and removal upon abandonment of leasehold activities.

(2) Disposal of equipment, cables, chains, containers, or other materials into the ocean is prohibited.

(3) Materials, equipment, tools, containers, and other items used on the OCS which are of such shape or configuration that they are likely to snag or damage fishing devices shall be handled and marked as follows:

(i) All loose materials, small tools, and other small objects shall be kept in a suitable storage area or a marked container when not in use or in a marked container before transport over OCS waters;

(ii) All cable, chain, or wire segments shall be recovered after use and securely stored;

(iii) Skid-mounted equipment, portable containers, spools or reels, and drums shall be marked with the owner's name prior to use or transport over OCS waters; and

(iv) All markings must clearly identify the owner and must be durable enough to resist the effects of the environmental conditions to which they are exposed.

(4) Any equipment or material described in paragraphs (h)(2), (h)(3)(ii), and (h)(3)(iii) of this section that is lost overboard shall be recorded on the daily operations report of the facility and reported to the Director and to the U.S. Coast Guard.

(i) Any bulk sampling or testing that is necessary to be conducted prior to submission of a Mining Plan shall be in accordance with an approved Testing Plan. The sale of any OCS minerals acquired under an approved Testing Plan shall be subject to the payment of the royalty specified in the lease to the United States.

(j) Installations and structures.(1) The lessee shall design, fabricate, install, use, inspect, and maintain all installations and structures, including platforms on the OCS, to assure the structural integrity of all installations and structures for the safe conduct of exploration, testing, mining, and processing activities considering the specific environmental conditions at the location of the installation or structure.

(2) All fixed or bottom-founded platforms or other structures, e.g., artificial islands shall be designed, fabricated, installed, inspected, and maintained in accordance with the provisions of part 250, subpart I, of this title.

(k) The lessee shall not produce any OCS mineral until the method of measurement and the procedures for product valuation have been instituted in accordance with the approved Testing or Mining Plan. The lessee shall enter the weight or quantity and quality of each mineral produced in accordance with §282.29 of this title.

(l) The lessee shall conduct OCS mineral processing operations in accordance with the approved Testing or Mining Plan and use due diligence in the reduction, concentration, or separation of mineral substances by mechanical or chemical processes, by evaporation, or other means, so that the percentage of concentrates or other mineral substances are recovered in accordance with the practices approved in the Testing or Mining Plan.

(m) No material shall be discharged or disposed of except in accordance with the approved disposal practice and procedures contained in the approved Delineation, Testing, or Mining Plan.

§ 282.28 Environmental protection measures.
top
(a) Exploration, testing, development, production, and processing activities proposed to be conducted under a lease will only be approved by the Director upon the determination that the adverse impacts of the proposed activities can be avoided, minimized, or otherwise mitigated. The Director shall take into account the information contained in the sale-specific environmental evaluation prepared in association with the lease offering as well as the site- and operational-specific environmental evaluations prepared in association with the review and evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality consequences of proposed OCS activities will follow the practices and procedures specified in §§250.194, 250.218, 250.249, and 250.303 of this title.

(b) If the baseline data available are judged by the Director to be inadequate to support an environmental evaluation of a proposed Delineation, Testing, or Mining Plan, the Director may require the lessee to collect additional environmental baseline data prior to the approval of the activities proposed.

(c)(1) The lessee shall monitor activities in a manner that develops the data and information necessary to enable the Director to assess the impacts of exploration, testing, mining, and processing activities on the environment on and off the lease; develop and evaluate methods for mitigating adverse environmental effects; validate assessments made in previous environmental evaluations; and ensure compliance with lease and other requirements for the protection of the environment.

(2) Monitoring of environmental effects shall include determination of the spatial and temporal environmental changes induced by the exploration, testing, development, production, and processing activities on the flora and fauna of the sea surface, the water column, and/or the seafloor.

(3) The Director may place observers onboard exploration, testing, mining, and processing vessels; installations; or structures to ensure that the provisions of the lease, the approved plan, and these regulations are followed and to evaluate the effectiveness of the approved monitoring and mitigation practices and procedures in protecting the environment.

(4) The Director may order or the lessee may request a modification of the approved monitoring program prior to the startup of testing activities or commercial-scale recovery, and at other appropriate times as necessary, to reflect accurately the proposed operations or to incorporate the results of recent research or improved monitoring techniques.

(5) When prototype test mining is proposed, the lessee shall include a monitoring strategy for assessing the impacts of the testing activities and for developing a strategy for monitoring commercial-scale recovery and mitigating the impacts of commercial-scale recovery more effectively. At a minimum, the proposed monitoring activities shall address specific concerns expressed in the lease-sale environmental analysis.

(6) When required, the monitoring plan shall specify:

(i) The sampling techniques and procedures to be used to acquire the needed data and information;

(ii) The format to be used in analysis and presentation of the data and information;

(iii) The equipment, techniques, and procedures to be used in carrying out the monitoring program; and

(iv) The name and qualifications of person(s) designated to be responsible for carrying out the environmental monitoring.

(d) Lessees shall develop and conduct their operations in a manner designed to avoid, minimize, or otherwise mitigate environmental impacts and to demonstrate the effectiveness of efforts to that end. Based upon results of the monitoring program, the Director may specify particular procedures for mitigating environmental impacts.

(e) In the event that equipment or procedural failure might result in significant additional damage to the environment, the lessee shall submit a Contingency Plan which specifies the procedures to be followed to institute corrective actions in response to such a failure and to minimize adverse impacts on the environment. Such procedures shall be designed for the site and mining activities described in the approved Delineation, Testing, or Mining Plan.

[54 FR 2067, Jan. 18, 1989; 64 FR 9066, Feb. 24, 1999, as amended at 64 FR 72795, Dec. 28, 1999; 70 FR 51519, Aug. 30, 2005]

§ 282.29 Reports and records.
top
(a) A report of the amount and value of each OCS mineral produced from each lease shall be made by the payor for the lease for each calendar month, beginning with the month in which approved testing, development, or production activities are initiated and shall be filed in duplicate with the Director on or before the 20th day of the succeeding month, unless an extension of time for the filing of such report is granted by the Director. The report shall disclose accurately and in detail all operations conducted during each month and present a general summary of the status of leasehold activities. The report shall be submitted each month until the lease is terminated or relinquished unless the Director authorizes omission of the report during an approved suspension of production. The report shall show for each calendar month the location of each mining and processing activity; the number of days operations were conducted; the identity, quantity, quality, and value of each OCS mineral produced, sold, transferred, used or otherwise disposed of; identity, quantity, and quality of an inventory maintained prior to the point of royalty determination; and other information as may be required by the Director.

(b) The lessee shall submit a status report on exploration and/or testing activities under an approved Delineation or Testing Plan to the Director within 30 days of the close of each calendar quarter which shall include:

(1) A summary of activities conducted;

(2) A listing of all geophysical and geochemical data acquired and developed such as acoustic or seismic profiling records;

(3) A map showing location of holes drilled and where bottom samples were taken; and

(4) Identification of samples analyzed.

(c) Each lessee shall submit to the Director a report of exploration and/or testing activities within 3 months after the completion of operations. The final report of exploration and/or testing activities conducted on the lease shall include:

(1) A description of work performed;

(2) Charts, maps, or plats depicting the area and leases in which activities were conducted specifically identifying the lines of geophysical traverses and/or the locations where geological activity was conducted and/or the locations of other exploration and testing activities;

(3) The dates on which the actual operations were performed;

(4) A narrative summary of any mineral occurrences; environmental hazards; and effects of the activities on the environment, aquatic life, archaeological resources, or other uses and users of the area in which the activities were conducted;

(5) Such other descriptions of the activities conducted as may be specified by the Director; and

(6) Records of all samples from core drilling or other tests made on the lease. The records shall be in such form that the location and direction of the samples can be accurately located on a map. The records shall include logs of all strata penetrated and conditions encountered, such as minerals, water, gas, or unusual conditions, and copies of analyses of all samples analyzed.

(d) The lessee shall report the results of environmental monitoring activities required in §282.28 of this part and shall submit such other environmental data as the Director may require to conform with the requirements of these regulations.

(e)(1) All maps shall be appropriately marked with reference to official lease boundaries and elevations marked with reference to sea level. When required by the Director, vertical projections and cross sections shall accompany plan views. The maps shall be kept current and submitted to the Director annually, or more often when required by the Director. The accuracy of maps furnished shall be certified by a professional engineer or land surveyor.

(2) The lessee shall prepare such maps of the leased lands as are necessary to show the geological conditions as determined from G&G surveys, bottom sampling, drill holes, trenching, dredging, or mining. All excavations shall be shown in such manner that the volume of OCS minerals produced during a royalty period can be accurately ascertained.

(f) Any lessee who acquires rock, mineral, and core samples under a lease shall keep a representative split of each geological sample and a quarter longitudinal segment of each core for 5 years during which time the samples shall be available for inspection at the convenience of the Director who may take cuts of such cores, cuttings, and samples.

(g)(1) The lessee shall keep all original data and information available for inspection or duplication, by the Director at the expense of the lessor, as long as the lease continues in force. Should the lessee choose to dispose of original data and information once the lease has expired, said data and information shall be offered to the lessor free of costs and shall, if accepted, become the property of the lessor.

(2) Navigation tapes showing the location(s) where samples were taken and test drilling conducted shall be retained for as long as the lease continues in force.

(h) Lessees shall maintain records in which will be kept an accurate account of all ore and rock mined; all ore put through a mill; all mineral products produced; all ore and mineral products sold, transferred, used, or otherwise disposed of and to whom sold or transferred, and the inventory weight, assay value, moisture content, base sales price, dates, penalties, and price received. The percentage of each of the mineral products recovered and the percentages lost shall be shown. The records associated with activities on a lease shall be available to the Director for auditing.

(i) When special forms or reports other than those referred to in the regulations in this part may be necessary, instructions for the filing of such forms or reports will be given by the Director.

§ 282.30 Right of use and easement.
top
(a) A right of use and easement that includes any area subject to a lease issued or maintained under the Act shall be granted only after the lessee has been notified by the requestor and afforded the opportunity to comment on the request. A holder of a right under a right of use and easement shall exercise that right in accordance with the requirements of the regulations in this part. A right of use and easement shall be exercised only in a manner which does not interfere unreasonably with operations of any lessee on its lease.

(b) Once a right of use and easement has been exercised, the right shall continue, beyond the termination of any lease on which it may be situated, as long as it is demonstrated to the Director that the right of use and easement is being exercised by the holder of the right and that the right of use and easement continues to serve the purpose specified in the grant. If the right of use and easement extends beyond the termination of any lease on which the right may be situated or if it is situated on an unleased portion of the OCS, the rights of all subsequent lessees shall be subject to such right. Upon termination of a right of use and easement, the holder of the right shall abandon the premises in the same manner that a lessee abandons activities on a lease to the satisfaction of the Director.

§ 282.31 Suspension of production or other operations.
top
A lessee may submit a request for a suspension of production or other operations. The request shall include justification for granting the requested suspension, a schedule of work leading to the initiation or restoration of production or other operations, and any other information the Director may require.

Subpart D—Payments
top
§ 282.40 Bonds.
top
(a) Pursuant to the requirements for a bond in §281.33 of this title, prior to the commencement of any activity on a lease, the lessee shall submit a surety or personal bond to cover the lessee's royalty and other obligations under the lease as specified in this section.

(b) All bonds furnished by a lessee or operator must be in a form approved by the Associate Director for Offshore Minerals Management. A single copy of the required form is to be executed by the principal or, in the case of surety bonds, by both the principal and an acceptable surety.

(c) Only those surety bonds issued by qualified surety companies approved by the Department of the Treasury shall be accepted. (See Department of Treasury Circular No. 570 and any supplemental or replacement circulars.)

(d) Personal bonds shall be accompanied by a cashier's check, certified check, or negotiable U.S. Treasury bonds of an equal value to the amount specified in the bond. Negotiable Treasury bonds shall be accompanied by a proper conveyance of full authority to the Director to sell such securities in case of default in the performance of the terms and conditions of the lease.

(e) A bond in the minimum amount of $50,000 to cover the lessee's obligations under the lease shall be submitted prior to the commencement of any activity on a leasehold. A $50,000 bond shall not be required on a lease if the lessee already maintains or furnishes a $300,000 bond conditioned on compliance with the terms of leases for OCS minerals other than oil, gas, and sulphur held by the lessee on the OCS for the area in which the lease is located. A bond submitted pursuant to §256.58(a) of this chapter may be amended to include the aforementioned condition for compliance. Prior to approval of a Delineation, Testing, or Mining Plan, the bond amount shall be adjusted, if appropriate, to cover the operations and activities described in the proposed plan.

(f) For the purposes of this section there are four areas:

(1) The Gulf of Mexico;

(2) The area offshore the Pacific Coast States of California, Oregon,Washington, and Hawaii;

(3) The area offshore the coast of Alaska; and

(4) The area offshore the Atlantic coast.

(g) A separate bond shall be required for each area. An operator's bond may be submitted for a specific lease(s) in the same amount as the lessee's bond(s) applicable to the lease(s) involved.

(h) Where, upon a default, the surety makes a payment to the United States of an obligation incurred under a lease, the face amount of the surety bond and the surety's liability thereunder shall be reduced by the amount of such payment.

(i) After default, the principal shall, within 6 months after notice or within such shorter period as may be fixed by the Director, either post a new bond or increase the existing bond to the amount previously held. In lieu thereof, the principal may, within that time, file separate or substitute bonds for each lease. Failure to meet these requirements may result in a suspension of operations including production on leases covered by such bonds.

(j) The Director shall not consent to termination of the period of liability of any bond unless an acceptable alternative bond has been filed or until all the terms and conditions of the lease covered by the bond have been met.

[54 FR 2067, Jan. 18, 1989, as amended at 62 FR 27960, May 22, 1997]

§ 282.41 Method of royalty calculation.
top
In the event that the provisions of royalty management regulations do not apply to the specific commodities produced under regulations in this part, the lessee shall comply with procedures specified in the leasing notice.

§ 282.42 Payments.
top
Rentals, royalties, and other payments due the Federal Government on leases for OCS minerals shall be paid and reports submitted by the payor for a lease in accordance with §281.26 of this title.

Subpart E—Appeals
top
§ 282.50 Appeals.
top
See 30 CFR part 290 for instructions on how to appeal any order or decision that we issue under this part.

[65 FR 3857, Jan. 25, 2000]